메뉴 건너뛰기




Volumn 21, Issue 3, 2005, Pages 186-194

Factors affecting ship design and construction lead time and cost

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION; COSTS; INTEGRATION; PROFESSIONAL ASPECTS;

EID: 24344485381     PISSN: 87561417     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (20)

References (35)
  • 1
    • 0001643223 scopus 로고
    • The persistence and transfer of learning in industrial settings
    • ARGOTE, L., BECKMAN, S. L., AND EPPLE, D. 1990 The persistence and transfer of learning in industrial settings, Management Science, 36, 140-154.
    • (1990) Management Science , vol.36 , pp. 140-154
    • Argote, L.1    Beckman, S.L.2    Epple, D.3
  • 2
    • 0030143357 scopus 로고    scopus 로고
    • Concurrent engineering: Application and implementation for U.S. shipbuilding
    • BENNETT, J. G., AND LAMB, T. 1996 Concurrent engineering: application and implementation for U.S. shipbuilding, JOURNAL OF SHIP PRODUCTION, 12, 2, 107-125.
    • (1996) Journal of Ship Production , vol.12 , Issue.2 , pp. 107-125
    • Bennett, J.G.1    Lamb, T.2
  • 4
    • 0023288589 scopus 로고
    • Comparison of the construction planning and manpower schedules for building the PD214 general mobilization ship in a U.S. shipyard and in a Japanese shipyard
    • BUNCH, H. M. 1987 Comparison of the construction planning and manpower schedules for building the PD214 general mobilization ship in a U.S. shipyard and in a Japanese shipyard, JOURNAL OF SHIP PRODUCTION, 3, 1, 25-36.
    • (1987) Journal of Ship Production , vol.3 , Issue.1 , pp. 25-36
    • Bunch, H.M.1
  • 5
    • 24344509991 scopus 로고
    • A study of the construction planning and manpower schedules for building the multipurpose mobilization ship, PD214, in a shipyard of the People's Republic of China
    • BUNCH, H. M. 1988 A study of the construction planning and manpower schedules for building the multipurpose mobilization ship, PD214, in a shipyard of the People's Republic of China, JOURNAL OF SHIP PRODUCTION, 4, 4, 244-266.
    • (1988) Journal of Ship Production , vol.4 , Issue.4 , pp. 244-266
    • Bunch, H.M.1
  • 6
    • 0026154898 scopus 로고
    • The application of critical path methodology to the management of ship design programs
    • CHAPPELL, J. P. 1991 The application of critical path methodology to the management of ship design programs, Marine Technology, 28, 3, 113-128.
    • (1991) Marine Technology , vol.28 , Issue.3 , pp. 113-128
    • Chappell, J.P.1
  • 7
    • 0008284319 scopus 로고
    • Publication 8-1, The Construction Institute Design Task Force, Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin, July
    • 1986 Evaluation of Design Effectiveness, Publication 8-1, The Construction Institute Design Task Force, Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin, July.
    • (1986) Evaluation of Design Effectiveness
  • 8
    • 4143124332 scopus 로고
    • Publication 6-10, The Construction Institute Cost/Schedule Controls Task Force, Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin, April
    • 1990 The Impact of Changes on Construction Cost and Schedule, Publication 6-10, The Construction Institute Cost/Schedule Controls Task Force, Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin, April.
    • (1990) The Impact of Changes on Construction Cost and Schedule
  • 9
    • 0001906688 scopus 로고
    • The rework cycle: Benchmarks for the project manager
    • COOPER, K. G. 1993 The rework cycle: benchmarks for the project manager, Project Management Journal, 24, 1, 17-21.
    • (1993) Project Management Journal , vol.24 , Issue.1 , pp. 17-21
    • Cooper, K.G.1
  • 10
    • 0036671186 scopus 로고    scopus 로고
    • Applying lean above the factory floor
    • DROGOSZ, J. D. 2002 Applying lean above the factory floor, JOURNAL OF SHIP PRODUCTION, 18, 3, 159-166.
