메뉴 건너뛰기




Volumn 167, Issue , 2015, Pages 187-203

Tactical capacity planning in a real-world ETO industry case: An action research

Author keywords

Aggregate production planning; Decision support system; Engineer to order; Mathematical programming

Indexed keywords

DECISION MAKING; MATHEMATICAL PROGRAMMING; PRODUCTION CONTROL;

EID: 84937399331     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2015.05.032     Document Type: Article
Times cited : (51)

References (63)
  • 1
    • 78650226885 scopus 로고    scopus 로고
    • A project scheduling approach to production planning with feeding precedence relations
    • A. Alfieri, T. Tolio, and M. Urgo A project scheduling approach to production planning with feeding precedence relations Int. J. Prod. Res. 49 4 2011 995 1020
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.4 , pp. 995-1020
    • Alfieri, A.1    Tolio, T.2    Urgo, M.3
  • 2
    • 84865351186 scopus 로고    scopus 로고
    • A two-stage stochastic programming project scheduling approach to production planning
    • A. Alfieri, T. Tolio, and M. Urgo A two-stage stochastic programming project scheduling approach to production planning Int. J. Adv. Manuf. Technol. 62 1-4 2012 279 290
    • (2012) Int. J. Adv. Manuf. Technol. , vol.62 , Issue.1-4 , pp. 279-290
    • Alfieri, A.1    Tolio, T.2    Urgo, M.3
  • 3
    • 38049077958 scopus 로고    scopus 로고
    • Tactical capacity management under capacity flexibility
    • O. Alp, and T. Tan Tactical capacity management under capacity flexibility IIE Trans. 40 3 2008 221 237
    • (2008) IIE Trans. , vol.40 , Issue.3 , pp. 221-237
    • Alp, O.1    Tan, T.2
  • 4
    • 84875747214 scopus 로고    scopus 로고
    • Integrated production planning and order acceptance under uncertainty: A robust optimization approach
    • T. Aouam, and N. Brahimi Integrated production planning and order acceptance under uncertainty: a robust optimization approach Eur. J. Oper. Res. 228 2013 504 515
    • (2013) Eur. J. Oper. Res. , vol.228 , pp. 504-515
    • Aouam, T.1    Brahimi, N.2
  • 5
    • 84937435923 scopus 로고    scopus 로고
    • Mixed-integer linear programming formulations
    • C. Schwindt, J. Zimmermann, Springer International Publishing Switzerland Vol. 1
    • C. Artigues, O. Kone, P. Lopez, and M. Mongea Mixed-integer linear programming formulations C. Schwindt, J. Zimmermann, Handbook on Project Management and Scheduling 2015 Springer International Publishing Switzerland 17 41 Vol. 1
    • (2015) Handbook on Project Management and Scheduling , pp. 17-41
    • Artigues, C.1    Kone, O.2    Lopez, P.3    Mongea, M.4
  • 6
    • 84863609307 scopus 로고    scopus 로고
    • Enterprise resource planning systems: An assessment of applicability to Make-To-Order companies
    • B. Aslan, M. Stevenson, and L. Hendry Enterprise resource planning systems: an assessment of applicability to Make-To-Order companies Comput. Ind. 63 2012 692 705
    • (2012) Comput. Ind. , vol.63 , pp. 692-705
    • Aslan, B.1    Stevenson, M.2    Hendry, L.3
  • 7
    • 51649088689 scopus 로고    scopus 로고
    • Resource leveling in Make-to-Order production: Modeling and Heuristic Solution Method
    • F. Ballestin, C. Schwindt, and J. Zimmermann Resource leveling in Make-to-Order production: modeling and Heuristic Solution Method Int. J. Oper. Res. 4 1 2007 1 13
    • (2007) Int. J. Oper. Res. , vol.4 , Issue.1 , pp. 1-13
    • Ballestin, F.1    Schwindt, C.2    Zimmermann, J.3
  • 8
    • 0027628028 scopus 로고
    • Production control in engineer-to-order firms
    • J.W.M. Bertrand, and D.R. Muntslag Production control in engineer-to-order firms Int. J. Prod. Econ. 30-31 1993 3 22
    • (1993) Int. J. Prod. Econ. , vol.30-31 , pp. 3-22
    • Bertrand, J.W.M.1    Muntslag, D.R.2
  • 9
    • 84856526941 scopus 로고    scopus 로고
    • Minimizing the completion time of a project under resource constraints and feeding precedence relations: A Lagrangian relaxation based lower bound
    • University of Rome Tor Vergata, 4OR, forthcoming
    • Bianco, L., Caramia, M., 2011. Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound. Technical report DII 03-09, University of Rome Tor Vergata, 4OR, forthcoming.
