메뉴 건너뛰기




Volumn 44, Issue 4, 2006, Pages 801-830

Hierarchical approach to production scheduling in make-to-order assembly

Author keywords

Flexible flow shop; Integer programming; Make to order assembly; Multi objective production scheduling

Indexed keywords

ASSEMBLY; CUSTOMER SATISFACTION; ELECTRONICS INDUSTRY; INTEGER PROGRAMMING; PRODUCTION ENGINEERING; SCHEDULING;

EID: 30844458381     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540500340969     Document Type: Article
Times cited : (32)

References (25)
  • 2
    • 0033325198 scopus 로고    scopus 로고
    • The simultaneous planning of production, capacity, and inventory in seasonal demand environments
    • Bradley, J.R. and Arntzen, B.C., The simultaneous planning of production, capacity, and inventory in seasonal demand environments. Oper. Res., 1999, 47, 795-806.
    • (1999) Oper. Res. , vol.47 , pp. 795-806
    • Bradley, J.R.1    Arntzen, B.C.2
  • 3
    • 0001563910 scopus 로고
    • Hierarchical production planning in a make-to-order company: A case study
    • Carravilla, M.A. and Pinho de Sousa, J., Hierarchical production planning in a make-to-order company: a case study. Eur, J. Oper. Res., 1995, 86, 43-56.
    • (1995) Eur, J. Oper. Res. , vol.86 , pp. 43-56
    • Carravilla, M.A.1    Pinho De Sousa, J.2
  • 4
    • 0031186470 scopus 로고    scopus 로고
    • Lot streaming in job-shop scheduling
    • Dauzere-Peres, S. and Lasserre, J.-B., Lot streaming in job-shop scheduling. Oper. Res., 1997, 45, 584-595.
    • (1997) Oper. Res. , vol.45 , pp. 584-595
    • Dauzere-Peres, S.1    Lasserre, J.-B.2
  • 5
    • 0032071138 scopus 로고    scopus 로고
    • Scheduling with finite capacity output buffers
    • Hall, N.G., Posner, M.E. and Potts, C.N., Scheduling with finite capacity output buffers. Oper. Res., 1998, 46, S84-S89.
    • (1998) Oper. Res. , vol.46
    • Hall, N.G.1    Posner, M.E.2    Potts, C.N.3
  • 7
    • 2442696779 scopus 로고    scopus 로고
    • Optimal versus heuristic scheduling of surface mount technology lines
    • Kaczmarczyk, W., Sawik, T., Schaller, A. and Tirpak, T.M., Optimal versus heuristic scheduling of surface mount technology lines. Int. J. Prod. Res., 2004, 42, 2083-2110.
    • (2004) Int. J. Prod. Res. , vol.42 , pp. 2083-2110
    • Kaczmarczyk, W.1    Sawik, T.2    Schaller, A.3    Tirpak, T.M.4
  • 9
    • 0034516883 scopus 로고    scopus 로고
    • Integration of assembly and fabrication for make-to-order production
    • Kolisch, R., Integration of assembly and fabrication for make-to-order production. Int. J. Prod. Econ., 2000, 68, 287-306.
    • (2000) Int. J. Prod. Econ. , vol.68 , pp. 287-306
    • Kolisch, R.1
  • 10
    • 0013367503 scopus 로고    scopus 로고
    • IMPReSS: An automated production planning and delivery quotation system at Harris Corporation - Semiconductor sector
    • Leachman, R.C., Benson, R.F., Liu, C. and Raar, D.J., IMPReSS: an automated production planning and delivery quotation system at Harris Corporation - semiconductor sector. Interfaces, 1996, 26, 6-37.
    • (1996) Interfaces , vol.26 , pp. 6-37
    • Leachman, R.C.1    Benson, R.F.2    Liu, C.3    Raar, D.J.4
  • 11
    • 0025414458 scopus 로고
    • Coordinated production scheduling for make-to-order manufacturing
    • Markland, R.E., Darby-Dowman, K.H. and Minor, E.D., Coordinated production scheduling for make-to-order manufacturing. Eur. J. Oper. Res., 1990, 45, 155-176.
    • (1990) Eur. J. Oper. Res. , vol.45 , pp. 155-176
    • Markland, R.E.1    Darby-Dowman, K.H.2    Minor, E.D.3
  • 13
    • 0032657381 scopus 로고    scopus 로고
    • Resource levelling for projects with schedule-dependent time windows
    • Neumann, K. and Zimmermann, J., Resource levelling for projects with schedule-dependent time windows. Eur. J. Oper. Res., 1999, 117, 591-605.
    • (1999) Eur. J. Oper. Res. , vol.117 , pp. 591-605
    • Neumann, K.1    Zimmermann, J.2
  • 15
    • 0037121160 scopus 로고    scopus 로고
    • Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
    • Sawik, T., Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line. Eur. J. Ope. Res., 2002, 143, 115-124.
    • (2002) Eur. J. Ope. Res. , vol.143 , pp. 115-124
    • Sawik, T.1
  • 16
    • 18844387410 scopus 로고    scopus 로고
    • Integer programming approach to production scheduling for make-to-order manufacturing
    • Sawik, T., Integer programming approach to production scheduling for make-to-order manufacturing. Math. Camput. Modelling, 2005a, 41, 99-118.
    • (2005) Math. Camput. Modelling , vol.41 , pp. 99-118
    • Sawik, T.1
  • 18
    • 26844524258 scopus 로고    scopus 로고
    • A cyclic versus flexible approach to materials ordering in make-to-order assembly
    • Sawik, T., A cyclic versus flexible approach to materials ordering in make-to-order assembly. Math. Comput. Modelling, 2005c, 42, 279-290.
    • (2005) Math. Comput. Modelling , vol.42 , pp. 279-290
    • Sawik, T.1
  • 20
    • 77957088268 scopus 로고
    • Mathematical programming models and methods for production planning and scheduling
    • edited by S.C. Graves, A.H.G. Rinnooy Ran and P.H. Zipkin, (North-Holland: Amsterdam)
    • Shapiro, J.F., Mathematical programming models and methods for production planning and scheduling. In Handbook in Operations Research and Management Science: Logistics of Production and Inventory, edited by S.C. Graves, A.H.G. Rinnooy Ran and P.H. Zipkin, 1993 (North-Holland: Amsterdam).
    • (1993) Handbook in Operations Research and Management Science: Logistics of Production and Inventory
    • Shapiro, J.F.1
  • 23
    • 0000857408 scopus 로고    scopus 로고
    • A Lagrangian-based heuristic for dynamic multi-level, multi-item constrained lotsizing with setup times
    • Tempelmeier, H. and Derstroff, M.C., A Lagrangian-based heuristic for dynamic multi-level, multi-item constrained lotsizing with setup times. Manag. Sci., 1996, 42, 738-747.
    • (1996) Manag. Sci. , vol.42 , pp. 738-747
    • Tempelmeier, H.1    Derstroff, M.C.2
  • 24
    • 0031139978 scopus 로고    scopus 로고
    • MIP modelling of changeovers in production planning and scheduling problems
    • Wolsey, L.A., MIP modelling of changeovers in production planning and scheduling problems. Eur. J. Oper. Res., 1997, 99, 154-165.
    • (1997) Eur. J. Oper. Res. , vol.99 , pp. 154-165
    • Wolsey, L.A.1
  • 25


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.