메뉴 건너뛰기




Volumn 104, Issue 2, 2006, Pages 676-693

Aggregate load-oriented workload control: A review and a re-classification of a key approach

Author keywords

Job shop; Make to order (MTO); Production planning and control (PPC); Workload control (WLC)

Indexed keywords

CLASSIFICATION (OF INFORMATION); DECISION SUPPORT SYSTEMS; INDUSTRIAL MANAGEMENT; INDUSTRIAL RESEARCH; PRODUCTION CONTROL; WORK SIMPLIFICATION;

EID: 33748750890     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2005.05.022     Document Type: Article
Times cited : (65)

References (53)
  • 1
    • 84985810576 scopus 로고
    • Due date assignment, job order release and sequencing interaction in job shop scheduling
    • Ahmed I., and Fisher W.W. Due date assignment, job order release and sequencing interaction in job shop scheduling. Decision Sciences 23 3 (1992) 633-646
    • (1992) Decision Sciences , vol.23 , Issue.3 , pp. 633-646
    • Ahmed, I.1    Fisher, W.W.2
  • 3
    • 0023979312 scopus 로고
    • Theory and practice of load oriented manufacturing control
    • Bechte W. Theory and practice of load oriented manufacturing control. International Journal of Production Research 26 3 (1988) 375-395
    • (1988) International Journal of Production Research , vol.26 , Issue.3 , pp. 375-395
    • Bechte, W.1
  • 4
    • 0002479150 scopus 로고
    • Load oriented manufacturing control just in time production for job shops
    • Bechte W. Load oriented manufacturing control just in time production for job shops. Production Planning and Control 5 (1994) 292-307
    • (1994) Production Planning and Control , vol.5 , pp. 292-307
    • Bechte, W.1
  • 6
    • 0036820319 scopus 로고    scopus 로고
    • Workload based order release and productivity: A missing link
    • Bertrand J.W.M., and Van Ooijen H.P.G. Workload based order release and productivity: A missing link. Production Planning and Control 13 7 (2002) 665-678
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 665-678
    • Bertrand, J.W.M.1    Van Ooijen, H.P.G.2
  • 8
    • 0024769152 scopus 로고
    • Implementing a loading heuristic in a discrete release job shop
    • Bobrowski P.M. Implementing a loading heuristic in a discrete release job shop. International Journal of Production Research 27 (1989) 1935-1948
    • (1989) International Journal of Production Research , vol.27 , pp. 1935-1948
    • Bobrowski, P.M.1
  • 9
    • 0036819876 scopus 로고    scopus 로고
    • The workload control concept: Theory and practical extensions of load oriented order release
    • Breithaupt J.W., Land M.J., and Nyhuis P. The workload control concept: Theory and practical extensions of load oriented order release. Production Planning and Control 13 7 (2002) 625-638
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 625-638
    • Breithaupt, J.W.1    Land, M.J.2    Nyhuis, P.3
  • 11
    • 0036819537 scopus 로고    scopus 로고
    • An experimental investigation on workload limiting methods with ORR policies in a job shop environment
    • Cigolini R., and Portioli-Staudacher A. An experimental investigation on workload limiting methods with ORR policies in a job shop environment. Production Planning and Control 13 7 (2002) 602-613
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 602-613
    • Cigolini, R.1    Portioli-Staudacher, A.2
  • 12
    • 0032628965 scopus 로고    scopus 로고
    • Pricing and lead time decisions for make-to-order firms with contingent orders
    • Easton F.F., and Moodie D.R. Pricing and lead time decisions for make-to-order firms with contingent orders. European Journal of Operational Research 116 2 (1999) 305-318
    • (1999) European Journal of Operational Research , vol.116 , Issue.2 , pp. 305-318
    • Easton, F.F.1    Moodie, D.R.2
  • 13
  • 14
    • 0036820210 scopus 로고    scopus 로고
    • The effectiveness of input control based on aggregate versus bottleneck workloads
    • Enns S.T., and Prongue Costa M. The effectiveness of input control based on aggregate versus bottleneck workloads. Production Planning and Control 13 7 (2002) 614-624
