Volumn 26, Issue 3, 2012, Pages 396-408

Performance of shuffled frog-leaping algorithm in finance-based scheduling

Author keywords

Cash flow; Evolutionary algorithms; Financial management; Genetic algorithms; Meta heuristics; Project financing; Shuffled frog leaping algorithm; Simulated annealing

Indexed keywords

CASH FLOW; FINANCIAL MANAGEMENTS; META HEURISTICS; PROJECT FINANCING; SHUFFLED FROG-LEAPING ALGORITHMS;

EID: 84861112610     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000157     Document Type: Article
Times cited : (33)

References (111)
  • 2
    • 84861151577 scopus 로고    scopus 로고
    • M.Sc. thesis, System Engineering Dept., King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia
    • Alghazi, A. (2009). Finance-based scheduling of activity networks. M.Sc. thesis, System Engineering Dept., King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia.
    • (2009) Finance-based Scheduling of Activity Networks
    • Alghazi, A.1
  • 3
    • 70350637537 scopus 로고    scopus 로고
    • Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities
    • CMECF3 0144-6193. 10.1080/01446190903191764
    • Ali, M., and Elazouni, A. (2009). Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Constr. Manage. Econ. CMECF3 0144-6193, 27 (9), 839-856. 10.1080/01446190903191764
    • (2009) Constr. Manage. Econ. , vol.27 , Issue.9 , pp. 839-856
    • Ali, M.1    Elazouni, A.2
  • 4
    • 34248524665 scopus 로고    scopus 로고
    • Probabilistic performance-based optimal design of steel moment-resisting frames. II: Applications
    • DOI 10.1061/(ASCE)0733-9445(2007)133:6(767)
    • Alimoradi, A., Pezeshk, S., and Foley, C. (2007). Probabilistic performance-based optimal design of steel moment-resisting frames. II: Applications. J. Struct. Eng. JSENDH 0733-9445, 133 (6), 767-776. 10.1061/(ASCE)0733-9445(2007)133:6(767) (Pubitemid 46753504)
    • (2007) Journal of Structural Engineering , vol.133 , Issue.6 , pp. 767-776
    • Alimoradi, A.1    Pezeshk, S.2    Foley, C.M.3
  • 5
    • 20444432198 scopus 로고    scopus 로고
    • Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques
    • DOI 10.1080/01446190500041578
    • Al-Sobiei, O., Arditi, D., and Polat, G. (2005). Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Constr. Manage. Econ. CMECF3 0144-6193, 23 (4), 423-430. 10.1080/01446190500041578 (Pubitemid 40815633)
    • (2005) Construction Management and Economics , vol.23 , Issue.4 , pp. 423-430
    • Al-Sobiei, O.S.1    Arditi, D.2    Polat, G.3
  • 6
    • 0032179802 scopus 로고    scopus 로고
    • An evolutionary approach to the capital budgeting of construction projects
    • Al-Tabtabai, H., and Alex, A. (1998). An evolutionary approach to the capital budgeting of construction projects. Cost Eng. CSTEDM 0274-9696 (Morgantown, WV), 40 (10), 28-34. (Pubitemid 128570353)
    • (1998) Cost Engineering (Morgantown, West Virginia) , vol.40 , Issue.10 , pp. 28-34
    • Al-Tabtabai, H.1    Alex, A.P.2
  • 7
    • 77950952082 scopus 로고    scopus 로고
    • A simulated annealing hyperheuristic for construction resource levelling
    • CMECF3 0144-6193. 10.1080/01446190903369907
    • Anagnostopoulos, K., and Koulinas, G. (2010). A simulated annealing hyperheuristic for construction resource levelling. Constr. Manage. Econ. CMECF3 0144-6193, 28 (2), 163-175. 10.1080/01446190903369907
    • (2010) Constr. Manage. Econ. , vol.28 , Issue.2 , pp. 163-175
    • Anagnostopoulos, K.1    Koulinas, G.2
  • 8
    • 0026173041 scopus 로고
    • Optimal steel frame design by simulated annealing
    • Balling, R. (1991). Optimal steel frame design by simulated annealing. J. Struct. Eng. JSENDH 0733-9445, 117 (6), 1780-1795. 10.1061/(ASCE)0733- 9445(1991)117:6(1780) (Pubitemid 21731128)
    • (1991) Journal of structural engineering New York, N.Y. , vol.117 , Issue.6 , pp. 1780-1795
    • Balling Richard, J.1
  • 9
    • 33748155228 scopus 로고    scopus 로고
    • Intelligence approach to production planning system for bespoke precast concrete products
    • DOI 10.1016/j.autcon.2005.09.007, PII S0926580505001421, Knowledge Enabled Information System Applications in Construction
    • Benjaoran, V., and Dawood, N. (2006). Intelligence approach to production planning system for bespoke precast concrete products. Autom. Constr. AUCOES 0926-5805, 15 (6), 737-745. 10.1016/j.autcon.2005.09.007 (Pubitemid 44311009)
    • (2006) Automation in Construction , vol.15 , Issue.6 , pp. 737-745
    • Benjaoran, V.1    Dawood, N.2
  • 10
    • 13944259031 scopus 로고    scopus 로고
    • Flowshop scheduling model for bespoke precast concrete production planning
    • DOI 10.1080/0144619042000287732
    • Benjaoran, V., Dawood, N., Hobbs, B. (2005). Flowshop scheduling model for bespoke precast concrete production planning. Constr. Manage. Econ. CMECF3 0144-6193, 23 (1), 93-105. 10.1080/0144619042000287732 (Pubitemid 40273715)
    • (2005) Construction Management and Economics , vol.23 , Issue.1 , pp. 93-105
    • Benjaoran, V.1    Dawood, N.2    Hobbs, B.3
  • 11
    • 0035388076 scopus 로고    scopus 로고
    • An application of simulated annealing to the optimum design of reinforced concrete retaining structures
    • DOI 10.1016/S0045-7949(01)00037-2, PII S0045794901000372
    • Ceranic, B., Fryer, C., and Baines, R. (2001). An application of simulated annealing to the optimum design of reinforced concrete retaining structures. Comput. Struct. CMSTCJ 0045-7949, 79 (17), 1569-1581. 10.1016/S0045-7949(01)00037-2 (Pubitemid 32833072)
    • (2001) Computers and Structures , vol.79 , Issue.17 , pp. 1569-1581
    • Ceranic, B.1    Fryer, C.2    Baines, R.W.3
  • 12
    • 0036034152 scopus 로고    scopus 로고
    • Optimal route network design for transit systems using genetic algorithms
    • DOI 10.1080/03052150210909
    • Chakroborty, P., and Dwivedi, T. (2002). Optimal route network design for transit systems using genetic algorithms. Eng. Optim. EGOPAX 0305-215X, 34 (1), 83-100. 10.1080/03052150210909 (Pubitemid 35262618)
    • (2002) Engineering Optimization , vol.34 , Issue.1 , pp. 83-100
    • Chakroborty, P.1    Dwivedi, T.2
  • 13
    • 0012234280 scopus 로고    scopus 로고
    • Production scheduling for precast plants using a flow shop sequencing model
    • DOI 10.1061/(ASCE)0887-3801(2002)16:3(165)
