-
1
-
-
0021496929
-
Sequencing rules and due-date assignments in a job shop
-
K.R.Baker, (1984). Sequencing rules and due-date assignments in a job shop. Management Science, 30, 1093–1104.10.1287/mnsc.30.9.1093
-
(1984)
Management Science
, vol.30
, pp. 1093-1104
-
-
Baker, K.R.1
-
2
-
-
0019582153
-
A comparison of due date selection rules
-
K.R.Baker,, & J.V.M.Bertrand, (1981). A comparison of due date selection rules. AIIE Transactions, 13, 123–131.
-
(1981)
AIIE Transactions
, vol.13
, pp. 123-131
-
-
Baker, K.R.1
Bertrand, J.V.M.2
-
4
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
P.Brucker,, A.Drexl,, R.Moehring,, K.Neumann,, & E.Pesch, (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112, 3–41.10.1016/S0377-2217(98)00204-5
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Moehring, R.3
Neumann, K.4
Pesch, E.5
-
6
-
-
0034263053
-
Integrated engineering environments for large complex products
-
G.Coates,, I.Ritchey,, H.B.Duffy,, W.Hills,, & R.I.Whitfield, (2000). Integrated engineering environments for large complex products. Concurrent Engineering: Research and Applications, 8, 171–182.10.1177/1063293X0000800302
-
(2000)
Concurrent Engineering: Research and Applications
, vol.8
, pp. 171-182
-
-
Coates, G.1
Ritchey, I.2
Duffy, H.B.3
Hills, W.4
Whitfield, R.I.5
-
7
-
-
0001173515
-
Priority dispatching and work-in-process inventory in a job shop
-
R.W.Conway, (1965a). Priority dispatching and work-in-process inventory in a job shop. Journal of Industrial Engineering, 16, 123–130.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 123-130
-
-
Conway, R.W.1
-
8
-
-
0001173515
-
Priority dispatching and job lateness in a job shop
-
R.W.Conway, (1965b). Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16, 228–237.
-
(1965)
Journal of Industrial Engineering
, vol.16
, pp. 228-237
-
-
Conway, R.W.1
-
9
-
-
0011788714
-
Network dispatching by shortest operation discipline
-
R.W.Conway,, & W.L.Maxwell, (1962). Network dispatching by shortest operation discipline. Operations Research, 10, 51–73.
-
(1962)
Operations Research
, vol.10
, pp. 51-73
-
-
Conway, R.W.1
Maxwell, W.L.2
-
10
-
-
0004113622
-
-
Reading, MA: Addison-Wesley
-
R.W.Conway,, W.L.Maxwell,, & L.W.Miller, (1967). Theory of Scheduling. Reading, MA: Addison-Wesley.
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
11
-
-
84908206482
-
Are you ETO? The increasing importance of custom (engineer-to-order) manufacturers
-
T.R.Cutler, (2005). Are you ETO? The increasing importance of custom (engineer-to-order) manufacturers. In MFG, pp. 1–3.
-
(2005)
In MFG
, pp. 1-3
-
-
Cutler, T.R.1
-
12
-
-
66449123062
-
Special orders, engineer to order challenges for the industrial engineer
-
T.R.Cutler, (2009). Special orders, engineer to order challenges for the industrial engineer. Industrial Engineer, 41, 36–38.
-
(2009)
Industrial Engineer
, vol.41
, pp. 36-38
-
-
Cutler, T.R.1
-
13
-
-
0009377460
-
Job shop dispatching using various due date setting criteria
-
D.A.Elvers, (1973). Job shop dispatching using various due date setting criteria. Production and Inventory Management, 14, 62–69.
-
(1973)
Production and Inventory Management
, vol.14
, pp. 62-69
-
-
Elvers, D.A.1
-
14
-
-
0020664019
-
Time completion for various dispatching rules in a job shop
-
D.A.Elvers,, & L.Taube, (1983). Time completion for various dispatching rules in a job shop. Omega, 11, 81–89.
-
(1983)
Omega
, vol.11
, pp. 81-89
-
-
Elvers, D.A.1
Taube, L.2
-
15
-
-
0000965956
-
Heuristics in job shop scheduling
-
W.S.Gere, (1966). Heuristics in job shop scheduling. Management Science, 13, 167–190.
