-
1
-
-
0141882956
-
A framework for the development of personalized, distributed web-based configuration systems
-
Ardissono, L., Felfernig, A., Friedrich, G., Goy, A., Jannach, D., Petrone, G., et al. (2003). A framework for the development of personalized, distributed web-based configuration systems. AI Magazine, 24(3), 93-108.
-
(2003)
AI Magazine
, vol.24
, Issue.3
, pp. 93-108
-
-
Ardissono, L.1
Felfernig, A.2
Friedrich, G.3
Goy, A.4
Jannach, D.5
Petrone, G.6
-
3
-
-
27844457069
-
Revenue management in order-driven production systems
-
Barut, M., & Sridharan, V. (2005). Revenue management in order-driven production systems. Decision Sciences, 36(2), 287-316.
-
(2005)
Decision Sciences
, vol.36
, Issue.2
, pp. 287-316
-
-
Barut, M.1
Sridharan, V.2
-
4
-
-
0033688665
-
Using hierarchical pseudo bills of material for customer order acceptance and optimal material replenishment in assemble to order manufacturing of non-modular products
-
Bertrand, J. W. M., Zuijderwijk, M., & Hegge, H. M. H. (2000). Using hierarchical pseudo bills of material for customer order acceptance and optimal material replenishment in assemble to order manufacturing of non-modular products. International Journal of Production Economics, 66(2), 171-184.
-
(2000)
International Journal of Production Economics
, vol.66
, Issue.2
, pp. 171-184
-
-
Bertrand, J.W.M.1
Zuijderwijk, M.2
Hegge, H.M.H.3
-
5
-
-
72049127664
-
A scheduling and capable-to-promise application for Swift & Company
-
Bixby, A., Downs, B., & Self, M. (2006). A scheduling and capable-to-promise application for Swift & Company. Interfaces, 36(1), 69-86.
-
(2006)
Interfaces
, vol.36
, Issue.1
, pp. 69-86
-
-
Bixby, A.1
Downs, B.2
Self, M.3
-
6
-
-
0347973105
-
Conventional wisdom on measurement: A structural equation perspective
-
Bollen, K. A., & Lennox, R. (1991). Conventional wisdom on measurement: A structural equation perspective. Psychological Bulletin, 110(2), 305-314.
-
(1991)
Psychological Bulletin
, vol.110
, Issue.2
, pp. 305-314
-
-
Bollen, K.A.1
Lennox, R.2
-
7
-
-
0002435444
-
Toward a method of middle-range theorizing
-
III.
-
Bourgeois, L. J., III. (1979). Toward a method of middle-range theorizing. Academy of Management Review, 4(3), 443-447.
-
(1979)
Academy of Management Review
, vol.4
, Issue.3
, pp. 443-447
-
-
Bourgeois, L.J.1
-
8
-
-
84856861774
-
-
Configure One's. Configure one's product configurator, accessed April 13, 2011, available at.
-
Configure One's. (2011). Configure one's product configurator, accessed April 13, 2011, available at
-
(2011)
-
-
-
9
-
-
85056005741
-
Multiple indicators in survey research
-
Curtis, R. F., & Jackson, J. (1962). Multiple indicators in survey research. American Journal of Sociology, 68(2), 195-204.
-
(1962)
American Journal of Sociology
, vol.68
, Issue.2
, pp. 195-204
-
-
Curtis, R.F.1
Jackson, J.2
-
11
-
-
4444337585
-
Improving inter-functional coordination to face high product variety and frequent modifications
-
Danese, P., & Romano, P. (2004). Improving inter-functional coordination to face high product variety and frequent modifications. International Journal of Operations & Production Management, 24(9), 863-885.
-
(2004)
International Journal of Operations & Production Management
, vol.24
, Issue.9
, pp. 863-885
-
-
Danese, P.1
Romano, P.2
-
12
-
-
0034325988
-
Approaches to mass customization: Configurations and empirical validation
-
Duray, R., Ward, P. T., Milligan, G. W., & Berry, W. L. (2000). Approaches to mass customization: Configurations and empirical validation. Journal of Operations Management, 18(6), 605-625.