    • Chan, W., and Hu, H. (2002). Production scheduling for precast plants using a flow shop sequencing model. J. Comput. Civ. Eng. JCCEE5 0887-3801, 16 (3), 165-174. 10.1061/(ASCE)0887-3801(2002)16:3(165) (Pubitemid 40475487)
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.3 , pp. 165-174
    • Chan, W.T.1    Hu, H.2
  • 14
    • 2642577642 scopus 로고    scopus 로고
    • A two-stage dynamic model on allocation of construction facilities with genetic algorithm
    • AUCOES 0926-5805. 10.1016/j.autcon.2004.02.001
    • Chau, K. (2004). A two-stage dynamic model on allocation of construction facilities with genetic algorithm. Autom. Constr. AUCOES 0926-5805, 13 (4), 481-490. 10.1016/j.autcon.2004.02.001
    • (2004) Autom. Constr. , vol.13 , Issue.4 , pp. 481-490
    • Chau, K.1
  • 15
    • 63549149518 scopus 로고    scopus 로고
    • Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
    • AUCOES 0926-5805. 10.1016/j.autcon.2008.10.007
    • Chen, P. H., and Shahandashti, S. (2009). Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Autom. Constr. AUCOES 0926-5805, 18 (4), 434-443. 10.1016/j.autcon.2008.10.007
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 434-443
    • Chen, P.H.1    Shahandashti, S.2
  • 16
    • 63549109485 scopus 로고    scopus 로고
    • A two-phase GA model for resource-constrained project scheduling
    • AUCOES 0926-5805. 10.1016/j.autcon.2008.11.003
    • Chen, P. H., and Weng, H. (2009). A two-phase GA model for resource-constrained project scheduling. Autom. Constr. AUCOES 0926-5805, 18 (4), 485-498. 10.1016/j.autcon.2008.11.003
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 485-498
    • Chen, P.H.1    Weng, H.2
  • 17
    • 77949489339 scopus 로고    scopus 로고
    • Project success prediction using an evolutionary support vector machine inference model
    • AUCOES 0926-5805. 10.1016/j.autcon.2009.12.003
    • Cheng, M. Y., Wu, Y. W., and Wu, C. F. (2010). Project success prediction using an evolutionary support vector machine inference model. Autom. Constr. AUCOES 0926-5805, 19 (3), 302-307. 10.1016/j.autcon.2009.12.003
    • (2010) Autom. Constr. , vol.19 , Issue.3 , pp. 302-307
    • Cheng, M.Y.1    Wu, Y.W.2    Wu, C.F.3
  • 18
    • 60849131719 scopus 로고    scopus 로고
    • Application of the shuffled frog leaping algorithm for the optimization of a general large-scale water supply system
    • WRMAEJ 0920-4741. 10.1007/s11269-008-9300-6
    • Chung, G., and Lansey, K. (2009). Application of the shuffled frog leaping algorithm for the optimization of a general large-scale water supply system. Water Resour. Manage. WRMAEJ 0920-4741, 23 (4), 797-823. 10.1007/s11269-008-9300-6
    • (2009) Water Resour. Manage. , vol.23 , Issue.4 , pp. 797-823
    • Chung, G.1    Lansey, K.2
  • 19
    • 32844466990 scopus 로고    scopus 로고
    • Construction scheduling using multi-constraint and genetic algorithms approach
    • DOI 10.1080/01446190500310486, PII W6602185465383
    • Dawood, N., and Sriprasert, E. (2006). Construction scheduling using multi-constraint and genetic algorithms approach. Constr. Manage. Econ. CMECF3 0144-6193, 24 (1), 19-30. 10.1080/01446190500310486 (Pubitemid 43250410)
    • (2006) Construction Management and Economics , vol.24 , Issue.1 , pp. 19-30
    • Dawood, N.1    Sriprasert, E.2
  • 20
    • 34548211019 scopus 로고    scopus 로고
    • A comparison of simulated annealing and genetic algorithm for optimum design of nonlinear steel space frames
    • DOI 10.1007/s00158-007-0096-4
    • Degertekin, S. (2007). A comparison of simulated annealing and genetic algorithm for optimum design of nonlinear steel space frames. Struct. Multidiscip. Optim. SMOTB4 1615-1488, 34 (4), 347-359. 10.1007/s00158-007-0096-4 (Pubitemid 47325968)
    • (2007) Structural and Multidisciplinary Optimization , vol.34 , Issue.4 , pp. 347-359
    • Degertekin, S.O.1
  • 21
    • 57849097645 scopus 로고    scopus 로고
    • A hybrid tabu-simulated annealing heuristic algorithm for optimum design of steel frames
    • 1229-9367
    • Degertekin, S., Hayalioglu, M., and Ulker, M. (2008). A hybrid tabu-simulated annealing heuristic algorithm for optimum design of steel frames. Steel Compos. Struct., 8 (6), 475-490. 1229-9367
    • (2008) Steel Compos. Struct. , vol.8 , Issue.6 , pp. 475-490
    • Degertekin, S.1    Hayalioglu, M.2    Ulker, M.3
  • 22
    • 33748765247 scopus 로고    scopus 로고
    • Determining attribute weights in a CBR model for early cost prediction of structural systems
    • DOI 10.1061/(ASCE)0733-9364(2006)132:10(1092)
    • Dogan, S., Arditi, D., and Murat, G. (2006). Determining attribute weights in a CBR model for early cost prediction of structural systems. J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (10), 1092-1098. 10.1061/(ASCE)0733- 9364(2006)132:10(1092) (Pubitemid 44410235)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.10 , pp. 1092-1098
    • Dogan, S.Z.1    Arditi, D.2    Murat Gunaydin, H.3
  • 24
    • 33751290672 scopus 로고    scopus 로고
    • Multiproject planning and resource controls for facility management
    • DOI 10.1061/(ASCE)0733-9364(2006)132:12(1294), 004612QCO
    • East, E., and Liu, L. (2006). Multiproject planning and resource controls for facility management. J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (12), 1294-1305. 10.1061/(ASCE)0733-9364(2006)132:12(1294) (Pubitemid 44794269)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.12 , pp. 1294-1305
    • East, E.W.1    Liu, L.Y.2
  • 25
    • 15944391749 scopus 로고    scopus 로고
    • Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(400)
    • Elazouni, A., and Metwally, F. (2005). Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (4), 400-412. 10.1061/(ASCE)0733-9364(2005)131: 4(400) (Pubitemid 40430136)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 400-412
    • Elazouni, A.M.1    Metwally, F.G.2
  • 26
    • 33748325851 scopus 로고    scopus 로고
    • Comparison of two evolutionary algorithms for optimization of bridge deck repairs
    • DOI 10.1111/j.1467-8667.2006.00458.x
    • Elbehairy, H., Elbeltagi, E., Hegazy, T., and Soudki, K. (2006). Comparison of two evolutionary algorithms for optimization of bridge deck repairs. Comput. Aided Civ. Infrastruct. Eng., 21 (8), 561-572. CCIEFR 1093-9687 10.1111/j.1467-8667.2006.00458.x (Pubitemid 44323729)
