-
1
-
-
0001643223
-
The persistence and transfer of learning in industrial settings
-
ARGOTE, L., BECKMAN, S. L., AND EPPLE, D. 1990 The persistence and transfer of learning in industrial settings, Management Science, 36, 140-154.
-
(1990)
Management Science
, vol.36
, pp. 140-154
-
-
Argote, L.1
Beckman, S.L.2
Epple, D.3
-
2
-
-
0030143357
-
Concurrent engineering: Application and implementation for U.S. shipbuilding
-
BENNETT, J. G., AND LAMB, T. 1996 Concurrent engineering: application and implementation for U.S. shipbuilding, JOURNAL OF SHIP PRODUCTION, 12, 2, 107-125.
-
(1996)
Journal of Ship Production
, vol.12
, Issue.2
, pp. 107-125
-
-
Bennett, J.G.1
Lamb, T.2
-
3
-
-
0026939536
-
SEAWOLF design for modular construction
-
BEVINS S. E, CLEMENS, C. F. JR., KING, D. E, KOGER, T. H. JR., AND POLLOCK, R. R. 1992 SEAWOLF design for modular construction, Marine Technology, 29, 4, 199-232.
-
(1992)
Marine Technology
, vol.29
, Issue.4
, pp. 199-232
-
-
Bevins, S.E.1
Clemens Jr., C.F.2
King, D.E.3
Koger Jr., T.H.4
Pollock, R.R.5
-
4
-
-
0023288589
-
Comparison of the construction planning and manpower schedules for building the PD214 general mobilization ship in a U.S. shipyard and in a Japanese shipyard
-
BUNCH, H. M. 1987 Comparison of the construction planning and manpower schedules for building the PD214 general mobilization ship in a U.S. shipyard and in a Japanese shipyard, JOURNAL OF SHIP PRODUCTION, 3, 1, 25-36.
-
(1987)
Journal of Ship Production
, vol.3
, Issue.1
, pp. 25-36
-
-
Bunch, H.M.1
-
5
-
-
24344509991
-
A study of the construction planning and manpower schedules for building the multipurpose mobilization ship, PD214, in a shipyard of the People's Republic of China
-
BUNCH, H. M. 1988 A study of the construction planning and manpower schedules for building the multipurpose mobilization ship, PD214, in a shipyard of the People's Republic of China, JOURNAL OF SHIP PRODUCTION, 4, 4, 244-266.
-
(1988)
Journal of Ship Production
, vol.4
, Issue.4
, pp. 244-266
-
-
Bunch, H.M.1
-
6
-
-
0026154898
-
The application of critical path methodology to the management of ship design programs
-
CHAPPELL, J. P. 1991 The application of critical path methodology to the management of ship design programs, Marine Technology, 28, 3, 113-128.
-
(1991)
Marine Technology
, vol.28
, Issue.3
, pp. 113-128
-
-
Chappell, J.P.1
-
7
-
-
0008284319
-
-
Publication 8-1, The Construction Institute Design Task Force, Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin, July
-
1986 Evaluation of Design Effectiveness, Publication 8-1, The Construction Institute Design Task Force, Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin, July.
-
(1986)
Evaluation of Design Effectiveness
-
-
-
8
-
-
4143124332
-
-
Publication 6-10, The Construction Institute Cost/Schedule Controls Task Force, Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin, April
-
1990 The Impact of Changes on Construction Cost and Schedule, Publication 6-10, The Construction Institute Cost/Schedule Controls Task Force, Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin, April.
-
(1990)
The Impact of Changes on Construction Cost and Schedule
-
-
-
9
-
-
0001906688
-
The rework cycle: Benchmarks for the project manager
-
COOPER, K. G. 1993 The rework cycle: benchmarks for the project manager, Project Management Journal, 24, 1, 17-21.
-
(1993)
Project Management Journal
, vol.24
, Issue.1
, pp. 17-21
-
-
Cooper, K.G.1
-
10
-
-
0036671186
-
Applying lean above the factory floor
-
DROGOSZ, J. D. 2002 Applying lean above the factory floor, JOURNAL OF SHIP PRODUCTION, 18, 3, 159-166.
-
(2002)
Journal of Ship Production
, vol.18
, Issue.3
, pp. 159-166
-
-
Drogosz, J.D.1
-
11
-
-
0028494375
-
The effect of learning when building ships
-
ERICHSEN, S. 1994 The effect of learning when building ships, JOURNAL OF SHIP PRODUCTION, 10, 3, 141-145.
