-
3
-
-
0002932056
-
Temporal factors in work scheduling
-
Folkard S., and Monk T.H. (Eds), John Wiley & Sons, New York
-
Kogi K. Temporal factors in work scheduling. In: Folkard S., and Monk T.H. (Eds). Introduction to the Problems of Shiftwork, Hours of Work (1985), John Wiley & Sons, New York
-
(1985)
Introduction to the Problems of Shiftwork, Hours of Work
-
-
Kogi, K.1
-
4
-
-
0037352167
-
Shift work, safety and productivity
-
Folkard S., and Tucker P. Shift work, safety and productivity. Occup. Med. 53 (2003) 95-101
-
(2003)
Occup. Med.
, vol.53
, pp. 95-101
-
-
Folkard, S.1
Tucker, P.2
-
6
-
-
0019972812
-
Rotating shift work schedules that disrupt sleep are improved by applying circadian principles
-
Czeisler C., Moore-Ede M., and Coleman R. Rotating shift work schedules that disrupt sleep are improved by applying circadian principles. Science 217 (1982) 460-463
-
(1982)
Science
, vol.217
, pp. 460-463
-
-
Czeisler, C.1
Moore-Ede, M.2
Coleman, R.3
-
7
-
-
3242662050
-
Assignment and allocation optimization of partially multiskilled workforce
-
Gomar J.E., Haas C.T., and Morton D.P. Assignment and allocation optimization of partially multiskilled workforce. J. Constr. Engrg. and Mgmt. 128 (2002) 103-109
-
(2002)
J. Constr. Engrg. and Mgmt.
, vol.128
, pp. 103-109
-
-
Gomar, J.E.1
Haas, C.T.2
Morton, D.P.3
-
9
-
-
0006767542
-
Optimization of crew configurations using activity-based costing
-
Maxwell D.A., Back W.E., and Toon J. Optimization of crew configurations using activity-based costing. J. Constr. Engrg. and Mgmt. 124 (1998) 162-168
-
(1998)
J. Constr. Engrg. and Mgmt.
, vol.124
, pp. 162-168
-
-
Maxwell, D.A.1
Back, W.E.2
Toon, J.3
-
11
-
-
0035392410
-
Optimum planning of highway construction under A + B bidding method
-
El-Rayes K. Optimum planning of highway construction under A + B bidding method. J. Constr. Engrg. and Mgmt. 127 (2001) 261-269
-
(2001)
J. Constr. Engrg. and Mgmt.
, vol.127
, pp. 261-269
-
-
El-Rayes, K.1
-
12
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
El-Rayes K., and Moselhi O. Optimizing resource utilization for repetitive construction projects. J. Constr. Engrg. and Mgmt. 127 (2001) 18-27
-
(2001)
J. Constr. Engrg. and Mgmt.
, vol.127
, pp. 18-27
-
-
El-Rayes, K.1
Moselhi, O.2
-
15
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng C., Liu L., and Burns S.A. Using genetic algorithms to solve construction time-cost trade-off problems. J. Comp. in Civ. Engrg. 11 (1997) 184-189
-
(1997)
J. Comp. in Civ. Engrg.
, vol.11
, pp. 184-189
-
-
Feng, C.1
Liu, L.2
Burns, S.A.3
-
16
-
-
0032638332
-
Using machine learning and GA to solve time-cost trade-off problems
-
Li H., Cao J., and Love P.E.D. Using machine learning and GA to solve time-cost trade-off problems. J. Constr. Engrg. and Mgmt. 125 (1999) 347-353
-
(1999)
J. Constr. Engrg. and Mgmt.
, vol.125
, pp. 347-353
-
-
Li, H.1
Cao, J.2
Love, P.E.D.3
-
17
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu S., and Yang C. GA-based multicriteria optimal model for construction scheduling. J. Constr. Engrg. and Mgmt. 125 (1999) 420-427
-
(1999)