    • (2006) Computer-Aided Civil and Infrastructure Engineering , vol.21 , Issue.8 , pp. 561-572
    • Elbehairy, H.1    Elbeltagi, E.2    Hegazy, T.3    Soudki, K.4
  • 27
    • 22344432656 scopus 로고    scopus 로고
    • Comparison among five evolutionary-based optimization algorithms
    • DOI 10.1016/j.aei.2005.01.004, PII S1474034605000091
    • Elbeltagi, E., Hegazy, T., and Grierson, D. (2005). Comparison among five evolutionary-based optimization algorithms. Adv. Eng. Inform. 1474-0346, 19 (1), 43-53. 10.1016/j.aei.2005.01.004 (Pubitemid 41000265)
    • (2005) Advanced Engineering Informatics , vol.19 , Issue.1 , pp. 43-53
    • Elbeltagi, E.1    Hegazy, T.2    Grierson, D.3
  • 28
    • 48249115605 scopus 로고    scopus 로고
    • A modified shuffled frog-leaping optimization algorithm: Applications to project management
    • 1744-8980. 10.1080/15732470500254535
    • Elbeltagi, E., Hegazy, T., and Grierson, D. (2007). A modified shuffled frog-leaping optimization algorithm: Applications to project management. Struct. Infrastruct. Eng. 1744-8980, 3 (1), 53-60. 10.1080/15732470500254535
    • (2007) Struct. Infrastruct. Eng. , vol.3 , Issue.1 , pp. 53-60
    • Elbeltagi, E.1    Hegazy, T.2    Grierson, D.3
  • 29
    • 0035501643 scopus 로고    scopus 로고
    • Schedule-dependent evolution of site layout planning
    • DOI 10.1080/01446190110066713
    • Elbeltagi, E., Hegazy, T., Hosny, A., and Eldosouky, A. (2001). Schedule-dependent evolution of site layout planning. Constr. Manage. Econ. CMECF3 0144-6193, 19 (7), 689-697. 10.1080/01446190110066713 (Pubitemid 32914379)
    • (2001) Construction Management and Economics , vol.19 , Issue.7 , pp. 689-697
    • Elbeltagi, E.1    Hegazy, T.2    Hosny, A.H.3    Eldosouky, A.4
  • 30
    • 0038363680 scopus 로고    scopus 로고
    • Optimization of water distribution network design using the shuffled frog leaping algorithm
    • DOI 10.1061/(ASCE)0733-9496(2003)129:3(210)
    • Eusuff, M., and Lansey, K. E. (2003). Optimization of water distribution network design using the shuffled frog leaping algorithm. J. Water Resour. Plann. Manage., 129 (3), 210-225. JWRMD5 0733-9496 10.1061/(ASCE)0733-9496(2003) 129:3(210) (Pubitemid 36562716)
    • (2003) Journal of Water Resources Planning and Management , vol.129 , Issue.3 , pp. 210-225
    • Eusuff, M.M.1    Lansey, K.E.2
  • 31
    • 33244474874 scopus 로고    scopus 로고
    • Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization
    • DOI 10.1080/03052150500384759, PII R65340053330467
    • Eusuff, M., Lansey, K., and Pasha, F. (2006). Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization. Eng. Optim. EGOPAX 0305-215X, 38 (2), 129-154. 10.1080/03052150500384759 (Pubitemid 43279596)
    • (2006) Engineering Optimization , vol.38 , Issue.2 , pp. 129-154
    • Eusuff, M.1    Lansey, K.2    Pasha, F.3
  • 32
    • 67349118477 scopus 로고    scopus 로고
    • Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    • AUCOES 0926-5805. 10.1016/j.autcon.2009.02.001
    • Eshtehardian, E., Afshar, A., and Abbasnia, R. (2009). Fuzzy-based MOGA approach to stochastic time-cost trade-off problem. Autom. Constr. AUCOES 0926-5805, 18 (5), 692-701. 10.1016/j.autcon.2009.02.001
    • (2009) Autom. Constr. , vol.18 , Issue.5 , pp. 692-701
    • Eshtehardian, E.1    Afshar, A.2    Abbasnia, R.3
  • 33
    • 58149229057 scopus 로고    scopus 로고
    • Hybrid time-cost optimization of nonserial repetitive construction projects
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2009)135:1(42)
    • Ezeldin, A., and Soliman, A. (2009). Hybrid time-cost optimization of nonserial repetitive construction projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (1), 42-55. 10.1061/(ASCE)0733-9364(2009)135:1(42)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.1 , pp. 42-55
    • Ezeldin, A.1    Soliman, A.2
  • 34
    • 77955715839 scopus 로고    scopus 로고
    • GA-based multi-objective optimization of finance-based construction project scheduling
    • 1226-7988 10.1007/s12205-010-0849-2
    • Fathi, H., and Afshar, A. (2010). GA-based multi-objective optimization of finance-based construction project scheduling. KSCE J Civ. Eng., 14 (5), 627-638. 1226-7988 10.1007/s12205-010-0849-2
    • (2010) KSCE J Civ. Eng. , vol.14 , Issue.5 , pp. 627-638
    • Fathi, H.1    Afshar, A.2
  • 35
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C. W., Liu, L., and Burns, S. (1997). Using genetic algorithms to solve construction time-cost trade-off problems. J. Comput. Civ. Eng. JCCEE5 0887-3801, 11 (3), 184-189. 10.1061/(ASCE)0887-3801(1997)11:3(184) (Pubitemid 127590539)
    • (1997) Journal of Computing in Civil Engineering , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.-W.1    Liu, L.2    Burns, S.A.3
  • 37
    • 84989487658 scopus 로고
    • Heuristics for integer programming using surrogate constraints
    • DESCDQ 0011-7315. 10.1111/j.1540-5915.1977.tb01074.x
    • Glover, F. (1977). Heuristics for integer programming using surrogate constraints. Decision Sciences DESCDQ 0011-7315, 8 (1), 156-166. 10.1111/j.1540-5915.1977.tb01074.x
    • (1977) Decision Sciences , vol.8 , Issue.1 , pp. 156-166
    • Glover, F.1
  • 38
    • 0022865373 scopus 로고
    • Future paths for integer programming and links to artificial intelligence
    • DOI 10.1016/0305-0548(86)90048-1
    • Glover, F. (1986). Future paths for integer programming and links to artificial intelligence. Comput. Oper. Res. CMORAP 0305-0548, 13 (5), 533-549. 10.1016/0305-0548(86)90048-1 (Pubitemid 17480188)
    • (1986) Computers and Operations Research , vol.13 , Issue.5 , pp. 533-549
    • Glover Fred1
  • 39
    • 40849142091 scopus 로고    scopus 로고
    • A genetic algorithm for the resource constrained multi-project scheduling problem
    • DOI 10.1016/j.ejor.2006.06.074, PII S0377221707005929
    • Gonalves, J., Mendes, J., and Resende, M. (2008). A genetic algorithm for the resource constrained multi-project scheduling problem. Eur. J. Oper. Res. EJORDT 0377-2217, 189 (3), 1171-1190. 10.1016/j.ejor.2006.06.074 (Pubitemid 351400562)
    • (2008) European Journal of Operational Research , vol.189 , Issue.3 , pp. 1171-1190
    • Goncalves, J.F.1    Mendes, J.J.M.2    Resende, M.G.C.3