    • (2002) Journal of Ship Production , vol.18 , Issue.3 , pp. 159-166
    • Drogosz, J.D.1
  • 11
    • 0028494375 scopus 로고
    • The effect of learning when building ships
    • ERICHSEN, S. 1994 The effect of learning when building ships, JOURNAL OF SHIP PRODUCTION, 10, 3, 141-145.
    • (1994) Journal of Ship Production , vol.10 , Issue.3 , pp. 141-145
    • Erichsen, S.1
  • 12
    • 24344446587 scopus 로고
    • Rework management: A current perspective
    • FENTON, P. H. 1988 Rework management: a current perspective, JOURNAL OF SHIP PRODUCTION, 4, 2, 134-143.
    • (1988) Journal of Ship Production , vol.4 , Issue.2 , pp. 134-143
    • Fenton, P.H.1
  • 13
    • 0022104649 scopus 로고
    • Impact of technological change on shipbuilding productivity
    • FRANKEL, E. G. 1985 Impact of technological change on shipbuilding productivity, JOURNAL OF SHIP PRODUCTION, 1, 3, 174-183.
    • (1985) Journal of Ship Production , vol.1 , Issue.3 , pp. 174-183
    • Frankel, E.G.1
  • 14
    • 0030083441 scopus 로고    scopus 로고
    • Economics and management of American shipbuilding and the potential for commercial competitiveness
    • FRANKEL, E. G. 1996 Economics and management of American shipbuilding and the potential for commercial competitiveness, JOURNAL OF SHIP PRODUCTION, 12, 1, 1-10.
    • (1996) Journal of Ship Production , vol.12 , Issue.1 , pp. 1-10
    • Frankel, E.G.1
  • 15
    • 0030146760 scopus 로고    scopus 로고
    • Analysis of competitiveness in commercial shipbuilding
    • HENGST, S., AND KOPPIES, J. D. M. 1996 Analysis of competitiveness in commercial shipbuilding, JOURNAL OF SHIP PRODUCTION, 12, 2, 73-84.
    • (1996) Journal of Ship Production , vol.12 , Issue.2 , pp. 73-84
    • Hengst, S.1    Koppies, J.D.M.2
  • 16
    • 24344472372 scopus 로고
    • The impact of a CAD system on a project organization
    • October, Calgary, Alberta, Canada
    • HOBBS, B., AND BOUCHARD, M. 1990 The impact of a CAD system on a project organization, Project Management Institute Seminar/Symposium, October, Calgary, Alberta, Canada.
    • (1990) Project Management Institute Seminar/Symposium
    • Hobbs, B.1    Bouchard, M.2
  • 17
    • 0023385477 scopus 로고
    • A scientific approach to engineering design
    • HUBKA, V., AND EDER, W. E. 1987 A scientific approach to engineering design, Design Studies, 8, 3, 123-137.
    • (1987) Design Studies , vol.8 , Issue.3 , pp. 123-137
    • Hubka, V.1    Eder, W.E.2
  • 18
    • 4143128716 scopus 로고
    • Publication 108, The Construction Industry Institute, The University of Texas at Austin, May
    • IBBS, C. W., AND ALLEN, W. E. 1995 Quantitative Impacts of Project Change, Publication 108, The Construction Industry Institute, The University of Texas at Austin, May.
    • (1995) Quantitative Impacts of Project Change
    • Ibbs, C.W.1    Allen, W.E.2
  • 20
    • 0036672601 scopus 로고    scopus 로고
    • Lean production in the Japanese shipbuilding industry
    • KOENIG, P. C., NARITA, H., AND BABA, K. 2002 Lean production in the Japanese shipbuilding industry, JOURNAL OF SHIP PRODUCTION, 18, 3, 167-174.
    • (2002) Journal of Ship Production , vol.18 , Issue.3 , pp. 167-174
    • Koenig, P.C.1    Narita, H.2    Baba, K.3
  • 21
    • 0031108561 scopus 로고    scopus 로고
    • A model-based framework to overlap product development activities
    • KRISHNAN, V., EPPINGER, S. D., AND WHITNEY, D. E. 1997 A model-based framework to overlap product development activities, MANAGEMENT SCIENCE, 43, 4, 437-451.
    • (1997) Management Science , vol.43 , Issue.4 , pp. 437-451
    • Krishnan, V.1    Eppinger, S.D.2    Whitney, D.E.3
  • 22
    • 3042537660 scopus 로고
    • Organization theory and shipbuilding: A brief overview
    • LAMB, T. 1992 Organization theory and shipbuilding: a brief overview, Marine Technology, 29, 2, 71-83.
    • (1992) Marine Technology , vol.29 , Issue.2 , pp. 71-83
    • Lamb, T.1
