메뉴 건너뛰기




Volumn 43, Issue 5, 2005, Pages 869-898

A review of production planning and control: The applicability of key concepts to the make-to-order industry

Author keywords

Job shop; Make to order (MTO); Production planning and control (PPC); Small and medium sized enterprises (SME); Workload control (WLC)

Indexed keywords

CONSTRAINT THEORY; ENTERPRISE RESOURCE PLANNING; INDUSTRIAL MANAGEMENT; STRATEGIC PLANNING;

EID: 27744563510     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/0020754042000298520     Document Type: Review
Times cited : (299)

References (106)
  • 1
    • 0032306745 scopus 로고    scopus 로고
    • Adaptation of JIT philosophy and Kanban technique to a small-sized manufacturing firm; a project management approach
    • Abdul-Nour, G., Lambert, S. and Drolet, J., Adaptation of JIT philosophy and Kanban technique to a small-sized manufacturing firm; a project management approach. Comp. & Ind. Eng., 1998, 35, 419-422.
    • (1998) Comp. & Ind. Eng. , vol.35 , pp. 419-422
    • Abdul-Nour, G.1    Lambert, S.2    Drolet, J.3
  • 2
    • 0001195095 scopus 로고    scopus 로고
    • Competitive advantage, customisation and a new taxonomy for non make-to-stock companies
    • Amaro, G.M., Hendry, L.C. and Kingsman, B.G., Competitive advantage, customisation and a new taxonomy for non make-to-stock companies. Int. J. Ops. and Prod. Manage., 1999, 19, 349-371.
    • (1999) Int. J. Ops. and Prod. Manage. , vol.19 , pp. 349-371
    • Amaro, G.M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 3
    • 0037211465 scopus 로고    scopus 로고
    • Managing multi-project environments through constant work-in-process
    • Anavi-Isakow, S. and Golany, B., Managing multi-project environments through constant work-in-process. Int. J. of Prod. Manage., 2003, 21, 9-18.
    • (2003) Int. J. of Prod. Manage. , vol.21 , pp. 9-18
    • Anavi-Isakow, S.1    Golany, B.2
  • 4
    • 0037448857 scopus 로고    scopus 로고
    • A strategic framework for the management of ERP enabled e-business change
    • Ash, C.G. and Burn, J.M., A strategic framework for the management of ERP enabled e-business change. Euro. J. Op. Res., 2003, 146, 374-387.
    • (2003) Euro. J. Op. Res. , vol.146 , pp. 374-387
    • Ash, C.G.1    Burn, J.M.2
  • 5
    • 0040914138 scopus 로고    scopus 로고
    • Ranking of generalised multi-stage Kanban policies
    • Axsater, S. and Rosling, K., Ranking of generalised multi-stage Kanban policies. Euro. J. Op. Res., 1999, 113, 560-567.
    • (1999) Euro. J. Op. Res. , vol.113 , pp. 560-567
    • Axsater, S.1    Rosling, K.2
  • 6
    • 0023979312 scopus 로고
    • Theory and practice of Load Oriented Manufacturing Control
    • Bechte, W., Theory and practice of Load Oriented Manufacturing Control. Int. J. Prod. Res., 1988, 26, 375-395.
    • (1988) Int. J. Prod. Res. , vol.26 , pp. 375-395
    • Bechte, W.1
  • 7
    • 0002479150 scopus 로고
    • Load oriented manufacturing control just in time production for job shops
    • Bechte, W., Load oriented manufacturing control just in time production for job shops. Prod. Plan. Con., 1994, 5, 292-307.
    • (1994) Prod. Plan. Con. , vol.5 , pp. 292-307
    • Bechte, W.1
  • 8
    • 0031078124 scopus 로고    scopus 로고
    • Order review and release strategies in a job shop environment: A review and a classification
    • Bergamaschi, D., Cigolini, R., Perona, M. and Portioli, A., Order review and release strategies in a job shop environment: a review and a classification. Int. J. Prod. Res., 1997, 35, 399-420.
    • (1997) Int. J. Prod. Res. , vol.35 , pp. 399-420
    • Bergamaschi, D.1    Cigolini, R.2    Perona, M.3    Portioli, A.4
  • 9
    • 0027628028 scopus 로고
    • Production control in engineer-to-order firms
    • Bertrand, J.W.M. and Muntslag, D.R., Production control in engineer-to-order firms. Int. J. Pro. Economics, 1993, 30/31, 3-22.
    • (1993) Int. J. Pro. Economics , vol.30-31 , pp. 3-22
    • Bertrand, J.W.M.1    Muntslag, D.R.2
  • 10
    • 0036820319 scopus 로고    scopus 로고
    • Workload based order release and productivity: A missing link
    • Bertrand, J.W.M. and Van Ooijen, H.P.G., Workload based order release and productivity: a missing link. Pro. Plan. Con., 2002, 13, 665-678.
    • (2002) Pro. Plan. Con. , vol.13 , pp. 665-678
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 11
    • 0003305051 scopus 로고    scopus 로고
    • Beginning SAP/R3 implementation at Geneva Pharmaceuticals
    • Bhattacherjee, A., Beginning SAP/R3 implementation at Geneva Pharmaceuticals. Com. of Assn for Infor. Sys., 2000, 4, 1-38.