  • 40
    • 0032654594 scopus 로고    scopus 로고
    • Genetic algorithms application and testing for equipment selection
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(32)
    • Haidar, A., Naoum, S., Howes, R., and Tah, J. (1999). Genetic algorithms application and testing for equipment selection. J. Constr. Eng. Manage., 125 (1), 32-38. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(32)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 32-38
    • Haidar, A.1    Naoum, S.2    Howes, R.3    Tah, J.4
  • 41
    • 77649337563 scopus 로고    scopus 로고
    • Improving the performance of simulated annealing in structural optimization
    • SMOTB4 1615-1488. 10.1007/s00158-009-0418-9
    • Hasanebi, O., Carbas, S., and Saka, M. (2010). Improving the performance of simulated annealing in structural optimization. Struct. Multidiscip. Optim. SMOTB4 1615-1488, 41 (2), 189-203. 10.1007/s00158-009-0418-9
    • (2010) Struct. Multidiscip. Optim. , vol.41 , Issue.2 , pp. 189-203
    • Hasanebi, O.1    Carbas, S.2    Saka, M.3
  • 42
    • 64049109482 scopus 로고    scopus 로고
    • Simulated annealing and tabu search for multi-mode project payment scheduling
    • EJORDT 0377-2217. 10.1016/j.ejor.2008.10.005
    • He, Z., Wang, N., Jia, T., and Xu, Y. (2009). Simulated annealing and tabu search for multi-mode project payment scheduling. Eur. J. Oper. Res. EJORDT 0377-2217, 198 (3), 688-696. 10.1016/j.ejor.2008.10.005
    • (2009) Eur. J. Oper. Res. , vol.198 , Issue.3 , pp. 688-696
    • He, Z.1    Wang, N.2    Jia, T.3    Xu, Y.4
  • 43
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • Hegazy, T. (1999 a). Optimization of resource allocation and leveling using genetic algorithms. J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 44
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost trade-off analysis using genetic algorithms
    • Hegazy, T. (1999 b). Optimization of construction time-cost trade-off analysis using genetic algorithms. Can. J. Civ. Eng. CJCEB8 0315-1468, 26 (6), 685-697. 10.1139/l99-031 (Pubitemid 30192514)
    • (1999) Canadian Journal of Civil Engineering , vol.26 , Issue.6 , pp. 685-697
    • Hegazy, T.1
  • 45
    • 12744251346 scopus 로고    scopus 로고
    • Distributed scheduling model for infrastructure networks
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(160)
    • Hegazy, T., Elhakeem, A., and Elbeltagi, E. (2004). Distributed scheduling model for infrastructure networks. J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (2), 160-167. 10.1061/(ASCE)0733-9364(2004)130:2(160) (Pubitemid 40265382)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 160-167
    • Hegazy, T.1    Elhakeem, A.2    Elbeltagi, E.3
  • 46
    • 0035509424 scopus 로고    scopus 로고
    • Simplified spreadsheet solutions. II: Overall schedule optimization
    • DOI 10.1061/(ASCE)0733-9364(2001)127:6(469), Reportnr 22158
    • Hegazy, T., and Ersahin, T. (2001). Simplified spreadsheet solutions. II: Overall schedule optimization. J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (6), 469-475. 10.1061/(ASCE)0733-9364(2001)127:6(469) (Pubitemid 33137751)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.6 , pp. 469-475
    • Hegazy, T.1    Ersahin, T.2
  • 47
    • 40849150750 scopus 로고    scopus 로고
    • Efficient repetitive scheduling for high-rise construction
    • DOI 10.1061/(ASCE)0733-9364(2008)134:4(253)
    • Hegazy, T., and Kamarah, E. (2008). Efficient repetitive scheduling for high-rise construction. J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (4), 253-264. 10.1061/(ASCE)0733-9364(2008)134:4(253) (Pubitemid 351399362)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.4 , pp. 253-264
    • Hegazy, T.1    Kamarah, E.2
  • 48
    • 6344281398 scopus 로고    scopus 로고
    • Resource optimization using combined simulation and genetic algorithms
    • DOI 10.1061/(ASCE)0733-9364(2003)129:6(698)
    • Hegazy, T., and Kassab, M. (2003). Resource optimization using combined simulation and genetic algorithms. J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (6), 698-705. 10.1061/(ASCE)0733-9364(2003)129:6(698) (Pubitemid 40265430)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.6 , pp. 698-705
    • Hegazy, T.1    Kassab, M.2
  • 49
    • 13944255840 scopus 로고    scopus 로고
    • Genetic optimization for dynamic project control
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(396)
    • Hegazy, T., and Petzold, K. (2003). Genetic optimization for dynamic project control. J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 396-404. 10.1061/(ASCE)0733-9364(2003)129:4(396) (Pubitemid 40265453)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 396-404
    • Hegazy, T.1    Petzold, K.2
  • 50
    • 0035335808 scopus 로고    scopus 로고
    • Cost optimization in projects with repetitive nonserial activities
    • DOI 10.1061/(ASCE)0733-9364(2001)127:3(183), Reportnr 22131
    • Hegazy, T., Wassef, N. (2001). Cost optimization in projects with repetitive nonserial activities. J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (3), 183-191. 10.1061/(ASCE)0733-9364(2001)127:3(183) (Pubitemid 32508536)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 183-191
    • Hegazy, T.1    Wassef, N.2
  • 52
    • 33846675940 scopus 로고    scopus 로고
    • An optimization model for workgroup-based repetitive scheduling
    • DOI 10.1139/L06-057
    • Huang, R. Y., and Sun, K. S. (2006). An optimization model for workgroup-based repetitive scheduling. Can. J. Civ. Eng. CJCEB8 0315-1468, 33 (9), 1172-1194. 10.1139/l06-057 (Pubitemid 46189985)
    • (2006) Canadian Journal of Civil Engineering , vol.33 , Issue.9 , pp. 1172-1194
    • Huang, R.-Y.1    Sun, K.-S.2
  • 53
    • 70349687128 scopus 로고    scopus 로고
    • Automated trade-off between time and cost in planning repetitive construction projects
    • CMECF3 0144-6193. 10.1080/01446190903117793
    • Hyari, K., El-Rayes, K., and El-Mashaleh, M. (2009). Automated trade-off between time and cost in planning repetitive construction projects. Constr. Manage. Econ. CMECF3 0144-6193, 27 (8), 749-761. 10.1080/01446190903117793
    • (2009) Constr. Manage. Econ. , vol.27 , Issue.8 , pp. 749-761
    • Hyari, K.1    El-Rayes, K.2    El-Mashaleh, M.3
  • 54
