-
1
-
-
57349175611
-
Integration of production and shipping planning: A co-operative approach
-
Baptiste, P., Alsene, E., and Gaudimier, R., 2008. Integration of production and shipping planning: A co-operative approach. Production Planning & Control, 19 (7), 645-654.
-
(2008)
Production Planning & Control
, vol.19
, Issue.7
, pp. 645-654
-
-
Baptiste, P.1
Alsene, E.2
Gaudimier, R.3
-
2
-
-
0035841878
-
MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search
-
DOI 10.1080/00207540110061607
-
Baykasoglu, A., 2001. MOAPPS 1.0: Aggregate production planning using the multiple-objective tabu search. International Journal of Production Research, 39 (16), 3685-3702. (Pubitemid 35165508)
-
(2001)
International Journal of Production Research
, vol.39
, Issue.16
, pp. 3685-3702
-
-
Baykasoglu, A.1
-
3
-
-
0026902990
-
A DSS for optimizing the aggregate production planning at Monsanto Antwerp
-
Bloemen, R., 1992. A DSS for optimizing the aggregate production planning at Monsanto Antwerp. European Journal of Operational Research, 61 (1-2), 30-40.
-
(1992)
European Journal of Operational Research
, vol.61
, Issue.1-2
, pp. 30-40
-
-
Bloemen, R.1
-
5
-
-
0242364686
-
An investigation on selection of simplified aggregate production planning strategies using MADM approaches
-
Chen, Y.-K. and Liao, H.-C., 2003. An investigation on selection of simplified aggregate production planning strategies using MADM approaches. International Journal of Production Research, 41 (14), 3359-3374.
-
(2003)
International Journal of Production Research
, vol.41
, Issue.14
, pp. 3359-3374
-
-
Chen, Y.-K.1
Liao, H.-C.2
-
6
-
-
0030214743
-
Build strategy Development
-
Clark, J. and Lamb, T., 1996. Build strategy development. Journal of Ship Production, 2 (3), 198-209. (Pubitemid 126588665)
-
(1996)
Journal of Ship Production
, vol.12
, Issue.3
, pp. 198-209
-
-
Clark, J.1
Lamb, T.2
-
7
-
-
84947926042
-
A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization: NSGA-II
-
18-20 September, Paris, France
-
Deb, K., et al., 2000. A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization: NSGA-II. In: Proceedings of the parallel problem solving from nature VI conference, 18-20 September, Paris, France, 849-858.
-
(2000)
Proceedings of the Parallel Problem Solving From Nature VI Conference
, pp. 849-858
-
-
Deb, K.1
-
9
-
-
85014157956
-
-
London: Butterworth- Heinemann
-
Eyres, D.J., 2007. Ship construction. London: Butterworth-Heinemann.
-
(2007)
Ship Construction
-
-
Eyres, D.J.1
-
10
-
-
80052169302
-
A group technology approach to master scheduling of shipbuilding projects
-
24-26 August 1998, Seattle, Washington
-
Gribskov, J., 1988. A group technology approach to master scheduling of shipbuilding projects. In: Proceedings of the NSAP ship production symposium, 24-26 August 1998, Seattle, Washington.
-
(1988)
Proceedings of the NSAP Ship Production Symposium
-
-
Gribskov, J.1
-
11
-
-
0141750714
-
Multiproduct aggregate production planning with fuzzy demands and fuzzy capacities
-
Fung, R.Y.K., Tang, J., and Wang, D., 2003. Multiproduct aggregate production planning with fuzzy demands and fuzzy capacities. IEEE Transactions on Systems, Man, Cybernetics - Part A: Systems and Humans, 33 (3), 302-313.
-
(2003)
IEEE Transactions on Systems, Man, Cybernetics - Part A: Systems and Humans
, vol.33
, Issue.3
, pp. 302-313
-
-
Fung, R.Y.K.1
Tang, J.2
Wang, D.3
-
12
-
-
0036672601
-
Lean production in the Japanese shipbuilding industry?
-
Koenig, P.C, Narita, H., and Baba, K., 2002. Lean production in the Japanese shipbuilding industry. Journal of Ship Production, 18 (3), 167-174. (Pubitemid 35010154)
-
(2002)
Journal of Ship Production
, vol.18
, Issue.3
, pp. 167-174
-
-
Koenig, P.C.1
Narita, H.2
Baba, K.3
-
14
-
-
0036715683
-
Combining convergence and diversity in evolutionary multi-objective optimization
-
Laumanns, M., et al., 2002. Combining convergence and diversity in evolutionary multi-objective optimization. Evolutionary Computation, 10 (3), 263-282.
