2
-
-
84861151577
-
-
M.Sc. thesis, System Engineering Dept., King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia
-
Alghazi, A. (2009). Finance-based scheduling of activity networks. M.Sc. thesis, System Engineering Dept., King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia.
-
(2009)
Finance-based Scheduling of Activity Networks
-
-
Alghazi, A.1
-
3
-
-
70350637537
-
Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities
-
CMECF3 0144-6193. 10.1080/01446190903191764
-
Ali, M., and Elazouni, A. (2009). Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities. Constr. Manage. Econ. CMECF3 0144-6193, 27 (9), 839-856. 10.1080/01446190903191764
-
(2009)
Constr. Manage. Econ.
, vol.27
, Issue.9
, pp. 839-856
-
-
Ali, M.1
Elazouni, A.2
-
4
-
-
34248524665
-
Probabilistic performance-based optimal design of steel moment-resisting frames. II: Applications
-
DOI 10.1061/(ASCE)0733-9445(2007)133:6(767)
-
Alimoradi, A., Pezeshk, S., and Foley, C. (2007). Probabilistic performance-based optimal design of steel moment-resisting frames. II: Applications. J. Struct. Eng. JSENDH 0733-9445, 133 (6), 767-776. 10.1061/(ASCE)0733-9445(2007)133:6(767) (Pubitemid 46753504)
-
(2007)
Journal of Structural Engineering
, vol.133
, Issue.6
, pp. 767-776
-
-
Alimoradi, A.1
Pezeshk, S.2
Foley, C.M.3
-
5
-
-
20444432198
-
Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques
-
DOI 10.1080/01446190500041578
-
Al-Sobiei, O., Arditi, D., and Polat, G. (2005). Predicting the risk of contractor default in Saudi Arabia utilizing artificial neural network (ANN) and genetic algorithm (GA) techniques. Constr. Manage. Econ. CMECF3 0144-6193, 23 (4), 423-430. 10.1080/01446190500041578 (Pubitemid 40815633)
-
(2005)
Construction Management and Economics
, vol.23
, Issue.4
, pp. 423-430
-
-
Al-Sobiei, O.S.1
Arditi, D.2
Polat, G.3
-
6
-
-
0032179802
-
An evolutionary approach to the capital budgeting of construction projects
-
Al-Tabtabai, H., and Alex, A. (1998). An evolutionary approach to the capital budgeting of construction projects. Cost Eng. CSTEDM 0274-9696 (Morgantown, WV), 40 (10), 28-34. (Pubitemid 128570353)
-
(1998)
Cost Engineering (Morgantown, West Virginia)
, vol.40
, Issue.10
, pp. 28-34
-
-
Al-Tabtabai, H.1
Alex, A.P.2
-
7
-
-
77950952082
-
A simulated annealing hyperheuristic for construction resource levelling
-
CMECF3 0144-6193. 10.1080/01446190903369907
-
Anagnostopoulos, K., and Koulinas, G. (2010). A simulated annealing hyperheuristic for construction resource levelling. Constr. Manage. Econ. CMECF3 0144-6193, 28 (2), 163-175. 10.1080/01446190903369907
-
(2010)
Constr. Manage. Econ.
, vol.28
, Issue.2
, pp. 163-175
-
-
Anagnostopoulos, K.1
Koulinas, G.2
-
8
-
-
0026173041
-
Optimal steel frame design by simulated annealing
-
Balling, R. (1991). Optimal steel frame design by simulated annealing. J. Struct. Eng. JSENDH 0733-9445, 117 (6), 1780-1795. 10.1061/(ASCE)0733- 9445(1991)117:6(1780) (Pubitemid 21731128)
-
(1991)
Journal of structural engineering New York, N.Y.
, vol.117
, Issue.6
, pp. 1780-1795
-
-
Balling Richard, J.1
-
9
-
-
33748155228
-
Intelligence approach to production planning system for bespoke precast concrete products
-
DOI 10.1016/j.autcon.2005.09.007, PII S0926580505001421, Knowledge Enabled Information System Applications in Construction
-
Benjaoran, V., and Dawood, N. (2006). Intelligence approach to production planning system for bespoke precast concrete products. Autom. Constr. AUCOES 0926-5805, 15 (6), 737-745. 10.1016/j.autcon.2005.09.007 (Pubitemid 44311009)
-
(2006)
Automation in Construction
, vol.15
, Issue.6
, pp. 737-745
-
-
Benjaoran, V.1
Dawood, N.2
-
10
-
-
13944259031
-
Flowshop scheduling model for bespoke precast concrete production planning
-
DOI 10.1080/0144619042000287732
-
Benjaoran, V., Dawood, N., Hobbs, B. (2005). Flowshop scheduling model for bespoke precast concrete production planning. Constr. Manage. Econ. CMECF3 0144-6193, 23 (1), 93-105. 10.1080/0144619042000287732 (Pubitemid 40273715)
-
(2005)
Construction Management and Economics
, vol.23
, Issue.1
, pp. 93-105
-
-
Benjaoran, V.1
Dawood, N.2
Hobbs, B.3
-
11
-
-
0035388076
-
An application of simulated annealing to the optimum design of reinforced concrete retaining structures
-
DOI 10.1016/S0045-7949(01)00037-2, PII S0045794901000372
-
Ceranic, B., Fryer, C., and Baines, R. (2001). An application of simulated annealing to the optimum design of reinforced concrete retaining structures. Comput. Struct. CMSTCJ 0045-7949, 79 (17), 1569-1581. 10.1016/S0045-7949(01)00037-2 (Pubitemid 32833072)
-
(2001)
Computers and Structures
, vol.79
, Issue.17
, pp. 1569-1581
-
-
Ceranic, B.1
Fryer, C.2
Baines, R.W.3
-
12
-
-
0036034152
-
Optimal route network design for transit systems using genetic algorithms
-
DOI 10.1080/03052150210909
-
Chakroborty, P., and Dwivedi, T. (2002). Optimal route network design for transit systems using genetic algorithms. Eng. Optim. EGOPAX 0305-215X, 34 (1), 83-100. 10.1080/03052150210909 (Pubitemid 35262618)
-
(2002)
Engineering Optimization
, vol.34
, Issue.1
, pp. 83-100
-
-
Chakroborty, P.1
Dwivedi, T.2
-
13
-
-
0012234280
-
Production scheduling for precast plants using a flow shop sequencing model
-
DOI 10.1061/(ASCE)0887-3801(2002)16:3(165)
-
Chan, W., and Hu, H. (2002). Production scheduling for precast plants using a flow shop sequencing model. J. Comput. Civ. Eng. JCCEE5 0887-3801, 16 (3), 165-174. 10.1061/(ASCE)0887-3801(2002)16:3(165) (Pubitemid 40475487)
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.3
, pp. 165-174
-
-
Chan, W.T.1
Hu, H.2
-
14
-
-
2642577642
-
A two-stage dynamic model on allocation of construction facilities with genetic algorithm
-
AUCOES 0926-5805. 10.1016/j.autcon.2004.02.001
-
Chau, K. (2004). A two-stage dynamic model on allocation of construction facilities with genetic algorithm. Autom. Constr. AUCOES 0926-5805, 13 (4), 481-490. 10.1016/j.autcon.2004.02.001
-
(2004)
Autom. Constr.