-
(1994)
Journal of Ship Production
, vol.10
, Issue.3
, pp. 141-145
-
-
Erichsen, S.1
-
12
-
-
24344446587
-
Rework management: A current perspective
-
FENTON, P. H. 1988 Rework management: a current perspective, JOURNAL OF SHIP PRODUCTION, 4, 2, 134-143.
-
(1988)
Journal of Ship Production
, vol.4
, Issue.2
, pp. 134-143
-
-
Fenton, P.H.1
-
13
-
-
0022104649
-
Impact of technological change on shipbuilding productivity
-
FRANKEL, E. G. 1985 Impact of technological change on shipbuilding productivity, JOURNAL OF SHIP PRODUCTION, 1, 3, 174-183.
-
(1985)
Journal of Ship Production
, vol.1
, Issue.3
, pp. 174-183
-
-
Frankel, E.G.1
-
14
-
-
0030083441
-
Economics and management of American shipbuilding and the potential for commercial competitiveness
-
FRANKEL, E. G. 1996 Economics and management of American shipbuilding and the potential for commercial competitiveness, JOURNAL OF SHIP PRODUCTION, 12, 1, 1-10.
-
(1996)
Journal of Ship Production
, vol.12
, Issue.1
, pp. 1-10
-
-
Frankel, E.G.1
-
15
-
-
0030146760
-
Analysis of competitiveness in commercial shipbuilding
-
HENGST, S., AND KOPPIES, J. D. M. 1996 Analysis of competitiveness in commercial shipbuilding, JOURNAL OF SHIP PRODUCTION, 12, 2, 73-84.
-
(1996)
Journal of Ship Production
, vol.12
, Issue.2
, pp. 73-84
-
-
Hengst, S.1
Koppies, J.D.M.2
-
16
-
-
24344472372
-
The impact of a CAD system on a project organization
-
October, Calgary, Alberta, Canada
-
HOBBS, B., AND BOUCHARD, M. 1990 The impact of a CAD system on a project organization, Project Management Institute Seminar/Symposium, October, Calgary, Alberta, Canada.
-
(1990)
Project Management Institute Seminar/Symposium
-
-
Hobbs, B.1
Bouchard, M.2
-
17
-
-
0023385477
-
A scientific approach to engineering design
-
HUBKA, V., AND EDER, W. E. 1987 A scientific approach to engineering design, Design Studies, 8, 3, 123-137.
-
(1987)
Design Studies
, vol.8
, Issue.3
, pp. 123-137
-
-
Hubka, V.1
Eder, W.E.2
-
18
-
-
4143128716
-
-
Publication 108, The Construction Industry Institute, The University of Texas at Austin, May
-
IBBS, C. W., AND ALLEN, W. E. 1995 Quantitative Impacts of Project Change, Publication 108, The Construction Industry Institute, The University of Texas at Austin, May.
-
(1995)
Quantitative Impacts of Project Change
-
-
Ibbs, C.W.1
Allen, W.E.2
-
20
-
-
0036672601
-
Lean production in the Japanese shipbuilding industry
-
KOENIG, P. C., NARITA, H., AND BABA, K. 2002 Lean production in the Japanese shipbuilding industry, JOURNAL OF SHIP PRODUCTION, 18, 3, 167-174.
-
(2002)
Journal of Ship Production
, vol.18
, Issue.3
, pp. 167-174
-
-
Koenig, P.C.1
Narita, H.2
Baba, K.3
-
21
-
-
0031108561
-
A model-based framework to overlap product development activities
-
KRISHNAN, V., EPPINGER, S. D., AND WHITNEY, D. E. 1997 A model-based framework to overlap product development activities, MANAGEMENT SCIENCE, 43, 4, 437-451.
-
(1997)
Management Science
, vol.43
, Issue.4
, pp. 437-451
-
-
Krishnan, V.1
Eppinger, S.D.2
Whitney, D.E.3
-
22
-
-
3042537660
-
Organization theory and shipbuilding: A brief overview
-
LAMB, T. 1992 Organization theory and shipbuilding: a brief overview, Marine Technology, 29, 2, 71-83.