    • (2011) Technical Report DII 03-09
    • Bianco, L.1    Caramia, M.2
  • 10
    • 84856537184 scopus 로고    scopus 로고
    • An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
    • L. Bianco, and M. Caramia An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations Eur. J. Oper. Res. 219 2012 73 85
    • (2012) Eur. J. Oper. Res. , vol.219 , pp. 73-85
    • Bianco, L.1    Caramia, M.2
  • 11
    • 84892920143 scopus 로고    scopus 로고
    • Convex optimization for aggregate production planning
    • M. Bushuev Convex optimization for aggregate production planning Int. J. Prod. Res. 52 4 2014 1050 1058
    • (2014) Int. J. Prod. Res. , vol.52 , Issue.4 , pp. 1050-1058
    • Bushuev, M.1
  • 12
    • 0037810482 scopus 로고    scopus 로고
    • Strategy not tactics drives aggregate planning
    • G. Buxey Strategy not tactics drives aggregate planning Int. J. Prod. Econ. 85 2003 331 346
    • (2003) Int. J. Prod. Econ. , vol.85 , pp. 331-346
    • Buxey, G.1
  • 13
    • 27144435498 scopus 로고    scopus 로고
    • Aggregate planning for seasonal demand: Reconciling theory with practice
    • G. Buxey Aggregate planning for seasonal demand: reconciling theory with practice Int. J. Oper. Prod. Manag. 25 11 2005 1083 1100
    • (2005) Int. J. Oper. Prod. Manag. , vol.25 , Issue.11 , pp. 1083-1100
    • Buxey, G.1
  • 14
    • 33748757057 scopus 로고    scopus 로고
    • A capacity-driven approach to establish reliable due dates in a MTO environment
    • D. Corti, A. Pozzetti, and M. Zorzini A capacity-driven approach to establish reliable due dates in a MTO environment Int. J. Prod. Econ. 104 2006 536 554
    • (2006) Int. J. Prod. Econ. , vol.104 , pp. 536-554
    • Corti, D.1    Pozzetti, A.2    Zorzini, M.3
  • 15
    • 0036017718 scopus 로고    scopus 로고
    • Action research for operations management
    • P. Coughlan, and D. Coghlan Action research for operations management Int. J. Oper. Prod. Manag. 22 2 2002 220 240
    • (2002) Int. J. Oper. Prod. Manag. , vol.22 , Issue.2 , pp. 220-240
    • Coughlan, P.1    Coghlan, D.2
  • 16
    • 15244355696 scopus 로고    scopus 로고
    • Workload based order acceptance in job shop environments
    • M.J.R. Ebben, E.W. Hans, and F.M.O. Weghuis Workload based order acceptance in job shop environments OR Spectr. 27 2005 107 122
    • (2005) OR Spectr. , vol.27 , pp. 107-122
    • Ebben, M.J.R.1    Hans, E.W.2    Weghuis, F.M.O.3
  • 17
    • 11844264822 scopus 로고    scopus 로고
    • Linear-programming-based heuristics for project capacity planning
    • N. Gademann, and M. Schutten Linear-programming-based heuristics for project capacity planning IIE Trans. 37 2005 153 165
    • (2005) IIE Trans. , vol.37 , pp. 153-165
    • Gademann, N.1    Schutten, M.2
  • 19
    • 70350568663 scopus 로고    scopus 로고
    • Engineer-to-order supply chain management: A literature review and research agenda
    • J. Gosling, and M. Naim Engineer-to-order supply chain management: a literature review and research agenda Int. J. Prod. Econ. 122 2009 741 754
    • (2009) Int. J. Prod. Econ. , vol.122 , pp. 741-754
    • Gosling, J.1    Naim, M.2
  • 20
    • 84885849174 scopus 로고    scopus 로고
    • Determining job complexity in an engineer-to-order environment for due date estimation using a proposed framework
    • D.H. Grabenstetter, and J.M. Usher Determining job complexity in an engineer-to-order environment for due date estimation using a proposed framework Int. J. Prod. Res. 51 19 2013 5728 5740
    • (2013) Int. J. Prod. Res. , vol.51 , Issue.19 , pp. 5728-5740
    • Grabenstetter, D.H.1    Usher, J.M.2