, vol.13
, Issue.4
, pp. 481-490
-
-
Chau, K.1
-
15
-
-
63549149518
-
Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints
-
AUCOES 0926-5805. 10.1016/j.autcon.2008.10.007
-
Chen, P. H., and Shahandashti, S. (2009). Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints. Autom. Constr. AUCOES 0926-5805, 18 (4), 434-443. 10.1016/j.autcon.2008.10.007
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 434-443
-
-
Chen, P.H.1
Shahandashti, S.2
-
16
-
-
63549109485
-
A two-phase GA model for resource-constrained project scheduling
-
AUCOES 0926-5805. 10.1016/j.autcon.2008.11.003
-
Chen, P. H., and Weng, H. (2009). A two-phase GA model for resource-constrained project scheduling. Autom. Constr. AUCOES 0926-5805, 18 (4), 485-498. 10.1016/j.autcon.2008.11.003
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 485-498
-
-
Chen, P.H.1
Weng, H.2
-
17
-
-
77949489339
-
Project success prediction using an evolutionary support vector machine inference model
-
AUCOES 0926-5805. 10.1016/j.autcon.2009.12.003
-
Cheng, M. Y., Wu, Y. W., and Wu, C. F. (2010). Project success prediction using an evolutionary support vector machine inference model. Autom. Constr. AUCOES 0926-5805, 19 (3), 302-307. 10.1016/j.autcon.2009.12.003
-
(2010)
Autom. Constr.
, vol.19
, Issue.3
, pp. 302-307
-
-
Cheng, M.Y.1
Wu, Y.W.2
Wu, C.F.3
-
18
-
-
60849131719
-
Application of the shuffled frog leaping algorithm for the optimization of a general large-scale water supply system
-
WRMAEJ 0920-4741. 10.1007/s11269-008-9300-6
-
Chung, G., and Lansey, K. (2009). Application of the shuffled frog leaping algorithm for the optimization of a general large-scale water supply system. Water Resour. Manage. WRMAEJ 0920-4741, 23 (4), 797-823. 10.1007/s11269-008-9300-6
-
(2009)
Water Resour. Manage.
, vol.23
, Issue.4
, pp. 797-823
-
-
Chung, G.1
Lansey, K.2
-
19
-
-
32844466990
-
Construction scheduling using multi-constraint and genetic algorithms approach
-
DOI 10.1080/01446190500310486, PII W6602185465383
-
Dawood, N., and Sriprasert, E. (2006). Construction scheduling using multi-constraint and genetic algorithms approach. Constr. Manage. Econ. CMECF3 0144-6193, 24 (1), 19-30. 10.1080/01446190500310486 (Pubitemid 43250410)
-
(2006)
Construction Management and Economics
, vol.24
, Issue.1
, pp. 19-30
-
-
Dawood, N.1
Sriprasert, E.2
-
20
-
-
34548211019
-
A comparison of simulated annealing and genetic algorithm for optimum design of nonlinear steel space frames
-
DOI 10.1007/s00158-007-0096-4
-
Degertekin, S. (2007). A comparison of simulated annealing and genetic algorithm for optimum design of nonlinear steel space frames. Struct. Multidiscip. Optim. SMOTB4 1615-1488, 34 (4), 347-359. 10.1007/s00158-007-0096-4 (Pubitemid 47325968)
-
(2007)
Structural and Multidisciplinary Optimization
, vol.34
, Issue.4
, pp. 347-359
-
-
Degertekin, S.O.1
-
21
-
-
57849097645
-
A hybrid tabu-simulated annealing heuristic algorithm for optimum design of steel frames
-
1229-9367
-
Degertekin, S., Hayalioglu, M., and Ulker, M. (2008). A hybrid tabu-simulated annealing heuristic algorithm for optimum design of steel frames. Steel Compos. Struct., 8 (6), 475-490. 1229-9367
-
(2008)
Steel Compos. Struct.
, vol.8
, Issue.6
, pp. 475-490
-
-
Degertekin, S.1
Hayalioglu, M.2
Ulker, M.3
-
22
-
-
33748765247
-
Determining attribute weights in a CBR model for early cost prediction of structural systems
-
DOI 10.1061/(ASCE)0733-9364(2006)132:10(1092)
-
Dogan, S., Arditi, D., and Murat, G. (2006). Determining attribute weights in a CBR model for early cost prediction of structural systems. J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (10), 1092-1098. 10.1061/(ASCE)0733- 9364(2006)132:10(1092) (Pubitemid 44410235)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.10
, pp. 1092-1098
-
-
Dogan, S.Z.1
Arditi, D.2
Murat Gunaydin, H.3
-
24
-
-
33751290672
-
Multiproject planning and resource controls for facility management
-
DOI 10.1061/(ASCE)0733-9364(2006)132:12(1294), 004612QCO
-
East, E., and Liu, L. (2006). Multiproject planning and resource controls for facility management. J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (12), 1294-1305. 10.1061/(ASCE)0733-9364(2006)132:12(1294) (Pubitemid 44794269)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.12
, pp. 1294-1305
-
-
East, E.W.1
Liu, L.Y.2
-
25
-
-
15944391749
-
Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
-
DOI 10.1061/(ASCE)0733-9364(2005)131:4(400)
-
Elazouni, A., and Metwally, F. (2005). Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (4), 400-412. 10.1061/(ASCE)0733-9364(2005)131: 4(400) (Pubitemid 40430136)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.4
, pp. 400-412
-
-
Elazouni, A.M.1
Metwally, F.G.2
-
26
-
-
33748325851
-
Comparison of two evolutionary algorithms for optimization of bridge deck repairs
-
DOI 10.1111/j.1467-8667.2006.00458.x
-
Elbehairy, H., Elbeltagi, E., Hegazy, T., and Soudki, K. (2006). Comparison of two evolutionary algorithms for optimization of bridge deck repairs. Comput. Aided Civ. Infrastruct. Eng., 21 (8), 561-572. CCIEFR 1093-9687 10.1111/j.1467-8667.2006.00458.x (Pubitemid 44323729)
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.8
, pp. 561-572
-
-
Elbehairy, H.1
Elbeltagi, E.2
Hegazy, T.3
Soudki, K.4
-
27
-
-
22344432656
-
Comparison among five evolutionary-based optimization algorithms
-
DOI 10.1016/j.aei.2005.01.004, PII S1474034605000091
-
Elbeltagi, E., Hegazy, T., and Grierson, D. (2005). Comparison among five evolutionary-based optimization algorithms. Adv. Eng. Inform. 1474-0346, 19 (1), 43-53. 10.1016/j.aei.2005.01.004 (Pubitemid 41000265)
-
(2005)
Advanced Engineering Informatics
, vol.19
, Issue.1
, pp. 43-53
-
-
Elbeltagi, E.1
Hegazy, T.2
Grierson, D.3
-
28
-
-
48249115605
-
A modified shuffled frog-leaping optimization algorithm: Applications to project management
-
1744-8980. 10.1080/15732470500254535
-
Elbeltagi, E., Hegazy, T., and Grierson, D. (2007). A modified shuffled frog-leaping optimization algorithm: Applications to project management. Struct. Infrastruct. Eng. 1744-8980, 3 (1), 53-60. 10.1080/15732470500254535
-
(2007)
Struct. Infrastruct. Eng.
