-
1
-
-
0030644746
-
Manpower scheduling optimization using genetic algorithms
-
ASCE, Reston, Va.
-
Al-Tabtabai, H., and Alex, A. P. (1997). " Manpower scheduling optimization using genetic algorithms.. " Proc., Computing in Civil Engineering, ASCE, Reston, Va., 702-709.
-
(1997)
Proc., Computing in Civil Engineering
, pp. 702-709
-
-
Al-Tabtabai, H.1
Alex, A.P.2
-
2
-
-
0003138486
-
Construction and demolition debris-The invisible waste stream
-
Apotheker, S. (1990). " Construction and demolition debris-The invisible waste stream.. " Resour. Recycl., 9 (12), 66-74.
-
(1990)
Resour. Recycl.
, vol.9
, Issue.12
, pp. 66-74
-
-
Apotheker, S.1
-
3
-
-
36248983539
-
Germany's construction and demolition debris recycling infrastructure: What lessons does it have for the U.S.?
-
Tampa, Fla.
-
Brooks, K. A., Adams, C., and Demsetz, L. A. (1994). " Germany's construction and demolition debris recycling infrastructure: What lessons does it have for the U.S.? " Proc., Sustainable Construction Conf., Tampa, Fla,.
-
(1994)
Proc., Sustainable Construction Conf.
-
-
Brooks, K.A.1
Adams, C.2
Demsetz, L.A.3
-
4
-
-
0028496605
-
Road-maintenance planning using genetic algorithms. I: Formulation
-
Chan, W. T., Fwa, T. F., and Tan, C. Y. (1994). " Road-maintenance planning using genetic algorithms. I: Formulation.. " J. Transp. Eng., 120 (5), 693-709.
-
(1994)
J. Transp. Eng.
, vol.120
, Issue.5
, pp. 693-709
-
-
Chan, W.T.1
Fwa, T.F.2
Tan, C.Y.3
-
5
-
-
0032689420
-
Optimizing genetic algorithm parameters for adaptive nulling
-
Monterey, Calif.
-
Chung, Y. C., and Haupt, R. L. (1999). " Optimizing genetic algorithm parameters for adaptive nulling.. " Proc., 15th Annual Review of Progress in Applied Computational Electromagnetics at the Naval Postgraduate School, Monterey, Calif,.
-
(1999)
Proc., 15th Annual Review of Progress in Applied Computational Electromagnetics at the Naval Postgraduate School
-
-
Chung, Y.C.1
Haupt, R.L.2
-
6
-
-
0003367479
-
Construction waste and a new design methodology
-
Tampa, Fla.
-
Craven, D. J., Okraglik, H. M., and Eilenberg, I. M. (1994). " Construction waste and a new design methodology.. " Proc., Sustainable Construction Conf., Tampa, Fla,.
-
(1994)
Proc., Sustainable Construction Conf.
-
-
Craven, D.J.1
Okraglik, H.M.2
Eilenberg, I.M.3
-
8
-
-
15944391749
-
Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
-
Elazouni, A., and Metwally, F. (2005). " Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms.. " J. Constr. Eng. Manage., 131 (4), 400-412.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.4
, pp. 400-412
-
-
Elazouni, A.1
Metwally, F.2
-
9
-
-
15944361924
-
Time-cost-quality trade off analysis for highway construction
-
El-Rayes, K., and Kandil, A. (2005). " Time-cost-quality trade off analysis for highway construction.. " J. Constr. Eng. Manage., 131 (4), 477-486.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.4
, pp. 477-486
-
-
El-Rayes, K.1
Kandil, A.2
-
10
-
-
0034172005
-
Stochastic construction time-cost trade-off analysis
-
Feng, C., Liu, L., and Burns, S. A. (2000). " Stochastic construction time-cost trade-off analysis.. " J. Comput. Civ. Eng., 14 (2), 117-126.
