-
1
-
-
12144266471
-
A heuristic to maximize the net present value for resource-constrained project-scheduling problems
-
Abbasi, G.Y., and Arabiat, Y.A. 2001. A heuristic to maximize the net present value for resource-constrained project-scheduling problems. Project Management Journal, 32(2): 17-24.
-
(2001)
Project Management Journal
, vol.32
, Issue.2
, pp. 17-24
-
-
Abbasi, G.Y.1
Arabiat, Y.A.2
-
3
-
-
0035482888
-
Algorithm for determining controlling path considering resource continuity
-
Ammar, M.A., and Elbeltagi, E. 2001. Algorithm for determining controlling path considering resource continuity. ASCE Journal Computing in Civil Engineering, 15(4): 292-298.
-
(2001)
ASCE Journal Computing in Civil Engineering
, vol.15
, Issue.4
, pp. 292-298
-
-
Ammar, M.A.1
Elbeltagi, E.2
-
5
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean, J.C. 1994. Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing, 6(2): 154-160.
-
(1994)
ORSA Journal on Computing
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.C.1
-
6
-
-
0019064535
-
Construction planning-beyond the critical path
-
Birrell, G.S. 1980. Construction planning-beyond the critical path. Journal of the Construction Division, ASCE, 106(CO3): 389-407.
-
(1980)
Journal of the Construction Division, ASCE
, vol.106
, Issue.CO3
, pp. 389-407
-
-
Birrell, G.S.1
-
7
-
-
0000981977
-
Planning construction of repetitive building units
-
Carr, R.I., and Mayer, W.L. 1974. Planning construction of repetitive building units. Journal of the Construction Division, ASCE, 100(CO3): 403-412.
-
(1974)
Journal of the Construction Division, ASCE
, vol.100
, Issue.CO3
, pp. 403-412
-
-
Carr, R.I.1
Mayer, W.L.2
-
8
-
-
0029207545
-
An application of genetic algorithms for flow shop problems
-
Amsterdam
-
Chen, C.L., Vempati, V.S., and Aljaber, N. 1995. An application of genetic algorithms for flow shop problems. European Journal of Operational Research, Amsterdam, 80: 389-396.
-
(1995)
European Journal of Operational Research
, vol.80
, pp. 389-396
-
-
Chen, C.L.1
Vempati, V.S.2
Aljaber, N.3
-
10
-
-
0004374576
-
A time-cost tradeoff model with resource consideration using genetic algorithm
-
Surrey, England
-
Chua, D.K.H., Can, W.T., and Govinan, K. 1997. A time-cost tradeoff model with resource consideration using genetic algorithm. Civil Engineering and System, Surrey, England, 14: 291-311.
-
(1997)
Civil Engineering and System
, vol.14
, pp. 291-311
-
-
Chua, D.K.H.1
Can, W.T.2
Govinan, K.3
-
14
-
-
0030784381
-
Scheduling projects to maximize net present value - The case of time-dependent, contingent cash flows
-
Etgar, R., Shtub, A., and LeBlanc, L.J. 1996. Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows. European Journal of Operational Research, 96(1): 90-96.
-
(1996)
European Journal of Operational Research
, vol.96
, Issue.1
, pp. 90-96
-
-
Etgar, R.1
Shtub, A.2
LeBlanc, L.J.3
-
15
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost tradeoff problems
-
Feng, C.W., Liu, L., and Burns, S.A. 1997. Using genetic algorithms to solve construction time-cost tradeoff problems. ASCE Journal of Construction Engineering and Management, 11(3): 184-189.
-
(1997)
ASCE Journal of Construction Engineering and Management
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
16
-
-
0033876271
-
Revisiting the golden triangle of cost, time and quality-the role of NPV in project control, success and failure
-
Gardiner, P.D., and Stewart, K. 2000. Revisiting the golden triangle of cost, time and quality-the role of NPV in project control, success and failure. International Journal of Project Management, 18: 251-256.
-
(2000)
International Journal of Project Management
, vol.18
, pp. 251-256
-
-
Gardiner, P.D.1
Stewart, K.2
-
17
-
-
0003722376
-
Genetic algorithms in search, optimization, and machine learning
-
Addison-Wesley, Reading, Mass
-
Goldberg, D.E. 1989. Genetic algorithms in search, optimization, and machine learning. Addison-Wesley, Reading, Mass.
-
(1989)
-
-
Goldberg, D.E.1
-
20
-
-
23744501109
-
System development for non-unit based repetitive project scheduling
-
Huang, R.-y., and Sun, K.-S. 2005. System development for non-unit based repetitive project scheduling. Automation in Construction, 14(5): 650-665.
-
(2005)
Automation in Construction
, vol.14
, Issue.5
, pp. 650-665
-
-
Huang, R.-Y.1
Sun, K.-S.2
-
21
-
-
0019583188
-
Linear scheduling method for highway construction
-
Johnston, D.W. 1981. Linear scheduling method for highway construction. Journal of the Construction Division, ASCE, 107(CO2): 247-261.
-
(1981)
Journal of the Construction Division, ASCE
, vol.107
, Issue.CO2
, pp. 247-261
-
-
Johnston, D.W.1
-
22
-
-
0004749860
-
The application of the "Line-of-balance" technique to the construction industry
-
297-300
-
Khisty, C.J. 1970. The application of the "Line-of-balance" technique to the construction industry. Indian Concrete Journal, 44(7): 297-300 and 319-320.
-
(1970)
Indian Concrete Journal
, vol.44
, Issue.7
, pp. 319-320
-
-
Khisty, C.J.1
-
28
-
-
0029224965
-
A genetic algorithm for flowshop sequencing
-
Reeves, C.R. 1995. A genetic algorithm for flowshop sequencing. Computing and Operations Research, 22(1): 5-13.
-
(1995)
Computing and Operations Research
, vol.22
, Issue.1
, pp. 5-13
-
-
Reeves, C.R.1
-
31
-
-
0019030431
-
Construction planning for linear projects
-
Selinger, S. 1980. Construction planning for linear projects. Journal of the Construction Division, ASCE, 106(CO2): 195-205.
-
(1980)
Journal of the Construction Division, ASCE
, vol.106
, Issue.CO2
, pp. 195-205
-
-
Selinger, S.1
-
34
-
-
12344265028
-
Applying pareto ranking and niche formation to genetic algorithm-based multi-objective time - Cost optimization
-
Zheng, D.X.M., Ng, S.T., and Kumaraswamy, M.M. 2005. Applying pareto ranking and niche formation to genetic algorithm-based multi-objective time-cost optimization. ASCE Journal of Construction Engineering and Management, 131(1): 81-91.
-
(2005)
ASCE Journal of Construction Engineering and Management
, vol.131
, Issue.1
, pp. 81-91
-
-
Zheng, D.X.M.1
Ng, S.T.2
Kumaraswamy, M.M.3
|