, vol.3
, Issue.1
, pp. 53-60
-
-
Elbeltagi, E.1
Hegazy, T.2
Grierson, D.3
-
29
-
-
0035501643
-
Schedule-dependent evolution of site layout planning
-
DOI 10.1080/01446190110066713
-
Elbeltagi, E., Hegazy, T., Hosny, A., and Eldosouky, A. (2001). Schedule-dependent evolution of site layout planning. Constr. Manage. Econ. CMECF3 0144-6193, 19 (7), 689-697. 10.1080/01446190110066713 (Pubitemid 32914379)
-
(2001)
Construction Management and Economics
, vol.19
, Issue.7
, pp. 689-697
-
-
Elbeltagi, E.1
Hegazy, T.2
Hosny, A.H.3
Eldosouky, A.4
-
30
-
-
0038363680
-
Optimization of water distribution network design using the shuffled frog leaping algorithm
-
DOI 10.1061/(ASCE)0733-9496(2003)129:3(210)
-
Eusuff, M., and Lansey, K. E. (2003). Optimization of water distribution network design using the shuffled frog leaping algorithm. J. Water Resour. Plann. Manage., 129 (3), 210-225. JWRMD5 0733-9496 10.1061/(ASCE)0733-9496(2003) 129:3(210) (Pubitemid 36562716)
-
(2003)
Journal of Water Resources Planning and Management
, vol.129
, Issue.3
, pp. 210-225
-
-
Eusuff, M.M.1
Lansey, K.E.2
-
31
-
-
33244474874
-
Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization
-
DOI 10.1080/03052150500384759, PII R65340053330467
-
Eusuff, M., Lansey, K., and Pasha, F. (2006). Shuffled frog-leaping algorithm: A memetic meta-heuristic for discrete optimization. Eng. Optim. EGOPAX 0305-215X, 38 (2), 129-154. 10.1080/03052150500384759 (Pubitemid 43279596)
-
(2006)
Engineering Optimization
, vol.38
, Issue.2
, pp. 129-154
-
-
Eusuff, M.1
Lansey, K.2
Pasha, F.3
-
32
-
-
67349118477
-
Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
-
AUCOES 0926-5805. 10.1016/j.autcon.2009.02.001
-
Eshtehardian, E., Afshar, A., and Abbasnia, R. (2009). Fuzzy-based MOGA approach to stochastic time-cost trade-off problem. Autom. Constr. AUCOES 0926-5805, 18 (5), 692-701. 10.1016/j.autcon.2009.02.001
-
(2009)
Autom. Constr.
, vol.18
, Issue.5
, pp. 692-701
-
-
Eshtehardian, E.1
Afshar, A.2
Abbasnia, R.3
-
33
-
-
58149229057
-
Hybrid time-cost optimization of nonserial repetitive construction projects
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2009)135:1(42)
-
Ezeldin, A., and Soliman, A. (2009). Hybrid time-cost optimization of nonserial repetitive construction projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (1), 42-55. 10.1061/(ASCE)0733-9364(2009)135:1(42)
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.1
, pp. 42-55
-
-
Ezeldin, A.1
Soliman, A.2
-
34
-
-
77955715839
-
GA-based multi-objective optimization of finance-based construction project scheduling
-
1226-7988 10.1007/s12205-010-0849-2
-
Fathi, H., and Afshar, A. (2010). GA-based multi-objective optimization of finance-based construction project scheduling. KSCE J Civ. Eng., 14 (5), 627-638. 1226-7988 10.1007/s12205-010-0849-2
-
(2010)
KSCE J Civ. Eng.
, vol.14
, Issue.5
, pp. 627-638
-
-
Fathi, H.1
Afshar, A.2
-
35
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng, C. W., Liu, L., and Burns, S. (1997). Using genetic algorithms to solve construction time-cost trade-off problems. J. Comput. Civ. Eng. JCCEE5 0887-3801, 11 (3), 184-189. 10.1061/(ASCE)0887-3801(1997)11:3(184) (Pubitemid 127590539)
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.-W.1
Liu, L.2
Burns, S.A.3
-
36
-
-
0003806013
-
-
Wiley, New York
-
Fogel, L., Owens, A. J., and Walsh, M. J. (1966). Artificial intelligence through simulated evolution, Wiley, New York.
-
(1966)
Artificial Intelligence Through Simulated Evolution
-
-
Fogel, L.1
Owens, A.J.2
Walsh, M.J.3
-
37
-
-
84989487658
-
Heuristics for integer programming using surrogate constraints
-
DESCDQ 0011-7315. 10.1111/j.1540-5915.1977.tb01074.x
-
Glover, F. (1977). Heuristics for integer programming using surrogate constraints. Decision Sciences DESCDQ 0011-7315, 8 (1), 156-166. 10.1111/j.1540-5915.1977.tb01074.x
-
(1977)
Decision Sciences
, vol.8
, Issue.1
, pp. 156-166
-
-
Glover, F.1
-
38
-
-
0022865373
-
Future paths for integer programming and links to artificial intelligence
-
DOI 10.1016/0305-0548(86)90048-1
-
Glover, F. (1986). Future paths for integer programming and links to artificial intelligence. Comput. Oper. Res. CMORAP 0305-0548, 13 (5), 533-549. 10.1016/0305-0548(86)90048-1 (Pubitemid 17480188)
-
(1986)
Computers and Operations Research
, vol.13
, Issue.5
, pp. 533-549
-
-
Glover Fred1
-
39
-
-
40849142091
-
A genetic algorithm for the resource constrained multi-project scheduling problem
-
DOI 10.1016/j.ejor.2006.06.074, PII S0377221707005929
-
Gonalves, J., Mendes, J., and Resende, M. (2008). A genetic algorithm for the resource constrained multi-project scheduling problem. Eur. J. Oper. Res. EJORDT 0377-2217, 189 (3), 1171-1190. 10.1016/j.ejor.2006.06.074 (Pubitemid 351400562)
-
(2008)
European Journal of Operational Research
, vol.189
, Issue.3
, pp. 1171-1190
-
-
Goncalves, J.F.1
Mendes, J.J.M.2
Resende, M.G.C.3
-
40
-
-
0032654594
-
Genetic algorithms application and testing for equipment selection
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
Haidar, A., Naoum, S., Howes, R., and Tah, J. (1999). Genetic algorithms application and testing for equipment selection. J. Constr. Eng. Manage., 125 (1), 32-38. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:1(32)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 32-38
-
-
Haidar, A.1
Naoum, S.2
Howes, R.3
Tah, J.4
-
41
-
-
77649337563
-
Improving the performance of simulated annealing in structural optimization
-
SMOTB4 1615-1488. 10.1007/s00158-009-0418-9
-
Hasanebi, O., Carbas, S., and Saka, M. (2010). Improving the performance of simulated annealing in structural optimization. Struct. Multidiscip. Optim. SMOTB4 1615-1488, 41 (2), 189-203. 10.1007/s00158-009-0418-9
-
(2010)
Struct. Multidiscip. Optim.