-
(2000)
J. Comput. Civ. Eng.
, vol.14
, Issue.2
, pp. 117-126
-
-
Feng, C.1
Liu, L.2
Burns, S.A.3
-
12
-
-
0001510482
-
A linear programming approach to the cutting-stock problem
-
Gilmore, P. C., and Gomory, R. E. (1961). " A linear programming approach to the cutting-stock problem.. " Operations Research Society of America, 9 (6), 849-859.
-
(1961)
Operations Research Society of America
, vol.9
, Issue.6
, pp. 849-859
-
-
Gilmore, P.C.1
Gomory, R.E.2
-
14
-
-
0025226302
-
Optimal solutions for the cutting stock problem
-
Goulimis, C. (1990). " Optimal solutions for the cutting stock problem.. " Eur. J. Oper. Res., 44 (2), 197-208.
-
(1990)
Eur. J. Oper. Res.
, vol.44
, Issue.2
, pp. 197-208
-
-
Goulimis, C.1
-
15
-
-
0016509207
-
Controlling cutting patterns changes in one-dimensional trim problems
-
Haessler, R. W. (1975). " Controlling cutting patterns changes in one-dimensional trim problems.. " Oper. Res., 23 (3), 483-493.
-
(1975)
Oper. Res.
, vol.23
, Issue.3
, pp. 483-493
-
-
Haessler, R.W.1
-
16
-
-
0033497302
-
Optimization of construction time-cost trade-off analysis using genetic algorithms
-
Hegazy, T. (1999). " Optimization of construction time-cost trade-off analysis using genetic algorithms.. " Can. J. Civ. Eng., 26 (6), 685-697.
-
(1999)
Can. J. Civ. Eng.
, vol.26
, Issue.6
, pp. 685-697
-
-
Hegazy, T.1
-
17
-
-
0033156961
-
EvoSite: Evolution-based model for site layout planning
-
Hegazy, T., and Elbeltagi, E. (1999). " EvoSite: Evolution-based model for site layout planning.. " J. Comput. Civ. Eng., 13 (3), 198-206.
-
(1999)
J. Comput. Civ. Eng.
, vol.13
, Issue.3
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
18
-
-
12744251346
-
Distributed scheduling model for infrastructure networks
-
Hegazy, T., Elhakeem, A., and Elbeltagi, E. (2004). " Distributed scheduling model for infrastructure networks.. " J. Constr. Eng. Manage., 130 (2), 160-167.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.2
, pp. 160-167
-
-
Hegazy, T.1
Elhakeem, A.2
Elbeltagi, E.3
-
19
-
-
36249015213
-
Cutting schedules for the paper industry
-
Ghent, Belgium.
-
Johnston, R. W. (1980). " Cutting schedules for the paper industry.. " Proc., 4th IFAC Conf., Ghent, Belgium,.
-
(1980)
Proc., 4th IFAC Conf.
-
-
Johnston, R.W.1
-
21
-
-
0027929260
-
An evolutionary approach to combinatorial optimization problems
-
ACM, Phoenix, Ariz.
-
Khuri, S., Back, T., and Heitkotter, J. (1994). " An evolutionary approach to combinatorial optimization problems.. " Proc., ACM Computer Science Conf., ACM, Phoenix, Ariz.
-
(1994)
Proc., ACM Computer Science Conf.
-
-
Khuri, S.1
Back, T.2
Heitkotter, J.3
-
22
-
-
0029358703
-
Solving a one-dimensional cutting-stock problem in a small manufacturing firm: A case study
-
Lefraņois, P., and Gascon, A. (1995). " Solving a one-dimensional cutting-stock problem in a small manufacturing firm: A case study.. " IIE Trans., 27 (4), 483-496.
-
(1995)
IIE Trans.
, vol.27
, Issue.4
, pp. 483-496
-
-
Lefraņois, P.1
Gascon, A.2
-
23
-
-
0032187321
-
Site-level facilities layout using genetic algorithms
-
Li, H., and Love, P. E. (1998). " Site-level facilities layout using genetic algorithms.. " J. Comput. Civ. Eng., 12 (4), 227-231.
