-
1
-
-
0002596236
-
Regularization neural network for construction cost estimation
-
ASCE
-
Adeli, H. and Wu, M. (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, ASCE, 124(1), 18-24.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.1
, pp. 18-24
-
-
Adeli, H.1
Wu, M.2
-
2
-
-
84993019210
-
Using genetic algorithms to solve optimization problems in construction
-
Al-Tabtabai and Alex, P.A. (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(2), 121-32.
-
(1999)
Engineering, Construction and Architectural Management
, vol.6
, Issue.2
, pp. 121-132
-
-
Al-Tabtabai, A.P.A.1
-
3
-
-
0028417085
-
Estimating construction productivity: Neural-network based approach
-
ASCE
-
Chao, L.C. and Skibniewski, M.J. (1994) Estimating construction productivity: neural-network based approach. Journal of Computing in Civil Engineering, ASCE, 8(2), 234-51.
-
(1994)
Journal of Computing in Civil Engineering
, vol.8
, Issue.2
, pp. 234-251
-
-
Chao, L.C.1
Skibniewski, M.J.2
-
4
-
-
0029273779
-
Neural networks of estimating construction technology acceptability
-
ASCE
-
Chao, L.C. and Skibniewski, M.J. (1995) Neural networks of estimating construction technology acceptability. Journal of Construction Engineering and Management, ASCE, 121(1), 130-42.
-
(1995)
Journal of Construction Engineering and Management
, vol.121
, Issue.1
, pp. 130-142
-
-
Chao, L.C.1
Skibniewski, M.J.2
-
6
-
-
0000096763
-
A systematic approach to the selection of an appropriate crane for a construction site
-
Gray, C. and Little, J. (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), 121-44.
-
(1985)
Construction Management and Economics
, vol.3
, Issue.2
, pp. 121-144
-
-
Gray, C.1
Little, J.2
-
7
-
-
0000794253
-
Neural network model for parametric cost estimation of highway projects
-
ASCE
-
Hegazy, T. and Ayed, A. (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, ASCE, 124(3), 210-18.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.3
, pp. 210-218
-
-
Hegazy, T.1
Ayed, A.2
-
8
-
-
0030189881
-
Neural network - Spreadsheet integration for earth-moving operations
-
Kartam, N. (1996) Neural network - spreadsheet integration for earth-moving operations. Microcomputers in Civil Engineering, 11(4), 283-8.
-
(1996)
Microcomputers in Civil Engineering
, vol.11
, Issue.4
, pp. 283-288
-
-
Kartam, N.1
-
9
-
-
0008276852
-
Prediction of hoisting time for tower cranes for public housing construction in Hong Kong
-
Leung, A.W.T. and Tam, C.M. (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), 305-14.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.3
, pp. 35-314
-
-
Leung, A.W.T.1
Tam, C.M.2
-
10
-
-
0032187321
-
Site-level facilities layout using genetic algorithms
-
Li, H. and Love, P.E.D. (1988) Site-level facilities layout using genetic algorithms. Journal of Computing in Civil Engineering, 12(4), 227-31.
-
(1988)
Journal of Computing in Civil Engineering
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.E.D.2
-
11
-
-
0026381932
-
Neural networks as tools in construction
-
Moselhi, O., Hegazy T. and Fazio P. (1991) Neural networks as tools in construction. Journal of Construction Engineering and Management, 117(4), 606-25.
-
(1991)
Journal of Construction Engineering and Management
, vol.117
, Issue.4
, pp. 606-625
-
-
Moselhi, O.1
Hegazy, T.2
Fazio, P.3
-
12
-
-
0030651776
-
Optimization of construction site layout - A genetic algorithm approach
-
PA, June
-
Philip M., Mahadevan N. and Varghese K. (1997) Optimization of construction site layout - a genetic algorithm approach, Computing in Civil Engineering. Proceedings of the 4th Congress held in Conjunction with A/E/C Systems '97 in Philadelphia, PA, June, pp. 710-17.