, vol.41
, Issue.2
, pp. 189-203
-
-
Hasanebi, O.1
Carbas, S.2
Saka, M.3
-
42
-
-
64049109482
-
Simulated annealing and tabu search for multi-mode project payment scheduling
-
EJORDT 0377-2217. 10.1016/j.ejor.2008.10.005
-
He, Z., Wang, N., Jia, T., and Xu, Y. (2009). Simulated annealing and tabu search for multi-mode project payment scheduling. Eur. J. Oper. Res. EJORDT 0377-2217, 198 (3), 688-696. 10.1016/j.ejor.2008.10.005
-
(2009)
Eur. J. Oper. Res.
, vol.198
, Issue.3
, pp. 688-696
-
-
He, Z.1
Wang, N.2
Jia, T.3
Xu, Y.4
-
43
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
Hegazy, T. (1999 a). Optimization of resource allocation and leveling using genetic algorithms. J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
44
-
-
0033497302
-
Optimization of construction time-cost trade-off analysis using genetic algorithms
-
Hegazy, T. (1999 b). Optimization of construction time-cost trade-off analysis using genetic algorithms. Can. J. Civ. Eng. CJCEB8 0315-1468, 26 (6), 685-697. 10.1139/l99-031 (Pubitemid 30192514)
-
(1999)
Canadian Journal of Civil Engineering
, vol.26
, Issue.6
, pp. 685-697
-
-
Hegazy, T.1
-
45
-
-
12744251346
-
Distributed scheduling model for infrastructure networks
-
DOI 10.1061/(ASCE)0733-9364(2004)130:2(160)
-
Hegazy, T., Elhakeem, A., and Elbeltagi, E. (2004). Distributed scheduling model for infrastructure networks. J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (2), 160-167. 10.1061/(ASCE)0733-9364(2004)130:2(160) (Pubitemid 40265382)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.2
, pp. 160-167
-
-
Hegazy, T.1
Elhakeem, A.2
Elbeltagi, E.3
-
46
-
-
0035509424
-
Simplified spreadsheet solutions. II: Overall schedule optimization
-
DOI 10.1061/(ASCE)0733-9364(2001)127:6(469), Reportnr 22158
-
Hegazy, T., and Ersahin, T. (2001). Simplified spreadsheet solutions. II: Overall schedule optimization. J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (6), 469-475. 10.1061/(ASCE)0733-9364(2001)127:6(469) (Pubitemid 33137751)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.6
, pp. 469-475
-
-
Hegazy, T.1
Ersahin, T.2
-
47
-
-
40849150750
-
Efficient repetitive scheduling for high-rise construction
-
DOI 10.1061/(ASCE)0733-9364(2008)134:4(253)
-
Hegazy, T., and Kamarah, E. (2008). Efficient repetitive scheduling for high-rise construction. J. Constr. Eng. Manage. JCEMD4 0733-9364, 134 (4), 253-264. 10.1061/(ASCE)0733-9364(2008)134:4(253) (Pubitemid 351399362)
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.4
, pp. 253-264
-
-
Hegazy, T.1
Kamarah, E.2
-
48
-
-
6344281398
-
Resource optimization using combined simulation and genetic algorithms
-
DOI 10.1061/(ASCE)0733-9364(2003)129:6(698)
-
Hegazy, T., and Kassab, M. (2003). Resource optimization using combined simulation and genetic algorithms. J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (6), 698-705. 10.1061/(ASCE)0733-9364(2003)129:6(698) (Pubitemid 40265430)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 698-705
-
-
Hegazy, T.1
Kassab, M.2
-
49
-
-
13944255840
-
Genetic optimization for dynamic project control
-
DOI 10.1061/(ASCE)0733-9364(2003)129:4(396)
-
Hegazy, T., and Petzold, K. (2003). Genetic optimization for dynamic project control. J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 396-404. 10.1061/(ASCE)0733-9364(2003)129:4(396) (Pubitemid 40265453)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 396-404
-
-
Hegazy, T.1
Petzold, K.2
-
50
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
DOI 10.1061/(ASCE)0733-9364(2001)127:3(183), Reportnr 22131
-
Hegazy, T., Wassef, N. (2001). Cost optimization in projects with repetitive nonserial activities. J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (3), 183-191. 10.1061/(ASCE)0733-9364(2001)127:3(183) (Pubitemid 32508536)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.3
, pp. 183-191
-
-
Hegazy, T.1
Wassef, N.2
-
52
-
-
33846675940
-
An optimization model for workgroup-based repetitive scheduling
-
DOI 10.1139/L06-057
-
Huang, R. Y., and Sun, K. S. (2006). An optimization model for workgroup-based repetitive scheduling. Can. J. Civ. Eng. CJCEB8 0315-1468, 33 (9), 1172-1194. 10.1139/l06-057 (Pubitemid 46189985)
-
(2006)
Canadian Journal of Civil Engineering
, vol.33
, Issue.9
, pp. 1172-1194
-
-
Huang, R.-Y.1
Sun, K.-S.2
-
53
-
-
70349687128
-
Automated trade-off between time and cost in planning repetitive construction projects
-
CMECF3 0144-6193. 10.1080/01446190903117793
-
Hyari, K., El-Rayes, K., and El-Mashaleh, M. (2009). Automated trade-off between time and cost in planning repetitive construction projects. Constr. Manage. Econ. CMECF3 0144-6193, 27 (8), 749-761. 10.1080/01446190903117793
-
(2009)
Constr. Manage. Econ.
, vol.27
, Issue.8
, pp. 749-761
-
-
Hyari, K.1
El-Rayes, K.2
El-Mashaleh, M.3
-
54
-
-
33646584142
-
Optimal planning and scheduling for repetitive construction projects
-
JMENEA 0742-597X. 10.1061/(ASCE)0742-597X(2006)22:1(11)
-
Hyari, K., and El-Rayes, K. (2006). Optimal planning and scheduling for repetitive construction projects. J. Manage. Eng. JMENEA 0742-597X, 22 (1), 11-19. 10.1061/(ASCE)0742-597X(2006)22:1(11)
-
(2006)
J. Manage. Eng.
, vol.22
, Issue.1
, pp. 11-19
-
-
Hyari, K.1
El-Rayes, K.2
-
55
-
-
33847198334
-
Optimization of floor-level construction material layout using genetic algorithms
-
AUCOES 0926-5805. 10.1016/j.autcon.2006.09.006
-
Jang, H., Lee, S., and Choi, S. (2007). Optimization of floor-level construction material layout using genetic algorithms. Autom. Constr. AUCOES 0926-5805, 16 (4), 531-545. 10.1016/j.autcon.2006.09.006
-
(2007)
Autom. Constr.