-
(1992)
Marine Technology
, vol.29
, Issue.2
, pp. 71-83
-
-
Lamb, T.1
-
23
-
-
0032655770
-
Accelerating the process of engineering change orders: Capacity and congestion effects
-
LOCH, C. H., AND TERWIESCH, C. 1999 Accelerating the process of engineering change orders: capacity and congestion effects, Journal of Product Innovation Management, 16, 145-159.
-
(1999)
Journal of Product Innovation Management
, vol.16
, pp. 145-159
-
-
Loch, C.H.1
Terwiesch, C.2
-
24
-
-
0032140351
-
Communication and uncertainty in concurrent engineering
-
LOCH, C. H., AND TERWIESCH, C. 1998 Communication and uncertainty in concurrent engineering, Management Science, 46, 8, 1032-1048.
-
(1998)
Management Science
, vol.46
, Issue.8
, pp. 1032-1048
-
-
Loch, C.H.1
Terwiesch, C.2
-
25
-
-
24344455258
-
-
System Engineering Plan, Halifax Shipyard Ltd./Fenco MacLearn Ltd., book 2
-
MARITIME COASTAL DEFENCE VESSEL PROGRAM CONTRACT SPECIFICATION. 1992 System Engineering Plan, Halifax Shipyard Ltd./Fenco MacLearn Ltd., vol. 3, book 2.
-
(1992)
Maritime Coastal Defence Vessel Program Contract Specification
, vol.3
-
-
-
27
-
-
0042305926
-
-
Institute for Research in Construction, Ottawa, Canada
-
NATIONAL RESEARCH COUNCIL OF CANADA. 1993 Productivity in Construction, Institute for Research in Construction, Ottawa, Canada.
-
(1993)
Productivity in Construction
-
-
-
28
-
-
24344471860
-
Managing project change
-
Project Management Institute, New Orleans, LA
-
SALERNO, V. 1995 Managing project change, 26th Annual Seminar/Symposium, Project Management Institute, New Orleans, LA.
-
(1995)
26th Annual Seminar/Symposium
-
-
Salerno, V.1
-
29
-
-
0031199079
-
A predictive model of sequential iteration in engineering design
-
SMITH, R. P., AND EPPINGER, S. D. 1997a A predictive model of sequential iteration in engineering design, Management Science, 43, 8, 1104-1120.
-
(1997)
Management Science
, vol.43
, Issue.8
, pp. 1104-1120
-
-
Smith, R.P.1
Eppinger, S.D.2
-
30
-
-
0031084622
-
Identifying controlling features of engineering design iteration
-
SMITH, R. P., AND EPPINGER, S. D. 1997b Identifying controlling features of engineering design iteration, Management Science, 43, 276-293.
-
(1997)
Management Science
, vol.43
, pp. 276-293
-
-
Smith, R.P.1
Eppinger, S.D.2
-
32
-
-
0036864292
-
Development of repeatable interim products utilizing the common generic block concept
-
STORCH, R. L., AND SUKAPANPOTHARAM, S. 2002 Development of repeatable interim products utilizing the common generic block concept, JOURNAL OF SHIP PRODUCTION, 18, 4, 195-202.
-
(2002)
Journal of Ship Production
, vol.18
, Issue.4
, pp. 195-202
-
-
Storch, R.L.1
Sukapanpotharam, S.2
-
33
-
-
0022106282
-
Considerations regarding improved productivity based upon experience for series production of merchant ships
-
SVERDRUP, C. F. 1985 Considerations regarding improved productivity based upon experience for series production of merchant ships, JOURNAL OF SHIP PRODUCTION, 1, 3, 149-156.
-
(1985)
Journal of Ship Production
, vol.1
, Issue.3
, pp. 149-156
-
-
Sverdrup, C.F.1
-
34
-
-
0032665573
-
Managing the process of engineering change orders: The case of the climate control system in automobile development
-
TERWIESCH, C., AND LOCH, C. H. 1999 Managing the process of engineering change orders: the case of the climate control system in automobile development, Journal of Product and Innovative Management, 16, 160-172.
-
(1999)
Journal of Product and Innovative Management
, vol.16
, pp. 160-172
-
-
Terwiesch, C.1
Loch, C.H.2
-
35
-
-
0003494672
-
-
The Free Press, Maxwell Macmillan, Canada
-
WHEELWRIGHT, S. C., AND CLARK, K. B. 1992 Revolutionizing Product Development, The Free Press, Maxwell Macmillan, Canada.
-
(1992)
Revolutionizing Product Development
-
-
Wheelwright, S.C.1
Clark, K.B.2
|