J. Constr. Engrg. and Mgmt.
, vol.125
, pp. 420-427
-
-
Leu, S.1
Yang, C.2
-
18
-
-
0035509424
-
Simplified spreadsheet solutions. II: overall schedule optimization
-
Hegazy T., and Ersahin T. Simplified spreadsheet solutions. II: overall schedule optimization. J. Constr. Engrg. and Mgmt. 127 (2001) 469-475
-
(2001)
J. Constr. Engrg. and Mgmt.
, vol.127
, pp. 469-475
-
-
Hegazy, T.1
Ersahin, T.2
-
19
-
-
0035391119
-
Optimal repetitive scheduling model with shareable resource constraint
-
Leu S., and Hwang S. Optimal repetitive scheduling model with shareable resource constraint. J. Constr. Engrg. and Mgmt. 127 (2001) 270-280
-
(2001)
J. Constr. Engrg. and Mgmt.
, vol.127
, pp. 270-280
-
-
Leu, S.1
Hwang, S.2
-
20
-
-
2342615793
-
Applying a genetic algorithm-based multiobjective approach for time-cost optimization
-
Zheng D.X.M., Ng S.T., and Kumaraswamy M.M. Applying a genetic algorithm-based multiobjective approach for time-cost optimization. J. Constr. Engrg. and Mgmt. 130 (2004) 168-176
-
(2004)
J. Constr. Engrg. and Mgmt.
, vol.130
, pp. 168-176
-
-
Zheng, D.X.M.1
Ng, S.T.2
Kumaraswamy, M.M.3
-
21
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
Senouci A.B., and Eldin N.N. Use of genetic algorithms in resource scheduling of construction projects. J. Constr. Engrg. and Mgmt. 130 (2004) 869-877
-
(2004)
J. Constr. Engrg. and Mgmt.
, vol.130
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
22
-
-
15944361924
-
Time-cost-quality trade-off analysis for highway construction
-
El-Rayes K., and Kandil A. Time-cost-quality trade-off analysis for highway construction. J. Constr. Engrg. and Mgmt. 131 (2005) 477-486
-
(2005)
J. Constr. Engrg. and Mgmt.
, vol.131
, pp. 477-486
-
-
El-Rayes, K.1
Kandil, A.2
-
23
-
-
33746214781
-
Scheduling construction projects using evolutionary algorithm
-
Jaskowski P., and Sobotka A. Scheduling construction projects using evolutionary algorithm. J. Constr. Engrg. Mgmt. 132 (2006) 861-870
-
(2006)
J. Constr. Engrg. Mgmt.
, vol.132
, pp. 861-870
-
-
Jaskowski, P.1
Sobotka, A.2
-
24
-
-
38149009704
-
Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off
-
Xiong Y., and Kuang Y. Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off. J. Constr. Engrg. and Mgmt. 134 (2008) 153-156
-
(2008)
J. Constr. Engrg. and Mgmt.
, vol.134
, pp. 153-156
-
-
Xiong, Y.1
Kuang, Y.2
-
27
-
-
0013326233
-
-
Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India
-
Deb K., Pratap A., Agrawal S., and Meyarivan T. A Fast and Elitist Multi-Objective Genetic Algorithm: NSGA-II (2001), Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India
-
(2001)
A Fast and Elitist Multi-Objective Genetic Algorithm: NSGA-II
-
-
Deb, K.1
Pratap, A.2
Agrawal, S.3
Meyarivan, T.4
-
28
-
-
0002866635
-
The critical-path method: resource planning and scheduling
-
Muth J.F., and Thompson G.L. (Eds), Prentice Hall
-
Kelly J.E. The critical-path method: resource planning and scheduling. In: Muth J.F., and Thompson G.L. (Eds). NJ, Industrial Scheduling (1963), Prentice Hall
-
(1963)
NJ, Industrial Scheduling
-
-
Kelly, J.E.1
|