, vol.16
, Issue.4
, pp. 531-545
-
-
Jang, H.1
Lee, S.2
Choi, S.3
-
56
-
-
0027912257
-
Simulated annealing for resource-constrained scheduling
-
DOI 10.1016/0377-2217(93)90231-B
-
Jeffcoat, D., and Bulfin, R. (1993). Simulated annealing for resource-constrained scheduling. Eur. J. Oper. Res. EJORDT 0377-2217, 70 (1), 43-51. 10.1016/0377-2217(93)90231-B (Pubitemid 23707635)
-
(1993)
European Journal of Operational Research
, vol.70
, Issue.1
, pp. 43-51
-
-
Jeffcoat David, E.1
Bulfin Robert, L.2
-
57
-
-
28344457938
-
Application of fuzzy GA for optimal vibration control of smart cylindrical shells
-
DOI 10.1088/0964-1726/14/6/018, PII S0964172605072952
-
Jin, Z., Yang, Y., and Soh, C. (2005). Application of fuzzy GA for optimal vibration control of smart cylindrical shells. Smart Mater. Struct. SMSTER 0964-1726, 14 (6), 1250-1264. 10.1088/0964-1726/14/6/018 (Pubitemid 41720784)
-
(2005)
Smart Materials and Structures
, vol.14
, Issue.6
, pp. 1250-1264
-
-
Jin, Z.1
Yang, Y.2
Soh, C.K.3
-
58
-
-
0033728517
-
Preliminary highway design with genetic algorithms and geographic information systems
-
1093-9687. CCIEFR 10.1111/0885-9507.00190
-
Jong, J. C., Jha, M., and Schonfeld, P. (2000). Preliminary highway design with genetic algorithms and geographic information systems. Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 15 (4), 261-271. CCIEFR 10.1111/0885-9507. 00190
-
(2000)
Comput. Aided Civ. Infrastruct. Eng.
, vol.15
, Issue.4
, pp. 261-271
-
-
Jong, J.C.1
Jha, M.2
Schonfeld, P.3
-
59
-
-
76549133751
-
Optimizing the utilization of multiple labor shifts in construction projects
-
AUCOES 0926-5805. 10.1016/j.autcon.2009.12.015
-
Jun, D., and El-Rayes, K. (2010). Optimizing the utilization of multiple labor shifts in construction projects. Autom. Constr. AUCOES 0926-5805, 19 (2), 109-119. 10.1016/j.autcon.2009.12.015
-
(2010)
Autom. Constr.
, vol.19
, Issue.2
, pp. 109-119
-
-
Jun, D.1
El-Rayes, K.2
-
60
-
-
33646171275
-
Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006)132:5(491)
-
Kandil, A., and El-Rayes, K. (2006). Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects. J. Constr. Eng. Manage., 132 (5), 491-498. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2006) 132:5(491)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.5
, pp. 491-498
-
-
Kandil, A.1
El-Rayes, K.2
-
61
-
-
0029535737
-
Particle swarm optimization
-
Vol., Perth, Australia
-
Kennedy, J., and Eberhart, R. (1995). Particle swarm optimization. Proc. IEEE Int. Conf. on Neural Networks, Vol. 4, Perth, Australia, 1942-1948.
-
(1995)
Proc. IEEE Int. Conf. on Neural Networks
, vol.4
, pp. 1942-1948
-
-
Kennedy, J.1
Eberhart, R.2
-
62
-
-
33748793663
-
Optimizing airport construction site layouts to minimize wildlife hazards
-
DOI 10.1061/(ASCE)0742-597X(2006)22:4(176)
-
Khalafallah, A., and El-Rayes, K. (2006). Optimizing airport construction site layouts to minimize wildlife hazards. J. Manage. Eng., 22 (4), 176-185. JMENEA 0742-597X 10.1061/(ASCE)0742-597X(2006)22:4(176) (Pubitemid 44410244)
-
(2006)
Journal of Management in Engineering
, vol.22
, Issue.4
, pp. 176-185
-
-
Khalafallah, A.1
El-Rayes, K.2
-
63
-
-
75649117074
-
Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2010)136:2(160)
-
Kim, J. L., and Ellis, R. (2010). Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (2), 160-169. 10.1061/(ASCE)0733- 9364(2010)136:2(160)
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.2
, pp. 160-169
-
-
Kim, J.L.1
Ellis, R.2
-
64
-
-
26444479778
-
Optimization by simulated annealing
-
SCIEAS 0036-8075. 10.1126/science.220.4598.671
-
Kirkpatrick, S., Gelatt, C. D. Jr., and Vecchi, M. P. (1983). Optimization by simulated annealing. Science SCIEAS 0036-8075, 220 (4598), 671-680. 10.1126/science.220.4598.671
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt Jr., C.D.2
Vecchi, M.P.3
-
65
-
-
33947408281
-
Dynamic prediction of project success using artificial intelligence
-
DOI 10.1061/(ASCE)0733-9364(2007)133:4(316)
-
Ko, C. H., Cheng, M. Y. (2007). Dynamic prediction of project success using artificial intelligence. J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (4), 316-324. 10.1061/(ASCE)0733-9364(2007)133:4(316) (Pubitemid 46447967)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.4
, pp. 316-324
-
-
Ko, C.-H.1
Cheng, M.-Y.2
-
66
-
-
77956618284
-
GA-based decision support systems for precast production planning
-
AUCOES 0926-5805. 10.1016/j.autcon.2010.06.004
-
Ko, C. H., and Wang, S. F. (2010). GA-based decision support systems for precast production planning. Autom. Constr. AUCOES 0926-5805, 19 (7), 907-916. 10.1016/j.autcon.2010.06.004
-
(2010)
Autom. Constr.
, vol.19
, Issue.7
, pp. 907-916
-
-
Ko, C.H.1
Wang, S.F.2
-
67
-
-
77953481735
-
A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects
-
CJCEB8 0315-1468. 10.1139/L10-007
-
Koo, C., Hong, T., Hyun, C., and Koo, K. (2010). A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects. Can. J. Civ. Eng. CJCEB8 0315-1468, 37 (5), 739-752. 10.1139/L10-007
-
(2010)
Can. J. Civ. Eng.