    • (2000) Com. of Assn for Infor. Sys. , vol.4 , pp. 1-38
    • Bhattacherjee, A.1
  • 12
    • 0024769152 scopus 로고
    • Implementing a loading heuristic in a discrete release job shop
    • Bobrowski, P.M., Implementing a loading heuristic in a discrete release job shop. Int. J. Prod. Res., 1989, 27, 1935-1948.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 1935-1948
    • Bobrowski, P.M.1
  • 13
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of load oriented order release
    • Breithaupt, J.W., Land, M.J. and Nyhuis, P., The workload control concept: theory and practical extensions of load oriented order release. Prod. Plan. Con., 2002, 13, 625-638.
    • (2002) Prod. Plan. Con. , vol.13 , pp. 625-638
    • Breithaupt, J.W.1    Land, M.J.2    Nyhuis, P.3
  • 14
    • 0141872926 scopus 로고    scopus 로고
    • e-Business strategy: How companies are shaping their supply chain through the Internet
    • Cagliano, R., Caniato, F. and Spina, G., e-Business strategy: how companies are shaping their supply chain through the Internet. Int. J. Op. Prod. Manage., 2003, 23, 1142-1162.
    • (2003) Int. J. Op. Prod. Manage. , vol.23 , pp. 1142-1162
    • Cagliano, R.1    Caniato, F.2    Spina, G.3
  • 15
    • 0038112235 scopus 로고    scopus 로고
    • Production planning and order acceptance in business to business electronic commerce
    • Calosso, T., Cantamessa, M., Vu, D. and Villa, A., Production planning and order acceptance in business to business electronic commerce. Int. J. Prod. Econ., 2003, 85, 233-249.
    • (2003) Int. J. Prod. Econ. , vol.85 , pp. 233-249
    • Calosso, T.1    Cantamessa, M.2    Vu, D.3    Villa, A.4
  • 17
    • 0036819537 scopus 로고    scopus 로고
    • An experimental investigation on workload limiting methods with ORR policies in a job shop environment
    • Cigolini, R. and Portioli-Staudacher, A., An experimental investigation on workload limiting methods with ORR policies in a job shop environment. Pro. Plan. Con., 2002, 13, 602-613.
    • (2002) Pro. Plan. Con. , vol.13 , pp. 602-613
    • Cigolini, R.1    Portioli-Staudacher, A.2
  • 18
    • 0028403388 scopus 로고
    • A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks
    • Cook, D.P., A simulation comparison of traditional, JIT and TOC manufacturing systems in a flow shop with bottlenecks. Prod. and Inven. Manage., 1994, First Quarter, 73-78.
    • (1994) Prod. and Inven. Manage. , vol.FIRST QUARTER , pp. 73-78
    • Cook, D.P.1
  • 20
    • 0034466408 scopus 로고    scopus 로고
    • Extended Kanban control system: Combining Kanban and base stock
    • Dallery, Y. and Liberopoulos, G., Extended Kanban control system: combining Kanban and base stock. IIE Trans., 2000, 32, 369-386.
    • (2000) IIE Trans. , vol.32 , pp. 369-386
    • Dallery, Y.1    Liberopoulos, G.2
  • 21
    • 0012306751 scopus 로고
    • A modified MRP for a production system with the coexistence of MRP and Kanbans
    • Ding, F.Y. and Yuen, M.N., A modified MRP for a production system with the coexistence of MRP and Kanbans. J. Oper. Manage., 1991, 10, 267-277.
    • (1991) J. Oper. Manage. , vol.10 , pp. 267-277
    • Ding, F.Y.1    Yuen, M.N.2
  • 22
    • 27744454955 scopus 로고
    • The impact of a constraint buffer in a flow shop
    • Duclos, L.K. and Spencer, M.S., The impact of a constraint buffer in a flow shop. Int. J. Prod. Econ., 1995, 42, 175-185.
    • (1995) Int. J. Prod. Econ. , vol.42 , pp. 175-185
    • Duclos, L.K.1    Spencer, M.S.2
  • 23
    • 27744485465 scopus 로고    scopus 로고
    • EITO, European Information Technology Observatory, Frankfurt, 2000
    • EITO, European Information Technology Observatory, Frankfurt, 2000.
  • 24
    • 0002992336 scopus 로고
    • An economic approach to job shop performance analysis
    • Enns, S.T., An economic approach to job shop performance analysis. Int. J. Prod. Econ., 1995, 38, 117-131.
    • (1995) Int. J. Prod. Econ. , vol.38 , pp. 117-131
    • Enns, S.T.1
  • 25
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck workloads
    • Enns, S.T. and Prongue Costa, M., The effectiveness of input control based on aggregate versus bottleneck workloads. Prod. Plan. Con., 2002, 13, 614-624.
    • (2002) Prod. Plan. Con. , vol.13 , pp. 614-624
    • Enns, S.T.1    Prongue Costa, M.2
  • 26
    • 27744465229 scopus 로고    scopus 로고
    • EUROPA, 2003. Available online at http://europa.eu.int/comm/enterprise/ enterprise_policy/sme_definition/index_en.htm
    • (2003)
  • 27
    • 0036819559 scopus 로고    scopus 로고
    • Workload control in the semiconductor industry
    • Fowler, J.W., Hogg, G.L. and Mason, S.J., Workload control in the semiconductor industry. Prod. Plan. Con., 2002, 13, 568-578.