-
(1997)
Computing in Civil Engineering. Proceedings of the 4th Congress Held in Conjunction With A/E/C Systems '97 in Philadelphia
, pp. 710-717
-
-
Philip, M.1
Mahadevan, N.2
Varghese, K.3
-
13
-
-
0001362287
-
Neural network model for estimating construction productivity
-
Portas, J. and AbouRizk, S. (1997) Neural network model for estimating construction productivity. Journal of Construction Engineering and Management, ASCE, 123(4), 399-410.
-
(1997)
Journal of Construction Engineering and Management
, vol.123
, Issue.4
, pp. 399-410
-
-
Portas, J.1
AbouRizk, S.2
-
14
-
-
0020941725
-
Single crane location optimisation
-
ASCE
-
Rodriguez-Ramos, W.E. and Francis, R.L. (1983) Single crane location optimisation. Journal of Construction Engineering and Management, ASCE, 109(4), 387-97.
-
(1983)
Journal of Construction Engineering and Management
, vol.109
, Issue.4
, pp. 387-397
-
-
Rodriguez-Ramos, W.E.1
Francis, R.L.2
-
15
-
-
0038800863
-
A neural network based system for predicting earthmoving production
-
Shi, J.J. (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), 463-71.
-
(1999)
Construction Management and Economics
, vol.17
, Issue.4
, pp. 463-471
-
-
Shi, J.J.1
-
16
-
-
0029522572
-
Analysis of earth-moving systems using discrete-event simulation
-
ASCE
-
Smith S.D., Osborne, J.R. and Forde, M.C. (1995) Analysis of earth-moving systems using discrete-event simulation. Journal of Construction Engineering and Management, ASCE, 121(4), 388-96.
-
(1995)
Journal of Construction Engineering and Management
, vol.121
, Issue.4
, pp. 388-396
-
-
Smith, S.D.1
Osborne, J.R.2
Forde, M.C.3
-
17
-
-
0032206731
-
Construction labor productivity modelling with neural networks
-
ASCE
-
Sonmez, R. and Rowings, J.E. (1998) Construction labor productivity modelling with neural networks. Journal of Construction Engineering and Management, ASCE, 124(6), 498-504.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.6
, pp. 498-504
-
-
Sonmez, R.1
Rowings, J.E.2
-
18
-
-
0035392349
-
Genetic algorithm for optimizing supply locations around tower crane
-
ASCE
-
Tam, C.M., Tong, K.L.T. and Chan, K.W.W. (2001) Genetic algorithm for optimizing supply locations around tower crane. Journal of Construction Engineering and Management, ASCE, 127(4), 315-21.
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.4
, pp. 315-321
-
-
Tam, C.M.1
Tong, K.L.T.2
Chan, K.W.W.3
-
19
-
-
0004411245
-
The selection of materials handling methods in construction by simulation
-
Wijesundera, D.A. and Harris, F.C. (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(2), 95-102.
-
(1989)
Construction Management and Economics
, vol.7
, Issue.2
, pp. 95-102
-
-
Wijesundera, D.A.1
Harris, F.C.2
-
20
-
-
0029344681
-
Construction-site layout using annealed neural network
-
Yeh, I.C. (1995) Construction-site layout using annealed neural network. ASCE Journal of Computing in Civil Engineering, 9(3), 201-8.
-
(1995)
ASCE Journal of Computing in Civil Engineering
, vol.9
, Issue.3
, pp. 201-208
-
-
Yeh, I.C.1
-
21
-
-
0033101167
-
Location optimization for a group of tower cranes
-
ASCE
-
Zhang, P., Harris, F.C., Olomolaiye, P.O. and Holt G.D. (1999) Location optimization for a group of tower cranes. Journal of Construction Engineering and Management, ASCE, 125(2), 115-22.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.2
, pp. 115-122
-
-
Zhang, P.1
Harris, F.C.2
Olomolaiye, P.O.3
Holt, G.D.4
|