    • 33646584142 scopus 로고    scopus 로고
    • Optimal planning and scheduling for repetitive construction projects
    • JMENEA 0742-597X. 10.1061/(ASCE)0742-597X(2006)22:1(11)
    • Hyari, K., and El-Rayes, K. (2006). Optimal planning and scheduling for repetitive construction projects. J. Manage. Eng. JMENEA 0742-597X, 22 (1), 11-19. 10.1061/(ASCE)0742-597X(2006)22:1(11)
    • (2006) J. Manage. Eng. , vol.22 , Issue.1 , pp. 11-19
    • Hyari, K.1    El-Rayes, K.2
  • 55
    • 33847198334 scopus 로고    scopus 로고
    • Optimization of floor-level construction material layout using genetic algorithms
    • AUCOES 0926-5805. 10.1016/j.autcon.2006.09.006
    • Jang, H., Lee, S., and Choi, S. (2007). Optimization of floor-level construction material layout using genetic algorithms. Autom. Constr. AUCOES 0926-5805, 16 (4), 531-545. 10.1016/j.autcon.2006.09.006
    • (2007) Autom. Constr. , vol.16 , Issue.4 , pp. 531-545
    • Jang, H.1    Lee, S.2    Choi, S.3
  • 56
    • 0027912257 scopus 로고
    • Simulated annealing for resource-constrained scheduling
    • DOI 10.1016/0377-2217(93)90231-B
    • Jeffcoat, D., and Bulfin, R. (1993). Simulated annealing for resource-constrained scheduling. Eur. J. Oper. Res. EJORDT 0377-2217, 70 (1), 43-51. 10.1016/0377-2217(93)90231-B (Pubitemid 23707635)
    • (1993) European Journal of Operational Research , vol.70 , Issue.1 , pp. 43-51
    • Jeffcoat David, E.1    Bulfin Robert, L.2
  • 57
    • 28344457938 scopus 로고    scopus 로고
    • Application of fuzzy GA for optimal vibration control of smart cylindrical shells
    • DOI 10.1088/0964-1726/14/6/018, PII S0964172605072952
    • Jin, Z., Yang, Y., and Soh, C. (2005). Application of fuzzy GA for optimal vibration control of smart cylindrical shells. Smart Mater. Struct. SMSTER 0964-1726, 14 (6), 1250-1264. 10.1088/0964-1726/14/6/018 (Pubitemid 41720784)
    • (2005) Smart Materials and Structures , vol.14 , Issue.6 , pp. 1250-1264
    • Jin, Z.1    Yang, Y.2    Soh, C.K.3
  • 58
    • 0033728517 scopus 로고    scopus 로고
    • Preliminary highway design with genetic algorithms and geographic information systems
    • 1093-9687. CCIEFR 10.1111/0885-9507.00190
    • Jong, J. C., Jha, M., and Schonfeld, P. (2000). Preliminary highway design with genetic algorithms and geographic information systems. Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 15 (4), 261-271. CCIEFR 10.1111/0885-9507. 00190
    • (2000) Comput. Aided Civ. Infrastruct. Eng. , vol.15 , Issue.4 , pp. 261-271
    • Jong, J.C.1    Jha, M.2    Schonfeld, P.3
  • 59
    • 76549133751 scopus 로고    scopus 로고
    • Optimizing the utilization of multiple labor shifts in construction projects
    • AUCOES 0926-5805. 10.1016/j.autcon.2009.12.015
    • Jun, D., and El-Rayes, K. (2010). Optimizing the utilization of multiple labor shifts in construction projects. Autom. Constr. AUCOES 0926-5805, 19 (2), 109-119. 10.1016/j.autcon.2009.12.015
    • (2010) Autom. Constr. , vol.19 , Issue.2 , pp. 109-119
    • Jun, D.1    El-Rayes, K.2
  • 60
    • 33646171275 scopus 로고    scopus 로고
    • Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:5(491)
    • Kandil, A., and El-Rayes, K. (2006). Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. J. Constr. Eng. Manage., 132 (5), 491-498. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006) 132:5(491)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.5 , pp. 491-498
    • Kandil, A.1    El-Rayes, K.2
  • 62
    • 33748793663 scopus 로고    scopus 로고
    • Optimizing airport construction site layouts to minimize wildlife hazards
    • DOI 10.1061/(ASCE)0742-597X(2006)22:4(176)
    • Khalafallah, A., and El-Rayes, K. (2006). Optimizing airport construction site layouts to minimize wildlife hazards. J. Manage. Eng., 22 (4), 176-185. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2006)22:4(176) (Pubitemid 44410244)
    • (2006) Journal of Management in Engineering , vol.22 , Issue.4 , pp. 176-185
    • Khalafallah, A.1    El-Rayes, K.2
  • 63
    • 75649117074 scopus 로고    scopus 로고
    • Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2010)136:2(160)
    • Kim, J. L., and Ellis, R. (2010). Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (2), 160-169. 10.1061/(ASCE)0733- 9364(2010)136:2(160)
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.2 , pp. 160-169
    • Kim, J.L.1    Ellis, R.2
  • 64
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • SCIEAS 0036-8075. 10.1126/science.220.4598.671
    • Kirkpatrick, S., Gelatt, C. D. Jr., and Vecchi, M. P. (1983). Optimization by simulated annealing. Science SCIEAS 0036-8075, 220 (4598), 671-680. 10.1126/science.220.4598.671
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt Jr., C.D.2    Vecchi, M.P.3
  • 65
    • 33947408281 scopus 로고    scopus 로고
    • Dynamic prediction of project success using artificial intelligence
    • DOI 10.1061/(ASCE)0733-9364(2007)133:4(316)
    • Ko, C. H., Cheng, M. Y. (2007). Dynamic prediction of project success using artificial intelligence. J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (4), 316-324. 10.1061/(ASCE)0733-9364(2007)133:4(316) (Pubitemid 46447967)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.4 , pp. 316-324
    • Ko, C.-H.1    Cheng, M.-Y.2
  • 66
    • 77956618284 scopus 로고    scopus 로고
    • GA-based decision support systems for precast production planning
    • AUCOES 0926-5805. 10.1016/j.autcon.2010.06.004
    • Ko, C. H., and Wang, S. F. (2010). GA-based decision support systems for precast production planning. Autom. Constr. AUCOES 0926-5805, 19 (7), 907-916. 10.1016/j.autcon.2010.06.004
    • (2010) Autom. Constr. , vol.19 , Issue.7 , pp. 907-916
    • Ko, C.H.1    Wang, S.F.2
  • 67
    • 77953481735 scopus 로고    scopus 로고
    • A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects
    • CJCEB8 0315-1468. 10.1139/L10-007
    • Koo, C., Hong, T., Hyun, C., and Koo, K. (2010). A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects. Can. J. Civ. Eng. CJCEB8 0315-1468, 37 (5), 739-752. 10.1139/L10-007
    • (2010) Can. J. Civ. Eng. , vol.37 , Issue.5 , pp. 739-752
    • Koo, C.1    Hong, T.2    Hyun, C.3    Koo, K.4
  • 68
    • 0347719691 scopus 로고    scopus 로고
    • Multiobjective water resources systems analysis using genetic algorithms - Application to Chou-Shui River Basin, Taiwan