, vol.37
, Issue.5
, pp. 739-752
-
-
Koo, C.1
Hong, T.2
Hyun, C.3
Koo, K.4
-
68
-
-
0347719691
-
Multiobjective water resources systems analysis using genetic algorithms - Application to Chou-Shui River Basin, Taiwan
-
Kuo, J. T., Cheng, W. C., and Chen, L. (2003). Multiobjective water resources systems analysis using genetic algorithms-Application to Chou-Shui River Basin, Taiwan. Water Sci. Technol., 48 (10), 71-77. WSTED4 0273-1223 (Pubitemid 38094345)
-
(2003)
Water Science and Technology
, vol.48
, Issue.10
, pp. 71-77
-
-
Kuo, J.-T.1
Cheng, W.-C.2
Chen, L.3
-
69
-
-
63549135759
-
The fuzzy GA-based multi-objective financial decision support model for Chinese state-owned construction firms
-
AUCOES 0926-5805. 10.1016/j.autcon.2008.10.004
-
Lam, K. C., Ning, X., and Gao, H. (2009 a). The fuzzy GA-based multi-objective financial decision support model for Chinese state-owned construction firms. Autom. Constr. AUCOES 0926-5805, 18 (4), 402-414. 10.1016/j.autcon.2008.10.004
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 402-414
-
-
Lam, K.C.1
Ning, X.2
Gao, H.3
-
70
-
-
70349334592
-
Conjoining MMAS to GA to solve construction site layout planning problem
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2009)135:10(1049)
-
Lam, K. C., Ning, X., and Lam, M. (2009 b). Conjoining MMAS to GA to solve construction site layout planning problem. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (10), 1049-1057. 10.1061/(ASCE)0733-9364(2009)135:10(1049)
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.10
, pp. 1049-1057
-
-
Lam, K.C.1
Ning, X.2
Lam, M.3
-
71
-
-
0035193271
-
GA-based fuzzy optimal model for construction time-cost trade-off
-
DOI 10.1016/S0263-7863(99)00035-6
-
Leu, S. S., Chen, A. T., and Yang, C. H. (2001). A GA-based fuzzy optimal model for construction time-cost trade-off. Int. J. Proj. Manage. IPMAEL, 19 (1), 47-58. 10.1016/S0263-7863(99)00035-6 http://www.sciencedirect.com/science/ article/pii/S0263786399000356. (Pubitemid 32020457)
-
(2001)
International Journal of Project Management
, vol.19
, Issue.1
, pp. 47-58
-
-
Leu, S.-S.1
Chen, A.-T.2
Yang, C.-H.3
-
72
-
-
0036499562
-
A genetic algorithm-based optimal resource-constrained scheduling simulation model
-
DOI 10.1080/01446190110109148
-
Leu, S. S., and Hung, T. H. (2002). A genetic algorithm-based optimal resource-constrained scheduling simulation model. Constr. Manage. Econ. CMECF3 0144-6193, 20 (2), 131-141. 10.1080/01446190110109148 (Pubitemid 34197193)
-
(2002)
Construction Management and Economics
, vol.20
, Issue.2
, pp. 131-141
-
-
Leu, S.-S.1
Hung, T.-H.2
-
73
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
-
Leu, S. S., and Yang, C. H. (1999). GA-based multicriteria optimal model for construction scheduling. J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (6), 420-427. 10.1061/(ASCE)0733-9364(1999)125:6(420) (Pubitemid 30509596)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
74
-
-
0034324916
-
Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
-
AUCOES 0926-5805. 10.1016/S0926-5805(99)00011-4
-
Leu, S. S., Yang, C. H., and Huang, J. C. (2000). Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Autom. Constr. AUCOES 0926-5805, 10 (1), 27-41. 10.1016/S0926-5805(99)00011-4
-
(2000)
Autom. Constr.
, vol.10
, Issue.1
, pp. 27-41
-
-
Leu, S.S.1
Yang, C.H.2
Huang, J.C.3
-
75
-
-
0032638332
-
Using machine learning and GA to solve time-cost trade-off problems
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1999)125:5(347)
-
Li, H., Cao, J. N., and Love, P. (1999). Using machine learning and GA to solve time-cost trade-off problems. J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (5), 347-353. 10.1061/(ASCE)0733-9364(1999)125:5(347)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.N.2
Love, P.3
-
76
-
-
0033880829
-
Genetic search for solving construction site-level unequal-area facility layout problems
-
DOI 10.1016/S0926-5805(99)00006-0
-
Li, H., and Love, P. (2000). Genetic search for solving construction site-level unequal-area facility layout problems. Autom. Constr., 9 (2), 217-226. AUCOES 0926-5805 10.1016/S0926-5805(99)00006-0 (Pubitemid 30541681)
-
(2000)
Automation in construction
, vol.9
, Issue.2
, pp. 217-226
-
-
Li, H.1
Love, P.E.D.2
-
77
-
-
77949291019
-
Novel multiobjective shuffled frog leaping algorithm with application to reservoir flood control operation
-
JWRMD5 0733-9496. 10.1061/(ASCE)WR.1943-5452.0000027
-
Li, Y., Zhou, J., Zhang, Y., Qin, H., and Liu, L. (2010). Novel multiobjective shuffled frog leaping algorithm with application to reservoir flood control operation. J. Water Resour. Plann. Manage. JWRMD5 0733-9496, 136 (2), 217-226. 10.1061/(ASCE)WR.1943-5452.0000027
-
(2010)
J. Water Resour. Plann. Manage.
, vol.136
, Issue.2
, pp. 217-226
-
-
Li, Y.1
Zhou, J.2
Zhang, Y.3
Qin, H.4
Liu, L.5
-
78
-
-
63549088269
-
A genetic algorithm-based method for scheduling repetitive construction projects
-
AUCOES 0926-5805. 10.1016/j.autcon.2008.11.005
-
Long, L., and Ohsato, A. (2009). A genetic algorithm-based method for scheduling repetitive construction projects. Autom. Constr. AUCOES 0926-5805, 18 (4), 499-511. 10.1016/j.autcon.2008.11.005
-
(2009)
Autom. Constr.
, vol.18
, Issue.4
, pp. 499-511
-
-
Long, L.1
Ohsato, A.2
-
79
-
-
13944277711
-
Multiobjective optimization of earthmoving operations
-
DOI 10.1061/(ASCE)0733-9364(2004)130:1(105)
-
Marzouk, M., and Moselhi, O. (2004). Multiobjective optimization of earthmoving operations. J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (1), 105-113. 10.1061/(ASCE)0733-9364(2004)130:1(105) (Pubitemid 40265411)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.1
, pp. 105-113
-
-
Marzouk, M.1
Moselhi, O.2
-
80
-
-
84861129799
-
-
MATLAB 7.4 [Computer software]. Massachusetts, MathWorks, Inc
-
MATLAB 7.4 [Computer software]. Massachusetts, MathWorks, Inc.
-
-
-
-
81
-
-
4344695708
-
Genetic algorithms for construction site layout in project planning
-
DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
-
Mawdesley, M., Al-jibouri, S., and Yang, H. (2002). Genetic algorithms for construction site layout in project planning. J. Constr. Eng. Manage. JCEMD4 0733-9364, 128 (5), 418-426. 10.1061/(ASCE)0733-9364(2002)128:5(418) (Pubitemid 40265526)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.5
, pp. 418-426
-
-
Mawdesley, M.J.1
Al-jibouri, S.H.2
Yang, H.3
-
82
-
-
4344602193
-
Application of GA in optimal robot selection for bridge restoration
-
AUCOES 0926-5805. 10.1016/j.autcon.2004.05.002
-
McCrea, A., and Navon, R. (2004). Application of GA in optimal robot selection for bridge restoration. Autom. Constr. AUCOES 0926-5805, 13 (6), 803-819. 10.1016/j.autcon.2004.05.002
-
(2004)
Autom. Constr.
