The multi-mode resource-constrained project scheduling problem with generalized precedence relations
-
De Reyck, B. and Herroelen, W., 1999. The multi-mode resource-constrained project scheduling problem with generalized precedence relations. European Journal of Operational Research, 119 (2), 538-556.
-
(1999)
European Journal of Operational Research
, vol.119
, Issue.2
, pp. 538-556
-
-
De Reyck, B.1
Herroelen, W.2
-
2
-
-
0031097802
-
A branch-and-bound procedure for the generalized resource-constrained project scheduling problem
-
Demeulemeester, E.L. and Herroelen, W.S., 1997. A branch-and-bound procedure for the generalized resource-constrained project scheduling problem. Operations Research, 45 (2), 201-212.
-
(1997)
Operations Research
, vol.45
, Issue.2
, pp. 201-212
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
3
-
-
3543055794
-
RanGen: A random network generator for activity-on-the-node networks
-
Demeulemeester, E., Vanhoucke, M., and Herroelen, W., 2003. RanGen: a random network generator for activity-on-the-node networks. Journal of Scheduling, 6 (1), 17-38.
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 17-38
-
-
Demeulemeester, E.1
Vanhoucke, M.2
Herroelen, W.3
-
5
-
-
0001215033
-
The analysis of activity networks under generalized precedence relations (GPRs)
-
Elmaghraby, S.E. and Kamburowski, J., 1992. The analysis of activity networks under generalized precedence relations (GPRs). Management Science, 38 (9), 1245-1263.
-
(1992)
Management Science
, vol.38
, Issue.9
, pp. 1245-1263
-
-
Elmaghraby, S.E.1
Kamburowski, J.2
-
7
-
-
21644447132
-
A branch-and-cut algorithm for scheduling of projects with variable-intensity activities
-
Kis, T., 2005. A branch-and-cut algorithm for scheduling of projects with variable-intensity activities. Mathematical Programming, 103 (3), 515-539.
-
(2005)
Mathematical Programming
, vol.103
, Issue.3
, pp. 515-539
-
-
Kis, T.1
-
8
-
-
73549085432
-
RCPS with variable intensity activities and feeding precedence constraints
-
Berlin: Springer
-
Kis, T., 2006. RCPS with variable intensity activities and feeding precedence constraints. In: Perspectives in modern project scheduling. Berlin: Springer, 105-129.
-
(2006)
Perspectives in Modern Project Scheduling
, pp. 105-129
-
-
Kis, T.1
-
9
-
-
0034634797
-
Project scheduling with time-varying resource constraints
-
Klein, R., 2000. Project scheduling with time-varying resource constraints. International Journal of Production Research, 38 (16), 3937-3952.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.16
, pp. 3937-3952
-
-
Klein, R.1
-
10
-
-
0025399333
-
Resource-constrained scheduling of projects with variable-intensity activities
-
Leachman, R.C., Dincerler, A., and Kim, S., 1990. Resource-constrained scheduling of projects with variable-intensity activities. IIE Transactions, 22 (1), 31-40.
-
(1990)
IIE Transactions
, vol.22
, Issue.1
, pp. 31-40
-
-
Leachman, R.C.1
Dincerler, A.2
Kim, S.3
-
11
-
-
0042343670
-
Project scheduling approach for production planning
-
Markus, A., et al., 2003. Project scheduling approach for production planning. Annals of the CIRP, 52 (1), 359-362.
-
(2003)
Annals of the CIRP
, vol.52
, Issue.1
, pp. 359-362
-
-
Markus, A.1
-
12
-
-
0000497721
-
Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
-
Neumann, K. and Schwindt, C., 1997. Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production. OR Spectrum, 19 (3), 205-217.
-
(1997)
OR Spectrum
, vol.19
, Issue.3
, pp. 205-217
-
-
Neumann, K.1
Schwindt, C.2
-
13
-
-
2842577299
-
A capacitated hierarchical approach to make-to-order production
-
Neumann, K. and Schwindt, C., 1998. A capacitated hierarchical approach to make-to-order production. European Journal of Automation, 32, 397-413.
-
(1998)
European Journal of Automation
, vol.32
, pp. 397-413
-
-
Neumann, K.1
Schwindt, C.2
-
15
-
-
0343953621
-
The risk of delay of a project in terms of the morphology of its network
-
Tavares, L.V., Ferreira, J.A., and Coelho, J.S., 1999. The risk of delay of a project in terms of the morphology of its network. European Journal of Operational Research, 119 (2), 510-537.
-
(1999)
European Journal of Operational Research
, vol.119
, Issue.2
, pp. 510-537
-
-
Tavares, L.V.1
Ferreira, J.A.2
Coelho, J.S.3
-
17
-
-
3142757956
-
Aggregation: The key to integrating production planning and scheduling
-
Vancza, J., Kis, T., and Kovacs, A., 2004. Aggregation: the key to integrating production planning and scheduling. Annals of the CIRP, 53 (1), 374-376.
-
(2004)
Annals of the CIRP
, vol.53
, Issue.1
, pp. 374-376
-
-
Vancza, J.1
Kis, T.2
Kovacs, A.3
-
19
-
-
36048990558
-
An evaluation of the adequacy of project network generators with systematically sampled networks
-
Vanhoucke, M., et al., 2008. An evaluation of the adequacy of project network generators with systematically sampled networks. European Journal of Operational Research, 187 (2), 511-524.
-
(2008)
European Journal of Operational Research
, vol.187
, Issue.2
, pp. 511-524
-
-
Vanhoucke, M.1
-
20
-
-
0000794175
-
Towards intelligent manufacturing planning and control systems
-
Zijm, W.H.M., 2000. Towards intelligent manufacturing planning and control systems. OR Spektrum, 22 (3), 313-345.
-
(2000)
OR Spektrum
, vol.22
, Issue.3
, pp. 313-345
-
-
Zijm, W.H.M.1
|