    • (2002) Prod. Plan. Con. , vol.13 , pp. 568-578
    • Fowler, J.W.1    Hogg, G.L.2    Mason, S.J.3
  • 28
    • 0011744806 scopus 로고
    • Implementing drum-buffer-rope to control manufacturing lead time
    • Fry, T.D., Karwan, K.R. and Steele, D.C., Implementing drum-buffer-rope to control manufacturing lead time. Int. J. Log. Manag., 1992, 2, 12-18.
    • (1992) Int. J. Log. Manag. , vol.2 , pp. 12-18
    • Fry, T.D.1    Karwan, K.R.2    Steele, D.C.3
  • 29
    • 0033749924 scopus 로고    scopus 로고
    • An evolutionary approach to select a pull system among Kanban, CONWIP and hybrid
    • Gaury, E.G.A., Pierreval, H. and Kleijnen, J.P.C., An evolutionary approach to select a pull system among Kanban, CONWIP and hybrid. J. Intel. Manuf., 2000, 11, 157-167.
    • (2000) J. Intel. Manuf. , vol.11 , pp. 157-167
    • Gaury, E.G.A.1    Pierreval, H.2    Kleijnen, J.P.C.3
  • 31
    • 0023964289 scopus 로고
    • Closed-loop job release control for VLSI circuit manufacturing
    • Glassey, C.R. and Resende, M.G., Closed-loop job release control for VLSI circuit manufacturing. IEEE Trans. on Semi. Manuf., 1988, 1, 36-46.
    • (1988) IEEE Trans. on Semi. Manuf. , vol.1 , pp. 36-46
    • Glassey, C.R.1    Resende, M.G.2
  • 35
    • 0024607567 scopus 로고
    • A framework for quantitative comparison of production control concepts
    • Grunwald, H., Striekwold, P.E.T. and Weeda, P.J., A framework for quantitative comparison of production control concepts. Int. J. Prod. Res., 1989, 27, 281-292.
    • (1989) Int. J. Prod. Res. , vol.27 , pp. 281-292
    • Grunwald, H.1    Striekwold, P.E.T.2    Weeda, P.J.3
  • 36
    • 0037063278 scopus 로고    scopus 로고
    • Modelling flow and jobbing shops as a queuing network for workload control
    • Haskose, A., Kingsman, B.G. and Worthington, D., Modelling flow and jobbing shops as a queuing network for workload control. Int. J. Prod. Econ., 2002, 78, 271-285.
    • (2002) Int. J. Prod. Econ. , vol.78 , pp. 271-285
    • Haskose, A.1    Kingsman, B.G.2    Worthington, D.3
  • 37
    • 27744503410 scopus 로고    scopus 로고
    • Product customisation and competitive advantage: An empirical study
    • Hendry, L.C., Kingsman, B.G. and Amaro, G.M., Product customisation and competitive advantage: an empirical study. EUROMA Conf. Pro., 2003, 1, 119-128.
    • (2003) EUROMA Conf. Pro. , vol.1 , pp. 119-128
    • Hendry, L.C.1    Kingsman, B.G.2    Amaro, G.M.3
  • 38
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • Hendry, L.C. and Wong, S.K., Alternative order release mechanisms: a comparison by simulation. Int. J. Prod. Res., 1994, 32, 2827-2842.
    • (1994) Int. J. Prod. Res. , vol.32 , pp. 2827-2842
    • Hendry, L.C.1    Wong, S.K.2
  • 39
    • 27744468807 scopus 로고    scopus 로고
    • Introducing the concept of workload control into MTO companies: Determining applicability
    • Henrich, P., Land, M.J. and Gaalman, G., Introducing the concept of workload control into MTO companies: determining applicability. Int. Working Seminar on Prod. Econ. Conf. Pro., 2002, 1, 111-124.
    • (2002) Int. Working Seminar on Prod. Econ. Conf. Pro. , vol.1 , pp. 111-124
    • Henrich, P.1    Land, M.J.2    Gaalman, G.3
  • 41
    • 0036778742 scopus 로고    scopus 로고
    • The critical success factors for ERP implementation: An organisational fit perspective
    • Hong, K.K. and Kim, Y.G., The critical success factors for ERP implementation: an organisational fit perspective. Inform, and Manage., 2002, 40, 25-40.
    • (2002) Inform, and Manage. , vol.40 , pp. 25-40
    • Hong, K.K.1    Kim, Y.G.2
  • 42
    • 0032046661 scopus 로고    scopus 로고
    • Setting WIP levels with Statistical Throughput Control (STC) in CONWIP production lines
    • Hopp, W.J. and Roof, M.L., Setting WIP levels with Statistical Throughput Control (STC) in CONWIP production lines. Int. J. Prod. Res., 1998, 36, 867-882.