, vol.13
, Issue.6
, pp. 803-819
-
-
McCrea, A.1
Navon, R.2
-
83
-
-
12244289668
-
Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models
-
DOI 10.1016/j.ejor.2003.10.053, PII S0377221704001134
-
Mika, M., Waligra, G., and Weeglarz, J. (2005). Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models. Eur. J. Oper. Res. EJORDT 0377-2217, 164 (3), 639-668. 10.1016/j.ejor.2003.10.053 (Pubitemid 40114587)
-
(2005)
European Journal of Operational Research
, vol.164
, Issue.SPEC. ISS. 3
, pp. 639-668
-
-
Mika, M.1
Waligora, G.2
Weeglarz, J.3
-
84
-
-
70349321609
-
Optimization of earthmoving operations in heavy civil engineering projects
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2009)135:10(948)
-
Moselhi, O., and Alshibani, A. (2009). Optimization of earthmoving operations in heavy civil engineering projects. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (10), 948-954. 10.1061/(ASCE)0733-9364(2009)135:10(948)
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.10
, pp. 948-954
-
-
Moselhi, O.1
Alshibani, A.2
-
85
-
-
70349317365
-
Optimizing postdisaster reconstruction planning for damaged transportation networks
-
JCEMD4 0733-9364. 10.1061/(ASCE)CO.1943-7862.0000070
-
Orabi, W., El-Rayes, K., Senouci, A., and Al-Derham, H. (2009). Optimizing postdisaster reconstruction planning for damaged transportation networks. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (10), 1039-1048. 10.1061/(ASCE)CO.1943-7862.0000070
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.10
, pp. 1039-1048
-
-
Orabi, W.1
El-Rayes, K.2
Senouci, A.3
Al-Derham, H.4
-
86
-
-
0141990673
-
A hybrid CAD-based construction site layout planning system using genetic algorithms
-
AUCOES 0926-5805. 10.1016/S0926-5805(03)00058-X
-
Osman, H., Georgy, M., and Ibrahim, M. (2003). A hybrid CAD-based construction site layout planning system using genetic algorithms. Autom. Constr. AUCOES 0926-5805, 12 (6), 749-764. 10.1016/S0926-5805(03)00058-X
-
(2003)
Autom. Constr.
, vol.12
, Issue.6
, pp. 749-764
-
-
Osman, H.1
Georgy, M.2
Ibrahim, M.3
-
88
-
-
0033225325
-
-
Trans. Res. Rec., 1683
-
Park, B., Messer, C., and Urbanik, T. II (1999). Traffic signal optimization program for oversaturated conditions: Genetic algorithm approach. Trans. Res. Rec., 1683, 133-142.
-
(1999)
Traffic Signal Optimization Program for Oversaturated Conditions: Genetic Algorithm Approach
, pp. 133-142
-
-
Park, B.1
Messer, C.2
Urbanik, I.I.T.3
-
89
-
-
52249110456
-
Multiobjective optimization of concrete frames by simulated annealing
-
CCIEFR 1093-9687. 10.1111/j.1467-8667.2008.00561.x
-
Paya, I., Yepes, V., Gonzlez-Vidosa, F., and Hospitaler, A. (2008). Multiobjective optimization of concrete frames by simulated annealing. Comput. Aided Civ. Infrastruct. Eng. CCIEFR 1093-9687, 23 (8), 596-610. 10.1111/j.1467-8667.2008.00561.x
-
(2008)
Comput. Aided Civ. Infrastruct. Eng.
, vol.23
, Issue.8
, pp. 596-610
-
-
Paya, I.1
Yepes, V.2
Gonzlez-Vidosa, F.3
Hospitaler, A.4
-
90
-
-
0034315488
-
Masonry arch collapse loads and mechanisms by heuristically seeded genetic algorithm
-
DOI 10.1016/S0045-7825(99)00477-6
-
Ponterosso, P., Fishwick, R., Fox, D., Liu, X., and Begg, D. (2000). Masonry arch collapse loads and mechanisms by heuristically seeded genetic algorithm. Comput. Methods Appl. Mech. Eng. CMMECC 0045-7825, 190 (8-10), 1233-1243. 10.1016/S0045-7825(99)00477-6 (Pubitemid 32029489)
-
(2000)
Computer Methods in Applied Mechanics and Engineering
, vol.190
, Issue.8-10
, pp. 1233-1243
-
-
Ponterosso, P.1
Fishwick, R.J.2
Fox, D.St.J.3
Liu, X.L.4
Begg, D.W.5
-
91
-
-
0142248280
-
Optimal lay-up of hybrid composite beams, plates and shells using cellular genetic algorithm
-
SEGMEQ 1225-4568. 10.1296/SEM2003.16.05.03
-
Rajasekaran, S., Nalinaa, K., Greeshma, S., Poornima, N., and Kumar, V. (2003). Optimal lay-up of hybrid composite beams, plates and shells using cellular genetic algorithm. Struct. Eng. Mech. SEGMEQ 1225-4568, 16 (5), 557-580. 10.1296/SEM2003.16.05.03
-
(2003)
Struct. Eng. Mech.
, vol.16
, Issue.5
, pp. 557-580
-
-
Rajasekaran, S.1
Nalinaa, K.2
Greeshma, S.3
Poornima, N.4
Kumar, V.5
-
92
-
-
36249023087
-
Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models
-
DOI 10.1061/(ASCE)0733-9364(2007)133:12(982)
-
Salem, O., Shahin, A., and Khalifa, Y. (2007). Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models. J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (12), 982-992. 10.1061/(ASCE)0733-9364(2007)133:12(982) (Pubitemid 350129071)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.12
, pp. 982-992
-
-
Salem, O.1
Shahin, A.2
Khalifa, Y.3
-
93
-
-
45749148242
-
Optimal construction site layout considering safety and environmental aspects
-
JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:7(536)
-
Sanad, H., Ammar, M., and Ibrahim, M. (2008). Optimal construction site layout considering safety and environmental aspects. J. Constr. Eng. Manage., 134 (7), 536-544. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2008)134:7(536)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.7
, pp. 536-544
-
-
Sanad, H.1
Ammar, M.2
Ibrahim, M.3
-
94
-
-
49249121672
-
Genetic algorithm-based multi-objective model for scheduling of linear construction projects
-
AESODT 0965-9978. 10.1016/j.advengsoft.2007.08.002
-
Senouci, A., and Al-Derham, H. (2008). Genetic algorithm-based multi-objective model for scheduling of linear construction projects. Adv. Eng. Softw. AESODT 0965-9978, 39 (12), 1023-1028. 10.1016/j.advengsoft.2007.08.002
-
(2008)
Adv. Eng. Softw.
, vol.39
, Issue.12
, pp. 1023-1028
-
-
Senouci, A.1
Al-Derham, H.2
-
95
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
-
Senouci, A., and Eldin, N. (2004). Use of genetic algorithms in resource scheduling of construction projects. J. Constr. Eng. Manage., 130 (6), 869-877. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2004)130:6(869) (Pubitemid 40265320)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
96
-
-
0036885372
-
Application of genetic algorithm for scheduling and schedule coordination problems
-
Shrivastava, P., Dhingra, S., and Gundaliya, P. (2002). Application of genetic algorithm for scheduling and schedule coordination problems. J. Adv. Transp., 36 (1), 23-41. JATRDC 0197-6729 10.1002/atr.5670360103 (Pubitemid 34515073)
-
(2002)
Journal of Advanced Transportation
, vol.36
, Issue.1
, pp. 23-41
-
-
Shrivastava, P.1
Dhingra, S.L.2
Gundaliya, P.J.3
-
98
-
-
0034207920
-
Development of an intelligent technique for traffic network incident detection
-
EAAIE6 0952-1976. 10.1016/S0952-1976(00)00011-7
-
Srinivasan, D., Cheu, R., Poh, Y., and Ng, A. (2000). Development of an intelligent technique for traffic network incident detection. Eng. Appl. Artif. Intell. EAAIE6 0952-1976, 13 (3), 311-322. 10.1016/S0952-1976(00)00011-7
-
(2000)
Eng. Appl. Artif. Intell.
