Volumn 27, Issue 9, 2009, Pages 839-856

Finance-based CPM/LOB scheduling of projects with repetitive non-serial activities

Author keywords

Cash flow management; Genetic algorithms; Line of balance; Repetitive construction; Scheduling

Indexed keywords

CASH FLOW MANAGEMENT; CASH FLOW MODELS; CONSTRUCTION PROJECTS; DYNAMIC PROGRAMMING MODEL; FEASIBLE SCHEDULE; FINANCIAL PLANNING; INTEGRATED MODELS; LINE OF BALANCE; LINE OF BALANCES; REPETITIVE CONSTRUCTION;

EID: 70350637537     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190903191764     Document Type: Article
Times cited : (50)

References (30)
  • 5
    • 0000981977 scopus 로고
    • Planning construction of repetitive building units
    • Carr, R. and Meyer, W. (1974) Planning construction of repetitive building units. ASCE Journal of the Construction Division, 100(3), 403-12.
    • (1974) ASCE Journal of the Construction Division , vol.100 , Issue.3 , pp. 403-12
    • Carr, R.1    Meyer, W.2
  • 7
    • 32844466990 scopus 로고    scopus 로고
    • Construction scheduling using multi-constraint and genetic algorithms approach
    • Dawood, N. and Sriprasert, E. (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(1), 19-30.
    • (2006) Construction Management and Economics , vol.24 , Issue.1 , pp. 19-30
    • Dawood, N.1    Sriprasert, E.2
  • 8
    • 67650294079 scopus 로고    scopus 로고
    • Heuristic method for multi-project finance-based scheduling
    • Elazouni, A. (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(2), 199-211.
    • (2009) Construction Management and Economics , vol.27 , Issue.2 , pp. 199-211
    • Elazouni, A.1
  • 9
    • 13944269539 scopus 로고    scopus 로고
    • Finance-based scheduling of construction projects using integer programming
    • Elazouni, A. and Gab-Allah, A. (2004) Finance-based scheduling of construction projects using integer programming. Journal of Construction Engineering and Management, 130(1), 15-24.
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 15-24
    • Elazouni, A.1    Gab-Allah, A.2
  • 10
    • 15944391749 scopus 로고    scopus 로고
    • Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
    • Elazouni, A. and Metwally, F. (2005) Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms. Journal of Construction Engineering and Management, 131(4), 400-12.
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 400-12
    • Elazouni, A.1    Metwally, F.2
  • 11
    • 33845769935 scopus 로고    scopus 로고
    • Expanding finance-based scheduling to devise overall-optimized project schedules
    • Elazouni, A. and Metwally, F. (2007) Expanding finance-based scheduling to devise overall-optimized project schedules. Journal of Construction Engineering and Management, 133(1), 86-90.
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.1 , pp. 86-90
    • Elazouni, A.1    Metwally, F.2
  • 12
    • 29144449379 scopus 로고    scopus 로고
    • Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks
    • Feng, C.-W. and Wu, H.-T. (2006) Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks. Automation in Construction, 15, 186-99.
    • (2006) Automation in Construction , vol.15 , pp. 186-99
    • Feng, C.-W.1    Wu, H.-T.2
  • 13
    • 0000904077 scopus 로고
    • Messy genetic algorithms: Motivation, analysis and first results
    • Goldberg, D.E., Deb, K. and Korb, B. (1989) Messy genetic algorithms: Motivation, analysis and first results. Complex Systems, 3, 493-530.
    • (1989) Complex Systems , vol.3 , pp. 493-530
    • Goldberg, D.E.1    Deb, K.2    Korb, B.3
  • 14
    • 14644404875 scopus 로고    scopus 로고
    • Practical limitations of line-of-balance in scheduling repetitive construction units
    • Hafez, S.M. (2004) Practical limitations of line-of-balance in scheduling repetitive construction units. Alexandria Engineering Journal, 43(5), 653-61.
    • (2004) Alexandria Engineering Journal , vol.43 , Issue.5 , pp. 653-61
    • Hafez, S.M.1
  • 15
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • Hartmann, S. (2001) Project scheduling with multiple modes: A genetic algorithm. Annals of Operations Research, 112, 111-35.
    • (2001) Annals of Operations Research , vol.112 , pp. 111-35
    • Hartmann, S.1
  • 16
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy, T. (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), 167-75.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.3 , pp. 167-75
    • Hegazy, T.1
  • 17
    • 0035335808 scopus 로고    scopus 로고
    • Cost optimization in projects with repetitive non-serial activities
    • Hegazy, T. and Wassef, N. (2001) Cost optimization in projects with repetitive non-serial activities. Journal of Construction Engineering and Management, 127(3), 183-91.
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 183-91
    • Hegazy, T.1    Wassef, N.2
  • 19
    • 0029226093 scopus 로고
    • POLO: Planning and optimization for linear operations
    • Huang, R.-Y. and Halpin, W. (1995) POLO: Planning and optimization for linear operations. Computing in Civil Engineering, 2, 1126-33.
    • (1995) Computing in Civil Engineering , vol.2 , pp. 1126-33
    • Huang, R.-Y.1    Halpin, W.2
  • 20
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • Johnston, D. (1981) Linear scheduling method for highway construction. ASCE Journal of the Construction Division, 107(2), 247-61.
    • (1981) ASCE Journal of the Construction Division , vol.107 , Issue.2 , pp. 247-61
    • Johnston, D.1
  • 22
    • 45849109552 scopus 로고    scopus 로고
    • Resource-constrained construction project scheduling model for profit maximization considering cash flow
    • Liu, S.-S. and Wang, C.-J. (2008) Resource-constrained construction project scheduling model for profit maximization considering cash flow. Automation in Construction, 17, 966-74.
    • (2008) Automation in Construction , vol.17 , pp. 966-74
    • Liu, S.-S.1    Wang, C.-J.2
  • 25
  • 26
    • 33847297058 scopus 로고    scopus 로고
    • A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
    • Shadrokh, S. and Kianfar, F. (2007) A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty. European Journal of Operational Research, 181, 86-101.
    • (2007) European Journal of Operational Research , vol.181 , pp. 86-101
    • Shadrokh, S.1    Kianfar, F.2
  • 30
    • 0006138041 scopus 로고    scopus 로고
    • Controlling activity interval times in LOB scheduling
    • Wang, C.-H. and Huang, Y.-C. (1998) Controlling activity interval times in LOB scheduling. Construction Management and Economics, 16(1), 5-16.
    • (1998) Construction Management and Economics , vol.16 , Issue.1 , pp. 5-16
    • Wang, C.-H.1    Huang, Y.-C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.