-
1
-
-
78650226885
-
A project scheduling approach to production planning with feeding precedence relations
-
A. Alfieri, T. Tolio, and M. Urgo A project scheduling approach to production planning with feeding precedence relations Int. J. Prod. Res. 49 4 2011 995 1020
-
(2011)
Int. J. Prod. Res.
, vol.49
, Issue.4
, pp. 995-1020
-
-
Alfieri, A.1
Tolio, T.2
Urgo, M.3
-
2
-
-
84865351186
-
A two-stage stochastic programming project scheduling approach to production planning
-
A. Alfieri, T. Tolio, and M. Urgo A two-stage stochastic programming project scheduling approach to production planning Int. J. Adv. Manuf. Technol. 62 1-4 2012 279 290
-
(2012)
Int. J. Adv. Manuf. Technol.
, vol.62
, Issue.1-4
, pp. 279-290
-
-
Alfieri, A.1
Tolio, T.2
Urgo, M.3
-
3
-
-
38049077958
-
Tactical capacity management under capacity flexibility
-
O. Alp, and T. Tan Tactical capacity management under capacity flexibility IIE Trans. 40 3 2008 221 237
-
(2008)
IIE Trans.
, vol.40
, Issue.3
, pp. 221-237
-
-
Alp, O.1
Tan, T.2
-
4
-
-
84875747214
-
Integrated production planning and order acceptance under uncertainty: A robust optimization approach
-
T. Aouam, and N. Brahimi Integrated production planning and order acceptance under uncertainty: a robust optimization approach Eur. J. Oper. Res. 228 2013 504 515
-
(2013)
Eur. J. Oper. Res.
, vol.228
, pp. 504-515
-
-
Aouam, T.1
Brahimi, N.2
-
5
-
-
84937435923
-
Mixed-integer linear programming formulations
-
C. Schwindt, J. Zimmermann, Springer International Publishing Switzerland Vol. 1
-
C. Artigues, O. Kone, P. Lopez, and M. Mongea Mixed-integer linear programming formulations C. Schwindt, J. Zimmermann, Handbook on Project Management and Scheduling 2015 Springer International Publishing Switzerland 17 41 Vol. 1
-
(2015)
Handbook on Project Management and Scheduling
, pp. 17-41
-
-
Artigues, C.1
Kone, O.2
Lopez, P.3
Mongea, M.4
-
6
-
-
84863609307
-
Enterprise resource planning systems: An assessment of applicability to Make-To-Order companies
-
B. Aslan, M. Stevenson, and L. Hendry Enterprise resource planning systems: an assessment of applicability to Make-To-Order companies Comput. Ind. 63 2012 692 705
-
(2012)
Comput. Ind.
, vol.63
, pp. 692-705
-
-
Aslan, B.1
Stevenson, M.2
Hendry, L.3
-
7
-
-
51649088689
-
Resource leveling in Make-to-Order production: Modeling and Heuristic Solution Method
-
F. Ballestin, C. Schwindt, and J. Zimmermann Resource leveling in Make-to-Order production: modeling and Heuristic Solution Method Int. J. Oper. Res. 4 1 2007 1 13
-
(2007)
Int. J. Oper. Res.
, vol.4
, Issue.1
, pp. 1-13
-
-
Ballestin, F.1
Schwindt, C.2
Zimmermann, J.3
-
8
-
-
0027628028
-
Production control in engineer-to-order firms
-
J.W.M. Bertrand, and D.R. Muntslag Production control in engineer-to-order firms Int. J. Prod. Econ. 30-31 1993 3 22
-
(1993)
Int. J. Prod. Econ.
, vol.30-31
, pp. 3-22
-
-
Bertrand, J.W.M.1
Muntslag, D.R.2
-
9
-
-
84856526941
-
Minimizing the completion time of a project under resource constraints and feeding precedence relations: A Lagrangian relaxation based lower bound
-
University of Rome Tor Vergata, 4OR, forthcoming
-
Bianco, L., Caramia, M., 2011. Minimizing the completion time of a project under resource constraints and feeding precedence relations: a Lagrangian relaxation based lower bound. Technical report DII 03-09, University of Rome Tor Vergata, 4OR, forthcoming.