-
(2000)
Journal of Operations Management
, vol.18
, Issue.6
, pp. 605-625
-
-
Duray, R.1
Ward, P.T.2
Milligan, G.W.3
Berry, W.L.4
-
13
-
-
0001073758
-
Building theories from case study research
-
Eisenhardt, K. M. (1989). Building theories from case study research. Academy of Management Review, 14(4), 532-550.
-
(1989)
Academy of Management Review
, vol.14
, Issue.4
, pp. 532-550
-
-
Eisenhardt, K.M.1
-
14
-
-
0000085786
-
Mass customization at Hewlett-Packard: The power of postponement
-
Feitzinger, E., & Lee, H. L. (1997). Mass customization at Hewlett-Packard: The power of postponement. Harvard Business Review, 75(1), 116-121.
-
(1997)
Harvard Business Review
, vol.75
, Issue.1
, pp. 116-121
-
-
Feitzinger, E.1
Lee, H.L.2
-
15
-
-
0032648150
-
The impact of product variety on automobile assembly operations: Empirical evidence and simulation analysis
-
Fisher, M. L., & Ittner, C. D. (1999). The impact of product variety on automobile assembly operations: Empirical evidence and simulation analysis. Management Science, 45(6), 771-786.
-
(1999)
Management Science
, vol.45
, Issue.6
, pp. 771-786
-
-
Fisher, M.L.1
Ittner, C.D.2
-
16
-
-
0039938903
-
Information-processing alternatives for coping with manufacturing environment complexity
-
Flynn, B. B., & Flynn, E. J. (1999). Information-processing alternatives for coping with manufacturing environment complexity. Decision Sciences, 30(4), 1021-1052.
-
(1999)
Decision Sciences
, vol.30
, Issue.4
, pp. 1021-1052
-
-
Flynn, B.B.1
Flynn, E.J.2
-
17
-
-
0010399877
-
Structural equation models with unobservable variables and measurement error: Algebra and statistics
-
Fornell, C., & Larcker, D. F. (1981). Structural equation models with unobservable variables and measurement error: Algebra and statistics. Journal of Marketing Research, 18(3), 382-388.
-
(1981)
Journal of Marketing Research
, vol.18
, Issue.3
, pp. 382-388
-
-
Fornell, C.1
Larcker, D.F.2
-
18
-
-
0036729958
-
Product configuration and inter-firm co-ordination: An innovative solution from a small manufacturing enterprise
-
Forza, C., & Salvador, F. (2002a). Product configuration and inter-firm co-ordination: An innovative solution from a small manufacturing enterprise. Computers in Industry, 49(1), 37-46.
-
(2002)
Computers in Industry
, vol.49
, Issue.1
, pp. 37-46
-
-
Forza, C.1
Salvador, F.2
-
19
-
-
0036497450
-
Managing for variety in the order acquisition and fulfilment process: The contribution of product configuration systems
-
Forza, C., & Salvador, F. (2002b). Managing for variety in the order acquisition and fulfilment process: The contribution of product configuration systems. International Journal of Production Economics, 76(1), 87-98.
-
(2002)
International Journal of Production Economics
, vol.76
, Issue.1
, pp. 87-98
-
-
Forza, C.1
Salvador, F.2
-
21
-
-
77951129165
-
Available-to-promise (ATP) systems: A classification and framework for analysis
-
Framinan, J. M., & Leisten, R. (2010). Available-to-promise (ATP) systems: A classification and framework for analysis. International Journal of Production Research, 48(11), 3079-3103.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.11
, pp. 3079-3103
-
-
Framinan, J.M.1
Leisten, R.2
-
24
-
-
33745035508
-
What happens after ERP implementation: Understanding the impact of interdependence and differentiation on plant-level outcomes
-
Gattiker, T. F., & Goodhue, D. L. (2005). What happens after ERP implementation: Understanding the impact of interdependence and differentiation on plant-level outcomes. MIS Quarterly, 29(3), 559-585.
