Volumn 134, Issue 4, 2008, Pages 253-264

Efficient repetitive scheduling for high-rise construction

Author keywords

Buildings, high rise; Computer applications; Construction management; Scheduling

Indexed keywords

COMPUTER APPLICATIONS; CONSTRUCTION INDUSTRY; COST BENEFIT ANALYSIS; GENETIC ALGORITHMS; MATHEMATICAL MODELS;

EID: 40849150750     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2008)134:4(253)     Document Type: Article
Times cited : (62)

References (13)
  • 5
    • 0027866760 scopus 로고
    • J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1993) 119:4(681), (4).
    • Moselhi, O., and El-Rayes, K. (1993). " Scheduling of repetitive projects with cost optimization.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(681), 119 (4), 681-697.
    • (1993) Scheduling of Repetitive Projects with Cost Optimization , vol.119 , pp. 681-697
    • Moselhi, O.1    El-Rayes, K.2
  • 6
    • 0025447970 scopus 로고
    • J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1990) 116:2(316), (2).
    • Reda, R. (1990). " RPM: Repetitive project modeling.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1990)116:2(316), 116 (2), 316-330.
    • (1990) RPM: Repetitive Project Modeling , vol.116 , pp. 316-330
    • Reda, R.1
  • 10
    • 0028495816 scopus 로고
    • J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1994) 120:3(667), (3).
    • Suhail, S., and Neale, R. (1994). " CPM/LOB: New methodology to integrate CPM and line of balance.." J. Constr. Eng. Manage. JCEMD4 0733-9364 10.1061/(ASCE)0733-9364(1994)120:3(667), 120 (3), 667-684.
    • (1994) CPM/LOB: New Methodology to Integrate CPM and Line of Balance , vol.120 , pp. 667-684
    • Suhail, S.1    Neale, R.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.