-
(2011)
Technical Report DII 03-09
-
-
Bianco, L.1
Caramia, M.2
-
10
-
-
84856537184
-
An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations
-
L. Bianco, and M. Caramia An exact algorithm to minimize the makespan in project scheduling with scarce resources and generalized precedence relations Eur. J. Oper. Res. 219 2012 73 85
-
(2012)
Eur. J. Oper. Res.
, vol.219
, pp. 73-85
-
-
Bianco, L.1
Caramia, M.2
-
11
-
-
84892920143
-
Convex optimization for aggregate production planning
-
M. Bushuev Convex optimization for aggregate production planning Int. J. Prod. Res. 52 4 2014 1050 1058
-
(2014)
Int. J. Prod. Res.
, vol.52
, Issue.4
, pp. 1050-1058
-
-
Bushuev, M.1
-
12
-
-
0037810482
-
Strategy not tactics drives aggregate planning
-
G. Buxey Strategy not tactics drives aggregate planning Int. J. Prod. Econ. 85 2003 331 346
-
(2003)
Int. J. Prod. Econ.
, vol.85
, pp. 331-346
-
-
Buxey, G.1
-
13
-
-
27144435498
-
Aggregate planning for seasonal demand: Reconciling theory with practice
-
G. Buxey Aggregate planning for seasonal demand: reconciling theory with practice Int. J. Oper. Prod. Manag. 25 11 2005 1083 1100
-
(2005)
Int. J. Oper. Prod. Manag.
, vol.25
, Issue.11
, pp. 1083-1100
-
-
Buxey, G.1
-
14
-
-
33748757057
-
A capacity-driven approach to establish reliable due dates in a MTO environment
-
D. Corti, A. Pozzetti, and M. Zorzini A capacity-driven approach to establish reliable due dates in a MTO environment Int. J. Prod. Econ. 104 2006 536 554
-
(2006)
Int. J. Prod. Econ.
, vol.104
, pp. 536-554
-
-
Corti, D.1
Pozzetti, A.2
Zorzini, M.3
-
15
-
-
0036017718
-
Action research for operations management
-
P. Coughlan, and D. Coghlan Action research for operations management Int. J. Oper. Prod. Manag. 22 2 2002 220 240
-
(2002)
Int. J. Oper. Prod. Manag.
, vol.22
, Issue.2
, pp. 220-240
-
-
Coughlan, P.1
Coghlan, D.2
-
16
-
-
15244355696
-
Workload based order acceptance in job shop environments
-
M.J.R. Ebben, E.W. Hans, and F.M.O. Weghuis Workload based order acceptance in job shop environments OR Spectr. 27 2005 107 122
-
(2005)
OR Spectr.
, vol.27
, pp. 107-122
-
-
Ebben, M.J.R.1
Hans, E.W.2
Weghuis, F.M.O.3
-
17
-
-
11844264822
-
Linear-programming-based heuristics for project capacity planning
-
N. Gademann, and M. Schutten Linear-programming-based heuristics for project capacity planning IIE Trans. 37 2005 153 165
-
(2005)
IIE Trans.
, vol.37
, pp. 153-165
-
-
Gademann, N.1
Schutten, M.2
-
19
-
-
70350568663
-
Engineer-to-order supply chain management: A literature review and research agenda
-
J. Gosling, and M. Naim Engineer-to-order supply chain management: a literature review and research agenda Int. J. Prod. Econ. 122 2009 741 754
-
(2009)
Int. J. Prod. Econ.
, vol.122
, pp. 741-754
-
-
Gosling, J.1
Naim, M.2
-
20
-
-
84885849174
-
Determining job complexity in an engineer-to-order environment for due date estimation using a proposed framework
-
D.H. Grabenstetter, and J.M. Usher Determining job complexity in an engineer-to-order environment for due date estimation using a proposed framework Int. J. Prod. Res. 51 19 2013 5728 5740
-
(2013)
Int. J. Prod. Res.
, vol.51
, Issue.19
, pp. 5728-5740
-
-
Grabenstetter, D.H.1
Usher, J.M.2
-
22
-
-
33751531856
-
A hierarchical approach to multi-project planning under uncertainty
-
E.W. Hans, W. Herroelen, R. Leus, and G. Wullink A hierarchical approach to multi-project planning under uncertainty Omega 35 2007 563 577
-
(2007)
Omega
, vol.35
, pp. 563-577
-
-
Hans, E.W.1
Herroelen, W.2
Leus, R.3
Wullink, G.4
-
23
-
-
0034672925
-
Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach
-
C. Hicks, and P.M. Braiden Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach Int. J. Prod. Res. 38 18 2000 4783 4810
-
(2000)
Int. J. Prod. Res.