  • 22
    • 33751531856 scopus 로고    scopus 로고
    • A hierarchical approach to multi-project planning under uncertainty
    • E.W. Hans, W. Herroelen, R. Leus, and G. Wullink A hierarchical approach to multi-project planning under uncertainty Omega 35 2007 563 577
    • (2007) Omega , vol.35 , pp. 563-577
    • Hans, E.W.1    Herroelen, W.2    Leus, R.3    Wullink, G.4
  • 23
    • 0034672925 scopus 로고    scopus 로고
    • Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach
    • C. Hicks, and P.M. Braiden Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach Int. J. Prod. Res. 38 18 2000 4783 4810
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.18 , pp. 4783-4810
    • Hicks, C.1    Braiden, P.M.2
  • 24
    • 0033878455 scopus 로고    scopus 로고
    • Supply chain management: A strategic issue in engineer-to-order manufacturing
    • C. Hicks, T. McGovern, and C.F. Earl Supply chain management: a strategic issue in engineer-to-order manufacturing Int. J. Prod. Econ. 65 2000 179 190
    • (2000) Int. J. Prod. Econ. , vol.65 , pp. 179-190
    • Hicks, C.1    McGovern, T.2    Earl, C.F.3
  • 25
    • 79957514950 scopus 로고    scopus 로고
    • Integrated order selection and production scheduling under MTO strategy
    • S. Huang, M. Lu, and G. Wan Integrated order selection and production scheduling under MTO strategy Int. J. Prod. Res. 49 13 2011 4085 4101
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.13 , pp. 4085-4101
    • Huang, S.1    Lu, M.2    Wan, G.3
  • 27
    • 84877999570 scopus 로고    scopus 로고
    • A simulation testing and analysis of aggregate production planning strategies
    • A. Jamalnia, and A. Feili A simulation testing and analysis of aggregate production planning strategies Prod. Plan. Control: Manag. Oper. 24 6 2013 423 448
    • (2013) Prod. Plan. Control: Manag. Oper. , vol.24 , Issue.6 , pp. 423-448
    • Jamalnia, A.1    Feili, A.2
  • 28
    • 78549271643 scopus 로고    scopus 로고
    • A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems
    • M. Kalantari, M. Rabbani, and M. Ebadian A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems Appl. Math. Model. 35 2011 1363 1377
    • (2011) Appl. Math. Model. , vol.35 , pp. 1363-1377
    • Kalantari, M.1    Rabbani, M.2    Ebadian, M.3
  • 29
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • B.G. Kingsman Modelling input-output workload control for dynamic capacity planning in production planning systems Int. J. Prod. Econ. 68 2000 73 93
    • (2000) Int. J. Prod. Econ. , vol.68 , pp. 73-93
    • Kingsman, B.G.1
  • 30
    • 21644447132 scopus 로고    scopus 로고
    • A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
    • T. Kis A branch-and-cut algorithm for scheduling of projects with variable-intensity activities Math. Program. 103 3 2005 515 539
    • (2005) Math. Program. , vol.103 , Issue.3 , pp. 515-539
    • Kis, T.1
  • 31
    • 84883890682 scopus 로고    scopus 로고
    • Modelling of flexibility costs in a decision support system for midterm capacity planning
    • L. Lingitz, C. Morawetz, D.T. Gigloo, S. Minner, and W. Sihn Modelling of flexibility costs in a decision support system for midterm capacity planning Proc. CIRP 7 2013 539 544
    • (2013) Proc. CIRP , vol.7 , pp. 539-544
    • Lingitz, L.1    Morawetz, C.2    Gigloo, D.T.3    Minner, S.4    Sihn, W.5
  • 32
  • 33
    • 77956408059 scopus 로고    scopus 로고
    • Planning working time accounts under demand uncertainty
    • A. Lusa, and R. Pastor Planning working time accounts under demand uncertainty Comput. Oper. Res. 38 2011 517 524