-
(2005)
MIS Quarterly
, vol.29
, Issue.3
, pp. 559-585
-
-
Gattiker, T.F.1
Goodhue, D.L.2
-
27
-
-
77958566889
-
The double-edged swords of autonomy and external knowledge: Analyzing team effectiveness in a multinational organization
-
Haas, M. R. (2010). The double-edged swords of autonomy and external knowledge: Analyzing team effectiveness in a multinational organization. Academy of Management Journal, 53(5), 989-1008.
-
(2010)
Academy of Management Journal
, vol.53
, Issue.5
, pp. 989-1008
-
-
Haas, M.R.1
-
28
-
-
13944260885
-
Cumulative effect of project changes for electrical and mechanical construction
-
Hanna, A. S., Camlic, R., Peterson, P. A., & Lee, M.-J. (2004). Cumulative effect of project changes for electrical and mechanical construction. Journal of Construction Engineering and Management, 130(6), 762-771.
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 762-771
-
-
Hanna, A.S.1
Camlic, R.2
Peterson, P.A.3
Lee, M.-J.4
-
29
-
-
0033746131
-
Effects of process maturity on quality, cycle time, and effort in software product development
-
Harter, D. E., Krishnan, M. S., & Slaughter, S. A. (2000). Effects of process maturity on quality, cycle time, and effort in software product development. Management Science, 46(4), 451-466.
-
(2000)
Management Science
, vol.46
, Issue.4
, pp. 451-466
-
-
Harter, D.E.1
Krishnan, M.S.2
Slaughter, S.A.3
-
30
-
-
84890913931
-
Maximum likelihood approaches to variance component estimation and to related problems
-
Harville, D. A. (1977). Maximum likelihood approaches to variance component estimation and to related problems. Journal of the American Statistical Association, 72(358), 320-338.
-
(1977)
Journal of the American Statistical Association
, vol.72
, Issue.358
, pp. 320-338
-
-
Harville, D.A.1
-
31
-
-
0000618550
-
The dynamics of process-product life cycles
-
Hayes, R. H., & Wheelwright, S. C. (1979). The dynamics of process-product life cycles. Harvard Business Review, 57(2), 127-136.
-
(1979)
Harvard Business Review
, vol.57
, Issue.2
, pp. 127-136
-
-
Hayes, R.H.1
Wheelwright, S.C.2
-
32
-
-
33646113366
-
Customization: Impact on product and process performance
-
Hegde, V. G., Kekre, S., Rajiv, S., & Tadikamalla, P. R. (2005). Customization: Impact on product and process performance. Production and Operations Management, 14(4), 388-399.
-
(2005)
Production and Operations Management
, vol.14
, Issue.4
, pp. 388-399
-
-
Hegde, V.G.1
Kekre, S.2
Rajiv, S.3
Tadikamalla, P.R.4
-
33
-
-
84990325315
-
Operations technology and organization structure: An empirical reappraisal
-
Hickson, D. J., Pugh, D. S., & Pheysey, D. C. (1969). Operations technology and organization structure: An empirical reappraisal. Administrative Science Quarterly, 14(3), 378-397.
-
(1969)
Administrative Science Quarterly
, vol.14
, Issue.3
, pp. 378-397
-
-
Hickson, D.J.1
Pugh, D.S.2
Pheysey, D.C.3
-
34
-
-
0032165489
-
Variety for sale: Mass customization or mass confusion?
-
Huffman, C., & Kahn, B. E. (1998). Variety for sale: Mass customization or mass confusion? Journal of Retailing, 74(4), 491-513.
-
(1998)
Journal of Retailing
, vol.74
, Issue.4
, pp. 491-513
-
-
Huffman, C.1
Kahn, B.E.2
-
35
-
-
58049220690
-
Estimating within-group interrater reliability with and without response bias
-
James, L. R., Demaree, R. G., & Wolf, G. (1984). Estimating within-group interrater reliability with and without response bias. Journal of Applied Psychology, 69(1), 85-98.
