Volumn 12, Issue 16, 2013, Pages 3880-3884

Research on complex product WBS process simulation and prediction

Author keywords

Design structure matrix; Iteration; Process simulation; Work breakdown structure

Indexed keywords

ITERATIVE METHODS; PROBABILITY;

EID: 84901719363     PISSN: 18125638     EISSN: 18125646     Source Type: Journal    
DOI: 10.3923/itj.2013.3880.3884     Document Type: Article
Times cited : (2)

References (9)
  • 1
    • 78049444992 scopus 로고    scopus 로고
    • A Neurogenetic approach for the resource-constrained project scheduling problem
    • Agarwal, A, S. Colak and S. A. Erenguc, 2011. A Neurogenetic approach for the resource-constrained project scheduling problem. Comput. Oper. Res., 38:33-50.
    • (2011) Comput. Oper. Res. , vol.38 , pp. 33-50
    • Agarwal, A.1    Colak, S.2    Erenguc, S.A.3
  • 2
    • 34548399728 scopus 로고    scopus 로고
    • A versatile algorithm for assembly line balancing
    • Boysen, N. and M. Fliedner, 2008. A versatile algorithm for assembly line balancing. Eur. J. Oper. Res., 184:39-56.
    • (2008) Eur. J. Oper. Res. , vol.184 , pp. 39-56
    • Boysen, N.1    Fliedner, M.2
  • 3
    • 77953684240 scopus 로고    scopus 로고
    • Resource-constrained multi-project scheduling: Priority rule performance revised
    • Browning, T. R. and A. A. Yassine, 2011. Resource-constrained multi-project scheduling: Priority rule performance revised. Int. J. Prod. Econ., 126:212-228.
    • (2011) Int. J. Prod. Econ. , vol.126 , pp. 212-228
    • Browning, T.R.1    Yassine, A.A.2
  • 4
    • 23344432043 scopus 로고    scopus 로고
    • A simulation-based process model for managing complex design projects
    • Cho, S. H. and S. D. Eppinger, 2005. A simulation-based process model for managing complex design projects. Trans. Engin. Manage., 52:316-328.
    • (2005) Trans. Engin. Manage. , vol.52 , pp. 316-328
    • Cho, S.H.1    Eppinger, S.D.2
  • 5
    • 84856602339 scopus 로고    scopus 로고
    • Impact propagation and risk assessment of requirement changes for software development projects based on design structure matrix
    • Fu, Y, M. Q. Li and F. Z. Chen, 2011. Impact propagation and risk assessment of requirement changes for software development projects based on design structure matrix. Int. J. Project Manage., 30:363-373.
    • (2011) Int. J. Project Manage. , vol.30 , pp. 363-373
    • Fu, Y.1    Li, M.Q.2    Chen, F.Z.3
  • 6
    • 33947364402 scopus 로고    scopus 로고
    • On representations and dynamic analysis of concurrent engineering design
    • Kim, D., 2007. On representations and dynamic analysis of concurrent engineering design. J. Eng. Design, 18:265-277.
    • (2007) J. Eng. Design , vol.18 , pp. 265-277
    • Kim, D.1
  • 7
    • 80052806598 scopus 로고    scopus 로고
    • Integration scheduling optimization for critical chain multiproject
    • Li, J, R. X. Wang and Y. T. Yang, 2011. Integration scheduling optimization for critical chain multiproject. Comput. Integ. Manufac. Syst. Beijing, 17:1772-1779.
    • (2011) Comput. Integ. Manufac. Syst. Beijing , vol.17 , pp. 1772-1779
    • Li, J.1    Wang, R.X.2    Yang, Y.T.3
  • 8
    • 0029635345 scopus 로고    scopus 로고
    • Activity nets: A guided tour through some recent developments
    • Elmaghraby, S. E., 2010. Activity nets: A guided tour through some recent developments. Eur. J. Oper. Res., 82:383-408.
    • (2010) Eur. J. Oper. Res. , vol.82 , pp. 383-408
    • Elmaghraby, S.E.1
  • 9
    • 79955652358 scopus 로고    scopus 로고
    • Project time calculation and optimization based on DSM activities overlapping
    • Yang, Q. and J. M. Huang, 2011. Project time calculation and optimization based on DSM activities overlapping. Syst. Eng. The. Prac, 31:496-450.
    • (2011) Syst. Eng. The. Prac , vol.31 , pp. 496-450
    • Yang, Q.1    Huang, J.M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.