    • (2011) Comput. Oper. Res. , vol.38 , pp. 517-524
    • Lusa, A.1    Pastor, R.2
  • 34
    • 0042343670 scopus 로고    scopus 로고
    • Project schedulling approach to production planning
    • A. Markus, J. Vancza, T. Kis, and A. Kovacs Project schedulling approach to production planning Ann. CIRP 52 1 2003 359 362
    • (2003) Ann. CIRP , vol.52 , Issue.1 , pp. 359-362
    • Markus, A.1    Vancza, J.2    Kis, T.3    Kovacs, A.4
  • 35
    • 79952191672 scopus 로고    scopus 로고
    • A branch and price solution approach for order acceptance and capacity planning in make-to-order operations
    • S. Mestry, P. Damodaran, and C. Chen A branch and price solution approach for order acceptance and capacity planning in make-to-order operations Eur. J. Oper. Res. 211 2011 480 495
    • (2011) Eur. J. Oper. Res. , vol.211 , pp. 480-495
    • Mestry, S.1    Damodaran, P.2    Chen, C.3
  • 36
    • 70749115681 scopus 로고    scopus 로고
    • Workload-dependent capacity control in production-to-order systems
    • G. Mincsovics, and N. Dellaert Workload-dependent capacity control in production-to-order systems IIE Trans. 41 10 2009 853 865
    • (2009) IIE Trans. , vol.41 , Issue.10 , pp. 853-865
    • Mincsovics, G.1    Dellaert, N.2
  • 39
    • 0026928408 scopus 로고
    • Aggregate production planning - A survey of models and methodologies
    • S.J. Nam, and R. Logendran Aggregate production planning - a survey of models and methodologies Eur. J. Oper. Res. 61 1992 255 272
    • (1992) Eur. J. Oper. Res. , vol.61 , pp. 255-272
    • Nam, S.J.1    Logendran, R.2
  • 40
    • 0036461438 scopus 로고    scopus 로고
    • Project scheduling with inventory constraints
    • K. Neumann, and C. Schwindt Project scheduling with inventory constraints Math. Methods Oper. Res. 56 2002 513 533
    • (2002) Math. Methods Oper. Res. , vol.56 , pp. 513-533
    • Neumann, K.1    Schwindt, C.2
  • 41
    • 0034559447 scopus 로고    scopus 로고
    • Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
    • K. Neumann, and J. Zimmermann Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints Eur. J. Oper. Res. 127 2000 425 443
    • (2000) Eur. J. Oper. Res. , vol.127 , pp. 425-443
    • Neumann, K.1    Zimmermann, J.2
  • 43
    • 84856520172 scopus 로고    scopus 로고
    • Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of Service Centres
    • S. Quintanilla, A. Pérez, P. Lino, and V. Valls Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of Service Centres Eur. J. Oper. Res. 219 2012 59 72
    • (2012) Eur. J. Oper. Res. , vol.219 , pp. 59-72
    • Quintanilla, S.1    Pérez, A.2    Lino, P.3    Valls, V.4
  • 44
    • 84861623898 scopus 로고    scopus 로고
    • A risk management-based approach for inventory planning of engineering-to-order production
    • A.M. Radke, and M.M. Tseng A risk management-based approach for inventory planning of engineering-to-order production CIRP Ann. - Manuf. Technol. 61 2012 387 390
    • (2012) CIRP Ann. - Manuf. Technol. , vol.61 , pp. 387-390
    • Radke, A.M.1    Tseng, M.M.2
  • 45
    • 84929297631 scopus 로고    scopus 로고
    • A risk management-based evaluation of inventory allocations for make-to-order production
    • A.M. Radke, T. Tolio, M.M. Tseng, and M. Urgo A risk management-based evaluation of inventory allocations for make-to-order production CIRP Ann. Manuf. Technol. 62 1 2013 459 462
    • (2013) CIRP Ann. Manuf. Technol. , vol.62 , Issue.1 , pp. 459-462
    • Radke, A.M.1    Tolio, T.2    Tseng, M.M.3    Urgo, M.4
  • 46
    • 81855209005 scopus 로고    scopus 로고