    • Kuo, J. T., Cheng, W. C., and Chen, L. (2003). Multiobjective water resources systems analysis using genetic algorithms-Application to Chou-Shui River Basin, Taiwan. Water Sci. Technol., 48 (10), 71-77. WSTED4 0273-1223 (Pubitemid 38094345)
    • (2003) Water Science and Technology , vol.48 , Issue.10 , pp. 71-77
    • Kuo, J.-T.1    Cheng, W.-C.2    Chen, L.3
  • 69
    • 63549135759 scopus 로고    scopus 로고
    • The fuzzy GA-based multi-objective financial decision support model for Chinese state-owned construction firms
    • AUCOES 0926-5805. 10.1016/j.autcon.2008.10.004
    • Lam, K. C., Ning, X., and Gao, H. (2009 a). The fuzzy GA-based multi-objective financial decision support model for Chinese state-owned construction firms. Autom. Constr. AUCOES 0926-5805, 18 (4), 402-414. 10.1016/j.autcon.2008.10.004
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 402-414
    • Lam, K.C.1    Ning, X.2    Gao, H.3
  • 70
    • 70349334592 scopus 로고    scopus 로고
    • Conjoining MMAS to GA to solve construction site layout planning problem
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2009)135:10(1049)
    • Lam, K. C., Ning, X., and Lam, M. (2009 b). Conjoining MMAS to GA to solve construction site layout planning problem. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (10), 1049-1057. 10.1061/(ASCE)0733-9364(2009)135:10(1049)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.10 , pp. 1049-1057
    • Lam, K.C.1    Ning, X.2    Lam, M.3
  • 71
    • 0035193271 scopus 로고    scopus 로고
    • GA-based fuzzy optimal model for construction time-cost trade-off
    • DOI 10.1016/S0263-7863(99)00035-6
    • Leu, S. S., Chen, A. T., and Yang, C. H. (2001). A GA-based fuzzy optimal model for construction time-cost trade-off. Int. J. Proj. Manage. IPMAEL, 19 (1), 47-58. 10.1016/S0263-7863(99)00035-6 http://www.sciencedirect.com/science/ article/pii/S0263786399000356. (Pubitemid 32020457)
    • (2001) International Journal of Project Management , vol.19 , Issue.1 , pp. 47-58
    • Leu, S.-S.1    Chen, A.-T.2    Yang, C.-H.3
  • 72
    • 0036499562 scopus 로고    scopus 로고
    • A genetic algorithm-based optimal resource-constrained scheduling simulation model
    • DOI 10.1080/01446190110109148
    • Leu, S. S., and Hung, T. H. (2002). A genetic algorithm-based optimal resource-constrained scheduling simulation model. Constr. Manage. Econ. CMECF3 0144-6193, 20 (2), 131-141. 10.1080/01446190110109148 (Pubitemid 34197193)
    • (2002) Construction Management and Economics , vol.20 , Issue.2 , pp. 131-141
    • Leu, S.-S.1    Hung, T.-H.2
  • 73
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
    • Leu, S. S., and Yang, C. H. (1999). GA-based multicriteria optimal model for construction scheduling. J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (6), 420-427. 10.1061/(ASCE)0733-9364(1999)125:6(420) (Pubitemid 30509596)
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.-S.1    Yang, C.-H.2
  • 74
    • 0034324916 scopus 로고    scopus 로고
    • Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
    • AUCOES 0926-5805. 10.1016/S0926-5805(99)00011-4
    • Leu, S. S., Yang, C. H., and Huang, J. C. (2000). Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Autom. Constr. AUCOES 0926-5805, 10 (1), 27-41. 10.1016/S0926-5805(99)00011-4
    • (2000) Autom. Constr. , vol.10 , Issue.1 , pp. 27-41
    • Leu, S.S.1    Yang, C.H.2    Huang, J.C.3
  • 75
    • 0032638332 scopus 로고    scopus 로고
    • Using machine learning and GA to solve time-cost trade-off problems
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1999)125:5(347)
    • Li, H., Cao, J. N., and Love, P. (1999). Using machine learning and GA to solve time-cost trade-off problems. J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (5), 347-353. 10.1061/(ASCE)0733-9364(1999)125:5(347)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 347-353
    • Li, H.1    Cao, J.N.2    Love, P.3
  • 76
    • 0033880829 scopus 로고    scopus 로고
    • Genetic search for solving construction site-level unequal-area facility layout problems
    • DOI 10.1016/S0926-5805(99)00006-0
    • Li, H., and Love, P. (2000). Genetic search for solving construction site-level unequal-area facility layout problems. Autom. Constr., 9 (2), 217-226. AUCOES 0926-5805 10.1016/S0926-5805(99)00006-0 (Pubitemid 30541681)
    • (2000) Automation in construction , vol.9 , Issue.2 , pp. 217-226
    • Li, H.1    Love, P.E.D.2
  • 77
    • 77949291019 scopus 로고    scopus 로고
    • Novel multiobjective shuffled frog leaping algorithm with application to reservoir flood control operation
    • JWRMD5 0733-9496. 10.1061/(ASCE)WR.1943-5452.0000027
    • Li, Y., Zhou, J., Zhang, Y., Qin, H., and Liu, L. (2010). Novel multiobjective shuffled frog leaping algorithm with application to reservoir flood control operation. J. Water Resour. Plann. Manage. JWRMD5 0733-9496, 136 (2), 217-226. 10.1061/(ASCE)WR.1943-5452.0000027
    • (2010) J. Water Resour. Plann. Manage. , vol.136 , Issue.2 , pp. 217-226
    • Li, Y.1    Zhou, J.2    Zhang, Y.3    Qin, H.4    Liu, L.5
  • 78
    • 63549088269 scopus 로고    scopus 로고
    • A genetic algorithm-based method for scheduling repetitive construction projects
    • AUCOES 0926-5805. 10.1016/j.autcon.2008.11.005
    • Long, L., and Ohsato, A. (2009). A genetic algorithm-based method for scheduling repetitive construction projects. Autom. Constr. AUCOES 0926-5805, 18 (4), 499-511. 10.1016/j.autcon.2008.11.005
    • (2009) Autom. Constr. , vol.18 , Issue.4 , pp. 499-511
    • Long, L.1    Ohsato, A.2
  • 79
    • 13944277711 scopus 로고    scopus 로고
    • Multiobjective optimization of earthmoving operations
    • DOI 10.1061/(ASCE)0733-9364(2004)130:1(105)
    • Marzouk, M., and Moselhi, O. (2004). Multiobjective optimization of earthmoving operations. J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (1), 105-113. 10.1061/(ASCE)0733-9364(2004)130:1(105) (Pubitemid 40265411)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 105-113
    • Marzouk, M.1    Moselhi, O.2
  • 80
    • 84861129799 scopus 로고    scopus 로고
    • MATLAB 7.4 [Computer software]. Massachusetts, MathWorks, Inc
    • MATLAB 7.4 [Computer software]. Massachusetts, MathWorks, Inc.