, vol.38
, Issue.18
, pp. 4783-4810
-
-
Hicks, C.1
Braiden, P.M.2
-
24
-
-
0033878455
-
Supply chain management: A strategic issue in engineer-to-order manufacturing
-
C. Hicks, T. McGovern, and C.F. Earl Supply chain management: a strategic issue in engineer-to-order manufacturing Int. J. Prod. Econ. 65 2000 179 190
-
(2000)
Int. J. Prod. Econ.
, vol.65
, pp. 179-190
-
-
Hicks, C.1
McGovern, T.2
Earl, C.F.3
-
25
-
-
79957514950
-
Integrated order selection and production scheduling under MTO strategy
-
S. Huang, M. Lu, and G. Wan Integrated order selection and production scheduling under MTO strategy Int. J. Prod. Res. 49 13 2011 4085 4101
-
(2011)
Int. J. Prod. Res.
, vol.49
, Issue.13
, pp. 4085-4101
-
-
Huang, S.1
Lu, M.2
Wan, G.3
-
26
-
-
70350571118
-
Simulation in manufacturing and business: A review
-
M. Jahangirian, T. Eldabi, A. Naseer, L. Stergioulas, and T. Young Simulation in manufacturing and business: a review Eur. J. Oper. Res. 203 2010 1 13
-
(2010)
Eur. J. Oper. Res.
, vol.203
, pp. 1-13
-
-
Jahangirian, M.1
Eldabi, T.2
Naseer, A.3
Stergioulas, L.4
Young, T.5
-
27
-
-
84877999570
-
A simulation testing and analysis of aggregate production planning strategies
-
A. Jamalnia, and A. Feili A simulation testing and analysis of aggregate production planning strategies Prod. Plan. Control: Manag. Oper. 24 6 2013 423 448
-
(2013)
Prod. Plan. Control: Manag. Oper.
, vol.24
, Issue.6
, pp. 423-448
-
-
Jamalnia, A.1
Feili, A.2
-
28
-
-
78549271643
-
A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems
-
M. Kalantari, M. Rabbani, and M. Ebadian A decision support system for order acceptance/rejection in hybrid MTS/MTO production systems Appl. Math. Model. 35 2011 1363 1377
-
(2011)
Appl. Math. Model.
, vol.35
, pp. 1363-1377
-
-
Kalantari, M.1
Rabbani, M.2
Ebadian, M.3
-
29
-
-
0034295811
-
Modelling input-output workload control for dynamic capacity planning in production planning systems
-
B.G. Kingsman Modelling input-output workload control for dynamic capacity planning in production planning systems Int. J. Prod. Econ. 68 2000 73 93
-
(2000)
Int. J. Prod. Econ.
, vol.68
, pp. 73-93
-
-
Kingsman, B.G.1
-
30
-
-
21644447132
-
A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
-
T. Kis A branch-and-cut algorithm for scheduling of projects with variable-intensity activities Math. Program. 103 3 2005 515 539
-
(2005)
Math. Program.
, vol.103
, Issue.3
, pp. 515-539
-
-
Kis, T.1
-
31
-
-
84883890682
-
Modelling of flexibility costs in a decision support system for midterm capacity planning
-
L. Lingitz, C. Morawetz, D.T. Gigloo, S. Minner, and W. Sihn Modelling of flexibility costs in a decision support system for midterm capacity planning Proc. CIRP 7 2013 539 544
-
(2013)
Proc. CIRP
, vol.7
, pp. 539-544
-
-
Lingitz, L.1
Morawetz, C.2
Gigloo, D.T.3
Minner, S.4
Sihn, W.5
-
32
-
-
0347999551
-
Integrated planning and scheduling in the engineer-to-order sector
-
D. Little, R. Rollins, M. Peck, and J.K. Porter Integrated planning and scheduling in the engineer-to-order sector Int. J. Comput. Integr. Manuf. 13 6 2000 545 554
-
(2000)
Int. J. Comput. Integr. Manuf.
