Volumn 136, Issue 9, 2010, Pages 1056-1060

Application of innovative critical chain method for project planning and control under resource constraints and uncertainty

Author keywords

Algorithms; Construction planning; Innovation; Scheduling

Indexed keywords

CONSTRUCTION PLANNING; CRITICAL CHAIN; CRITICAL CHAIN METHOD; IMPROVED GENETIC ALGORITHMS; PROJECT PLANNING AND CONTROL; RESOURCE CONSTRAINT;

EID: 77955869817     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000209     Document Type: Article
Times cited : (28)

References (10)
  • 1
    • 24644445552 scopus 로고    scopus 로고
    • Fuzzy-critical-chain-based project management
    • CKCKDZ 0253-3839, (in Chinese)
    • Chen, M. K., and Hsu, S. P. (2004). " Fuzzy-critical-chain-based project management." J. Chin. Inst. Eng. CKCKDZ 0253-3839, 21 (2), 167-176 (in Chinese).
    • (2004) J. Chin. Inst. Eng. , vol.21 , Issue.2 , pp. 167-176
    • Chen, M.K.1    Hsu, S.P.2
  • 2
    • 0003926816 scopus 로고    scopus 로고
    • The North River, Great Barrington, Mass
    • Goldratt, E. (1997). Critical chain, The North River, Great Barrington, Mass.
    • (1997) Critical Chain
    • Goldratt, E.1
  • 3
    • 13944255840 scopus 로고    scopus 로고
    • Genetic optimization for dynamic project control
    • DOI 10.1061/(ASCE)0733-9364(2003)129:4(396)
    • Hegazy, T., and Petzold, K. (2003). " Genetic optimization for dynamic project control." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (4), 396-404. 10.1061/(ASCE)0733-9364(2003)129:4(396) (Pubitemid 40265453)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.4 , pp. 396-404
    • Hegazy, T.1    Petzold, K.2
  • 4
    • 56349099276 scopus 로고    scopus 로고
    • Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory
    • " ESAPEH 0957-4174, 10.1016/j.eswa.2007.12.038
    • Kuo, T. C., Chang, S. H., and Huang, S. N. (2009). " Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory." Expert Sys. Applic. ESAPEH 0957-4174, 36 (2), 1783-1792. 10.1016/j.eswa.2007.12.038
    • (2009) Expert Sys. Applic. , vol.36 , Issue.2 , pp. 1783-1792
    • Kuo, T.C.1    Chang, S.H.2    Huang, S.N.3
  • 5
    • 49349090365 scopus 로고    scopus 로고
    • Fuzzy critical chain method for project scheduling under resource constraints and uncertainty
    • IPMAEL 0263-7863, 10.1016/j.ijproman.2007.09.012
    • Long, L. D., and Ohsato, A. (2008). " Fuzzy critical chain method for project scheduling under resource constraints and uncertainty." Int. J. Proj. Manage. IPMAEL 0263-7863, 26 (6), 688-698. 10.1016/j.ijproman.2007.09.012
    • (2008) Int. J. Proj. Manage. , vol.26 , Issue.6 , pp. 688-698
    • Long, L.D.1    Ohsato, A.2
  • 6
    • 0009981746 scopus 로고
    • A comparative assessment of measures of similarity of fuzzy values
    • FSSYD8 0165-0114, 10.1016/0165-0114(93)90141-4
    • Pappis, C. P., and Karacapilidis, N. I. (1993). " A comparative assessment of measures of similarity of fuzzy values." Fuzzy Sets Syst. FSSYD8 0165-0114, 56 (2), 171-174. 10.1016/0165-0114(93)90141-4
    • (1993) Fuzzy Sets Syst. , vol.56 , Issue.2 , pp. 171-174
    • Pappis, C.P.1    Karacapilidis, N.I.2
  • 7
    • 0035426806 scopus 로고    scopus 로고
    • An investigation into the fundamentals of critical chain project scheduling
    • DOI 10.1016/S0263-7863(00)00026-0, PII S0263786300000260
    • Steyn, H. (2001). " An investigation into the fundamentals of critical chain project scheduling." Int. J. Proj. Manage. IPMAEL 0263-7863, 19 (6), 363-369. 10.1016/S0263-7863(00)00026-0 (Pubitemid 32646674)
    • (2001) International Journal of Project Management , vol.19 , Issue.6 , pp. 363-369
    • Steyn, H.1
  • 8
    • 0348167521 scopus 로고    scopus 로고
    • On the optimal management of project risk
    • " EJORDT 0377-2217, 10.1016/S0377-2217(97)00344-5
    • Tavares, L. V., Ferreira, J. A., and Coelho, J. S. (1998). " On the optimal management of project risk." Eur. J. Oper. Res. EJORDT 0377-2217, 107 (2), 451-469. 10.1016/S0377-2217(97)00344-5
    • (1998) Eur. J. Oper. Res. , vol.107 , Issue.2 , pp. 451-469
    • Tavares, L.V.1    Ferreira, J.A.2    Coelho, J.S.3
  • 9
    • 33947389629 scopus 로고    scopus 로고
    • Project planning for construction under uncertainty with limited resources
    • DOI 10.1061/(ASCE)0733-9364(2007)133:4(268)
    • Vaziri, K., Carr, P. G., and Nozick, L. K. (2007). " Project planning for construction under uncertainty with limited resources." J. Constr. Eng. Manage. JCEMD4 0733-9364, 133 (4), 268-276. 10.1061/(ASCE)0733- 9364(2007)133:4(268) (Pubitemid 46447962)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.4 , pp. 268-276
    • Vaziri, K.1    Carr, P.G.2    Nozick, L.K.3
  • 10
    • 32944474678 scopus 로고    scopus 로고
    • Particle swarm optimization for preemptive scheduling under break and resource-constraints
    • DOI 10.1061/(ASCE)0733-9364(2006)132:3(259)
    • Zhang, H., Li, H., and Tam, C. M. (2006). " Particle swarm optimization for preemptive scheduling under break and resource-constraints. " J. Constr. Eng. Manage. JCEMD4 0733-9364, 132 (3), 259-267. 10.1061/(ASCE)0733-9364(2006)132:3(259) (Pubitemid 43260126)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.3 , pp. 259-267
    • Zhang, H.1    Li, H.2    Tam, C.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.