  • 81
    • 4344695708 scopus 로고    scopus 로고
    • Genetic algorithms for construction site layout in project planning
    • DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
    • Mawdesley, M., Al-jibouri, S., and Yang, H. (2002). Genetic algorithms for construction site layout in project planning. J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (5), 418-426. 10.1061/(ASCE)0733-9364(2002)128:5(418) (Pubitemid 40265526)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.5 , pp. 418-426
    • Mawdesley, M.J.1    Al-jibouri, S.H.2    Yang, H.3
  • 82
    • 4344602193 scopus 로고    scopus 로고
    • Application of GA in optimal robot selection for bridge restoration
    • AUCOES 0926-5805. 10.1016/j.autcon.2004.05.002
    • McCrea, A., and Navon, R. (2004). Application of GA in optimal robot selection for bridge restoration. Autom. Constr. AUCOES 0926-5805, 13 (6), 803-819. 10.1016/j.autcon.2004.05.002
    • (2004) Autom. Constr. , vol.13 , Issue.6 , pp. 803-819
    • McCrea, A.1    Navon, R.2
  • 83
    • 12244289668 scopus 로고    scopus 로고
    • Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
    • DOI 10.1016/j.ejor.2003.10.053, PII S0377221704001134
    • Mika, M., Waligra, G., and Weeglarz, J. (2005). Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. Eur. J. Oper. Res. EJORDT 0377-2217, 164 (3), 639-668. 10.1016/j.ejor.2003.10.053 (Pubitemid 40114587)
    • (2005) European Journal of Operational Research , vol.164 , Issue.SPEC. ISS. 3 , pp. 639-668
    • Mika, M.1    Waligora, G.2    Weeglarz, J.3
  • 84
    • 70349321609 scopus 로고    scopus 로고
    • Optimization of earthmoving operations in heavy civil engineering projects
    • JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2009)135:10(948)
    • Moselhi, O., and Alshibani, A. (2009). Optimization of earthmoving operations in heavy civil engineering projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (10), 948-954. 10.1061/(ASCE)0733-9364(2009)135:10(948)
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.10 , pp. 948-954
    • Moselhi, O.1    Alshibani, A.2
  • 85
    • 70349317365 scopus 로고    scopus 로고
    • Optimizing postdisaster reconstruction planning for damaged transportation networks
    • JCEMD4 0733-9364. 10.1061/(ASCE)CO.1943-7862.0000070
    • Orabi, W., El-Rayes, K., Senouci, A., and Al-Derham, H. (2009). Optimizing postdisaster reconstruction planning for damaged transportation networks. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (10), 1039-1048. 10.1061/(ASCE)CO.1943-7862.0000070
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.10 , pp. 1039-1048
    • Orabi, W.1    El-Rayes, K.2    Senouci, A.3    Al-Derham, H.4
  • 86
    • 0141990673 scopus 로고    scopus 로고
    • A hybrid CAD-based construction site layout planning system using genetic algorithms
    • AUCOES 0926-5805. 10.1016/S0926-5805(03)00058-X
    • Osman, H., Georgy, M., and Ibrahim, M. (2003). A hybrid CAD-based construction site layout planning system using genetic algorithms. Autom. Constr. AUCOES 0926-5805, 12 (6), 749-764. 10.1016/S0926-5805(03)00058-X
    • (2003) Autom. Constr. , vol.12 , Issue.6 , pp. 749-764
    • Osman, H.1    Georgy, M.2    Ibrahim, M.3
  • 89
    • 52249110456 scopus 로고    scopus 로고
    • Multiobjective optimization of concrete frames by simulated annealing
    • CCIEFR 1093-9687. 10.1111/j.1467-8667.2008.00561.x
    • Paya, I., Yepes, V., Gonzlez-Vidosa, F., and Hospitaler, A. (2008). Multiobjective optimization of concrete frames by simulated annealing. Comput. Aided Civ. Infrastruct. Eng. CCIEFR 1093-9687, 23 (8), 596-610. 10.1111/j.1467-8667.2008.00561.x
    • (2008) Comput. Aided Civ. Infrastruct. Eng. , vol.23 , Issue.8 , pp. 596-610
    • Paya, I.1    Yepes, V.2    Gonzlez-Vidosa, F.3    Hospitaler, A.4
  • 90
    • 0034315488 scopus 로고    scopus 로고
    • Masonry arch collapse loads and mechanisms by heuristically seeded genetic algorithm
    • DOI 10.1016/S0045-7825(99)00477-6
    • Ponterosso, P., Fishwick, R., Fox, D., Liu, X., and Begg, D. (2000). Masonry arch collapse loads and mechanisms by heuristically seeded genetic algorithm. Comput. Methods Appl. Mech. Eng. CMMECC 0045-7825, 190 (8-10), 1233-1243. 10.1016/S0045-7825(99)00477-6 (Pubitemid 32029489)
    • (2000) Computer Methods in Applied Mechanics and Engineering , vol.190 , Issue.8-10 , pp. 1233-1243
    • Ponterosso, P.1    Fishwick, R.J.2    Fox, D.St.J.3    Liu, X.L.4    Begg, D.W.5
  • 91
    • 0142248280 scopus 로고    scopus 로고
    • Optimal lay-up of hybrid composite beams, plates and shells using cellular genetic algorithm
    • SEGMEQ 1225-4568. 10.1296/SEM2003.16.05.03
    • Rajasekaran, S., Nalinaa, K., Greeshma, S., Poornima, N., and Kumar, V. (2003). Optimal lay-up of hybrid composite beams, plates and shells using cellular genetic algorithm. Struct. Eng. Mech. SEGMEQ 1225-4568, 16 (5), 557-580. 10.1296/SEM2003.16.05.03
    • (2003) Struct. Eng. Mech. , vol.16 , Issue.5 , pp. 557-580
    • Rajasekaran, S.1    Nalinaa, K.2    Greeshma, S.3    Poornima, N.4    Kumar, V.5
  • 92
    • 36249023087 scopus 로고    scopus 로고
    • Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models
    • DOI 10.1061/(ASCE)0733-9364(2007)133:12(982)
    • Salem, O., Shahin, A., and Khalifa, Y. (2007). Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models. J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (12), 982-992. 10.1061/(ASCE)0733-9364(2007)133:12(982) (Pubitemid 350129071)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.12 , pp. 982-992
    • Salem, O.1    Shahin, A.2    Khalifa, Y.3
  • 93
    • 45749148242 scopus 로고    scopus 로고
    • Optimal construction site layout considering safety and environmental aspects
    • JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:7(536)
    • Sanad, H., Ammar, M., and Ibrahim, M. (2008). Optimal construction site layout considering safety and environmental aspects. J. Constr. Eng. Manage., 134 (7), 536-544. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:7(536)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.7 , pp. 536-544
    • Sanad, H.1    Ammar, M.2    Ibrahim, M.3
  • 94
    • 49249121672 scopus 로고    scopus 로고
    • Genetic algorithm-based multi-objective model for scheduling of linear construction projects
    • AESODT 0965-9978. 10.1016/j.advengsoft.2007.08.002
    • Senouci, A., and Al-Derham, H. (2008). Genetic algorithm-based multi-objective model for scheduling of linear construction projects. Adv. Eng. Softw. AESODT 0965-9978, 39 (12), 1023-1028. 10.1016/j.advengsoft.2007.08.002
    • (2008) Adv. Eng. Softw. , vol.39 , Issue.12 , pp. 1023-1028
    • Senouci, A.1    Al-Derham, H.2
  • 95
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