    • (1998) Int. J. Prod. Res. , vol.36 , pp. 867-882
    • Hopp, W.J.1    Roof, M.L.2
  • 44
    • 0347753267 scopus 로고    scopus 로고
    • A classification of business-to-business buying decisions: Risk importance and probability as a framework for e-business benefits
    • Hunter, L.M., Kasouf, C.J., Celuch, K.G. and Curry, K.A., A classification of business-to-business buying decisions: risk importance and probability as a framework for e-business benefits. Ind. Mark. Manage., 2004, 33, 145-154.
    • (2004) Ind. Mark. Manage. , vol.33 , pp. 145-154
    • Hunter, L.M.1    Kasouf, C.J.2    Celuch, K.G.3    Curry, K.A.4
  • 45
    • 0242332842 scopus 로고    scopus 로고
    • Modelling and analysis of wafer fabrication scheduling via generalised stochastic Petri net and simulated annealing
    • Jain, V., Swarnkar, R. and Tiwari, M.K., Modelling and analysis of wafer fabrication scheduling via generalised stochastic Petri net and simulated annealing. Int. J. Prod. Res., 2003, 41, 3501-3527.
    • (2003) Int. J. Prod. Res. , vol.41 , pp. 3501-3527
    • Jain, V.1    Swarnkar, R.2    Tiwari, M.K.3
  • 46
    • 0023833632 scopus 로고
    • MRP 96: Time to rethink manufacturing logistics
    • Kanet, J.J., MRP 96: time to rethink manufacturing logistics. Prod. and Inven. Manage. J., 1988a, 29, 57-61.
    • (1988) Prod. and Inven. Manage. J. , vol.29 , pp. 57-61
    • Kanet, J.J.1
  • 47
    • 38249027443 scopus 로고
    • Load-limited order release in job shop scheduling systems
    • Kanet, J.J., Load-limited order release in job shop scheduling systems. J. Op. Manage., 1988b, 7, 44-58.
    • (1988) J. Op. Manage. , vol.7 , pp. 44-58
    • Kanet, J.J.1
  • 48
    • 0034294071 scopus 로고    scopus 로고
    • A performance comparison of pull type control mechanisms for multi stage manufacturing
    • Karaesmen, F. and Dallery, Y., A performance comparison of pull type control mechanisms for multi stage manufacturing. Int. J. Prod. Econ., 2000, 68, 59-71.
    • (2000) Int. J. Prod. Econ. , vol.68 , pp. 59-71
    • Karaesmen, F.1    Dallery, Y.2
  • 49
    • 0024725591 scopus 로고
    • Getting control of just-in-time
    • Karmarkar, U., Getting control of just-in-time. Harvard Bus. Rev., 1989, 67, 122-131.
    • (1989) Harvard Bus. Rev. , vol.67 , pp. 122-131
    • Karmarkar, U.1
  • 50
    • 0035634662 scopus 로고    scopus 로고
    • Internet based supply chain management: A classification of approaches to manufacturing planning and control
    • Kehoe, D.F. and Boughton, N.J., Internet based supply chain management: a classification of approaches to manufacturing planning and control. Int. J. Op. and Prod. Manage., 2001a, 21, 516-524.
    • (2001) Int. J. Op. and Prod. Manage. , vol.21 , pp. 516-524
    • Kehoe, D.F.1    Boughton, N.J.2
  • 51
    • 0035611593 scopus 로고    scopus 로고
    • New paradigms in planning and control across manufacturing supply chains: The utilisation of Internet technologies
    • Kehoe, D.F. and Boughton, N.J., New paradigms in planning and control across manufacturing supply chains: the utilisation of Internet technologies. Int. J. Op. and Prod. Manage., 2001b, 21, 582-593.
    • (2001) Int. J. Op. and Prod. Manage. , vol.21 , pp. 582-593
    • Kehoe, D.F.1    Boughton, N.J.2
  • 52
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman, B.G., Modelling input-output workload control for dynamic capacity planning in production planning systems. Int. J. Prod. Econ., 2000, 68, 73-93.
    • (2000) Int. J. Prod. Econ. , vol.68 , pp. 73-93
    • Kingsman, B.G.1
  • 53
    • 0036819875 scopus 로고    scopus 로고
    • The relative contributions of input and output controls on the performance of a workload control system in make to order companies
    • Kingsman, B.G. and Hendry, L.C., The relative contributions of input and output controls on the performance of a workload control system in make to order companies. Prod. Plan. Con., 2002, 13, 579-590.
    • (2002) Prod. Plan. Con. , vol.13 , pp. 579-590
    • Kingsman, B.G.1    Hendry, L.C.2
  • 54
    • 0030410144 scopus 로고    scopus 로고
    • Responding to customer enquiries in make-to-order companies: Problems and solutions
    • Kingsman, B.G., Hendry, L.C., Mercer, A. and De Souza, A., Responding to customer enquiries in make-to-order companies: problems and solutions. Int. J. Prod. Econ., 1996, 46/47, 219-231.
    • (1996) Int. J. Prod. Econ. , vol.46-47 , pp. 219-231
    • Kingsman, B.G.1    Hendry, L.C.2    Mercer, A.3    De Souza, A.4
  • 55
    • 0032311649 scopus 로고    scopus 로고
    • General structure and characteristics of quick response production system
    • Kuroda, M. and Takeda, K., General structure and characteristics of quick response production system. Comp. & Ind. Eng., 1998, 35, 395.