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 614-624
    • Enns, S.T.1    Prongue Costa, M.2
  • 15
    • 33748754409 scopus 로고    scopus 로고
    • EUROPA, 2003. http://europa.eu.int/comm/enterprise/enterprise_policy/sme_definition/index_en.htm.
  • 16
  • 18
    • 0024961857 scopus 로고
    • Production planning systems and their applicability to make to order companies
    • Hendry L.C., and Kingsman B.G. Production planning systems and their applicability to make to order companies. European Journal of Operational Research 40 (1989) 1-15
    • (1989) European Journal of Operational Research , vol.40 , pp. 1-15
    • Hendry, L.C.1    Kingsman, B.G.2
  • 20
    • 0000327811 scopus 로고
    • Alternative order release mechanisms: A comparison by simulation
    • Hendry L.C., and Wong S.K. Alternative order release mechanisms: A comparison by simulation. International Journal of Production Research 32 12 (1994) 2827-2842
    • (1994) International Journal of Production Research , vol.32 , Issue.12 , pp. 2827-2842
    • Hendry, L.C.1    Wong, S.K.2
  • 21
    • 27744503410 scopus 로고    scopus 로고
    • Product customisation and competitive advantage: An empirical study
    • Hendry L.C., Kingsman B.G., and Amaro G.M. Product customisation and competitive advantage: An empirical study. EUROMA Conference Proceedings 1 (2003) 119-128
    • (2003) EUROMA Conference Proceedings , vol.1 , pp. 119-128
    • Hendry, L.C.1    Kingsman, B.G.2    Amaro, G.M.3
  • 23
    • 0242332842 scopus 로고    scopus 로고
    • Modelling and analysis of wafer fabrication scheduling via generalised stochastic Petri net and simulated annealing
    • Jain V., Swarnkar R., and Tiwari M.K. Modelling and analysis of wafer fabrication scheduling via generalised stochastic Petri net and simulated annealing. International Journal of Production Research 41 15 (2003) 3501-3527
    • (2003) International Journal of Production Research , vol.41 , Issue.15 , pp. 3501-3527
    • Jain, V.1    Swarnkar, R.2    Tiwari, M.K.3
  • 24
    • 0034295811 scopus 로고    scopus 로고
    • Modelling input-output workload control for dynamic capacity planning in production planning systems
    • Kingsman B.G. Modelling input-output workload control for dynamic capacity planning in production planning systems. International Journal of Production Economics 68 1 (2000) 73-93
    • (2000) International Journal of Production Economics , vol.68 , Issue.1 , pp. 73-93
    • Kingsman, B.G.1
  • 25
    • 0036819875 scopus 로고    scopus 로고
    • The relative contributions of input and output controls on the performance of a workload control system in make to order companies
    • Kingsman B.G., and Hendry L.C. The relative contributions of input and output controls on the performance of a workload control system in make to order companies. Production Planning and Control 13 7 (2002) 579-590
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 579-590
    • Kingsman, B.G.1    Hendry, L.C.2
  • 26
    • 0343299650 scopus 로고    scopus 로고
    • Strike rate matrices for integrating marketing and production during the tendering process in make-to-order subcontractors
    • Kingsman B.G., and Mercer A. Strike rate matrices for integrating marketing and production during the tendering process in make-to-order subcontractors. International Journal of Operational Research 4 1 (1997) 251-257
    • (1997) International Journal of Operational Research , vol.4 , Issue.1 , pp. 251-257
    • Kingsman, B.G.1    Mercer, A.2
  • 30
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • Land M.J., and Gaalman G. The performance of workload control concepts in job shops: Improving the release method. International Journal of Production Economics 56-57 (1998) 347-364
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.2
  • 34
    • 0036820605 scopus 로고    scopus 로고
    • Lot sizing in workload control systems
    • Missbauer H. Lot sizing in workload control systems. Production Planning and Control 13 7 (2002) 649-664
