메뉴 건너뛰기




Volumn 3, Issue 1, 2015, Pages 201-217

Sequencing jobs in an engineer-to-order engineering environment

Author keywords

design; engineer to order; sequencing

Indexed keywords

COMPETITION; DESIGN; DIGITAL STORAGE; DISCRETE EVENT SIMULATION; PRODUCT DESIGN;

EID: 84977111282     PISSN: None     EISSN: 21693277     Source Type: Journal    
DOI: 10.1080/21693277.2015.1035461     Document Type: Article
Times cited : (20)

References (43)
  • 1
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job shop
    • K.R.Baker, (1984). Sequencing rules and due-date assignments in a job shop. Management Science, 30, 1093–1104.10.1287/mnsc.30.9.1093
    • (1984) Management Science , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 2
    • 0019582153 scopus 로고
    • A comparison of due date selection rules
    • K.R.Baker,, & J.V.M.Bertrand, (1981). A comparison of due date selection rules. AIIE Transactions, 13, 123–131.
    • (1981) AIIE Transactions , vol.13 , pp. 123-131
    • Baker, K.R.1    Bertrand, J.V.M.2
  • 4
  • 7
    • 0001173515 scopus 로고
    • Priority dispatching and work-in-process inventory in a job shop
    • R.W.Conway, (1965a). Priority dispatching and work-in-process inventory in a job shop. Journal of Industrial Engineering, 16, 123–130.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 123-130
    • Conway, R.W.1
  • 8
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • R.W.Conway, (1965b). Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16, 228–237.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 228-237
    • Conway, R.W.1
  • 9
    • 0011788714 scopus 로고
    • Network dispatching by shortest operation discipline
    • R.W.Conway,, & W.L.Maxwell, (1962). Network dispatching by shortest operation discipline. Operations Research, 10, 51–73.
    • (1962) Operations Research , vol.10 , pp. 51-73
    • Conway, R.W.1    Maxwell, W.L.2
  • 11
    • 84908206482 scopus 로고    scopus 로고
    • Are you ETO? The increasing importance of custom (engineer-to-order) manufacturers
    • T.R.Cutler, (2005). Are you ETO? The increasing importance of custom (engineer-to-order) manufacturers. In MFG, pp. 1–3.
    • (2005) In MFG , pp. 1-3
    • Cutler, T.R.1
  • 12
    • 66449123062 scopus 로고    scopus 로고
    • Special orders, engineer to order challenges for the industrial engineer
    • T.R.Cutler, (2009). Special orders, engineer to order challenges for the industrial engineer. Industrial Engineer, 41, 36–38.
    • (2009) Industrial Engineer , vol.41 , pp. 36-38
    • Cutler, T.R.1
  • 13
    • 0009377460 scopus 로고
    • Job shop dispatching using various due date setting criteria
    • D.A.Elvers, (1973). Job shop dispatching using various due date setting criteria. Production and Inventory Management, 14, 62–69.
    • (1973) Production and Inventory Management , vol.14 , pp. 62-69
    • Elvers, D.A.1
  • 14
    • 0020664019 scopus 로고
    • Time completion for various dispatching rules in a job shop
    • D.A.Elvers,, & L.Taube, (1983). Time completion for various dispatching rules in a job shop. Omega, 11, 81–89.
    • (1983) Omega , vol.11 , pp. 81-89
    • Elvers, D.A.1    Taube, L.2
  • 15
    • 0000965956 scopus 로고
    • Heuristics in job shop scheduling
    • W.S.Gere, (1966). Heuristics in job shop scheduling. Management Science, 13, 167–190.
    • (1966) Management Science , vol.13 , pp. 167-190
    • Gere, W.S.1
  • 16
    • 70350568663 scopus 로고    scopus 로고
    • Engineer to order supply chain management: A literature review and research agenda
    • J.Gosling,, & M.M.Naim, (2009). Engineer to order supply chain management: A literature review and research agenda. International Journal of Production Economics, 122, 741–754.10.1016/j.ijpe.2009.07.002
    • (2009) International Journal of Production Economics , vol.122 , pp. 741-754
    • Gosling, J.1    Naim, M.M.2
  • 17
    • 84885849174 scopus 로고    scopus 로고
    • Determining job complexity in an engineer to order environment for due date estimation using a proposed framework
    • D.H.Grabenstetter,, & J.M.Usher, (2013). Determining job complexity in an engineer to order environment for due date estimation using a proposed framework. International Journal of Production Research, 51, 5728–5740.10.1080/00207543.2013.787169
    • (2013) International Journal of Production Research , vol.51 , pp. 5728-5740
    • Grabenstetter, D.H.1    Usher, J.M.2
  • 20
    • 0034672925 scopus 로고    scopus 로고
    • Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach
    • C.Hicks,, & P.M.Braiden, (2000). Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach. International Journal of Production Research, 38, 4783–4810.10.1080/00207540010001019
    • (2000) International Journal of Production Research , vol.38 , pp. 4783-4810
    • Hicks, C.1    Braiden, P.M.2
  • 21
    • 33747140357 scopus 로고    scopus 로고
    • Dispatching rules for production scheduling in the capital goods industry
    • C.Hicks,, & P.Pongcharoen, (2006). Dispatching rules for production scheduling in the capital goods industry. International Journal of Production Economics, 104, 154–163.10.1016/j.ijpe.2005.07.005