  • 23
    • 0032655770 scopus 로고    scopus 로고
    • Accelerating the process of engineering change orders: Capacity and congestion effects
    • LOCH, C. H., AND TERWIESCH, C. 1999 Accelerating the process of engineering change orders: capacity and congestion effects, Journal of Product Innovation Management, 16, 145-159.
    • (1999) Journal of Product Innovation Management , vol.16 , pp. 145-159
    • Loch, C.H.1    Terwiesch, C.2
  • 24
    • 0032140351 scopus 로고    scopus 로고
    • Communication and uncertainty in concurrent engineering
    • LOCH, C. H., AND TERWIESCH, C. 1998 Communication and uncertainty in concurrent engineering, Management Science, 46, 8, 1032-1048.
    • (1998) Management Science , vol.46 , Issue.8 , pp. 1032-1048
    • Loch, C.H.1    Terwiesch, C.2
  • 25
    • 24344455258 scopus 로고
    • System Engineering Plan, Halifax Shipyard Ltd./Fenco MacLearn Ltd., book 2
    • MARITIME COASTAL DEFENCE VESSEL PROGRAM CONTRACT SPECIFICATION. 1992 System Engineering Plan, Halifax Shipyard Ltd./Fenco MacLearn Ltd., vol. 3, book 2.
    • (1992) Maritime Coastal Defence Vessel Program Contract Specification , vol.3
  • 27
    • 0042305926 scopus 로고
    • Institute for Research in Construction, Ottawa, Canada
    • NATIONAL RESEARCH COUNCIL OF CANADA. 1993 Productivity in Construction, Institute for Research in Construction, Ottawa, Canada.
    • (1993) Productivity in Construction
  • 28
    • 24344471860 scopus 로고
    • Managing project change
    • Project Management Institute, New Orleans, LA
    • SALERNO, V. 1995 Managing project change, 26th Annual Seminar/Symposium, Project Management Institute, New Orleans, LA.
    • (1995) 26th Annual Seminar/Symposium
    • Salerno, V.1
  • 29
    • 0031199079 scopus 로고    scopus 로고
    • A predictive model of sequential iteration in engineering design
    • SMITH, R. P., AND EPPINGER, S. D. 1997a A predictive model of sequential iteration in engineering design, Management Science, 43, 8, 1104-1120.
    • (1997) Management Science , vol.43 , Issue.8 , pp. 1104-1120
    • Smith, R.P.1    Eppinger, S.D.2
  • 30
    • 0031084622 scopus 로고    scopus 로고
    • Identifying controlling features of engineering design iteration
    • SMITH, R. P., AND EPPINGER, S. D. 1997b Identifying controlling features of engineering design iteration, Management Science, 43, 276-293.
    • (1997) Management Science , vol.43 , pp. 276-293
    • Smith, R.P.1    Eppinger, S.D.2
  • 32
    • 0036864292 scopus 로고    scopus 로고
    • Development of repeatable interim products utilizing the common generic block concept
    • STORCH, R. L., AND SUKAPANPOTHARAM, S. 2002 Development of repeatable interim products utilizing the common generic block concept, JOURNAL OF SHIP PRODUCTION, 18, 4, 195-202.
    • (2002) Journal of Ship Production , vol.18 , Issue.4 , pp. 195-202
    • Storch, R.L.1    Sukapanpotharam, S.2
  • 33
    • 0022106282 scopus 로고
    • Considerations regarding improved productivity based upon experience for series production of merchant ships
    • SVERDRUP, C. F. 1985 Considerations regarding improved productivity based upon experience for series production of merchant ships, JOURNAL OF SHIP PRODUCTION, 1, 3, 149-156.
    • (1985) Journal of Ship Production , vol.1 , Issue.3 , pp. 149-156
    • Sverdrup, C.F.1
  • 34
    • 0032665573 scopus 로고    scopus 로고
    • Managing the process of engineering change orders: The case of the climate control system in automobile development
    • TERWIESCH, C., AND LOCH, C. H. 1999 Managing the process of engineering change orders: the case of the climate control system in automobile development, Journal of Product and Innovative Management, 16, 160-172.
    • (1999) Journal of Product and Innovative Management , vol.16 , pp. 160-172
    • Terwiesch, C.1    Loch, C.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.