-
(1984)
Journal of Applied Psychology
, vol.69
, Issue.1
, pp. 85-98
-
-
James, L.R.1
Demaree, R.G.2
Wolf, G.3
-
36
-
-
77951703636
-
Demand fulfilment and ATP
-
H. Stadtler & C. Kilger (Eds.), 3rd ed.). Berlin, Germany : Springer
-
Kilger, C., & Schneeweiss, L. (2005). Demand fulfilment and ATP. In H. Stadtler & C. Kilger (Eds.), Supply chain management and advanced planning: concepts, models, software and case studies (3rd ed.). Berlin, Germany : Springer, 179-195.
-
(2005)
Supply chain management and advanced planning: concepts, models, software and case studies
, pp. 179-195
-
-
Kilger, C.1
Schneeweiss, L.2
-
37
-
-
34548714144
-
Customization and real time information access in integrated eBusiness supply chain relationships
-
Klein, R. (2007). Customization and real time information access in integrated eBusiness supply chain relationships. Journal of Operations Management, 25(6), 1366-1381.
-
(2007)
Journal of Operations Management
, vol.25
, Issue.6
, pp. 1366-1381
-
-
Klein, R.1
-
38
-
-
22944433485
-
A business model for uncertainty management
-
Koh, S. C. L., Gunasekaran, A., & Saad, S. M. (2005). A business model for uncertainty management. Benchmarking: An International Journal, 12(4), 383-400.
-
(2005)
Benchmarking: An International Journal
, vol.12
, Issue.4
, pp. 383-400
-
-
Koh, S.C.L.1
Gunasekaran, A.2
Saad, S.M.3
-
39
-
-
23844549857
-
Change and uncertainty in SME manufacturing environments using ERP
-
Koh, S. C. L., & Simpson, M. (2005). Change and uncertainty in SME manufacturing environments using ERP. Journal of Manufacturing Technology Management, 16(6), 629-653.
-
(2005)
Journal of Manufacturing Technology Management
, vol.16
, Issue.6
, pp. 629-653
-
-
Koh, S.C.L.1
Simpson, M.2
-
40
-
-
19944400423
-
Responding schedule changes in build-to-order supply chains
-
Krajewski, L., Wei, J. C., & Tang, L. L. (2005). Responding schedule changes in build-to-order supply chains. Journal of Operations Management, 23(5), 452-469.
-
(2005)
Journal of Operations Management
, vol.23
, Issue.5
, pp. 452-469
-
-
Krajewski, L.1
Wei, J.C.2
Tang, L.L.3
-
41
-
-
0035239259
-
Product development decisions: A review of the literature
-
Krishnan, V., & Ulrich, K. T. (2001). Product development decisions: A review of the literature. Management Science, 47(1), 1-21.
-
(2001)
Management Science
, vol.47
, Issue.1
, pp. 1-21
-
-
Krishnan, V.1
Ulrich, K.T.2
-
42
-
-
84948193503
-
Differentiation and integration in complex organizations
-
Lawrence, P. R., & Lorsch, J. W. (1967). Differentiation and integration in complex organizations. Administrative Science Quarterly, 12(1), 1-47.
-
(1967)
Administrative Science Quarterly
, vol.12
, Issue.1
, pp. 1-47
-
-
Lawrence, P.R.1
Lorsch, J.W.2
-
44
-
-
1542528338
-
Organizational performance as a dependent variable
-
March, J. G., & Sutton, R. I. (1997). Organizational performance as a dependent variable. Organization Science, 8(6), 698-706.
-
(1997)
Organization Science
, vol.8
, Issue.6
, pp. 698-706
-
-
March, J.G.1
Sutton, R.I.2
-
45
-
-
0002584653
-
The customization-responsiveness squeeze
-
McCutcheon, D. M., Raturi, A. S., & Meredith, J. R. (1994). The customization-responsiveness squeeze. Sloan Management Review, 35(2), 89-99.
-
(1994)
Sloan Management Review
, vol.35
, Issue.2
, pp. 89-99
-
-
McCutcheon, D.M.1
Raturi, A.S.2
Meredith, J.R.3
-
46
-
-
84980258822
-
Toward a new contingency approach: The search for organizational gestalts
-
Miller, D. (1981). Toward a new contingency approach: The search for organizational gestalts. Journal of Management Studies, 18(1), 1-26.