-
(1966)
Management Science
, vol.13
, pp. 167-190
-
-
Gere, W.S.1
-
16
-
-
70350568663
-
Engineer to order supply chain management: A literature review and research agenda
-
J.Gosling,, & M.M.Naim, (2009). Engineer to order supply chain management: A literature review and research agenda. International Journal of Production Economics, 122, 741–754.10.1016/j.ijpe.2009.07.002
-
(2009)
International Journal of Production Economics
, vol.122
, pp. 741-754
-
-
Gosling, J.1
Naim, M.M.2
-
17
-
-
84885849174
-
Determining job complexity in an engineer to order environment for due date estimation using a proposed framework
-
D.H.Grabenstetter,, & J.M.Usher, (2013). Determining job complexity in an engineer to order environment for due date estimation using a proposed framework. International Journal of Production Research, 51, 5728–5740.10.1080/00207543.2013.787169
-
(2013)
International Journal of Production Research
, vol.51
, pp. 5728-5740
-
-
Grabenstetter, D.H.1
Usher, J.M.2
-
19
-
-
0004132488
-
-
2nd ed., New York, NY: McGraw-Hill
-
C.Harrell,, B.K.Ghosh,, & R.O.Bowden, (2004). Simulation using ProModel (2nd ed.). New York, NY: McGraw-Hill.
-
(2004)
Simulation using ProModel
-
-
Harrell, C.1
Ghosh, B.K.2
Bowden, R.O.3
-
20
-
-
0034672925
-
Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach
-
C.Hicks,, & P.M.Braiden, (2000). Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach. International Journal of Production Research, 38, 4783–4810.10.1080/00207540010001019
-
(2000)
International Journal of Production Research
, vol.38
, pp. 4783-4810
-
-
Hicks, C.1
Braiden, P.M.2
-
21
-
-
33747140357
-
Dispatching rules for production scheduling in the capital goods industry
-
C.Hicks,, & P.Pongcharoen, (2006). Dispatching rules for production scheduling in the capital goods industry. International Journal of Production Economics, 104, 154–163.10.1016/j.ijpe.2005.07.005
-
(2006)
International Journal of Production Economics
, vol.104
, pp. 154-163
-
-
Hicks, C.1
Pongcharoen, P.2
-
22
-
-
67549084647
-
Applying different control approaches for resources with high and low utilisation: A case study of the production of complex products with stochastic processing times
-
C.Hicks,, & P.Pongcharoen, (2009). Applying different control approaches for resources with high and low utilisation: A case study of the production of complex products with stochastic processing times. International Journal of Technology Management, 48, 202–218.10.1504/IJTM.2009.024916
-
(2009)
International Journal of Technology Management
, vol.48
, pp. 202-218
-
-
Hicks, C.1
Pongcharoen, P.2
-
23
-
-
0033878455
-
Supply chain management: A strategic issue in engineer-to-order manufacturing
-
C.Hicks,, T.McGovern,, & C.F.Earl, (2000). Supply chain management: A strategic issue in engineer-to-order manufacturing. International Journal of Production Economics, 65, 179–190.10.1016/S0925-5273(99)00026-2
-
(2000)
International Journal of Production Economics
, vol.65
, pp. 179-190
-
-
Hicks, C.1
McGovern, T.2
Earl, C.F.3
-
24
-
-
2442511284
-
A typology of UK engineer-to-order companies
-
C.Hicks,, T.McGovern,, & C.F.Earl, (2001). A typology of UK engineer-to-order companies. International Journal of Logistics: Research and Applications, 4, 43–56.10.1080/13675560110038068
-
(2001)
International Journal of Logistics: Research and Applications
, vol.4
, pp. 43-56
-
-
Hicks, C.1
McGovern, T.2
Earl, C.F.3
-
25
-
-
34250217458
-
Dynamic scheduling for complex engineer to order products
-
C.Hicks,, D.P.Song,, & C.F.Earl, (2007). Dynamic scheduling for complex engineer to order products. International Journal of Production Research, 45, 3477–3503.10.1080/00207540600767772
-
(2007)
International Journal of Production Research
, vol.45
, pp. 3477-3503
-
-
Hicks, C.1
Song, D.P.2
Earl, C.F.3
-
26
-
-
0012298197
-
Priority dispatching with operation due dates in a job shop
-
J.J.Kanet,, & J.C.Hayya, (1982). Priority dispatching with operation due dates in a job shop. Journal of Operations Management, 2, 167–175.
-
(1982)
Journal of Operations Management
, vol.2
, pp. 167-175
-
-
Kanet, J.J.1
Hayya, J.C.2
-
27
-
-
21544444259
-
-
4th ed., New York, NY: McGraw-Hill Irwin
-
M.H.Kutner,, C.J.Nachtsheim,, & J.Neter, (2004). Applied linear regression models (4th ed.). New York, NY: McGraw-Hill Irwin.
-
(2004)
Applied linear regression models
-
-
Kutner, M.H.1
Nachtsheim, C.J.2
Neter, J.3
-
28
-
-
0347999551
-
Integrated planning and scheduling in the engineer to order sector
-
D.Little,, R.Rollins,, M.Peck,, & J.K.Porter, (2000). Integrated planning and scheduling in the engineer to order sector. International Journal of Computer Integrated Manufacturing, 13, 545–554.