, vol.13
, Issue.6
, pp. 545-554
-
-
Little, D.1
Rollins, R.2
Peck, M.3
Porter, J.K.4
-
33
-
-
77956408059
-
Planning working time accounts under demand uncertainty
-
A. Lusa, and R. Pastor Planning working time accounts under demand uncertainty Comput. Oper. Res. 38 2011 517 524
-
(2011)
Comput. Oper. Res.
, vol.38
, pp. 517-524
-
-
Lusa, A.1
Pastor, R.2
-
34
-
-
0042343670
-
Project schedulling approach to production planning
-
A. Markus, J. Vancza, T. Kis, and A. Kovacs Project schedulling approach to production planning Ann. CIRP 52 1 2003 359 362
-
(2003)
Ann. CIRP
, vol.52
, Issue.1
, pp. 359-362
-
-
Markus, A.1
Vancza, J.2
Kis, T.3
Kovacs, A.4
-
35
-
-
79952191672
-
A branch and price solution approach for order acceptance and capacity planning in make-to-order operations
-
S. Mestry, P. Damodaran, and C. Chen A branch and price solution approach for order acceptance and capacity planning in make-to-order operations Eur. J. Oper. Res. 211 2011 480 495
-
(2011)
Eur. J. Oper. Res.
, vol.211
, pp. 480-495
-
-
Mestry, S.1
Damodaran, P.2
Chen, C.3
-
36
-
-
70749115681
-
Workload-dependent capacity control in production-to-order systems
-
G. Mincsovics, and N. Dellaert Workload-dependent capacity control in production-to-order systems IIE Trans. 41 10 2009 853 865
-
(2009)
IIE Trans.
, vol.41
, Issue.10
, pp. 853-865
-
-
Mincsovics, G.1
Dellaert, N.2
-
37
-
-
73549102405
-
Digital enterprise solution for integrated production planning and control
-
L. Monostori, G. Erdos, B. Kadar, T. Kis, A. Kovacs, A. Pfeiffer, and J. Vancza Digital enterprise solution for integrated production planning and control Comput. Ind. 61 2010 112 126
-
(2010)
Comput. Ind.
, vol.61
, pp. 112-126
-
-
Monostori, L.1
Erdos, G.2
Kadar, B.3
Kis, T.4
Kovacs, A.5
Pfeiffer, A.6
Vancza, J.7
-
39
-
-
0026928408
-
Aggregate production planning - A survey of models and methodologies
-
S.J. Nam, and R. Logendran Aggregate production planning - a survey of models and methodologies Eur. J. Oper. Res. 61 1992 255 272
-
(1992)
Eur. J. Oper. Res.
, vol.61
, pp. 255-272
-
-
Nam, S.J.1
Logendran, R.2
-
40
-
-
0036461438
-
Project scheduling with inventory constraints
-
K. Neumann, and C. Schwindt Project scheduling with inventory constraints Math. Methods Oper. Res. 56 2002 513 533
-
(2002)
Math. Methods Oper. Res.
, vol.56
, pp. 513-533
-
-
Neumann, K.1
Schwindt, C.2
-
41
-
-
0034559447
-
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
-
K. Neumann, and J. Zimmermann Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints Eur. J. Oper. Res. 127 2000 425 443
-
(2000)
Eur. J. Oper. Res.
, vol.127
, pp. 425-443
-
-
Neumann, K.1
Zimmermann, J.2
-
43
-
-
84856520172
-
Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of Service Centres
-
S. Quintanilla, A. Pérez, P. Lino, and V. Valls Time and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of Service Centres Eur. J. Oper. Res. 219 2012 59 72
-
(2012)
Eur. J. Oper. Res.
, vol.219
, pp. 59-72
-
-
Quintanilla, S.1
Pérez, A.2
Lino, P.3
Valls, V.4
-
44
-
-
84861623898
-
A risk management-based approach for inventory planning of engineering-to-order production
-
A.M. Radke, and M.M. Tseng A risk management-based approach for inventory planning of engineering-to-order production CIRP Ann. - Manuf. Technol. 61 2012 387 390
-
(2012)
CIRP Ann. - Manuf. Technol.