-
(1981)
Journal of Management Studies
, vol.18
, Issue.1
, pp. 1-26
-
-
Miller, D.1
-
47
-
-
0035629092
-
Doing research that is useful to practice: A model and empirical exploration
-
Mohrman, S. A., Gibson, C. B., & Mohrman, A. M., Jr. (2001). Doing research that is useful to practice: A model and empirical exploration. Academy of Management Journal, 44(2), 357-375.
-
(2001)
Academy of Management Journal
, vol.44
, Issue.2
, pp. 357-375
-
-
Mohrman, S.A.1
Gibson, C.B.2
Mohrman Jr, A.M.3
-
48
-
-
0040082973
-
Using the correct statistical test for the equality of regression coefficients
-
Paternoster, R., Brame, R., Mazerolle, P., & Piquero, A. (1998). Using the correct statistical test for the equality of regression coefficients. Criminology, 36(4), 859-866.
-
(1998)
Criminology
, vol.36
, Issue.4
, pp. 859-866
-
-
Paternoster, R.1
Brame, R.2
Mazerolle, P.3
Piquero, A.4
-
49
-
-
77956889208
-
Recovery of inter-block information when block sizes are unequal
-
Patterson, H. D., & Thompson, R. (1971). Recovery of inter-block information when block sizes are unequal. Biometrika, 58(3), 545-554.
-
(1971)
Biometrika
, vol.58
, Issue.3
, pp. 545-554
-
-
Patterson, H.D.1
Thompson, R.2
-
50
-
-
9544231676
-
Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management
-
Pibernik, R. (2005). Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management. International Journal of Production Economics, 93, 239-252.
-
(2005)
International Journal of Production Economics
, vol.93
, pp. 239-252
-
-
Pibernik, R.1
-
53
-
-
84970235764
-
Self-reports in organizational research: Problems and prospects
-
Podsakoff, P. M., & Organ, D. W. (1986). Self-reports in organizational research: Problems and prospects. Journal of Management, 12(4), 531-544.
-
(1986)
Journal of Management
, vol.12
, Issue.4
, pp. 531-544
-
-
Podsakoff, P.M.1
Organ, D.W.2
-
54
-
-
0141907688
-
Common method biases in behavioral research: A critical review of the literature and recommended remedies
-
Podsakoff, P. M., MacKenzie, S. B., Lee, J.-Y., & Podsakoff, N. P. (2003). Common method biases in behavioral research: A critical review of the literature and recommended remedies. Journal of Applied Psychology, 88(5), 879-903.
-
(2003)
Journal of Applied Psychology
, vol.88
, Issue.5
, pp. 879-903
-
-
Podsakoff, P.M.1
MacKenzie, S.B.2
Lee, J.-Y.3
Podsakoff, N.P.4
-
56
-
-
0345010120
-
Managing product variety: An integrative review and research directions
-
Ramdas, K. (2003). Managing product variety: An integrative review and research directions. Production and Operations Management, 12(1), 79-101.
-
(2003)
Production and Operations Management
, vol.12
, Issue.1
, pp. 79-101
-
-
Ramdas, K.1
-
57
-
-
0035707598
-
Product variety, supply chain structure, and firm performance: Analysis of the U.S. bicycle industry
-
Randall, T., & Ulrich, K. (2001). Product variety, supply chain structure, and firm performance: Analysis of the U.S. bicycle industry. Management Science, 47(12), 1588-1604.
-
(2001)
Management Science
, vol.47
, Issue.12
, pp. 1588-1604
-
-
Randall, T.1
Ulrich, K.2
-
58
-
-
24944465750
-
Effects of delivery systems on change order size and frequency in mechanical construction
-
Riley, D. R., Diller, B. E., & Kerr, D. (2005). Effects of delivery systems on change order size and frequency in mechanical construction. Journal of Construction Engineering and Management, 131(9), 953-962.