-
(1998)
J. Comput. Civ. Eng.
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.E.2
-
24
-
-
18444377400
-
Multiobjective optimization of bridge deck rehabilitation using genetic algorithm
-
Liu, C., and Hammad, A. (1997). " Multiobjective optimization of bridge deck rehabilitation using genetic algorithm.. " Microcomput. Civ. Eng., 12 (6), 431-443.
-
(1997)
Microcomput. Civ. Eng.
, vol.12
, Issue.6
, pp. 431-443
-
-
Liu, C.1
Hammad, A.2
-
25
-
-
13944277711
-
Multiobjective optimization of earthmoving operations
-
Marzouk, M., and Moselhi, O. (2004). " Multiobjective optimization of earthmoving operations.. " J. Constr. Eng. Manage., 130 (1), 105-113.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.1
, pp. 105-113
-
-
Marzouk, M.1
Moselhi, O.2
-
26
-
-
4344695708
-
Genetic algorithms for construction site layout in project planning
-
Mawdesley, M., Al-jibouri, S., and Yang, H. (2002). " Genetic algorithms for construction site layout in project planning.. " J. Constr. Eng. Manage., 128 (5), 418-426.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.5
, pp. 418-426
-
-
Mawdesley, M.1
Al-Jibouri, S.2
Yang, H.3
-
27
-
-
0033099577
-
Cost effective waste management plan
-
Mills, T. H., Showalter, E., and Jarman, D. (1999). " Cost effective waste management plan.. " Cost Eng., 41 (3), 35-43.
-
(1999)
Cost Eng.
, vol.41
, Issue.3
, pp. 35-43
-
-
Mills, T.H.1
Showalter, E.2
Jarman, D.3
-
29
-
-
13944256583
-
Incorporating practicability into genetic algorithm-based time-cost optimization
-
Que, B. (2002). " Incorporating practicability into genetic algorithm-based time-cost optimization.. " J. Constr. Eng. Manage., 128 (2), 139-143.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.2
, pp. 139-143
-
-
Que, B.1
-
30
-
-
3042751093
-
Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry
-
Shahin, A., and Salem, O. (2004). " Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry.. " Can. J. Civ. Eng., 31 (2), 321-332.
-
(2004)
Can. J. Civ. Eng.
, vol.31
, Issue.2
, pp. 321-332
-
-
Shahin, A.1
Salem, O.2
-
31
-
-
0035392349
-
Genetic algorithms for optimizing supply locations around tower crane
-
Tam, C. M., Tong, T., and Chan, W. (2001). " Genetic algorithms for optimizing supply locations around tower crane.. " J. Constr. Eng. Manage., 127 (4), 315-321.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 315-321
-
-
Tam, C.M.1
Tong, T.2
Chan, W.3
-
32
-
-
0030291565
-
Random search in the one-dimensional cutting stock problem
-
Vahrenkamp, R. (1996). " Random search in the one-dimensional cutting stock problem.. " Eur. J. Oper. Res., 95 (1), 191-200.
-
(1996)
Eur. J. Oper. Res.
, vol.95
, Issue.1
, pp. 191-200
-
-
Vahrenkamp, R.1
-
33
-
-
2342615793
-
Applying a genetic algorithm-based multiobjective approach for time-cost optimization
-
Zheng, D., Ng, T., and Kumaraswamy, M. (2004). " Applying a genetic algorithm-based multiobjective approach for time-cost optimization.. " J. Constr. Eng. Manage., 130 (2), 168-176.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.2
, pp. 168-176
-
-
Zheng, D.1
Ng, T.2
Kumaraswamy, M.3
-
34
-
-
12344265028
-
Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
-
Zheng, D., Ng, T., and Kumaraswamy, M. (2005). " Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization.. " J. Constr. Eng. Manage., 131 (1), 81-91.
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.1
, pp. 81-91
-
-
Zheng, D.1
Ng, T.2
Kumaraswamy, M.3
|