    • (2006) International Journal of Production Economics , vol.104 , pp. 154-163
    • Hicks, C.1    Pongcharoen, P.2
  • 22
    • 67549084647 scopus 로고    scopus 로고
    • Applying different control approaches for resources with high and low utilisation: A case study of the production of complex products with stochastic processing times
    • C.Hicks,, & P.Pongcharoen, (2009). Applying different control approaches for resources with high and low utilisation: A case study of the production of complex products with stochastic processing times. International Journal of Technology Management, 48, 202–218.10.1504/IJTM.2009.024916
    • (2009) International Journal of Technology Management , vol.48 , pp. 202-218
    • Hicks, C.1    Pongcharoen, P.2
  • 23
    • 0033878455 scopus 로고    scopus 로고
    • Supply chain management: A strategic issue in engineer-to-order manufacturing
    • C.Hicks,, T.McGovern,, & C.F.Earl, (2000). Supply chain management: A strategic issue in engineer-to-order manufacturing. International Journal of Production Economics, 65, 179–190.10.1016/S0925-5273(99)00026-2
    • (2000) International Journal of Production Economics , vol.65 , pp. 179-190
    • Hicks, C.1    McGovern, T.2    Earl, C.F.3
  • 25
  • 26
    • 0012298197 scopus 로고
    • Priority dispatching with operation due dates in a job shop
    • J.J.Kanet,, & J.C.Hayya, (1982). Priority dispatching with operation due dates in a job shop. Journal of Operations Management, 2, 167–175.
    • (1982) Journal of Operations Management , vol.2 , pp. 167-175
    • Kanet, J.J.1    Hayya, J.C.2
  • 29
    • 0019540666 scopus 로고
    • Combined scheduling system for reducing job tardiness in a job shop
    • S.Miyazaki, (1981). Combined scheduling system for reducing job tardiness in a job shop. International Journal of Production Research, 19, 201–211.
    • (1981) International Journal of Production Research , vol.19 , pp. 201-211
    • Miyazaki, S.1
  • 32
    • 34249652389 scopus 로고    scopus 로고
    • An ontology-based approach to support decision-making for the design of ETO (engineer to order) products
    • A.Pandit,, & Y.Zhu, (2009). An ontology-based approach to support decision-making for the design of ETO (engineer to order) products. Automation in Construction, 16, 759–770.
    • (2009) Automation in Construction , vol.16 , pp. 759-770
    • Pandit, A.1    Zhu, Y.2
  • 33
    • 0037063279 scopus 로고    scopus 로고
    • Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products
    • P.Pongcharoen,, C.Hicks,, P.M.Braiden,, & D.J.Stewardson, (2002). Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products. International Journal of Production Economics, 78, 311–322.10.1016/S0925-5273(02)00104-4
    • (2002) International Journal of Production Economics , vol.78 , pp. 311-322
    • Pongcharoen, P.1    Hicks, C.2    Braiden, P.M.3    Stewardson, D.J.4
  • 34
    • 0141636312 scopus 로고    scopus 로고
    • The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure
    • P.Pongcharoen,, C.Hicks,, & P.M.Braiden, (2004). The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure. European Journal of Operational Research, 152, 215–225.10.1016/S0377-2217(02)00645-8
    • (2004) European Journal of Operational Research , vol.152 , pp. 215-225
    • Pongcharoen, P.1    Hicks, C.2    Braiden, P.M.3
  • 35
    • 0032028267 scopus 로고    scopus 로고
    • Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method
    • X.Qi,, & F.S.Tu, (1998). Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method. European Journal of Operational Research, 105, 502–508.10.1016/S0377-2217(97)00075-1
    • (1998) European Journal of Operational Research , vol.105 , pp. 502-508
    • Qi, X.1    Tu, F.S.2
  • 39
    • 33749553327 scopus 로고    scopus 로고
    • An ordinal optimization based evolution strategy to schedule complex make to order products
    • D.P.Song,, C.Hicks,, & C.F.Earl, (2006). An ordinal optimization based evolution strategy to schedule complex make to order products. International Journal of Production Research, 44, 4877–4895.10.1080/00207540600620922
    • (2006) International Journal of Production Research , vol.44 , pp. 4877-4895
    • Song, D.P.1    Hicks, C.2    Earl, C.F.3
  • 40
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make-to-order industry
    • M.Stevenson,, L.C.Hendry,, & B.G.Kingsman, (2005). A review of production planning and control: The applicability of key concepts to the make-to-order industry. International Journal of Production Research, 43, 869–898.10.1080/0020754042000298520
    • (2005) International Journal of Production Research , vol.43 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 42
    • 0018454859 scopus 로고
    • A simulation study of predictable due dates
    • J.K.Weeks, (1979). A simulation study of predictable due dates. Management Science, 25, 363–373.
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 43
    • 0142096452 scopus 로고    scopus 로고
    • Nestlé’s ERP Odyssey
    • B.Worthen, (2002). Nestlé’s ERP Odyssey. CIO, 15, 1–9.
    • (2002) CIO , vol.15 , pp. 1-9
    • Worthen, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.