-
(2002)
Evolutionary Computation
, vol.10
, Issue.3
, pp. 263-282
-
-
Laumanns, M.1
-
15
-
-
0031103567
-
Developing scheduling systems for Daewoo Shipbuilding: DAS project
-
PII S0377221796002056
-
Lee, J.K., et al., 1997. Developing scheduling systems for Daewoo Shipbuilding: DAS project. European Journal of Operational Research, 97 (2), 380-395. (Pubitemid 127381094)
-
(1997)
European Journal of Operational Research
, vol.97
, Issue.2
, pp. 380-395
-
-
Lee, J.K.1
Lee, K.J.2
Park, H.K.3
Hong, J.S.4
Lee, J.S.5
-
16
-
-
0142186077
-
Multi-site aggregate production planning with multiple objectives: A goal programming approach
-
Leung, S.C.H., Wu, Y., and Lai, K.K., 2003. Multi-site aggregate production planning with multiple objectives: A goal programming approach. Production Planning & Control, 14 (5), 425-436.
-
(2003)
Production Planning & Control
, vol.14
, Issue.5
, pp. 425-436
-
-
Leung, S.C.H.1
Wu, Y.2
Lai, K.K.3
-
17
-
-
84867344242
-
-
Available from: [Accessed 10 January 2010]
-
Liker, J.K. and Lamb, T., 2000. Lean manufacturing principles guide [online]. Available from: Http:// www.nsrp.org/Project-Information/major- projects/deliverables/ase-910001.pdf [Accessed 10 January 2010].
-
(2000)
Lean Manufacturing Principles Guide [Online]
-
-
Liker, J.K.1
Lamb, T.2
-
18
-
-
70049097452
-
The man-hour estimation models & its comparison of interim products assembly for shipbuilding
-
Liu, B. and Jiang, Z.H., 2005. The man-hour estimation models & its comparison of interim products assembly for shipbuilding. International Journal of Operations Research, 2 (1), 9-14.
-
(2005)
International Journal of Operations Research
, vol.2
, Issue.1
, pp. 9-14
-
-
Liu, B.1
Jiang, Z.H.2
-
19
-
-
0018001157
-
Production switching heuristics for the aggregate production planning problem
-
Mellichamp, J.M. and Love, R.M., 1978. Production switching heuristics for the aggregate production planning problem. Management Science, 24 (12), 1242-1251.
-
(1978)
Management Science
, vol.24
, Issue.12
, pp. 1242-1251
-
-
Mellichamp, J.M.1
Love, R.M.2
-
20
-
-
0026928408
-
Aggregate production planning - A survey of models and methodologies
-
DOI 10.1016/0377-2217(92)90356-E
-
Nam, S. and Logendran, R., 1992. Aggregate production planning - a survey of models and methodologies. European Journal of Operational Research, 61 (3), 255-272. (Pubitemid 23558219)
-
(1992)
European Journal of Operational Research
, vol.61
, Issue.3
, pp. 255-272
-
-
Nam Sang-jin1
Logendran Rasaratnam2
-
21
-
-
0029306826
-
Modified production switching heuristics for aggregate production planning
-
Nam, S. and Logendran, R., 1995. Modified production switching heuristics for aggregate production planning. Computers & Operations Research, 22 (5), 531-541.
-
(1995)
Computers & Operations Research
, vol.22
, Issue.5
, pp. 531-541
-
-
Nam, S.1
Logendran, R.2
-
22
-
-
0034559447
-
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
-
Neumann, K. and Zimmermann, J., 2000. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research, 127 (2), 425-443.
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 425-443
-
-
Neumann, K.1
Zimmermann, J.2
-
23
-
-
80052170341
-
Implementation of PC-based project management in an integrated planning process
-
3-6 September, San Diego, CA
-
Neumann, R.J. and McQuaide, D.J., 1991. Implementation of PC-based project management in an integrated planning process. In: Proceedings of the ship production symposium, 3-6 September, San Diego, CA.