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 649-664
    • Missbauer, H.1
  • 36
    • 0032635740 scopus 로고    scopus 로고
    • Delivery date decision support system for the large scale make-to, -order manufacturing companies: A Korean electric motor company case
    • Park C., Song J., Kim J.-G., and Kim I. Delivery date decision support system for the large scale make-to, -order manufacturing companies: A Korean electric motor company case. Production Planning and Control 10 6 (1999) 585-597
    • (1999) Production Planning and Control , vol.10 , Issue.6 , pp. 585-597
    • Park, C.1    Song, J.2    Kim, J.-G.3    Kim, I.4
  • 37
    • 0032118511 scopus 로고    scopus 로고
    • The impact of parameters setting in load oriented manufacturing control
    • Perona M., and Portioli A. The impact of parameters setting in load oriented manufacturing control. International Journal of Production Economics 55 (1998) 133-142
    • (1998) International Journal of Production Economics , vol.55 , pp. 133-142
    • Perona, M.1    Portioli, A.2
  • 39
    • 21344497794 scopus 로고
    • An evaluation of capacity sensitive order review and release procedures in job shops
    • Philipoom P.R., Malhotra M.K., and Jensen J.B. An evaluation of capacity sensitive order review and release procedures in job shops. Decision Sciences 24 6 (1993) 1109-1133
    • (1993) Decision Sciences , vol.24 , Issue.6 , pp. 1109-1133
    • Philipoom, P.R.1    Malhotra, M.K.2    Jensen, J.B.3
  • 40
    • 27744604305 scopus 로고    scopus 로고
    • General bucket: A new release procedure for workload control
    • preprints
    • Portioli A. General bucket: A new release procedure for workload control. International Working Seminar on Production Economics 2 (2002) 305-406 preprints
    • (2002) International Working Seminar on Production Economics , vol.2 , pp. 305-406
    • Portioli, A.1
  • 41
  • 43
    • 30844465769 scopus 로고    scopus 로고
    • Production planning in a make to order environment: The case of a mould manufacturer
    • Silva C., and Magalhaes J.M. Production planning in a make to order environment: The case of a mould manufacturer. EUROMA POMS Conference Proceedings 2 (2003) 729-738
    • (2003) EUROMA POMS Conference Proceedings , vol.2 , pp. 729-738
    • Silva, C.1    Magalhaes, J.M.2
  • 44
    • 0002673047 scopus 로고    scopus 로고
    • An exposition of multiple constraint scheduling as implemented in the goal system (formerly disaster)
    • Simons J.V., and Simpson III W.P. An exposition of multiple constraint scheduling as implemented in the goal system (formerly disaster). Production and Operations Management 6 1 (1997) 3-22
    • (1997) Production and Operations Management , vol.6 , Issue.1 , pp. 3-22
    • Simons, J.V.1    Simpson III, W.P.2
  • 46
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make to order industry
    • Stevenson M., Hendry L.C., and Kingsman B.G. A review of production planning and control: The applicability of key concepts to the make to order industry. International Journal of Production Research 43 5 (2005) 869-898
    • (2005) International Journal of Production Research , vol.43 , Issue.5 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 47
    • 33748745887 scopus 로고    scopus 로고
    • Tatsiopoulos, I.P., 1983. A microcomputer-based interactive system for managing production and marketing in small component manufacturing firms using a hierarchical backlog control and lead time management technology. Ph.D. Thesis, Lancaster University, England.
  • 48
    • 0031224302 scopus 로고    scopus 로고
    • An order release reference model as a link between production management and shop floor control software
    • Tatsiopoulos I.P. An order release reference model as a link between production management and shop floor control software. Computers in Industry 33 (1997) 335-344
    • (1997) Computers in Industry , vol.33 , pp. 335-344
    • Tatsiopoulos, I.P.1
  • 52


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.