" Constr. Manage. Econom. CMECF3 0144-6193 10.1080/ 01446190210131647, (4).
-
Arditi, D., Sikangwan, P., and Tokdemir, O. (2002). " Scheduling system for high-rise building construction.." Constr. Manage. Econom. CMECF3 0144-6193 10.1080/01446190210131647, 20 (4), 353-364.
-
(2002)
Scheduling System for High-rise Building Construction
, vol.20
, pp. 353-364
-
-
Arditi, D.1
Sikangwan, P.2
Tokdemir, O.3
-
3
-
-
0035335808
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001) 127:3(183), (3).
-
Hegazy, T., and Wassef, N. (2001). " Cost optimization in projects with repetitive nonserial activities.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(2001)127:3(183), 127 (3), 183-191.
-
(2001)
Cost Optimization in Projects with Repetitive Nonserial Activities
, vol.127
, pp. 183-191
-
-
Hegazy, T.1
Wassef, N.2
-
4
-
-
40849087469
-
-
MS thesis, Center for Building Studies, Concordia Univ., Montreal, Canada.
-
Laramee, J. (1983). " A planning and scheduling system for high-rise building construction.." MS thesis, Center for Building Studies, Concordia Univ., Montreal, Canada.
-
(1983)
A Planning and Scheduling System for High-rise Building Construction
-
-
Laramee, J.1
-
5
-
-
0027866760
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1993) 119:4(681), (4).
-
Moselhi, O., and El-Rayes, K. (1993). " Scheduling of repetitive projects with cost optimization.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(681), 119 (4), 681-697.
-
(1993)
Scheduling of Repetitive Projects with Cost Optimization
, vol.119
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
6
-
-
0025447970
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1990) 116:2(316), (2).
-
Reda, R. (1990). " RPM: Repetitive project modeling.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1990)116:2(316), 116 (2), 316-330.
-
(1990)
RPM: Repetitive Project Modeling
, vol.116
, pp. 316-330
-
-
Reda, R.1
-
7
-
-
0023984188
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364, (1).
-
Russell, A., and Caselton, W. (1988). " Extensions to linear scheduling optimization.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 114 (1), 36-52.
-
(1988)
Extensions to Linear Scheduling Optimization
, vol.114
, pp. 36-52
-
-
Russell, A.1
Caselton, W.2
-
10
-
-
0028495816
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1994) 120:3(667), (3).
-
Suhail, S., and Neale, R. (1994). " CPM/LOB: New methodology to integrate CPM and line of balance.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1994)120:3(667), 120 (3), 667-684.
-
(1994)
CPM/LOB: New Methodology to Integrate CPM and Line of Balance
, vol.120
, pp. 667-684
-
-
Suhail, S.1
Neale, R.2
-
11
-
-
0028750185
-
-
J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1994) 120:4(875), (4).
-
Thabet, W., and Beliveau, Y. (1994). " HVLS: Horizontal and vertical logic scheduling for multistory projects.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1994)120:4(875), 120 (4), 875-892.
-
(1994)
HVLS: Horizontal and Vertical Logic Scheduling for Multistory Projects
, vol.120
, pp. 875-892
-
-
Thabet, W.1
Beliveau, Y.2
-
12
-
-
0030825017
-
-
J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(1997)11: 1(48), (1).
-
Thabet, W., and Beliveau, Y. (1997). " SCaRC: Space-constrained resource-constrained scheduling system.." J. Comput. Civ. Eng. JCCEE5 0887-3801 10.1061/(ASCE)0887-3801(1997)11:1(48), 11 (1), 48-59.
-
(1997)
SCaRC: Space-constrained Resource-constrained Scheduling System
, vol.11
, pp. 48-59
-
-
Thabet, W.1
Beliveau, Y.2
|