메뉴 건너뛰기




Volumn 21, Issue 3, 2003, Pages 257-266

GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing construction

Author keywords

Genetic algorithms; Public housing construction; Site layout; Tower crane

Indexed keywords

GENETIC ALGORITHMS; MATHEMATICAL MODELS; MOTION PLANNING; NEURAL NETWORKS; PLANT LAYOUT;

EID: 0037647504     PISSN: 01446193     EISSN: None     Source Type: Journal    
DOI: 10.1080/0144619032000049665     Document Type: Article
Times cited : (97)

References (21)
  • 1
    • 0002596236 scopus 로고    scopus 로고
    • Regularization neural network for construction cost estimation
    • ASCE
    • Adeli, H. and Wu, M. (1998) Regularization neural network for construction cost estimation. Journal of Construction Engineering and Management, ASCE, 124(1), 18-24.
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.1 , pp. 18-24
    • Adeli, H.1    Wu, M.2
  • 2
    • 84993019210 scopus 로고    scopus 로고
    • Using genetic algorithms to solve optimization problems in construction
    • Al-Tabtabai and Alex, P.A. (1999) Using genetic algorithms to solve optimization problems in construction. Engineering, Construction and Architectural Management, 6(2), 121-32.
    • (1999) Engineering, Construction and Architectural Management , vol.6 , Issue.2 , pp. 121-132
    • Al-Tabtabai, A.P.A.1
  • 3
    • 0028417085 scopus 로고
    • Estimating construction productivity: Neural-network based approach
    • ASCE
    • Chao, L.C. and Skibniewski, M.J. (1994) Estimating construction productivity: neural-network based approach. Journal of Computing in Civil Engineering, ASCE, 8(2), 234-51.
    • (1994) Journal of Computing in Civil Engineering , vol.8 , Issue.2 , pp. 234-251
    • Chao, L.C.1    Skibniewski, M.J.2
  • 6
    • 0000096763 scopus 로고
    • A systematic approach to the selection of an appropriate crane for a construction site
    • Gray, C. and Little, J. (1985) A systematic approach to the selection of an appropriate crane for a construction site. Construction Management and Economics, 3(2), 121-44.
    • (1985) Construction Management and Economics , vol.3 , Issue.2 , pp. 121-144
    • Gray, C.1    Little, J.2
  • 7
    • 0000794253 scopus 로고    scopus 로고
    • Neural network model for parametric cost estimation of highway projects
    • ASCE
    • Hegazy, T. and Ayed, A. (1998) Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management, ASCE, 124(3), 210-18.
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.3 , pp. 210-218
    • Hegazy, T.1    Ayed, A.2
  • 8
    • 0030189881 scopus 로고    scopus 로고
    • Neural network - Spreadsheet integration for earth-moving operations
    • Kartam, N. (1996) Neural network - spreadsheet integration for earth-moving operations. Microcomputers in Civil Engineering, 11(4), 283-8.
    • (1996) Microcomputers in Civil Engineering , vol.11 , Issue.4 , pp. 283-288
    • Kartam, N.1
  • 9
    • 0008276852 scopus 로고    scopus 로고
    • Prediction of hoisting time for tower cranes for public housing construction in Hong Kong
    • Leung, A.W.T. and Tam, C.M. (1999) Prediction of hoisting time for tower cranes for public housing construction in Hong Kong. Construction Management and Economics, 17(3), 305-14.
    • (1999) Construction Management and Economics , vol.17 , Issue.3 , pp. 35-314
    • Leung, A.W.T.1    Tam, C.M.2
  • 10
    • 0032187321 scopus 로고
    • Site-level facilities layout using genetic algorithms
    • Li, H. and Love, P.E.D. (1988) Site-level facilities layout using genetic algorithms. Journal of Computing in Civil Engineering, 12(4), 227-31.
    • (1988) Journal of Computing in Civil Engineering , vol.12 , Issue.4 , pp. 227-231
    • Li, H.1    Love, P.E.D.2
  • 15
    • 0038800863 scopus 로고    scopus 로고
    • A neural network based system for predicting earthmoving production
    • Shi, J.J. (1999) A neural network based system for predicting earthmoving production. Construction Management and Economics, 17(4), 463-71.
    • (1999) Construction Management and Economics , vol.17 , Issue.4 , pp. 463-471
    • Shi, J.J.1
  • 17
    • 0032206731 scopus 로고    scopus 로고
    • Construction labor productivity modelling with neural networks
    • ASCE
    • Sonmez, R. and Rowings, J.E. (1998) Construction labor productivity modelling with neural networks. Journal of Construction Engineering and Management, ASCE, 124(6), 498-504.
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.6 , pp. 498-504
    • Sonmez, R.1    Rowings, J.E.2
  • 19
    • 0004411245 scopus 로고
    • The selection of materials handling methods in construction by simulation
    • Wijesundera, D.A. and Harris, F.C. (1989) The selection of materials handling methods in construction by simulation. Construction Management and Economics, 7(2), 95-102.
    • (1989) Construction Management and Economics , vol.7 , Issue.2 , pp. 95-102
    • Wijesundera, D.A.1    Harris, F.C.2
  • 20
    • 0029344681 scopus 로고
    • Construction-site layout using annealed neural network
    • Yeh, I.C. (1995) Construction-site layout using annealed neural network. ASCE Journal of Computing in Civil Engineering, 9(3), 201-8.
    • (1995) ASCE Journal of Computing in Civil Engineering , vol.9 , Issue.3 , pp. 201-208
    • Yeh, I.C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.