    • (1998) Comp. & Ind. Eng. , vol.35 , pp. 395
    • Kuroda, M.1    Takeda, K.2
  • 56
    • 0030401650 scopus 로고    scopus 로고
    • Workload control concepts in job shops - A critical assessment
    • Land, M.J. and Gaalman, G., Workload control concepts in job shops - a critical assessment. Int. J. Prod. Econ., 1996, 46/47, 535-548.
    • (1996) Int. J. Prod. Econ. , vol.46-47 , pp. 535-548
    • Land, M.J.1    Gaalman, G.2
  • 57
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • Land, M.J. and Gaalman, G., The performance of workload control concepts in job shops: improving the release method. Int. J. Prod. Econ., 1998, 56/57, 347-364.
    • (1998) Int. J. Prod. Econ. , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.2
  • 58
    • 0037678804 scopus 로고    scopus 로고
    • The impact of organisation size on Enterprise Resource Planning (ERP) implementations in the US manufacturing sector
    • Mabert, V.A., Soni, A. and Venkataramanan, M.A., The impact of organisation size on Enterprise Resource Planning (ERP) implementations in the US manufacturing sector. The Int. J. of Manage. Sci., 2003, 31, 235-246.
    • (2003) The Int. J. of Manage. Sci. , vol.31 , pp. 235-246
    • Mabert, V.A.1    Soni, A.2    Venkataramanan, M.A.3
  • 59
    • 18844436478 scopus 로고    scopus 로고
    • The performance of the theory of constraints methodology: Analysis and discussion of successful TOC applications
    • Mabin, V.J. and Balderstone, S.J., The performance of the theory of constraints methodology: analysis and discussion of successful TOC applications. Int. J. Op. and Prod. Manage., 2003, 23, 568-595.
    • (2003) Int. J. Op. and Prod. Manage. , vol.23 , pp. 568-595
    • Mabin, V.J.1    Balderstone, S.J.2
  • 60
    • 1542574913 scopus 로고    scopus 로고
    • The impact of electronic data interchange on reducing bullwhip effect and supply chain inventory costs
    • Machuca, J.A.D. and Barajas, R.P., The impact of electronic data interchange on reducing bullwhip effect and supply chain inventory costs. Trans. Res. Part E, 2004, 40, 209-228.
    • (2004) Trans. Res. Part E , vol.40 , pp. 209-228
    • Machuca, J.A.D.1    Barajas, R.P.2
  • 61
    • 0037448866 scopus 로고    scopus 로고
    • Issues in implementing ERP: A case study
    • Mandal, P. and Gunasekaran, A., Issues in implementing ERP: a case study. Euro. J. Op. Res., 2003, 146, 274-283.
    • (2003) Euro. J. Op. Res. , vol.146 , pp. 274-283
    • Mandal, P.1    Gunasekaran, A.2
  • 62
    • 0008439902 scopus 로고
    • Concepts, practices and expectations of MRP, JIT and OPT in Finland and Japan
    • Matsuura, H., Kurosu, S. and Lehtimaki, A., Concepts, practices and expectations of MRP, JIT and OPT in Finland and Japan. Int. J. Prod. Econ., 1995, 41, 267-272.
    • (1995) Int. J. Prod. Econ. , vol.41 , pp. 267-272
    • Matsuura, H.1    Kurosu, S.2    Lehtimaki, A.3
  • 63
    • 0036778903 scopus 로고    scopus 로고
    • Successful implementation of ERP projects: Evidence from two case studies
    • Motwani, J., Mirchendani, D., Madan, M. and Gunasekaran, A., Successful implementation of ERP projects: evidence from two case studies. Int. J. Prod. Econ., 2002, 75, 83-96.
    • (2002) Int. J. Prod. Econ. , vol.75 , pp. 83-96
    • Motwani, J.1    Mirchendani, D.2    Madan, M.3    Gunasekaran, A.4
  • 64
    • 27744515837 scopus 로고    scopus 로고
    • The SHEN model for MTO SME's: A performance improvement tool
    • Muda, M.S. and Hendry, L.C., The SHEN model for MTO SME's: a performance improvement tool. Int. J. Op. and Prod. Manage., 2003, 23, 470-486.
    • (2003) Int. J. Op. and Prod. Manage. , vol.23 , pp. 470-486
    • Muda, M.S.1    Hendry, L.C.2
  • 65
    • 0041381407 scopus 로고    scopus 로고
    • Implementing Enterprise Resource Planning (ERP) systems in small and midsize manufacturing firms
    • Muscatello, J.R., Small, M.H. and Chen, I.J., Implementing Enterprise Resource Planning (ERP) systems in small and midsize manufacturing firms. Int. J. Op. and Prod. Manage., 2003, 23, 850-871.
    • (2003) Int. J. Op. and Prod. Manage. , vol.23 , pp. 850-871
    • Muscatello, J.R.1    Small, M.H.2    Chen, I.J.3
  • 66
    • 0026817845 scopus 로고
    • A simulation study of bottleneck scheduling
    • Neely, A.D. and Byrne, M.D., A simulation study of bottleneck scheduling. Int. J. Prod. Econ., 1992, 26, 187-192.
