-
1
-
-
5244248406
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1996) 122:4(329), (4).
-
Cheng, M. Y., and O'Connor, J. T. (1996). " ArcSite: Enhanced GIS for construction site layout.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1996)122:4(329), 122 (4), 329-336.
-
(1996)
ArcSite: Enhanced GIS for Construction Site Layout
, vol.122
, pp. 329-336
-
-
Cheng, M.Y.1
O'Connor, J.T.2
-
2
-
-
45749147595
-
-
Ph.D. thesis, Mansoura Univ., Mansoura, Egypt.
-
Elbeltagi, E. (1999). " Construction site management.." Ph.D. thesis, Mansoura Univ., Mansoura, Egypt.
-
(1999)
Construction Site Management
-
-
Elbeltagi, E.1
-
3
-
-
13944281386
-
-
" J. Constr. Eng. Manage. JCEMD4 0733-9364, (4).
-
Elbeltagi, E., Hegazy, T., and Eldosouky, A. (2004). " Dynamic layout of construction temporary facilities considering safety.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (4), 534-541.
-
(2004)
Dynamic Layout of Construction Temporary Facilities Considering Safety
, vol.130
, pp. 534-541
-
-
Elbeltagi, E.1
Hegazy, T.2
Eldosouky, A.3
-
4
-
-
45749122886
-
-
Wrox, Birmingham, Ala.
-
Green, J., Stephen, B., and Felipe, M. (2000). Excel 2000 VBA programmer's reference, Wrox, Birmingham, Ala.
-
(2000)
Excel 2000 VBA Programmer's Reference
-
-
Green, J.1
Stephen, B.2
Felipe, M.3
-
7
-
-
0033156961
-
-
J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(1999)13: 3(198), (3).
-
Hegazy, T., and Elbeltagi, E. (1999). " EvoSite: Evolution-based model for site layout planning.." J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(1999)13:3(198), 13 (3), 198-206.
-
(1999)
EvoSite: Evolution-based Model for Site Layout Planning
, vol.13
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
9
-
-
0032187321
-
-
J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(1998)12: 4(227), (4).
-
Li, H., and Love, P. (1998). " Site-level facilities layout using genetic algorithms.." J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(1998)12:4(227), 12 (4), 227-231.
-
(1998)
Site-level Facilities Layout Using Genetic Algorithms
, vol.12
, pp. 227-231
-
-
Li, H.1
Love, P.2
-
10
-
-
8744311461
-
-
Microsoft Corporation.., Redmond, Wash.
-
Microsoft Corporation. (2000). Microsoft Project 2000, Redmond, Wash.
-
(2000)
Microsoft Project 2000
-
-
-
11
-
-
45749129985
-
-
Microsoft Corporation... Redmond, Wash.
-
Microsoft Corporation. (2002). Excel reference manual. Redmond, Wash.
-
(2002)
Excel Reference Manual
-
-
-
12
-
-
45749126275
-
-
Occupational Safety and Health Administration (OSHA).., USDOL, Washington, D.C..
-
Occupational Safety and Health Administration (OSHA). (1987). Occupational Safety and Health Administrations, construction industry, USDOL, Washington, D.C., 19-26.
-
(1987)
Occupational Safety and Health Administrations, Construction Industry
, pp. 19-26
-
-
-
13
-
-
45749096045
-
An automated system for dynamic construction site layout planning
-
Ain Shams Univ., Cairo, Egypt
-
Osman, H., Georgy, M., and Ibrahim, M. (2003). " An automated system for dynamic construction site layout planning.." 10th Int. Colloquium on Structural and Geotechnical Engineering, Ain Shams Univ., Cairo, Egypt, 1-13.
-
(2003)
10th Int. Colloquium on Structural and Geotechnical Engineering
, pp. 1-13
-
-
Osman, H.1
Georgy, M.2
Ibrahim, M.3
-
14
-
-
45749142255
-
-
Ongoing MSc Research, Structural Engineering Dept., Tanta Univ., Tanta, Egypt
-
Sanad, H., (2006). " Optimal arrangement of temporary facilities in construction sites.." Ongoing MSc Research, Structural Engineering Dept., Tanta Univ., Tanta, Egypt.
-
(2006)
Optimal Arrangement of Temporary Facilities in Construction Sites
-
-
Sanad, H.1
-
16
-
-
2342444431
-
-
" J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887- 3801(2002)16:2(143), (2).
-
Zouein, P., Harmanani, H., and Hajar, A. (2002). " Genetic algorithm for solving site layout problem with unequal-size and constrained facilities.." J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887- 3801(2002)16:2(143), 16 (2), 143-151.
-
(2002)
Genetic Algorithm for Solving Site Layout Problem with Unequal-size and Constrained Facilities
, vol.16
, pp. 143-151
-
-
Zouein, P.1
Harmanani, H.2
Hajar, A.3
-
17
-
-
0033313625
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999) 125:6(400), (6).
-
Zouein, P., and Tommelein, I. (1999). " Dynamic layout planning using a hybrid incremental solution method.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1999)125:6(400), 125 (6), 400-408.
-
(1999)
Dynamic Layout Planning Using A Hybrid Incremental Solution Method
, vol.125
, pp. 400-408
-
-
Zouein, P.1
Tommelein, I.2
|