-
(2000)
International Journal of Computer Integrated Manufacturing
, vol.13
, pp. 545-554
-
-
Little, D.1
Rollins, R.2
Peck, M.3
Porter, J.K.4
-
29
-
-
0019540666
-
Combined scheduling system for reducing job tardiness in a job shop
-
S.Miyazaki, (1981). Combined scheduling system for reducing job tardiness in a job shop. International Journal of Production Research, 19, 201–211.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 201-211
-
-
Miyazaki, S.1
-
30
-
-
84952253486
-
Job shop scheduling heuristics and frequency of scheduling
-
A.P.Muhlemann,, A.G.Lockett,, & C.K.Farn, (1982). Job shop scheduling heuristics and frequency of scheduling. International Journal of Production Research, 20, 227–241.
-
(1982)
International Journal of Production Research
, vol.20
, pp. 227-241
-
-
Muhlemann, A.P.1
Lockett, A.G.2
Farn, C.K.3
-
32
-
-
34249652389
-
An ontology-based approach to support decision-making for the design of ETO (engineer to order) products
-
A.Pandit,, & Y.Zhu, (2009). An ontology-based approach to support decision-making for the design of ETO (engineer to order) products. Automation in Construction, 16, 759–770.
-
(2009)
Automation in Construction
, vol.16
, pp. 759-770
-
-
Pandit, A.1
Zhu, Y.2
-
33
-
-
0037063279
-
Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products
-
P.Pongcharoen,, C.Hicks,, P.M.Braiden,, & D.J.Stewardson, (2002). Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products. International Journal of Production Economics, 78, 311–322.10.1016/S0925-5273(02)00104-4
-
(2002)
International Journal of Production Economics
, vol.78
, pp. 311-322
-
-
Pongcharoen, P.1
Hicks, C.2
Braiden, P.M.3
Stewardson, D.J.4
-
34
-
-
0141636312
-
The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure
-
P.Pongcharoen,, C.Hicks,, & P.M.Braiden, (2004). The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure. European Journal of Operational Research, 152, 215–225.10.1016/S0377-2217(02)00645-8
-
(2004)
European Journal of Operational Research
, vol.152
, pp. 215-225
-
-
Pongcharoen, P.1
Hicks, C.2
Braiden, P.M.3
-
35
-
-
0032028267
-
Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method
-
X.Qi,, & F.S.Tu, (1998). Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method. European Journal of Operational Research, 105, 502–508.10.1016/S0377-2217(97)00075-1
-
(1998)
European Journal of Operational Research
, vol.105
, pp. 502-508
-
-
Qi, X.1
Tu, F.S.2
-
37
-
-
0035878030
-
Stage due date planning for multistage assembly systems
-
D.P.Song,, C.Hicks,, & C.F.Earl, (2001). Stage due date planning for multistage assembly systems. International Journal of Production Research, 39, 1943–1954.10.1080/00207540110035543
-
(2001)
International Journal of Production Research
, vol.39
, pp. 1943-1954
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
38
-
-
84908162271
-
Product due date assignments for complex assemblies
-
D.P.Song,, C.Hicks,, & C.F.Earl, (2002). Product due date assignments for complex assemblies. International Journal of Production Research, 76, 4877–4895.
-
(2002)
International Journal of Production Research
, vol.76
, pp. 4877-4895
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
39
-
-
33749553327
-
An ordinal optimization based evolution strategy to schedule complex make to order products
-
D.P.Song,, C.Hicks,, & C.F.Earl, (2006). An ordinal optimization based evolution strategy to schedule complex make to order products. International Journal of Production Research, 44, 4877–4895.10.1080/00207540600620922
-
(2006)
International Journal of Production Research
, vol.44
, pp. 4877-4895
-
-
Song, D.P.1
Hicks, C.2
Earl, C.F.3
-
40
-
-
27744563510
-
A review of production planning and control: The applicability of key concepts to the make-to-order industry
-
M.Stevenson,, L.C.Hendry,, & B.G.Kingsman, (2005). A review of production planning and control: The applicability of key concepts to the make-to-order industry. International Journal of Production Research, 43, 869–898.10.1080/0020754042000298520
-
(2005)
International Journal of Production Research
, vol.43
, pp. 869-898
-
-
Stevenson, M.1
Hendry, L.C.2
Kingsman, B.G.3
-
42
-
-
0018454859
-
A simulation study of predictable due dates
-
J.K.Weeks, (1979). A simulation study of predictable due dates. Management Science, 25, 363–373.
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
43
-
-
0142096452
-
Nestlé’s ERP Odyssey
-
B.Worthen, (2002). Nestlé’s ERP Odyssey. CIO, 15, 1–9.
-
(2002)
CIO
, vol.15
, pp. 1-9
-
-
Worthen, B.1
|