    • Senouci, A., and Eldin, N. (2004). Use of genetic algorithms in resource scheduling of construction projects. J. Constr. Eng. Manage., 130 (6), 869-877. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2004)130:6(869) (Pubitemid 40265320)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 96
    • 0036885372 scopus 로고    scopus 로고
    • Application of genetic algorithm for scheduling and schedule coordination problems
    • Shrivastava, P., Dhingra, S., and Gundaliya, P. (2002). Application of genetic algorithm for scheduling and schedule coordination problems. J. Adv. Transp., 36 (1), 23-41. JATRDC 0197-6729 10.1002/atr.5670360103 (Pubitemid 34515073)
    • (2002) Journal of Advanced Transportation , vol.36 , Issue.1 , pp. 23-41
    • Shrivastava, P.1    Dhingra, S.L.2    Gundaliya, P.J.3
  • 98
    • 0034207920 scopus 로고    scopus 로고
    • Development of an intelligent technique for traffic network incident detection
    • EAAIE6 0952-1976. 10.1016/S0952-1976(00)00011-7
    • Srinivasan, D., Cheu, R., Poh, Y., and Ng, A. (2000). Development of an intelligent technique for traffic network incident detection. Eng. Appl. Artif. Intell. EAAIE6 0952-1976, 13 (3), 311-322. 10.1016/S0952-1976(00)00011-7
    • (2000) Eng. Appl. Artif. Intell. , vol.13 , Issue.3 , pp. 311-322
    • Srinivasan, D.1    Cheu, R.2    Poh, Y.3    Ng, A.4
  • 99
    • 0037647504 scopus 로고    scopus 로고
    • GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
    • DOI 10.1080/0144619032000049665
    • Tam, C., and Tong, T. (2003). GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. Constr. Manage. Econ. CMECF3 0144-6193, 21 (3), 257-266. 10.1080/ 0144619032000049665 (Pubitemid 36650330)
    • (2003) Construction Management and Economics , vol.21 , Issue.3 , pp. 257-266
    • Tam, C.M.1    Tong, T.K.L.2
  • 100
    • 0035392349 scopus 로고    scopus 로고
    • Genetic algorithm for optimizing supply locations around tower crane
    • DOI 10.1061/(ASCE)0733-9364(2001)127:4(315), Reportnr 22153
    • Tam, C., Tong, T., and Chan, W. (2001). Genetic algorithm for optimizing supply locations around tower crane. J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (4), 315-320. 10.1061/(ASCE)0733-9364(2001)127:4(315) (Pubitemid 32715362)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 315-320
    • Tam, C.M.1    Tong, T.K.L.2    Chan, W.K.W.3
  • 101
    • 36549077064 scopus 로고    scopus 로고
    • An integrated system for earthmoving planning
    • DOI 10.1080/01446190701468836, PII 783076851
    • Tam, C., Tong, T., and Wong, B. (2007). An integrated system for earthmoving planning. Constr. Manage. Econ. CMECF3 0144-6193, 25 (11), 1127-1137. 10.1080/01446190701468836 (Pubitemid 350176765)
    • (2007) Construction Management and Economics , vol.25 , Issue.11 , pp. 1125-1135
    • Tam, C.M.1    Tong, T.K.L.2    Wong, B.W.L.3
  • 102
    • 68049120612 scopus 로고    scopus 로고
    • An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs
    • CMECF3 0144-6193. 10.1080/01446190902883049
    • Tang, L., and Leung, A. (2009). An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs. Constr. Manage. Econ. CMECF3 0144-6193, 27 (5), 499-513. 10.1080/01446190902883049
    • (2009) Constr. Manage. Econ. , vol.27 , Issue.5 , pp. 499-513
    • Tang, L.1    Leung, A.2
  • 103
    • 0030148968 scopus 로고    scopus 로고
    • Topological design of truss structures using simulated annealing
    • SENRE8 0952-5807
    • Topping, B., Khan, A., and Leite (1996). Topological design of truss structures using simulated annealing. Struct. Eng. Rev., 8 (2-3), 301-314. SENRE8 0952-5807
    • (1996) Struct. Eng. Rev. , vol.8 , Issue.23 , pp. 301-314
    • Topping, B.1    Khan, A.2    Leite3
  • 104
    • 0034916911 scopus 로고    scopus 로고
    • Design optimization of structural steelwork using a genetic algorithm, FEM and a system of design rules
    • Toropov, V., and Mahfouz, S. (2001). Design optimization of structural steelwork using a genetic algorithm, FEM and a system of design rules. Eng. Comput. 0264-4401, 18, (3-4), 437-459. 10.1108/02644400110387118 (Pubitemid 32690565)
    • (2001) Engineering Computations (Swansea, Wales) , vol.18 , Issue.3-4 , pp. 437-459
    • Toropov, V.V.1    Mahfouz, S.Y.2
  • 106
    • 0029344681 scopus 로고
    • Construction-site layout using annealed neural network
    • JCCEE5 0887-3801. 10.1061/(ASCE)0887-3801(1995)9:3(201)
    • Yeh, I. C. (1995). Construction-site layout using annealed neural network. J. Comput. Civ. Eng. JCCEE5 0887-3801, 9 (3), 201-208. 10.1061/(ASCE)0887-3801(1995)9:3(201)
    • (1995) J. Comput. Civ. Eng. , vol.9 , Issue.3 , pp. 201-208
    • Yeh, I.C.1
  • 107
    • 38849141525 scopus 로고    scopus 로고
    • A parametric study of optimum earth-retaining walls by simulated annealing
    • DOI 10.1016/j.engstruct.2007.05.023, PII S0141029607002313
    • Yepes, V., Alcala, J., Perea, C., and Gonzlez-Vidosa, F. (2008). A parametric study of optimum earth-retaining walls by simulated annealing. Eng. Struct. ENSTDF 0141-0296, 30 (3), 821-830. 10.1016/j.engstruct.2007.05.023 (Pubitemid 351201833)
    • (2008) Engineering Structures , vol.30 , Issue.3 , pp. 821-830
    • Yepes, V.1    Alcala, J.2    Perea, C.3    Gonzalez-Vidosa, F.4
  • 108
    • 0036885370 scopus 로고    scopus 로고
    • Multiobjective bilevel optimization for transportation planning and management problems
    • Yin, Y. (2002). Multiobjective bilevel optimization for transportation planning and management problems. J. Adv. Transp. JATRDC 0197-6729, 36 (1), 93-105. 10.1002/atr.5670360106 (Pubitemid 34515076)
    • (2002) Journal of Advanced Transportation , vol.36 , Issue.1 , pp. 93-105
    • Yin, Y.1
  • 109
    • 70350070859 scopus 로고    scopus 로고
    • Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets
    • JCEMD4 0733-9364. 10.1061/(ASCE)CO.1943-7862.0000092
    • Zahraie, B., and Tavakolan, M. (2009). Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (11), 1162-1171. 10.1061/(ASCE)CO.1943-7862.0000092
    • (2009) J. Constr. Eng. Manage. , vol.135 , Issue.11 , pp. 1162-1171
    • Zahraie, B.1    Tavakolan, M.2
  • 110
    • 77955869817 scopus 로고    scopus 로고
    • Application of innovative critical chain method for project planning and control under resource constraints and uncertainty
    • JCEMD4 0733-9364. 10.1061/(ASCE)CO.1943-7862.0000209
    • Zhao, Z., You, W., and Zuo, J. (2010). Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (9), 1056-1060. 10.1061/(ASCE)CO.1943-7862.0000209
    • (2010) J. Constr. Eng. Manage. , vol.136 , Issue.9 , pp. 1056-1060
    • Zhao, Z.1    You, W.2    Zuo, J.3
  • 111
    • 12344265028 scopus 로고    scopus 로고
    • Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2005)131:1(81)
    • Zheng, D., Ng, S., and Kumaraswamy, M. (2005). Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (1), 81-91. 10.1061/(ASCE)0733-9364(2005)131:1(81) (Pubitemid 40135235)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3