    • (1992) Int. J. Prod. Econ. , vol.26 , pp. 187-192
    • Neely, A.D.1    Byrne, M.D.2
  • 67
    • 0037810496 scopus 로고    scopus 로고
    • Strategic positioning of the order penetration point
    • Olhager, J., Strategic positioning of the order penetration point. Int. J. Prod. Econ., 2003, 85, 319-329.
    • (2003) Int. J. Prod. Econ. , vol.85 , pp. 319-329
    • Olhager, J.1
  • 68
    • 0034295978 scopus 로고    scopus 로고
    • The influence of shop characteristics on workload control
    • Oosterman, B., Land, M.L. and Gaalman, G., The influence of shop characteristics on workload control. Int. J. Prod. Econ., 2000, 68, 107-119.
    • (2000) Int. J. Prod. Econ. , vol.68 , pp. 107-119
    • Oosterman, B.1    Land, M.L.2    Gaalman, G.3
  • 69
    • 0032635740 scopus 로고    scopus 로고
    • Delivery date decision support system for the large scale make-to-order manufacturing companies: A Korean electric motor company case
    • Park, C., Song, J., Kim, J-G. and Kim, I., Delivery date decision support system for the large scale make-to-order manufacturing companies: a Korean electric motor company case. Prod. Plan. Con., 1999, 10, 585-597.
    • (1999) Prod. Plan. Con. , vol.10 , pp. 585-597
    • Park, C.1    Song, J.2    Kim, J.-G.3    Kim, I.4
  • 70
    • 0031249163 scopus 로고    scopus 로고
    • TOC for world class global supply chain management
    • Perez, J.L., TOC for world class global supply chain management. Comp. and Ind. Eng., 1997, 33, 289-293.
    • (1997) Comp. and Ind. Eng. , vol.33 , pp. 289-293
    • Perez, J.L.1
  • 71
    • 0036017706 scopus 로고    scopus 로고
    • Critical factors of MRP implementation in small and medium sized firms
    • Petroni, A., Critical factors of MRP implementation in small and medium sized firms. Int. J. Op. and Prod. Manage., 2002, 22, 329-348.
    • (2002) Int. J. Op. and Prod. Manage. , vol.22 , pp. 329-348
    • Petroni, A.1
  • 72
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • Philipoom, P. R., Malhotra, M.K. and Jensen, J.B., An evaluation of capacity sensitive order review and release procedures in job shops. Decision Sci., 1993, 24, 1109-1133.
    • (1993) Decision Sci. , vol.24 , pp. 1109-1133
    • Philipoom, P.R.1    Malhotra, M.K.2    Jensen, J.B.3
  • 73
    • 0033355582 scopus 로고    scopus 로고
    • Focusing material requirements planning (MRP) towards performance
    • Plenert, G., Focusing material requirements planning (MRP) towards performance. European J. Op. Res., 1999, 119, 91-99.
    • (1999) European J. Op. Res. , vol.119 , pp. 91-99
    • Plenert, G.1
  • 74
    • 0022734005 scopus 로고
    • MRP, JIT and OPT: What's 'best'?
    • Plenert, G. and Best, T.D., MRP, JIT and OPT: what's 'best'? Prod. and Invent. Manage., 1986, Second Quarter, 22-29.
    • (1986) Prod. and Invent. Manage. , vol.SECOND QUARTER , pp. 22-29
    • Plenert, G.1    Best, T.D.2
  • 75
    • 27744604305 scopus 로고    scopus 로고
    • General bucket: A new release procedure for workload control
    • Pre-Prints
    • Portioli, A., General bucket: a new release procedure for workload control. Int. Work. Sem. on Prod. Econ., Pre-Prints, 2002, 2, 305-406.
    • (2002) Int. Work. Sem. on Prod. Econ. , vol.2 , pp. 305-406
    • Portioli, A.1
  • 76
    • 0026414537 scopus 로고
    • MRP, MRP II, OPT, JIT, and CIM - Succession, evolution, or necessary combination
    • 1991
    • Ptak, C.A., 1991, MRP, MRP II, OPT, JIT, and CIM - succession, evolution, or necessary combination. Prod. and Inven. Manage., 1991, Second Quarter, 7-11.
    • (1991) Prod. and Inven. Manage. , vol.SECOND QUARTER , pp. 7-11
    • Ptak, C.A.1
  • 77
    • 0036033099 scopus 로고    scopus 로고
    • E-Commerce: The challenge for the UK SME's in the twenty-first century
    • Quayle, M., E-Commerce: the challenge for the UK SME's in the twenty-first century. Int. J. Op. and Prod. Manage., 2002, 22, 1148-1161.
    • (2002) Int. J. Op. and Prod. Manage. , vol.22 , pp. 1148-1161
    • Quayle, M.1
  • 78
    • 0032114853 scopus 로고    scopus 로고
    • A quantitative approach to estimate the size of the time buffer in the theory of constraints
    • Radovilsky, Z.D., A quantitative approach to estimate the size of the time buffer in the theory of constraints. Int. J. Prod. Econ., 1998, 55, 113-119.
    • (1998) Int. J. Prod. Econ. , vol.55 , pp. 113-119
    • Radovilsky, Z.D.1
  • 79
    • 0032376210 scopus 로고    scopus 로고
    • Theory of constraints: A review of the philosophy and its applications
    • Rahman, S., Theory of constraints: a review of the philosophy and its applications. Int. J. Op. and Prod. Manage., 1998, 18, 336-355.