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.9
, pp. 953-962
-
-
Riley, D.R.1
Diller, B.E.2
Kerr, D.3
-
59
-
-
0001834005
-
Planning for product platforms
-
Robertson, D., & Ulrich, K. (1998). Planning for product platforms. Sloan Management Review, 39(4), 19-31.
-
(1998)
Sloan Management Review
, vol.39
, Issue.4
, pp. 19-31
-
-
Robertson, D.1
Ulrich, K.2
-
60
-
-
0038735060
-
Revisiting alternative theoretical paradigms in manufacturing strategy
-
Safizadeh, M. H., Ritzman, L. P., & Mallick, D. (2000). Revisiting alternative theoretical paradigms in manufacturing strategy. Production and Operations Management, 9(2), 111-127.
-
(2000)
Production and Operations Management
, vol.9
, Issue.2
, pp. 111-127
-
-
Safizadeh, M.H.1
Ritzman, L.P.2
Mallick, D.3
-
61
-
-
0036722566
-
Modularity, product variety, production volume, and component sourcing: Theorizing beyond generic prescriptions
-
Salvador, F., Forza, C., & Rungtusanatham, M. (2002). Modularity, product variety, production volume, and component sourcing: Theorizing beyond generic prescriptions. Journal of Operations Management, 20(5), 549-575.
-
(2002)
Journal of Operations Management
, vol.20
, Issue.5
, pp. 549-575
-
-
Salvador, F.1
Forza, C.2
Rungtusanatham, M.3
-
62
-
-
4344652268
-
Configuring products to address the customization-responsiveness squeeze: A survey of management issues and opportunities
-
Salvador, F., & Forza, C. (2004). Configuring products to address the customization-responsiveness squeeze: A survey of management issues and opportunities. International Journal of Production Economics, 91(3), 273-291.
-
(2004)
International Journal of Production Economics
, vol.91
, Issue.3
, pp. 273-291
-
-
Salvador, F.1
Forza, C.2
-
63
-
-
84856859373
-
-
SAP. SAP Library: mySAP ERP 6.0: Variant Configuration. Retrieved April 13, 2011, from.
-
SAP. (2011a). SAP Library: mySAP ERP 6.0: Variant Configuration. Retrieved April 13, 2011, from
-
(2011)
-
-
-
64
-
-
84856941049
-
-
SAP. SAP Library: mySAP SCM 5.0: Global Available-to-Promise. Retrieved April 13, 2011, from.
-
SAP. (2011b). SAP Library: mySAP SCM 5.0: Global Available-to-Promise. Retrieved April 13, 2011, from
-
(2011)
-
-
-
65
-
-
0035295082
-
One size does not fit all projects: Exploring classical contingency domains
-
Shenhar, A. J. (2001). One size does not fit all projects: Exploring classical contingency domains. Management Science, 47(3), 394-414.
-
(2001)
Management Science
, vol.47
, Issue.3
, pp. 394-414
-
-
Shenhar, A.J.1
-
66
-
-
3543147710
-
The effects of purchased parts commonality on manufacturing lead time
-
Sheu, C., & Wacker, J. G. (1997). The effects of purchased parts commonality on manufacturing lead time. International Journal of Operations & Production Management, 17(8), 725-745.
-
(1997)
International Journal of Operations & Production Management
, vol.17
, Issue.8
, pp. 725-745
-
-
Sheu, C.1
Wacker, J.G.2
-
67
-
-
78049462315
-
Common method bias in regression models with linear, quadratic, and interaction effects
-
Siemsen, E., Roth, A., & Oliveira, P. (2010). Common method bias in regression models with linear, quadratic, and interaction effects. Organizational Research Methods, 13(3), 456-476.
-
(2010)
Organizational Research Methods
, vol.13
, Issue.3
, pp. 456-476
-
-
Siemsen, E.1
Roth, A.2
Oliveira, P.3
-
69
-
-
0001696354
-
Quality management: Universal or context dependent?
-
Sousa, R., & Voss, C. A. (2001). Quality management: Universal or context dependent? Production and Operations Management, 10(4), 383-404.