, vol.61
, pp. 387-390
-
-
Radke, A.M.1
Tseng, M.M.2
-
45
-
-
84929297631
-
A risk management-based evaluation of inventory allocations for make-to-order production
-
A.M. Radke, T. Tolio, M.M. Tseng, and M. Urgo A risk management-based evaluation of inventory allocations for make-to-order production CIRP Ann. Manuf. Technol. 62 1 2013 459 462
-
(2013)
CIRP Ann. Manuf. Technol.
, vol.62
, Issue.1
, pp. 459-462
-
-
Radke, A.M.1
Tolio, T.2
Tseng, M.M.3
Urgo, M.4
-
46
-
-
81855209005
-
An aggregate production planning model for two phase production systems: Solving with genetic algorithm and tabu search
-
R. Ramezanian, D. Rahmani, and F. Barzinpour An aggregate production planning model for two phase production systems: solving with genetic algorithm and tabu search Expert Syst. Appl. 39 2012 1256 1263
-
(2012)
Expert Syst. Appl.
, vol.39
, pp. 1256-1263
-
-
Ramezanian, R.1
Rahmani, D.2
Barzinpour, F.3
-
47
-
-
84860241716
-
Mixed-integer linear programming for resource leveling problems
-
J. Rieck, J. Zimmermann, and T. Gather Mixed-integer linear programming for resource leveling problems Eur. J. Oper. Res. 221 2012 27 37
-
(2012)
Eur. J. Oper. Res.
, vol.221
, pp. 27-37
-
-
Rieck, J.1
Zimmermann, J.2
Gather, T.3
-
48
-
-
56549109952
-
Order acceptance using genetic algorithms
-
W.O. Rom, and S.A. Slotnick Order acceptance using genetic algorithms Comput. Oper. Res. 36 2009 1758 1767
-
(2009)
Comput. Oper. Res.
, vol.36
, pp. 1758-1767
-
-
Rom, W.O.1
Slotnick, S.A.2
-
49
-
-
70449595763
-
Multi-objective due-date setting in a make-to-order environment
-
T. Sawik Multi-objective due-date setting in a make-to-order environment Int. J. Prod. Res. 47 22 2009 6205 6231
-
(2009)
Int. J. Prod. Res.
, vol.47
, Issue.22
, pp. 6205-6231
-
-
Sawik, T.1
-
50
-
-
84937422721
-
Continuous preemption problems
-
C. Schwindt, J. Zimmermann, Springer International Publishing Switzerland Vol. 1
-
C. Schwindt, and T. Paetz Continuous preemption problems C. Schwindt, J. Zimmermann, Handbook on Project Management and Scheduling 2015 Springer International Publishing Switzerland 251 295 Vol. 1
-
(2015)
Handbook on Project Management and Scheduling
, pp. 251-295
-
-
Schwindt, C.1
Paetz, T.2
-
51
-
-
0001775820
-
Batch scheduling in process industries: An application of resource-constrained project scheduling
-
C. Schwindt, and N. Trautmann Batch scheduling in process industries: an application of resource-constrained project scheduling OR Spektrum 22 2000 501 524
-
(2000)
OR Spektrum
, vol.22
, pp. 501-524
-
-
Schwindt, C.1
Trautmann, N.2
-
52
-
-
84856010392
-
Selecting make-to-stock and postponement policies for different products in a chemical plant: A case study using discrete event simulation
-
B. Sharda, and N. Akiya Selecting make-to-stock and postponement policies for different products in a chemical plant: a case study using discrete event simulation Int. J. Prod. Econ. 136 1 2012 161 171
-
(2012)
Int. J. Prod. Econ.
, vol.136
, Issue.1
, pp. 161-171
-
-
Sharda, B.1
Akiya, N.2
-
53
-
-
80051877260
-
Aggregate production planning in the automotive industry with special consideration of workforce flexibility
-
T. Sillekens, A. Koberstein, and L. Suhl Aggregate production planning in the automotive industry with special consideration of workforce flexibility Int. J. Prod. Res. 49 17 2011 5055 5078
-
(2011)
Int. J. Prod. Res.
, vol.49
, Issue.17
, pp. 5055-5078
-
-
Sillekens, T.1
Koberstein, A.2
Suhl, L.3
-
54
-
-
33847678988
-
Order acceptance with weighted tardiness
-
S.A. Slotnick, and T.E. Morton Order acceptance with weighted tardiness Comput. Oper. Res. 34 2007 3029 3042
-
(2007)
Comput. Oper. Res.
