Volumn 133, Issue 12, 2007, Pages 982-992

Minimizing cutting wastes of reinforcement steel bars using genetic algorithms and integer programming models

Author keywords

Algorithms; Bars; Construction management; Optimization; Steel; Structure reinforcement

Indexed keywords

CONSTRUCTION MANAGEMENT; CUTTING STOCK PROBLEM (CSP); STRUCTURE REINFORCEMENT;

EID: 36249023087     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2007)133:12(982)     Document Type: Article
Times cited : (39)

References (34)
  • 1
    • 0030644746 scopus 로고    scopus 로고
    • Manpower scheduling optimization using genetic algorithms
    • ASCE, Reston, Va.
    • Al-Tabtabai, H., and Alex, A. P. (1997). " Manpower scheduling optimization using genetic algorithms.. " Proc., Computing in Civil Engineering, ASCE, Reston, Va., 702-709.
    • (1997) Proc., Computing in Civil Engineering , pp. 702-709
    • Al-Tabtabai, H.1    Alex, A.P.2
  • 2
    • 0003138486 scopus 로고
    • Construction and demolition debris-The invisible waste stream
    • Apotheker, S. (1990). " Construction and demolition debris-The invisible waste stream.. " Resour. Recycl., 9 (12), 66-74.
    • (1990) Resour. Recycl. , vol.9 , Issue.12 , pp. 66-74
    • Apotheker, S.1
  • 3
    • 36248983539 scopus 로고
    • Germany's construction and demolition debris recycling infrastructure: What lessons does it have for the U.S.?
    • Tampa, Fla.
    • Brooks, K. A., Adams, C., and Demsetz, L. A. (1994). " Germany's construction and demolition debris recycling infrastructure: What lessons does it have for the U.S.? " Proc., Sustainable Construction Conf., Tampa, Fla,.
    • (1994) Proc., Sustainable Construction Conf.
    • Brooks, K.A.1    Adams, C.2    Demsetz, L.A.3
  • 4
    • 0028496605 scopus 로고
    • Road-maintenance planning using genetic algorithms. I: Formulation
    • Chan, W. T., Fwa, T. F., and Tan, C. Y. (1994). " Road-maintenance planning using genetic algorithms. I: Formulation.. " J. Transp. Eng., 120 (5), 693-709.
    • (1994) J. Transp. Eng. , vol.120 , Issue.5 , pp. 693-709
    • Chan, W.T.1    Fwa, T.F.2    Tan, C.Y.3
  • 8
    • 15944391749 scopus 로고    scopus 로고
    • Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
    • Elazouni, A., and Metwally, F. (2005). " Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms.. " J. Constr. Eng. Manage., 131 (4), 400-412.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 400-412
    • Elazouni, A.1    Metwally, F.2
  • 9
    • 15944361924 scopus 로고    scopus 로고
    • Time-cost-quality trade off analysis for highway construction
    • El-Rayes, K., and Kandil, A. (2005). " Time-cost-quality trade off analysis for highway construction.. " J. Constr. Eng. Manage., 131 (4), 477-486.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 477-486
    • El-Rayes, K.1    Kandil, A.2
  • 10
    • 0034172005 scopus 로고    scopus 로고
    • Stochastic construction time-cost trade-off analysis
    • Feng, C., Liu, L., and Burns, S. A. (2000). " Stochastic construction time-cost trade-off analysis.. " J. Comput. Civ. Eng., 14 (2), 117-126.
    • (2000) J. Comput. Civ. Eng. , vol.14 , Issue.2 , pp. 117-126
    • Feng, C.1    Liu, L.2    Burns, S.A.3
  • 12
    • 0001510482 scopus 로고
    • A linear programming approach to the cutting-stock problem
    • Gilmore, P. C., and Gomory, R. E. (1961). " A linear programming approach to the cutting-stock problem.. " Operations Research Society of America, 9 (6), 849-859.
