-
1
-
-
0004048738
-
-
Springer: Berlin
-
Blażewicz, J., Ecker, K.H., Schmidt, G. and Wȩglarz, J., Scheduling in Computer and Manufacturing Systems, 1994 (Springer: Berlin).
-
(1994)
Scheduling in Computer and Manufacturing Systems
-
-
Blazewicz, J.1
Ecker, K.H.2
Schmidt, G.3
Wȩglarz, J.4
-
2
-
-
0033325198
-
The simultaneous planning of production, capacity, and inventory in seasonal demand environments
-
Bradley, J.R. and Arntzen, B.C., The simultaneous planning of production, capacity, and inventory in seasonal demand environments. Oper. Res., 1999, 47, 795-806.
-
(1999)
Oper. Res.
, vol.47
, pp. 795-806
-
-
Bradley, J.R.1
Arntzen, B.C.2
-
3
-
-
0001563910
-
Hierarchical production planning in a make-to-order company: A case study
-
Carravilla, M.A. and Pinho de Sousa, J., Hierarchical production planning in a make-to-order company: a case study. Eur, J. Oper. Res., 1995, 86, 43-56.
-
(1995)
Eur, J. Oper. Res.
, vol.86
, pp. 43-56
-
-
Carravilla, M.A.1
Pinho De Sousa, J.2
-
4
-
-
0031186470
-
Lot streaming in job-shop scheduling
-
Dauzere-Peres, S. and Lasserre, J.-B., Lot streaming in job-shop scheduling. Oper. Res., 1997, 45, 584-595.
-
(1997)
Oper. Res.
, vol.45
, pp. 584-595
-
-
Dauzere-Peres, S.1
Lasserre, J.-B.2
-
5
-
-
0032071138
-
Scheduling with finite capacity output buffers
-
Hall, N.G., Posner, M.E. and Potts, C.N., Scheduling with finite capacity output buffers. Oper. Res., 1998, 46, S84-S89.
-
(1998)
Oper. Res.
, vol.46
-
-
Hall, N.G.1
Posner, M.E.2
Potts, C.N.3
-
7
-
-
2442696779
-
Optimal versus heuristic scheduling of surface mount technology lines
-
Kaczmarczyk, W., Sawik, T., Schaller, A. and Tirpak, T.M., Optimal versus heuristic scheduling of surface mount technology lines. Int. J. Prod. Res., 2004, 42, 2083-2110.
-
(2004)
Int. J. Prod. Res.
, vol.42
, pp. 2083-2110
-
-
Kaczmarczyk, W.1
Sawik, T.2
Schaller, A.3
Tirpak, T.M.4
-
9
-
-
0034516883
-
Integration of assembly and fabrication for make-to-order production
-
Kolisch, R., Integration of assembly and fabrication for make-to-order production. Int. J. Prod. Econ., 2000, 68, 287-306.
-
(2000)
Int. J. Prod. Econ.
, vol.68
, pp. 287-306
-
-
Kolisch, R.1
-
10
-
-
0013367503
-
IMPReSS: An automated production planning and delivery quotation system at Harris Corporation - Semiconductor sector
-
Leachman, R.C., Benson, R.F., Liu, C. and Raar, D.J., IMPReSS: an automated production planning and delivery quotation system at Harris Corporation - semiconductor sector. Interfaces, 1996, 26, 6-37.
-
(1996)
Interfaces
, vol.26
, pp. 6-37
-
-
Leachman, R.C.1
Benson, R.F.2
Liu, C.3
Raar, D.J.4
-
11
-
-
0025414458
-
Coordinated production scheduling for make-to-order manufacturing
-
Markland, R.E., Darby-Dowman, K.H. and Minor, E.D., Coordinated production scheduling for make-to-order manufacturing. Eur. J. Oper. Res., 1990, 45, 155-176.
-
(1990)
Eur. J. Oper. Res.