    • (1998) Int. J. Op. and Prod. Manage. , vol.18 , pp. 336-355
    • Rahman, S.1
  • 80
    • 0010843780 scopus 로고
    • Push, pull and squeeze shop floor control with computer simulation
    • Ramsay, M.L., Push, pull and squeeze shop floor control with computer simulation. Ind. Eng., 1990, 22, 39-45.
    • (1990) Ind. Eng. , vol.22 , pp. 39-45
    • Ramsay, M.L.1
  • 81
    • 27744578953 scopus 로고    scopus 로고
    • Enhancing a Theory of Constraints (TOC) application using workload control principles
    • Pre-Prints
    • Riezebos, J., Korte, G.J. and Land, M.L., Enhancing a Theory of Constraints (TOC) application using workload control principles. Int. Work. Semi. on Prod. Econ., Pre-Prints, 2002, 1, 241-262.
    • (2002) Int. Work. Semi. on Prod. Econ. , vol.1 , pp. 241-262
    • Riezebos, J.1    Korte, G.J.2    Land, M.L.3
  • 82
    • 0033307341 scopus 로고    scopus 로고
    • CONLOAD - A new lot release rule for semiconductor wafer fabs
    • Rose, O., CONLOAD - A new lot release rule for semiconductor wafer fabs. Winter Sim. Conf., 1999, 850-855.
    • (1999) Winter Sim. Conf. , pp. 850-855
    • Rose, O.1
  • 83
    • 0034316827 scopus 로고    scopus 로고
    • Fine planning for supply chains in semiconductor manufacture
    • Rupp, T.M. and Ristic, M., Fine planning for supply chains in semiconductor manufacture. J. Mat. Pro. Tech., 2000, 107, 390-397.
    • (2000) J. Mat. Pro. Tech. , vol.107 , pp. 390-397
    • Rupp, T.M.1    Ristic, M.2
  • 84
    • 0032646165 scopus 로고    scopus 로고
    • Analysis of order review/release problems in production systems
    • Sabuncuoglu, I. and Karapinar, H.Y., Analysis of order review/release problems in production systems. Int. J. Prod. Econ., 1999, 62, 259-279.
    • (1999) Int. J. Prod. Econ. , vol.62 , pp. 259-279
    • Sabuncuoglu, I.1    Karapinar, H.Y.2
  • 85
    • 0043032763 scopus 로고    scopus 로고
    • Using a case study to test the role of three key social enablers in ERP implementation
    • Sarker, S. and Lee, A.S., Using a case study to test the role of three key social enablers in ERP implementation. Inform. and Manage., 2003, 40, 813-829.
    • (2003) Inform. and Manage. , vol.40 , pp. 813-829
    • Sarker, S.1    Lee, A.S.2
  • 86
    • 21244476885 scopus 로고    scopus 로고
    • Implementing enterprise resource planning systems with total quality control and business process reengineering
    • Schniederjans, M.J. and Kim, G.C., Implementing enterprise resource planning systems with total quality control and business process reengineering. Int. J. Op. and Prod. Manage., 2003, 23, 418-429.
    • (2003) Int. J. Op. and Prod. Manage. , vol.23 , pp. 418-429
    • Schniederjans, M.J.1    Kim, G.C.2
  • 88
    • 0002673047 scopus 로고    scopus 로고
    • An exposition of multiple constraint scheduling as implemented in the goal system (formerly disaster)
    • Simons, J.V. and Simpson, III, W.P., An exposition of multiple constraint scheduling as implemented in the goal system (formerly disaster). Prod. and Oper. Manage., 1997, 6, 3-22.
    • (1997) Prod. and Oper. Manage. , vol.6 , pp. 3-22
    • Simons, J.V.1    Simpson III, W.P.2
  • 89
    • 0011755560 scopus 로고
    • Modelling and analysis of just-in-time manufacturing systems: A review
    • Singh, N. and Brar, J.K., Modelling and analysis of just-in-time manufacturing systems: a review. Int. J. Op. and Prod. Manage., 1992, 12, 3-19.
    • (1992) Int. J. Op. and Prod. Manage. , vol.12 , pp. 3-19
    • Singh, N.1    Brar, J.K.2
  • 90
    • 0042044389 scopus 로고    scopus 로고
    • Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment
    • Smet, R.D. and Gelders, L., Using simulation to evaluate the introduction of a Kanban subsystem within an MRP-controlled manufacturing environment. Int. J. Prod. Econ., 1998, 56/57, 111-122.
    • (1998) Int. J. Prod. Econ. , vol.56-57 , pp. 111-122
    • Smet, R.D.1    Gelders, L.2
  • 91
    • 2642516348 scopus 로고    scopus 로고
    • Combined make-to-order and make-to-stock in a food production system
    • in press
    • Soman, C.A., Van Donk, D.P. and Gaalman, G., Combined make-to-order and make-to-stock in a food production system. Int. J. Prod. Econ., 2004 (in press).
    • (2004) Int. J. Prod. Econ.