-
(2001)
Production and Operations Management
, vol.10
, Issue.4
, pp. 383-404
-
-
Sousa, R.1
Voss, C.A.2
-
70
-
-
0037213748
-
Linking quality management to manufacturing strategy: An empirical investigation of customer focus practices
-
Sousa, R. (2003). Linking quality management to manufacturing strategy: An empirical investigation of customer focus practices. Journal of Operations Management, 21(1), 1-18.
-
(2003)
Journal of Operations Management
, vol.21
, Issue.1
, pp. 1-18
-
-
Sousa, R.1
-
71
-
-
53349141239
-
Contingency research in operations management practices
-
Sousa, R., & Voss, C. A. (2008). Contingency research in operations management practices. Journal of Operations Management, 26(6), 697-713.
-
(2008)
Journal of Operations Management
, vol.26
, Issue.6
, pp. 697-713
-
-
Sousa, R.1
Voss, C.A.2
-
72
-
-
10444237299
-
Supply chain management and advanced planning - basics, overview and challenges
-
Stadtler, H. (2005). Supply chain management and advanced planning - basics, overview and challenges. European Journal of Operational Research, 163(3), 575-588.
-
(2005)
European Journal of Operational Research
, vol.163
, Issue.3
, pp. 575-588
-
-
Stadtler, H.1
-
73
-
-
0001432841
-
Modular production - a new concept
-
Starr, M. K. (1965). Modular production - a new concept. Harvard Business Review, 43(6), 131-142.
-
(1965)
Harvard Business Review
, vol.43
, Issue.6
, pp. 131-142
-
-
Starr, M.K.1
-
74
-
-
14844351304
-
Evaluation of postponement structures to accommodate mass customization
-
Su, J. C. P., Chang, Y.-L., & Ferguson, M. (2005). Evaluation of postponement structures to accommodate mass customization. Journal of Operations Management, 23(3-4), 305-318.
-
(2005)
Journal of Operations Management
, vol.23
, Issue.3-4
, pp. 305-318
-
-
Su, J.C.P.1
Chang, Y.-L.2
Ferguson, M.3
-
75
-
-
29144483522
-
The antecedents of supply chain agility of a firm: Scale development and model testing
-
Swafford, P. M., Ghosh, S., & Murthy, N. (2006). The antecedents of supply chain agility of a firm: Scale development and model testing. Journal of Operations Management, 24(2), 170-188.
-
(2006)
Journal of Operations Management
, vol.24
, Issue.2
, pp. 170-188
-
-
Swafford, P.M.1
Ghosh, S.2
Murthy, N.3
-
76
-
-
0031553306
-
Delivery and trade-offs
-
Szwejczewski, M., Mapes, J., & New, C. (1997). Delivery and trade-offs. International Journal of Production Economics, 53(3), 323-330.
-
(1997)
International Journal of Production Economics
, vol.53
, Issue.3
, pp. 323-330
-
-
Szwejczewski, M.1
Mapes, J.2
New, C.3
-
77
-
-
61849120811
-
Customization strategies in electronic retailing: Implications of customer purchase behavior
-
Thirumalai, S., & Sinha, K. K. (2009). Customization strategies in electronic retailing: Implications of customer purchase behavior. Decision Sciences, 40(1), 5-36.
-
(2009)
Decision Sciences
, vol.40
, Issue.1
, pp. 5-36
-
-
Thirumalai, S.1
Sinha, K.K.2
-
78
-
-
14844338815
-
Measuring modularity-based manufacturing practices and their impact on mass customization capability: A customer-driven perspective
-
Tu, Q., Vonderembse, M. A., Ragu-Nathan, T. S., & Ragu-Nathan, B. (2004). Measuring modularity-based manufacturing practices and their impact on mass customization capability: A customer-driven perspective. Decision Sciences, 35(2), 147-168.
-
(2004)
Decision Sciences
, vol.35
, Issue.2
, pp. 147-168
-
-
Tu, Q.1
Vonderembse, M.A.2
Ragu-Nathan, T.S.3
Ragu-Nathan, B.4
-
79
-
-
0000471240
-
Information processing as an integrating concept in organizational design
-
Tushman, M. L., & Nadler, D. A. (1978). Information processing as an integrating concept in organizational design. Academy of Management Review, 3(3), 613-624.