    • An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search
    • R. Ramezanian, D. Rahmani, and F. Barzinpour An aggregate production planning model for two phase production systems: solving with genetic algorithm and tabu search Expert Syst. Appl. 39 2012 1256 1263
    • (2012) Expert Syst. Appl. , vol.39 , pp. 1256-1263
    • Ramezanian, R.1    Rahmani, D.2    Barzinpour, F.3
  • 47
    • 84860241716 scopus 로고    scopus 로고
    • Mixed-integer linear programming for resource leveling problems
    • J. Rieck, J. Zimmermann, and T. Gather Mixed-integer linear programming for resource leveling problems Eur. J. Oper. Res. 221 2012 27 37
    • (2012) Eur. J. Oper. Res. , vol.221 , pp. 27-37
    • Rieck, J.1    Zimmermann, J.2    Gather, T.3
  • 48
    • 56549109952 scopus 로고    scopus 로고
    • Order acceptance using genetic algorithms
    • W.O. Rom, and S.A. Slotnick Order acceptance using genetic algorithms Comput. Oper. Res. 36 2009 1758 1767
    • (2009) Comput. Oper. Res. , vol.36 , pp. 1758-1767
    • Rom, W.O.1    Slotnick, S.A.2
  • 49
    • 70449595763 scopus 로고    scopus 로고
    • Multi-objective due-date setting in a make-to-order environment
    • T. Sawik Multi-objective due-date setting in a make-to-order environment Int. J. Prod. Res. 47 22 2009 6205 6231
    • (2009) Int. J. Prod. Res. , vol.47 , Issue.22 , pp. 6205-6231
    • Sawik, T.1
  • 50
    • 84937422721 scopus 로고    scopus 로고
    • Continuous preemption problems
    • C. Schwindt, J. Zimmermann, Springer International Publishing Switzerland Vol. 1
    • C. Schwindt, and T. Paetz Continuous preemption problems C. Schwindt, J. Zimmermann, Handbook on Project Management and Scheduling 2015 Springer International Publishing Switzerland 251 295 Vol. 1
    • (2015) Handbook on Project Management and Scheduling , pp. 251-295
    • Schwindt, C.1    Paetz, T.2
  • 51
    • 0001775820 scopus 로고    scopus 로고
    • Batch scheduling in process industries: An application of resource-constrained project scheduling
    • C. Schwindt, and N. Trautmann Batch scheduling in process industries: an application of resource-constrained project scheduling OR Spektrum 22 2000 501 524
    • (2000) OR Spektrum , vol.22 , pp. 501-524
    • Schwindt, C.1    Trautmann, N.2
  • 52
    • 84856010392 scopus 로고    scopus 로고
    • Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation
    • B. Sharda, and N. Akiya Selecting make-to-stock and postponement policies for different products in a chemical plant: a case study using discrete event simulation Int. J. Prod. Econ. 136 1 2012 161 171
    • (2012) Int. J. Prod. Econ. , vol.136 , Issue.1 , pp. 161-171
    • Sharda, B.1    Akiya, N.2
  • 53
    • 80051877260 scopus 로고    scopus 로고
    • Aggregate production planning in the automotive industry with special consideration of workforce flexibility
    • T. Sillekens, A. Koberstein, and L. Suhl Aggregate production planning in the automotive industry with special consideration of workforce flexibility Int. J. Prod. Res. 49 17 2011 5055 5078
    • (2011) Int. J. Prod. Res. , vol.49 , Issue.17 , pp. 5055-5078
    • Sillekens, T.1    Koberstein, A.2    Suhl, L.3
  • 54
    • 33847678988 scopus 로고    scopus 로고
    • Order acceptance with weighted tardiness
    • S.A. Slotnick, and T.E. Morton Order acceptance with weighted tardiness Comput. Oper. Res. 34 2007 3029 3042
    • (2007) Comput. Oper. Res. , vol.34 , pp. 3029-3042
    • Slotnick, S.A.1    Morton, T.E.2
  • 55
    • 34250179507 scopus 로고    scopus 로고
    • A rolling horizon approach to plan outsourcing in manufacturing-to-order environments affected by uncertainty