, vol.34
, pp. 3029-3042
-
-
Slotnick, S.A.1
Morton, T.E.2
-
55
-
-
34250179507
-
A rolling horizon approach to plan outsourcing in manufacturing-to-order environments affected by uncertainty
-
T. Tolio, and M. Urgo A rolling horizon approach to plan outsourcing in manufacturing-to-order environments affected by uncertainty CIRP Ann. Manuf. Technol. 2007 01
-
(2007)
CIRP Ann. Manuf. Technol.
, pp. 01
-
-
Tolio, T.1
Urgo, M.2
-
56
-
-
79958282448
-
Setting order promising times in a supply chain network using hybrid simulation-analytical approach: An industrial case study
-
S. Tunali, P.M. Ozfirat, and G. Ay Setting order promising times in a supply chain network using hybrid simulation-analytical approach: an industrial case study Simul. Model. Pract. Theory 19 2011 1967 1982
-
(2011)
Simul. Model. Pract. Theory
, vol.19
, pp. 1967-1982
-
-
Tunali, S.1
Ozfirat, P.M.2
Ay, G.3
-
57
-
-
84890562488
-
A modified particle swarm optimization for aggregate production planning
-
S. Wang, and M. Yeh A modified particle swarm optimization for aggregate production planning Expert Syst. Appl. 41 2014 3069 3077
-
(2014)
Expert Syst. Appl.
, vol.41
, pp. 3069-3077
-
-
Wang, S.1
Yeh, M.2
-
58
-
-
84869489651
-
Order acceptance and scheduling in a two-machine flowshop
-
X. Wang, X. Xie, and T.C.E. Cheng Order acceptance and scheduling in a two-machine flowshop Int. J. Prod. Econ. 141 2013 366 376
-
(2013)
Int. J. Prod. Econ.
, vol.141
, pp. 366-376
-
-
Wang, X.1
Xie, X.2
Cheng, T.C.E.3
-
59
-
-
10444275636
-
Scenario-based approach for flexible resource loading under uncertainty
-
G. Wullink, A.J.R.M. Gademann, E.W. Hans, and A. van Harten Scenario-based approach for flexible resource loading under uncertainty Int. J. Prod. Res. 42 24 2004 5079 5098
-
(2004)
Int. J. Prod. Res.
, vol.42
, Issue.24
, pp. 5079-5098
-
-
Wullink, G.1
Gademann, A.J.R.M.2
Hans, E.W.3
Van Harten, A.4
-
60
-
-
84868302516
-
Key practices, manufacturing capability and attainment of manufacturing goals: The perspective of project/engineer-to-order manufacturing
-
L. Yang Key practices, manufacturing capability and attainment of manufacturing goals: the perspective of project/engineer-to-order manufacturing Int. J. Proj. Manag. 31 2013 109 125
-
(2013)
Int. J. Proj. Manag.
, vol.31
, pp. 109-125
-
-
Yang, L.1
-
61
-
-
84855543932
-
Analytical study on multi-product production planning with outsourcing
-
L. Zhen Analytical study on multi-product production planning with outsourcing Comput. Oper. Res. 39 2012 2100 2110
-
(2012)
Comput. Oper. Res.
, vol.39
, pp. 2100-2110
-
-
Zhen, L.1
-
62
-
-
84884588695
-
Order acceptance and scheduling with machine availability constraints
-
X. Zhong, J. Ou, and G. Wang Order acceptance and scheduling with machine availability constraints Eur. J. Oper. Res. 232 2014 435 441
-
(2014)
Eur. J. Oper. Res.
, vol.232
, pp. 435-441
-
-
Zhong, X.1
Ou, J.2
Wang, G.3
-
63
-
-
39649122099
-
Due date (DD) quotation and capacity planning in make-to order companies: Results from an empirical analysis
-
M. Zorzini, D. Corti, and A. Pozzetti Due date (DD) quotation and capacity planning in make-to order companies: results from an empirical analysis Int. J. Prod. Econ. 112 2008 919 933
-
(2008)
Int. J. Prod. Econ.
, vol.112
, pp. 919-933
-
-
Zorzini, M.1
Corti, D.2
Pozzetti, A.3
|