    • (1961) Operations Research Society of America , vol.9 , Issue.6 , pp. 849-859
    • Gilmore, P.C.1    Gomory, R.E.2
  • 14
    • 0025226302 scopus 로고
    • Optimal solutions for the cutting stock problem
    • Goulimis, C. (1990). " Optimal solutions for the cutting stock problem.. " Eur. J. Oper. Res., 44 (2), 197-208.
    • (1990) Eur. J. Oper. Res. , vol.44 , Issue.2 , pp. 197-208
    • Goulimis, C.1
  • 15
    • 0016509207 scopus 로고
    • Controlling cutting patterns changes in one-dimensional trim problems
    • Haessler, R. W. (1975). " Controlling cutting patterns changes in one-dimensional trim problems.. " Oper. Res., 23 (3), 483-493.
    • (1975) Oper. Res. , vol.23 , Issue.3 , pp. 483-493
    • Haessler, R.W.1
  • 16
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost trade-off analysis using genetic algorithms
    • Hegazy, T. (1999). " Optimization of construction time-cost trade-off analysis using genetic algorithms.. " Can. J. Civ. Eng., 26 (6), 685-697.
    • (1999) Can. J. Civ. Eng. , vol.26 , Issue.6 , pp. 685-697
    • Hegazy, T.1
  • 17
    • 0033156961 scopus 로고    scopus 로고
    • EvoSite: Evolution-based model for site layout planning
    • Hegazy, T., and Elbeltagi, E. (1999). " EvoSite: Evolution-based model for site layout planning.. " J. Comput. Civ. Eng., 13 (3), 198-206.
    • (1999) J. Comput. Civ. Eng. , vol.13 , Issue.3 , pp. 198-206
    • Hegazy, T.1    Elbeltagi, E.2
  • 18
    • 12744251346 scopus 로고    scopus 로고
    • Distributed scheduling model for infrastructure networks
    • Hegazy, T., Elhakeem, A., and Elbeltagi, E. (2004). " Distributed scheduling model for infrastructure networks.. " J. Constr. Eng. Manage., 130 (2), 160-167.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 160-167
    • Hegazy, T.1    Elhakeem, A.2    Elbeltagi, E.3
  • 19
    • 36249015213 scopus 로고
    • Cutting schedules for the paper industry
    • Ghent, Belgium.
    • Johnston, R. W. (1980). " Cutting schedules for the paper industry.. " Proc., 4th IFAC Conf., Ghent, Belgium,.
    • (1980) Proc., 4th IFAC Conf.
    • Johnston, R.W.1
  • 21
    • 0027929260 scopus 로고
    • An evolutionary approach to combinatorial optimization problems
    • ACM, Phoenix, Ariz.
    • Khuri, S., Back, T., and Heitkotter, J. (1994). " An evolutionary approach to combinatorial optimization problems.. " Proc., ACM Computer Science Conf., ACM, Phoenix, Ariz.
    • (1994) Proc., ACM Computer Science Conf.
    • Khuri, S.1    Back, T.2    Heitkotter, J.3
  • 22
    • 0029358703 scopus 로고
    • Solving a one-dimensional cutting-stock problem in a small manufacturing firm: A case study
    • Lefraņois, P., and Gascon, A. (1995). " Solving a one-dimensional cutting-stock problem in a small manufacturing firm: A case study.. " IIE Trans., 27 (4), 483-496.
    • (1995) IIE Trans. , vol.27 , Issue.4 , pp. 483-496
    • Lefraņois, P.1    Gascon, A.2
  • 23
    • 0032187321 scopus 로고    scopus 로고
    • Site-level facilities layout using genetic algorithms
    • Li, H., and Love, P. E. (1998). " Site-level facilities layout using genetic algorithms.. " J. Comput. Civ. Eng., 12 (4), 227-231.
    • (1998) J. Comput. Civ. Eng. , vol.12 , Issue.4 , pp. 227-231
    • Li, H.1    Love, P.E.2
  • 24
    • 18444377400 scopus 로고    scopus 로고
    • Multiobjective optimization of bridge deck rehabilitation using genetic algorithm
    • Liu, C., and Hammad, A. (1997). " Multiobjective optimization of bridge deck rehabilitation using genetic algorithm.. " Microcomput. Civ. Eng., 12 (6), 431-443.