    • T. Tolio, and M. Urgo A rolling horizon approach to plan outsourcing in manufacturing-to-order environments affected by uncertainty CIRP Ann. Manuf. Technol. 2007 01
    • (2007) CIRP Ann. Manuf. Technol. , pp. 01
    • Tolio, T.1    Urgo, M.2
  • 56
    • 79958282448 scopus 로고    scopus 로고
    • Setting order promising times in a supply chain network using hybrid simulation-analytical approach: An industrial case study
    • S. Tunali, P.M. Ozfirat, and G. Ay Setting order promising times in a supply chain network using hybrid simulation-analytical approach: an industrial case study Simul. Model. Pract. Theory 19 2011 1967 1982
    • (2011) Simul. Model. Pract. Theory , vol.19 , pp. 1967-1982
    • Tunali, S.1    Ozfirat, P.M.2    Ay, G.3
  • 57
    • 84890562488 scopus 로고    scopus 로고
    • A modified particle swarm optimization for aggregate production planning
    • S. Wang, and M. Yeh A modified particle swarm optimization for aggregate production planning Expert Syst. Appl. 41 2014 3069 3077
    • (2014) Expert Syst. Appl. , vol.41 , pp. 3069-3077
    • Wang, S.1    Yeh, M.2
  • 58
    • 84869489651 scopus 로고    scopus 로고
    • Order acceptance and scheduling in a two-machine flowshop
    • X. Wang, X. Xie, and T.C.E. Cheng Order acceptance and scheduling in a two-machine flowshop Int. J. Prod. Econ. 141 2013 366 376
    • (2013) Int. J. Prod. Econ. , vol.141 , pp. 366-376
    • Wang, X.1    Xie, X.2    Cheng, T.C.E.3
  • 59
    • 10444275636 scopus 로고    scopus 로고
    • Scenario-based approach for flexible resource loading under uncertainty
    • G. Wullink, A.J.R.M. Gademann, E.W. Hans, and A. van Harten Scenario-based approach for flexible resource loading under uncertainty Int. J. Prod. Res. 42 24 2004 5079 5098
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.24 , pp. 5079-5098
    • Wullink, G.1    Gademann, A.J.R.M.2    Hans, E.W.3    Van Harten, A.4
  • 60
    • 84868302516 scopus 로고    scopus 로고
    • Key practices, manufacturing capability and attainment of manufacturing goals: The perspective of project/engineer-to-order manufacturing
    • L. Yang Key practices, manufacturing capability and attainment of manufacturing goals: the perspective of project/engineer-to-order manufacturing Int. J. Proj. Manag. 31 2013 109 125
    • (2013) Int. J. Proj. Manag. , vol.31 , pp. 109-125
    • Yang, L.1
  • 61
    • 84855543932 scopus 로고    scopus 로고
    • Analytical study on multi-product production planning with outsourcing
    • L. Zhen Analytical study on multi-product production planning with outsourcing Comput. Oper. Res. 39 2012 2100 2110
    • (2012) Comput. Oper. Res. , vol.39 , pp. 2100-2110
    • Zhen, L.1
  • 62
    • 84884588695 scopus 로고    scopus 로고
    • Order acceptance and scheduling with machine availability constraints
    • X. Zhong, J. Ou, and G. Wang Order acceptance and scheduling with machine availability constraints Eur. J. Oper. Res. 232 2014 435 441
    • (2014) Eur. J. Oper. Res. , vol.232 , pp. 435-441
    • Zhong, X.1    Ou, J.2    Wang, G.3
  • 63
    • 39649122099 scopus 로고    scopus 로고
    • Due date (DD) quotation and capacity planning in make-to order companies: Results from an empirical analysis
    • M. Zorzini, D. Corti, and A. Pozzetti Due date (DD) quotation and capacity planning in make-to order companies: results from an empirical analysis Int. J. Prod. Econ. 112 2008 919 933
    • (2008) Int. J. Prod. Econ. , vol.112 , pp. 919-933
    • Zorzini, M.1    Corti, D.2    Pozzetti, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.