메뉴 건너뛰기




Volumn 33, Issue 9, 2006, Pages 2757-2774

Assembly line balancing and group working: A heuristic procedure for workers' groups operating on the same product and workstation

Author keywords

Assembly line balancing; Heuristic methods

Indexed keywords

ASSEMBLY; AUTOMOTIVE INDUSTRY; COMPUTER WORKSTATIONS; HEURISTIC METHODS;

EID: 30744451443     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2005.02.027     Document Type: Article
Times cited : (106)

References (23)
  • 1
    • 0024641634 scopus 로고
    • A Comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • S. Ghosh, and R.J. Gagnon A Comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems International Journal of Production Research 27 1989 637 670
    • (1989) International Journal of Production Research , vol.27 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 3
  • 4
    • 25144450992 scopus 로고    scopus 로고
    • A survey on problems and methods in generalized assembly line balancing
    • doi: 10.1016/j.ejor.2004.07.023, in press, [corrected proof, available online 11 September 2004]
    • Becker B, Scholl A. A survey on problems and methods in generalized assembly line balancing, European Journal of Operational Research, doi: 10.1016/j.ejor.2004.07.023, in press, [corrected proof, available online 11 September 2004].
    • European Journal of Operational Research
    • Becker, B.1    Scholl, A.2
  • 6
    • 30744476974 scopus 로고
    • Organising the production line of military jeep-type vehicles (Mercedes 240 GD) of Hellenic Vehicles Industry S.A. (EL.B.O.)
    • Industrial Management Division, Aristotle University of Thessaloniki, Greece [in Greek]
    • Psoinos D, Georgiadis P, Koskosidis D, Asteriadis T, Dimitriadis S. Organising the production line of military jeep-type vehicles (Mercedes 240 GD) of Hellenic Vehicles Industry S.A. (EL.B.O.). Research report, Industrial Management Division, Aristotle University of Thessaloniki, Greece, 1987 [in Greek].
    • (1987) Research Report
    • Psoinos, D.1    Georgiadis, P.2    Koskosidis, D.3    Asteriadis, T.4    Dimitriadis, S.5
  • 8
    • 0022768294 scopus 로고
    • A survey of exact algorithms for the simple assembly line balancing problem
    • I. Baybars A survey of exact algorithms for the simple assembly line balancing problem Management Science 32 1986 909 932
    • (1986) Management Science , vol.32 , pp. 909-932
    • Baybars, I.1
  • 9
    • 25144482035 scopus 로고    scopus 로고
    • State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
    • doi: 10.1016/j.ejor.2004.07.022, in press [corrected proof, available online 30 December 2004]
    • Scholl A, Becker B. State-of-the-art exact and heuristic solution procedures for simple assembly line balancing. European Journal of Operational Research, doi: 10.1016/j.ejor.2004.07.022, in press [corrected proof, available online 30 December 2004].
    • European Journal of Operational Research
    • Scholl, A.1    Becker, B.2
  • 10
    • 0022699406 scopus 로고
    • A comparative evaluation of heuristic line balancing techniques
    • F.B. Talbot, J.H. Patterson, and W.V. Gehrlein A comparative evaluation of heuristic line balancing techniques Management Science 32 1986 430 454
    • (1986) Management Science , vol.32 , pp. 430-454
    • Talbot, F.B.1    Patterson, J.H.2    Gehrlein, W.V.3
  • 12
    • 0016027179 scopus 로고
    • Assembly line balancing with multiple stations
    • G.M. Baxey Assembly line balancing with multiple stations Management Science 20 1974 1010 1021
    • (1974) Management Science , vol.20 , pp. 1010-1021
    • Baxey, G.M.1
  • 13
    • 0020816054 scopus 로고
    • A method for assembly line balancing with more than one worker in each station
    • F. Akagi, H. Osaki, and S. Kikuchi A method for assembly line balancing with more than one worker in each station International Journal of Production Research 21 1983 755 770
    • (1983) International Journal of Production Research , vol.21 , pp. 755-770
    • Akagi, F.1    Osaki, H.2    Kikuchi, S.3
  • 14
  • 16
    • 0000030393 scopus 로고
    • Assembly line balancing with a precedence matrix
    • T.R. Hoffmann Assembly line balancing with a precedence matrix Management Science 9 1963 551 562
    • (1963) Management Science , vol.9 , pp. 551-562
    • Hoffmann, T.R.1
  • 18
    • 0033115142 scopus 로고    scopus 로고
    • Balancing assembly lines effectively - A computational comparison
    • A. Scholl, and R. Klein Balancing assembly lines effectively - a computational comparison European Journal of Operational Research 114 1999 50 58
    • (1999) European Journal of Operational Research , vol.114 , pp. 50-58
    • Scholl, A.1    Klein, R.2
  • 19
    • 0001430010 scopus 로고
    • Parallel sequencing and assembly line problems
    • T.C. Hu Parallel sequencing and assembly line problems Operations Research 9 1961 841 848
    • (1961) Operations Research , vol.9 , pp. 841-848
    • Hu, T.C.1
  • 20
  • 22
    • 0021202885 scopus 로고
    • An integer programming algorithm with network cuts solving the assembly line balancing problem
    • F.B. Talbot, and J.H. Patterson An integer programming algorithm with network cuts solving the assembly line balancing problem Management Science 30 1984 85 89
    • (1984) Management Science , vol.30 , pp. 85-89
    • Talbot, F.B.1    Patterson, J.H.2
  • 23
    • 0037448813 scopus 로고    scopus 로고
    • An enumerative heuristic and reduction methods for the assembly line balancing problem
    • K. Fleszar, and K.S. Hindi An enumerative heuristic and reduction methods for the assembly line balancing problem European Journal of Operational Research 145 2001 606 620
    • (2001) European Journal of Operational Research , vol.145 , pp. 606-620
    • Fleszar, K.1    Hindi, K.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.