, vol.45
, pp. 155-176
-
-
Markland, R.E.1
Darby-Dowman, K.H.2
Minor, E.D.3
-
13
-
-
0032657381
-
Resource levelling for projects with schedule-dependent time windows
-
Neumann, K. and Zimmermann, J., Resource levelling for projects with schedule-dependent time windows. Eur. J. Oper. Res., 1999, 117, 591-605.
-
(1999)
Eur. J. Oper. Res.
, vol.117
, pp. 591-605
-
-
Neumann, K.1
Zimmermann, J.2
-
15
-
-
0037121160
-
Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
-
Sawik, T., Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. Eur. J. Ope. Res., 2002, 143, 115-124.
-
(2002)
Eur. J. Ope. Res.
, vol.143
, pp. 115-124
-
-
Sawik, T.1
-
16
-
-
18844387410
-
Integer programming approach to production scheduling for make-to-order manufacturing
-
Sawik, T., Integer programming approach to production scheduling for make-to-order manufacturing. Math. Camput. Modelling, 2005a, 41, 99-118.
-
(2005)
Math. Camput. Modelling
, vol.41
, pp. 99-118
-
-
Sawik, T.1
-
17
-
-
30844435317
-
Multi-objective master production scheduling in make-to-order discrete manufacturing
-
Zakynthos Island, Greece, May 20-25
-
Sawik, T., Multi-objective master production scheduling in make-to-order discrete manufacturing, in Proceedings of the Fifth International Conference on Analysis of Manufacturing Systems - Production Management, Zakynthos Island, Greece, May 20-25, 2005b, pp. 209-216.
-
(2005)
Proceedings of the Fifth International Conference on Analysis of Manufacturing Systems - Production Management
, pp. 209-216
-
-
Sawik, T.1
-
18
-
-
26844524258
-
A cyclic versus flexible approach to materials ordering in make-to-order assembly
-
Sawik, T., A cyclic versus flexible approach to materials ordering in make-to-order assembly. Math. Comput. Modelling, 2005c, 42, 279-290.
-
(2005)
Math. Comput. Modelling
, vol.42
, pp. 279-290
-
-
Sawik, T.1
-
20
-
-
77957088268
-
Mathematical programming models and methods for production planning and scheduling
-
edited by S.C. Graves, A.H.G. Rinnooy Ran and P.H. Zipkin, (North-Holland: Amsterdam)
-
Shapiro, J.F., Mathematical programming models and methods for production planning and scheduling. In Handbook in Operations Research and Management Science: Logistics of Production and Inventory, edited by S.C. Graves, A.H.G. Rinnooy Ran and P.H. Zipkin, 1993 (North-Holland: Amsterdam).
-
(1993)
Handbook in Operations Research and Management Science: Logistics of Production and Inventory
-
-
Shapiro, J.F.1
-
23
-
-
0000857408
-
A Lagrangian-based heuristic for dynamic multi-level, multi-item constrained lotsizing with setup times
-
Tempelmeier, H. and Derstroff, M.C., A Lagrangian-based heuristic for dynamic multi-level, multi-item constrained lotsizing with setup times. Manag. Sci., 1996, 42, 738-747.
-
(1996)
Manag. Sci.
, vol.42
, pp. 738-747
-
-
Tempelmeier, H.1
Derstroff, M.C.2
-
24
-
-
0031139978
-
MIP modelling of changeovers in production planning and scheduling problems
-
Wolsey, L.A., MIP modelling of changeovers in production planning and scheduling problems. Eur. J. Oper. Res., 1997, 99, 154-165.
-
(1997)
Eur. J. Oper. Res.
, vol.99
, pp. 154-165
-
-
Wolsey, L.A.1
-
25
-
-
0030269847
-
Optimal resource leveling of multi-resource projects
-
Younis, M.A. and Saad, B., Optimal resource leveling of multi-resource projects. Computers and Industrial Engineering, 1996, 31, 1-4.
-
(1996)
Computers and Industrial Engineering
, vol.31
, pp. 1-4
-
-
Younis, M.A.1
Saad, B.2
|