메뉴 건너뛰기




Volumn 39, Issue 12, 2008, Pages 1023-1028

Genetic algorithm-based multi-objective model for scheduling of linear construction projects

Author keywords

Cost control; Genetic algorithms; Information technology (IT); Linear construction projects; Multi objective optimization; Scheduling

Indexed keywords

ALGORITHMS; CONSTRUCTION INDUSTRY; GENETIC ALGORITHMS; MOBILE TELECOMMUNICATION SYSTEMS; MULTIOBJECTIVE OPTIMIZATION; OPTIMIZATION;

EID: 49249121672     PISSN: 09659978     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.advengsoft.2007.08.002     Document Type: Article
Times cited : (67)

References (12)
  • 1
    • 0025598377 scopus 로고
    • Formal development of line-of-balance technique
    • Al Serraj Z.M. Formal development of line-of-balance technique. J Constr Eng Manage, ASCE 116 4 (1990) 689-704
    • (1990) J Constr Eng Manage, ASCE , vol.116 , Issue.4 , pp. 689-704
    • Al Serraj, Z.M.1
  • 2
    • 0022778511 scopus 로고
    • Line-of-balance scheduling in pavement construction
    • Arditi D., and Albulak Z.M. Line-of-balance scheduling in pavement construction. J Constr Div, ASCE 112 3 (1986) 411-424
    • (1986) J Constr Div, ASCE , vol.112 , Issue.3 , pp. 411-424
    • Arditi, D.1    Albulak, Z.M.2
  • 4
    • 85009466083 scopus 로고    scopus 로고
    • Deb K, Agrawal S, Pratap A, Meyarivan T. A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization. KANGAL Report No. 200001. Kanpur, India: Genetic Algorithm Laboratory, Indian Institute of Technology; 2001.
    • Deb K, Agrawal S, Pratap A, Meyarivan T. A fast elitist non-dominated sorting genetic algorithm for multi-objective optimization. KANGAL Report No. 200001. Kanpur, India: Genetic Algorithm Laboratory, Indian Institute of Technology; 2001.
  • 6
    • 0028409229 scopus 로고
    • Scheduling and control of linear projects
    • Eldin N.N., and Senouci A.B. Scheduling and control of linear projects. Canad J Civil Eng 21 2 (1994) 219-230
    • (1994) Canad J Civil Eng , vol.21 , Issue.2 , pp. 219-230
    • Eldin, N.N.1    Senouci, A.B.2
  • 8
    • 0035335808 scopus 로고    scopus 로고
    • Cost optimization in projects with repetitive nonserial activities
    • Hegazy T., and Wassef N. Cost optimization in projects with repetitive nonserial activities. J Constr Eng Manage, ASCE 127 3 (2001) 183-191
    • (2001) J Constr Eng Manage, ASCE , vol.127 , Issue.3 , pp. 183-191
    • Hegazy, T.1    Wassef, N.2
  • 9
    • 0025447970 scopus 로고
    • RPM: repetitive project modeling
    • Reda R.M. RPM: repetitive project modeling. J Constr Eng Manage, ASCE 116 2 (1990) 316-330
    • (1990) J Constr Eng Manage, ASCE , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.M.1
  • 10
    • 0023984188 scopus 로고
    • Extensions to linear scheduling optimization
    • Russell A.D., and Caselton W.F. Extensions to linear scheduling optimization. Phys Rev Lett 114 1 (1988) 36-52
    • (1988) Phys Rev Lett , vol.114 , Issue.1 , pp. 36-52
    • Russell, A.D.1    Caselton, W.F.2
  • 11
    • 0019030431 scopus 로고
    • Construction planning for linear projects
    • Selinger S. Construction planning for linear projects. J Constr Div, ASCE 106 2 (1980) 195-205
    • (1980) J Constr Div, ASCE , vol.106 , Issue.2 , pp. 195-205
    • Selinger, S.1
  • 12
    • 0033318858 scopus 로고    scopus 로고
    • Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach
    • Zitzler E., and Thiele L. Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach. IEEE Trans Evolut Comput 3 4 (1999) 257-271
    • (1999) IEEE Trans Evolut Comput , vol.3 , Issue.4 , pp. 257-271
    • Zitzler, E.1    Thiele, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.