    • (1997) Microcomput. Civ. Eng. , vol.12 , Issue.6 , pp. 431-443
    • Liu, C.1    Hammad, A.2
  • 25
    • 13944277711 scopus 로고    scopus 로고
    • Multiobjective optimization of earthmoving operations
    • Marzouk, M., and Moselhi, O. (2004). " Multiobjective optimization of earthmoving operations.. " J. Constr. Eng. Manage., 130 (1), 105-113.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.1 , pp. 105-113
    • Marzouk, M.1    Moselhi, O.2
  • 26
    • 4344695708 scopus 로고    scopus 로고
    • Genetic algorithms for construction site layout in project planning
    • Mawdesley, M., Al-jibouri, S., and Yang, H. (2002). " Genetic algorithms for construction site layout in project planning.. " J. Constr. Eng. Manage., 128 (5), 418-426.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.5 , pp. 418-426
    • Mawdesley, M.1    Al-Jibouri, S.2    Yang, H.3
  • 27
    • 0033099577 scopus 로고    scopus 로고
    • Cost effective waste management plan
    • Mills, T. H., Showalter, E., and Jarman, D. (1999). " Cost effective waste management plan.. " Cost Eng., 41 (3), 35-43.
    • (1999) Cost Eng. , vol.41 , Issue.3 , pp. 35-43
    • Mills, T.H.1    Showalter, E.2    Jarman, D.3
  • 29
    • 13944256583 scopus 로고    scopus 로고
    • Incorporating practicability into genetic algorithm-based time-cost optimization
    • Que, B. (2002). " Incorporating practicability into genetic algorithm-based time-cost optimization.. " J. Constr. Eng. Manage., 128 (2), 139-143.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 139-143
    • Que, B.1
  • 30
    • 3042751093 scopus 로고    scopus 로고
    • Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry
    • Shahin, A., and Salem, O. (2004). " Using genetic algorithms in solving the one-dimensional cutting stock problem in the construction industry.. " Can. J. Civ. Eng., 31 (2), 321-332.
    • (2004) Can. J. Civ. Eng. , vol.31 , Issue.2 , pp. 321-332
    • Shahin, A.1    Salem, O.2
  • 31
    • 0035392349 scopus 로고    scopus 로고
    • Genetic algorithms for optimizing supply locations around tower crane
    • Tam, C. M., Tong, T., and Chan, W. (2001). " Genetic algorithms for optimizing supply locations around tower crane.. " J. Constr. Eng. Manage., 127 (4), 315-321.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 315-321
    • Tam, C.M.1    Tong, T.2    Chan, W.3
  • 32
    • 0030291565 scopus 로고    scopus 로고
    • Random search in the one-dimensional cutting stock problem
    • Vahrenkamp, R. (1996). " Random search in the one-dimensional cutting stock problem.. " Eur. J. Oper. Res., 95 (1), 191-200.
    • (1996) Eur. J. Oper. Res. , vol.95 , Issue.1 , pp. 191-200
    • Vahrenkamp, R.1
  • 33
    • 2342615793 scopus 로고    scopus 로고
    • Applying a genetic algorithm-based multiobjective approach for time-cost optimization
    • Zheng, D., Ng, T., and Kumaraswamy, M. (2004). " Applying a genetic algorithm-based multiobjective approach for time-cost optimization.. " J. Constr. Eng. Manage., 130 (2), 168-176.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.1    Ng, T.2    Kumaraswamy, M.3
  • 34
    • 12344265028 scopus 로고    scopus 로고
    • Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • Zheng, D., Ng, T., and Kumaraswamy, M. (2005). " Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization.. " J. Constr. Eng. Manage., 131 (1), 81-91.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.1    Ng, T.2    Kumaraswamy, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.