-
(1978)
Academy of Management Review
, vol.3
, Issue.3
, pp. 613-624
-
-
Tushman, M.L.1
Nadler, D.A.2
-
80
-
-
33644923480
-
The planning flexibility bottleneck in food processing industries
-
Van Wezel, W., Van Donk, D. P., & Gaalman, G. (2006). The planning flexibility bottleneck in food processing industries. Journal of Operations Management, 24(3), 287-300.
-
(2006)
Journal of Operations Management
, vol.24
, Issue.3
, pp. 287-300
-
-
Van Wezel, W.1
Van Donk, D.P.2
Gaalman, G.3
-
81
-
-
33744975686
-
Optimization-based decision support for order promising in supply chain networks
-
Venkatadri, U., Srinivasan, A., Montreuil, B., & Saraswat, A. (2006). Optimization-based decision support for order promising in supply chain networks. International Journal of Production Economics, 103(1), 117-130.
-
(2006)
International Journal of Production Economics
, vol.103
, Issue.1
, pp. 117-130
-
-
Venkatadri, U.1
Srinivasan, A.2
Montreuil, B.3
Saraswat, A.4
-
82
-
-
0000030687
-
The concept of fit in strategy research: Toward verbal and statistical correspondence
-
Venkatraman, N. (1989). The concept of fit in strategy research: Toward verbal and statistical correspondence. Academy of Management Review, 14(3), 423-444.
-
(1989)
Academy of Management Review
, vol.14
, Issue.3
, pp. 423-444
-
-
Venkatraman, N.1
-
83
-
-
22544465501
-
-
(5th ed.). New York, NY : McGraw-Hill Irwin.
-
Vollmann, T. E., Berry, W. L., Whybark, D. C., & Jacobs, F. R. (2005). Manufacturing planning and control for supply chain management (5th ed.). New York, NY : McGraw-Hill Irwin.
-
(2005)
Manufacturing planning and control for supply chain management
-
-
Vollmann, T.E.1
Berry, W.L.2
Whybark, D.C.3
Jacobs, F.R.4
-
84
-
-
70449904902
-
Service architecture and modularity
-
Voss, C. A., & Hsuan, J. (2009). Service architecture and modularity. Decision Sciences, 40(3), 541-569.
-
(2009)
Decision Sciences
, vol.40
, Issue.3
, pp. 541-569
-
-
Voss, C.A.1
Hsuan, J.2
-
85
-
-
19944375780
-
Managing build-to-order short life-cycle products: Benefits of pre-season price incentives with standardization
-
Weng, Z. K., & Parlar, M. (2005). Managing build-to-order short life-cycle products: Benefits of pre-season price incentives with standardization. Journal of Operations Management, 23(5), 482-495.
-
(2005)
Journal of Operations Management
, vol.23
, Issue.5
, pp. 482-495
-
-
Weng, Z.K.1
Parlar, M.2
-
87
-
-
0036568674
-
Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects
-
Yeo, K. T., & Ning, J. H. (2002). Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects. International Journal of Project Management, 20(4), 253-262.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.4
, pp. 253-262
-
-
Yeo, K.T.1
Ning, J.H.2
-
88
-
-
0034555721
-
Three likelihood-based methods for mean and covariance structure analysis with nonnormal missing data
-
Yuan, K.-H., & Bentler, P. M. (2000). Three likelihood-based methods for mean and covariance structure analysis with nonnormal missing data. Sociological Methodology, 30, 165-200.
-
(2000)
Sociological Methodology
, vol.30
, pp. 165-200
-
-
Yuan, K.-H.1
Bentler, P.M.2
-
89
-
-
39649122099
-
Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis
-
Zorzini, M., Corti, D., & Pozzetti, A. (2008). Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis. International Journal of Production Economics, 112(2), 919-933.
-
(2008)
International Journal of Production Economics
, vol.112
, Issue.2
, pp. 919-933
-
-
Zorzini, M.1
Corti, D.2
Pozzetti, A.3
|