-
(1991)
Proceedings of the ship production symposium
-
-
Neumann, R.J.1
McQuaide, D.J.2
-
24
-
-
80052161931
-
Network scheduling development in an MRP II environment
-
1-4 November, Williamsburg, Virginia
-
Neumann, R.J., 1993. Network scheduling development in an MRP II environment. In: Proceedings of the ship production symposium, 1-4 November, Williamsburg, Virginia.
-
(1993)
Proceedings of the ship production symposium
-
-
Neumann, R.J.1
-
25
-
-
33947672314
-
Assembly block storage location assignment at a shipyard: A case of Hyundai Heavy Industries
-
DOI 10.1080/09537280601009039, PII 773630681
-
Park, C., et al., 2007. Assembly block storage location assignment at a shipyard: A case of Hyundai Heavy Industries. Production Planning & Control, 18 (3), 180-189. (Pubitemid 46492024)
-
(2007)
Production Planning and Control
, vol.18
, Issue.3
, pp. 180-189
-
-
Park, C.1
Seo, J.2
Kim, J.3
Lee, S.4
Baek, T.-H.5
Min, S.-K.6
-
26
-
-
0041467637
-
Resource-constrained shop-level scheduling in a shipyard
-
Prasad, V.R., et al., 2003. Resource-constrained shop-level scheduling in a shipyard. Journal of Ship Production, 19 (2), 65-75.
-
(2003)
Journal of Ship Production
, vol.19
, Issue.2
, pp. 65-75
-
-
Prasad, V.R.1
-
27
-
-
70350051317
-
Optimizing resource leveling in construction projects
-
Rayes, K.E. and Jun, D.H., 2009. Optimizing resource leveling in construction projects. Journal of Construction and Engineering Management, 135 (11), 1172-1180.
-
(2009)
Journal of Construction and Engineering Management
, vol.135
, Issue.11
, pp. 1172-1180
-
-
Rayes, K.E.1
Jun, D.H.2
-
29
-
-
0034659589
-
A labour-constrained model for aggregate production planning
-
DOI 10.1080/002075400188546
-
Silva, J.P., Lisboa, J., and Huang, P., 2000. A labour-constrained model for aggregate production planning. International Journal of Production Research, 38 (9), 2143-2152. (Pubitemid 35401866)
-
(2000)
International Journal of Production Research
, vol.38
, Issue.9
, pp. 2143-2152
-
-
Silva, J.P.1
Lisboa, J.2
Huang, P.3
-
31
-
-
0033097214
-
Improving flow to achieve lean manufacturing in shipbuilding
-
Storch, R.L and Lim, S., 1999. Improving flow to achieve lean manufacturing in shipbuilding. Production Planning & Control, 10 (2), 127-137.
-
(1999)
Production Planning & Control
, vol.10
, Issue.2
, pp. 127-137
-
-
Storch, R.L.1
Lim, S.2
-
32
-
-
0019565498
-
Aggregate production planning for a heavy manufacturing industry
-
DOI 10.1016/0377-2217(81)90046-1
-
Tang, J.C.S., Adulbhan, P., and Zubair, T., 1981. An aggregate production planning for a heavy manufacturing industry. European Journal of Operational Research, 7 (1), 22-29. (Pubitemid 11415065)
-
(1981)
European Journal of Operational Research
, vol.7
, Issue.1
, pp. 22-29
-
-
Tang John, C.S.1
Adulbhan Pakorn2
Zubair Tahir3
-
33
-
-
0034309361
-
Fuzzy formulation for multi-product aggregate production planning
-
DOI 10.1080/095372800432133
-
Tang, J., Wang, D., and Fung, R.Y.K., 2000. Fuzzy formulation for multi-product aggregate production planning. Production Planning & Control, 11 (7), 670-676. (Pubitemid 35394407)
-
(2000)
Production Planning and Control
, vol.11
, Issue.7
, pp. 670-676
-
-
Tang, J.1
Wang, D.2
Fung, R.Y.K.3
-
34
-
-
0035899769
-
Aggregate production planning with multiple objectives in a fuzzy environment
-
Wang, R.C. and Fang, H.H., 2001. Aggregate production planning with multiple objectives in a fuzzy environment. European Journal of Operational Research, 133 (3), 521-536.
-
(2001)
European Journal of Operational Research
, vol.133
, Issue.3
, pp. 521-536
-
-
Wang, R.C.1
Fang, H.H.2
|