, vol.13
, Issue.3
, pp. 311-322
-
-
Srinivasan, D.1
Cheu, R.2
Poh, Y.3
Ng, A.4
-
99
-
-
0037647504
-
GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction
-
DOI 10.1080/0144619032000049665
-
Tam, C., and Tong, T. (2003). GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction. Constr. Manage. Econ. CMECF3 0144-6193, 21 (3), 257-266. 10.1080/ 0144619032000049665 (Pubitemid 36650330)
-
(2003)
Construction Management and Economics
, vol.21
, Issue.3
, pp. 257-266
-
-
Tam, C.M.1
Tong, T.K.L.2
-
100
-
-
0035392349
-
Genetic algorithm for optimizing supply locations around tower crane
-
DOI 10.1061/(ASCE)0733-9364(2001)127:4(315), Reportnr 22153
-
Tam, C., Tong, T., and Chan, W. (2001). Genetic algorithm for optimizing supply locations around tower crane. J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (4), 315-320. 10.1061/(ASCE)0733-9364(2001)127:4(315) (Pubitemid 32715362)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.4
, pp. 315-320
-
-
Tam, C.M.1
Tong, T.K.L.2
Chan, W.K.W.3
-
101
-
-
36549077064
-
An integrated system for earthmoving planning
-
DOI 10.1080/01446190701468836, PII 783076851
-
Tam, C., Tong, T., and Wong, B. (2007). An integrated system for earthmoving planning. Constr. Manage. Econ. CMECF3 0144-6193, 25 (11), 1127-1137. 10.1080/01446190701468836 (Pubitemid 350176765)
-
(2007)
Construction Management and Economics
, vol.25
, Issue.11
, pp. 1125-1135
-
-
Tam, C.M.1
Tong, T.K.L.2
Wong, B.W.L.3
-
102
-
-
68049120612
-
An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs
-
CMECF3 0144-6193. 10.1080/01446190902883049
-
Tang, L., and Leung, A. (2009). An entropy-based financial decision support system (e-FDSS) for project analysis in construction SMEs. Constr. Manage. Econ. CMECF3 0144-6193, 27 (5), 499-513. 10.1080/01446190902883049
-
(2009)
Constr. Manage. Econ.
, vol.27
, Issue.5
, pp. 499-513
-
-
Tang, L.1
Leung, A.2
-
103
-
-
0030148968
-
Topological design of truss structures using simulated annealing
-
SENRE8 0952-5807
-
Topping, B., Khan, A., and Leite (1996). Topological design of truss structures using simulated annealing. Struct. Eng. Rev., 8 (2-3), 301-314. SENRE8 0952-5807
-
(1996)
Struct. Eng. Rev.
, vol.8
, Issue.23
, pp. 301-314
-
-
Topping, B.1
Khan, A.2
Leite3
-
104
-
-
0034916911
-
Design optimization of structural steelwork using a genetic algorithm, FEM and a system of design rules
-
Toropov, V., and Mahfouz, S. (2001). Design optimization of structural steelwork using a genetic algorithm, FEM and a system of design rules. Eng. Comput. 0264-4401, 18, (3-4), 437-459. 10.1108/02644400110387118 (Pubitemid 32690565)
-
(2001)
Engineering Computations (Swansea, Wales)
, vol.18
, Issue.3-4
, pp. 437-459
-
-
Toropov, V.V.1
Mahfouz, S.Y.2
-
105
-
-
15744390529
-
-
Trans Res. Rec., 1891
-
Tsai, B. W., Kannekanti, V., and Harvey, J. (2004). Application of genetic algorithm in asphalt pavement design. Transp. Res. Rec., 1891, 112-120.
-
(2004)
Application of Genetic Algorithm in Asphalt Pavement Design
, pp. 112-120
-
-
Tsai, B.W.1
Kannekanti, V.2
Harvey, J.3
-
106
-
-
0029344681
-
Construction-site layout using annealed neural network
-
JCCEE5 0887-3801. 10.1061/(ASCE)0887-3801(1995)9:3(201)
-
Yeh, I. C. (1995). Construction-site layout using annealed neural network. J. Comput. Civ. Eng. JCCEE5 0887-3801, 9 (3), 201-208. 10.1061/(ASCE)0887-3801(1995)9:3(201)
-
(1995)
J. Comput. Civ. Eng.
, vol.9
, Issue.3
, pp. 201-208
-
-
Yeh, I.C.1
-
107
-
-
38849141525
-
A parametric study of optimum earth-retaining walls by simulated annealing
-
DOI 10.1016/j.engstruct.2007.05.023, PII S0141029607002313
-
Yepes, V., Alcala, J., Perea, C., and Gonzlez-Vidosa, F. (2008). A parametric study of optimum earth-retaining walls by simulated annealing. Eng. Struct. ENSTDF 0141-0296, 30 (3), 821-830. 10.1016/j.engstruct.2007.05.023 (Pubitemid 351201833)
-
(2008)
Engineering Structures
, vol.30
, Issue.3
, pp. 821-830
-
-
Yepes, V.1
Alcala, J.2
Perea, C.3
Gonzalez-Vidosa, F.4
-
108
-
-
0036885370
-
Multiobjective bilevel optimization for transportation planning and management problems
-
Yin, Y. (2002). Multiobjective bilevel optimization for transportation planning and management problems. J. Adv. Transp. JATRDC 0197-6729, 36 (1), 93-105. 10.1002/atr.5670360106 (Pubitemid 34515076)
-
(2002)
Journal of Advanced Transportation
, vol.36
, Issue.1
, pp. 93-105
-
-
Yin, Y.1
-
109
-
-
70350070859
-
Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets
-
JCEMD4 0733-9364. 10.1061/(ASCE)CO.1943-7862.0000092
-
Zahraie, B., and Tavakolan, M. (2009). Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets. J. Constr. Eng. Manage. JCEMD4 0733-9364, 135 (11), 1162-1171. 10.1061/(ASCE)CO.1943-7862.0000092
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, Issue.11
, pp. 1162-1171
-
-
Zahraie, B.1
Tavakolan, M.2
-
110
-
-
77955869817
-
Application of innovative critical chain method for project planning and control under resource constraints and uncertainty
-
JCEMD4 0733-9364. 10.1061/(ASCE)CO.1943-7862.0000209
-
Zhao, Z., You, W., and Zuo, J. (2010). Application of innovative critical chain method for project planning and control under resource constraints and uncertainty. J. Constr. Eng. Manage. JCEMD4 0733-9364, 136 (9), 1056-1060. 10.1061/(ASCE)CO.1943-7862.0000209
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.9
, pp. 1056-1060
-
-
Zhao, Z.1
You, W.2
Zuo, J.3
-
111
-
-
12344265028
-
Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
-
DOI 10.1061/(ASCE)0733-9364(2005)131:1(81)
-
Zheng, D., Ng, S., and Kumaraswamy, M. (2005). Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization. J. Constr. Eng. Manage. JCEMD4 0733-9364, 131 (1), 81-91. 10.1061/(ASCE)0733-9364(2005)131:1(81) (Pubitemid 40135235)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 81-91
-
-
Zheng, D.X.M.1
Ng, S.T.2
Kumaraswamy, M.M.3
|