메뉴 건너뛰기




Volumn 33, Issue 9, 2006, Pages 1172-1194

An optimization model for workgroup-based repetitive scheduling

Author keywords

Construction scheduling; Genetic algorithm; Optimization; Repetitive project; Workgroup

Indexed keywords

CONSTRUCTION INDUSTRY; GENETIC ALGORITHMS; OPTIMIZATION; SCHEDULING;

EID: 33846675940     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L06-057     Document Type: Article
Times cited : (5)

References (34)
  • 1
    • 12144266471 scopus 로고    scopus 로고
    • A heuristic to maximize the net present value for resource-constrained project-scheduling problems
    • Abbasi, G.Y., and Arabiat, Y.A. 2001. A heuristic to maximize the net present value for resource-constrained project-scheduling problems. Project Management Journal, 32(2): 17-24.
    • (2001) Project Management Journal , vol.32 , Issue.2 , pp. 17-24
    • Abbasi, G.Y.1    Arabiat, Y.A.2
  • 3
    • 0035482888 scopus 로고    scopus 로고
    • Algorithm for determining controlling path considering resource continuity
    • Ammar, M.A., and Elbeltagi, E. 2001. Algorithm for determining controlling path considering resource continuity. ASCE Journal Computing in Civil Engineering, 15(4): 292-298.
    • (2001) ASCE Journal Computing in Civil Engineering , vol.15 , Issue.4 , pp. 292-298
    • Ammar, M.A.1    Elbeltagi, E.2
  • 5
    • 0001096735 scopus 로고
    • Genetic algorithms and random keys for sequencing and optimization
    • Bean, J.C. 1994. Genetic algorithms and random keys for sequencing and optimization. ORSA Journal on Computing, 6(2): 154-160.
    • (1994) ORSA Journal on Computing , vol.6 , Issue.2 , pp. 154-160
    • Bean, J.C.1
  • 6
    • 0019064535 scopus 로고
    • Construction planning-beyond the critical path
    • Birrell, G.S. 1980. Construction planning-beyond the critical path. Journal of the Construction Division, ASCE, 106(CO3): 389-407.
    • (1980) Journal of the Construction Division, ASCE , vol.106 , Issue.CO3 , pp. 389-407
    • Birrell, G.S.1
  • 7
  • 10
    • 0004374576 scopus 로고    scopus 로고
    • A time-cost tradeoff model with resource consideration using genetic algorithm
    • Surrey, England
    • Chua, D.K.H., Can, W.T., and Govinan, K. 1997. A time-cost tradeoff model with resource consideration using genetic algorithm. Civil Engineering and System, Surrey, England, 14: 291-311.
    • (1997) Civil Engineering and System , vol.14 , pp. 291-311
    • Chua, D.K.H.1    Can, W.T.2    Govinan, K.3
  • 14
    • 0030784381 scopus 로고    scopus 로고
    • Scheduling projects to maximize net present value - The case of time-dependent, contingent cash flows
    • Etgar, R., Shtub, A., and LeBlanc, L.J. 1996. Scheduling projects to maximize net present value - the case of time-dependent, contingent cash flows. European Journal of Operational Research, 96(1): 90-96.
    • (1996) European Journal of Operational Research , vol.96 , Issue.1 , pp. 90-96
    • Etgar, R.1    Shtub, A.2    LeBlanc, L.J.3
  • 16
    • 0033876271 scopus 로고    scopus 로고
    • Revisiting the golden triangle of cost, time and quality-the role of NPV in project control, success and failure
    • Gardiner, P.D., and Stewart, K. 2000. Revisiting the golden triangle of cost, time and quality-the role of NPV in project control, success and failure. International Journal of Project Management, 18: 251-256.
    • (2000) International Journal of Project Management , vol.18 , pp. 251-256
    • Gardiner, P.D.1    Stewart, K.2
  • 17
    • 0003722376 scopus 로고
    • Genetic algorithms in search, optimization, and machine learning
    • Addison-Wesley, Reading, Mass
    • Goldberg, D.E. 1989. Genetic algorithms in search, optimization, and machine learning. Addison-Wesley, Reading, Mass.
    • (1989)
    • Goldberg, D.E.1
  • 20
    • 23744501109 scopus 로고    scopus 로고
    • System development for non-unit based repetitive project scheduling
    • Huang, R.-y., and Sun, K.-S. 2005. System development for non-unit based repetitive project scheduling. Automation in Construction, 14(5): 650-665.
    • (2005) Automation in Construction , vol.14 , Issue.5 , pp. 650-665
    • Huang, R.-Y.1    Sun, K.-S.2
  • 21
    • 0019583188 scopus 로고
    • Linear scheduling method for highway construction
    • Johnston, D.W. 1981. Linear scheduling method for highway construction. Journal of the Construction Division, ASCE, 107(CO2): 247-261.
    • (1981) Journal of the Construction Division, ASCE , vol.107 , Issue.CO2 , pp. 247-261
    • Johnston, D.W.1
  • 22
    • 0004749860 scopus 로고
    • The application of the "Line-of-balance" technique to the construction industry
    • 297-300
    • Khisty, C.J. 1970. The application of the "Line-of-balance" technique to the construction industry. Indian Concrete Journal, 44(7): 297-300 and 319-320.
    • (1970) Indian Concrete Journal , vol.44 , Issue.7 , pp. 319-320
    • Khisty, C.J.1
  • 24
  • 28
    • 0029224965 scopus 로고
    • A genetic algorithm for flowshop sequencing
    • Reeves, C.R. 1995. A genetic algorithm for flowshop sequencing. Computing and Operations Research, 22(1): 5-13.
    • (1995) Computing and Operations Research , vol.22 , Issue.1 , pp. 5-13
    • Reeves, C.R.1
  • 31
  • 34
    • 12344265028 scopus 로고    scopus 로고
    • Applying pareto ranking and niche formation to genetic algorithm-based multi-objective time - Cost optimization
    • Zheng, D.X.M., Ng, S.T., and Kumaraswamy, M.M. 2005. Applying pareto ranking and niche formation to genetic algorithm-based multi-objective time-cost optimization. ASCE Journal of Construction Engineering and Management, 131(1): 81-91.
    • (2005) ASCE Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.