메뉴 건너뛰기




Volumn 23, Issue 4, 2007, Pages 223-230

A statistical analysis of engineering project risks in the Korean shipbuilding industry

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION INDUSTRY; PROJECT MANAGEMENT; QUALITY CONTROL; RAW MATERIALS; RISK MANAGEMENT; STATISTICAL METHODS; STRUCTURAL DESIGN;

EID: 38049144587     PISSN: 87561417     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (15)

References (22)
  • 1
    • 0027621699 scopus 로고    scopus 로고
    • AGRAWAL, R., IMIELINSKI, T., AND SWAMI, A. 1993 Mining association rules between sets of items in large databases, Proceedings, ACM SIGMOD International Conference on Management of Data, 207-216.
    • AGRAWAL, R., IMIELINSKI, T., AND SWAMI, A. 1993 Mining association rules between sets of items in large databases, Proceedings, ACM SIGMOD International Conference on Management of Data, 207-216.
  • 2
    • 38049111652 scopus 로고    scopus 로고
    • AGRAWAL, R., AND SRIKANT, R. 1994 Fast algorithms for mining association rules, Proceedings, 20th International Conference on Very Large Databases, 487-499.
    • AGRAWAL, R., AND SRIKANT, R. 1994 Fast algorithms for mining association rules, Proceedings, 20th International Conference on Very Large Databases, 487-499.
  • 4
  • 5
    • 3843104640 scopus 로고    scopus 로고
    • Knowledge-driven production and qualification: Key factors for sustainable productivity
    • BRODDA, J. 2004 Knowledge-driven production and qualification: Key factors for sustainable productivity, JOURNAL OF SHIP PRODUCTION, 20, 2, 100-106.
    • (2004) JOURNAL OF SHIP PRODUCTION , vol.20 , Issue.2 , pp. 100-106
    • BRODDA, J.1
  • 6
    • 25844440109 scopus 로고    scopus 로고
    • A novel manufacturing defect detection method using a association rule mining techniques
    • CHEN, W., TSENG, S., AND WANG, C. 2005 A novel manufacturing defect detection method using a association rule mining techniques. Expert Systems with Applications, 29, 4, 807-815.
    • (2005) Expert Systems with Applications , vol.29 , Issue.4 , pp. 807-815
    • CHEN, W.1    TSENG, S.2    WANG, C.3
  • 7
    • 38049099409 scopus 로고    scopus 로고
    • CLARKSON RESEARCH SERVICE, Clarkson Research Service
    • CLARKSON RESEARCH SERVICE 2007 Shipping sector reports, Clarkson Research Service.
    • (2007) Shipping sector reports
  • 8
    • 0001848701 scopus 로고
    • Planning for project control through risk analysis: A petroleum pipeline-laying project
    • DEY, P., TABUCANON, M. T., AND OGUNLANA, S. O. 1994 Planning for project control through risk analysis: a petroleum pipeline-laying project. International Journal of Project Management, 12, 1, 23-33.
    • (1994) International Journal of Project Management , vol.12 , Issue.1 , pp. 23-33
    • DEY, P.1    TABUCANON, M.T.2    OGUNLANA, S.O.3
  • 9
    • 84992993173 scopus 로고    scopus 로고
    • Risk and risk management in construction: A review and future directions for research
    • EDWARDS, P. J., AND BOWEN, P. A. 1998 Risk and risk management in construction: a review and future directions for research, Engineering Construction and Architectural Management, 5, 4, 339-349.
    • (1998) Engineering Construction and Architectural Management , vol.5 , Issue.4 , pp. 339-349
    • EDWARDS, P.J.1    BOWEN, P.A.2
  • 11
    • 0347537738 scopus 로고    scopus 로고
    • Productivity improvement at the SENESCO shipyard
    • GEBHARDT, L. P., AND JARVIS, R. G. 2003 Productivity improvement at the SENESCO shipyard, JOURNAL OF SHIP PRODUCTION, 19, 3, 187-193.
    • (2003) JOURNAL OF SHIP PRODUCTION , vol.19 , Issue.3 , pp. 187-193
    • GEBHARDT, L.P.1    JARVIS, R.G.2
  • 12
    • 0035392728 scopus 로고    scopus 로고
    • Approaches for making risk-based go/no-go decision international projects
    • HAN, S. H., AND DIEKMANN, J. E. 2001 Approaches for making risk-based go/no-go decision international projects, Journal of Construction Engineering and Management, 127, 4, 255-349.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 255-349
    • HAN, S.H.1    DIEKMANN, J.E.2
  • 14
    • 38049175747 scopus 로고    scopus 로고
    • An exploratory study of risks in information system development projects: Using association rule mining
    • KIM, E. H., AND PARK, Y. 2006 An exploratory study of risks in information system development projects: using association rule mining, International Journal of Technology Intelligence and Planning, 2, 4, 404-417.
    • (2006) International Journal of Technology Intelligence and Planning , vol.2 , Issue.4 , pp. 404-417
    • KIM, E.H.1    PARK, Y.2
  • 15
    • 0037837717 scopus 로고    scopus 로고
    • Shipbuilding productivity rates of change in east Asia
    • KOENIG, P. C., NARITA, H., AND BABA, K. 2003 Shipbuilding productivity rates of change in east Asia, JOURNAL OF SHIP PRODUCTION, 19, 1, 32-37.
    • (2003) JOURNAL OF SHIP PRODUCTION , vol.19 , Issue.1 , pp. 32-37
    • KOENIG, P.C.1    NARITA, H.2    BABA, K.3
  • 17
  • 18
    • 0034095288 scopus 로고    scopus 로고
    • China shipbuilding management challenges in the 1980s
    • LU, B. Z., AND TANG, A. S. T. 2000 China shipbuilding management challenges in the 1980s, Maritime Policy & Management, 27, 1, 71-78.
    • (2000) Maritime Policy & Management , vol.27 , Issue.1 , pp. 71-78
    • LU, B.Z.1    TANG, A.S.T.2
  • 19
    • 0035501151 scopus 로고    scopus 로고
    • Understanding and managing risks in large engineering projects
    • MILLER, R., AND LESSARD, D. 2001 Understanding and managing risks in large engineering projects, International Journal of Project Management, 19, 8, 437-443.
    • (2001) International Journal of Project Management , vol.19 , Issue.8 , pp. 437-443
    • MILLER, R.1    LESSARD, D.2
  • 20
    • 24344485381 scopus 로고    scopus 로고
    • Factors affecting ship design and construction lead time and cost
    • MOYST, H., AND DAS, B. 2005 Factors affecting ship design and construction lead time and cost, JOURNAL OF SHIP PRODUCTION, 21, 3, 186-194.
    • (2005) JOURNAL OF SHIP PRODUCTION , vol.21 , Issue.3 , pp. 186-194
    • MOYST, H.1    DAS, B.2
  • 22
    • 0011127465 scopus 로고
    • Risk management for overseas construction projects
    • ZHI, H. 1995 Risk management for overseas construction projects, International Journal of Project Management, 13, 4, 231-237.
    • (1995) International Journal of Project Management , vol.13 , Issue.4 , pp. 231-237
    • ZHI, H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.