    • Soman, C.A.1    Van Donk, D.P.2    Gaalman, G.3
  • 92
    • 0037211515 scopus 로고    scopus 로고
    • Successful implementation of advanced manufacturing technology: A cross sectional survey
    • Sower, V.E. and Abshire, R.D., Successful implementation of advanced manufacturing technology: a cross sectional survey. Int. J. Com. Appl. in Tech., 2003, 16, 12-20.
    • (2003) Int. J. Com. Appl. in Tech. , vol.16 , pp. 12-20
    • Sower, V.E.1    Abshire, R.D.2
  • 93
    • 0000170779 scopus 로고
    • A hierarchical control architecture for CONWIP production systems
    • Spearman, M.L., Hopp, W.J. and Woodruff, D.L., A hierarchical control architecture for CONWIP production systems. J. Manuf. and Oper. Manage., 1989, 2, 147-171.
    • (1989) J. Manuf. and Oper. Manage. , vol.2 , pp. 147-171
    • Spearman, M.L.1    Hopp, W.J.2    Woodruff, D.L.3
  • 95
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparisons
    • Spearman, M.L. and Zazanis, M.A., Push and pull production systems: issues and comparisons. Oper. Res., 1992, 40, 521-532.
    • (1992) Oper. Res. , vol.40 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2
  • 96
    • 3543084481 scopus 로고    scopus 로고
    • Product customisation and manufacturing strategy
    • Spring, M. and Dalrymple, J., Product customisation and manufacturing strategy. Int. J. Op. and Prod. Manage., 2000, 20, 441-467.
    • (2000) Int. J. Op. and Prod. Manage. , vol.20 , pp. 441-467
    • Spring, M.1    Dalrymple, J.2
  • 97
    • 27744518733 scopus 로고    scopus 로고
    • How quick response manufacturing takes the wait out
    • Suri, R., How quick response manufacturing takes the wait out. J. Qual. and Part. 1999, 22, 46.
    • (1999) J. Qual. and Part. , vol.22 , pp. 46
    • Suri, R.1
  • 98
    • 0035898986 scopus 로고    scopus 로고
    • An adaptive approach to controlling Kanban systems
    • Tardif, V. and Maaseidvaag, L., An adaptive approach to controlling Kanban systems. Euro. J. Op. Res., 2001, 132, 411-424.
    • (2001) Euro. J. Op. Res. , vol.132 , pp. 411-424
    • Tardif, V.1    Maaseidvaag, L.2
  • 99
    • 27744510204 scopus 로고    scopus 로고
    • What kind of 'numbers' can a company expect after implementing quick response manufacturing?
    • Society of Manufacturing Engineers Press
    • Tubino, F. and Suri, R., What kind of 'numbers' can a company expect after implementing quick response manufacturing?, in Quick Response Manufacturing 2000 Conference Proceedings (Society of Manufacturing Engineers Press), 2000, pp. 943-972.
    • (2000) Quick Response Manufacturing 2000 Conference Proceedings , pp. 943-972
    • Tubino, F.1    Suri, R.2
  • 100
    • 1642381138 scopus 로고    scopus 로고
    • The effects of a simple arrival rate control policy on throughput and work-in-process in production systems with workload dependent processing rates
    • Van Ooijen, H.P.G. and Bertrand, J.W.M., The effects of a simple arrival rate control policy on throughput and work-in-process in production systems with workload dependent processing rates. Int. J. Prod. Econ., 2003, 85, 61-68.
    • (2003) Int. J. Prod. Econ. , vol.85 , pp. 61-68
    • Van Ooijen, H.P.G.1    Bertrand, J.W.M.2
  • 102
    • 0039453188 scopus 로고
    • Competitive factors and performance measurement: Applying the theory of constraints to meet customer needs
    • Wahlers, J.L. and Cox, J.F., Competitive factors and performance measurement: applying the theory of constraints to meet customer needs. Int. J. Prod. Econ., 1994, 37, 229-240.
    • (1994) Int. J. Prod. Econ. , vol.37 , pp. 229-240
    • Wahlers, J.L.1    Cox, J.F.2
  • 103
    • 0024055865 scopus 로고
    • Scheduling semiconductor wafer fabrication
    • Wein, L.M., Scheduling semiconductor wafer fabrication. IEEE Trans. on Semiconductor Manuf., 1988, 1, 115-130.
    • (1988) IEEE Trans. on Semiconductor Manuf. , vol.1 , pp. 115-130
    • Wein, L.M.1
  • 105
    • 0347600405 scopus 로고    scopus 로고
    • Enterprise information systems project implementation: A case study of ERP in Rolls-Royce
    • Yusuf, Y., Gunasekaran, A. and Abthorpe, M.S., Enterprise information systems project implementation: a case study of ERP in Rolls-Royce. Int. J. Prod. Econ., 2004, 87, 251-266.
    • (2004) Int. J. Prod. Econ. , vol.87 , pp. 251-266
    • Yusuf, Y.1    Gunasekaran, A.2    Abthorpe, M.S.3
  • 106
    • 0027609191 scopus 로고
    • New concepts for production planning and control
    • Zapfel, G. and Missbauer, H., New concepts for production planning and control. Euro. J. Oper. Res., 1993, 67, 297-320.
    • (1993) Euro. J. Oper. Res. , vol.67 , pp. 297-320
    • Zapfel, G.1    Missbauer, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.