-
1
-
-
0011717411
-
A Heuristic for Scheduling Model for Multi-project Organizations
-
Unpublished Ph.D. Thesis, University of North California
-
Mize, H.H. (1964). "A Heuristic for Scheduling Model for Multi-project Organizations", Unpublished Ph.D. Thesis, University of North California, 1964.
-
(1964)
-
-
Mize, H.H.1
-
2
-
-
0011717163
-
Toward the development of a complete multi-project scheduling system
-
Fendley L.G. Toward the development of a complete multi-project scheduling system. Journal of Industrial Engineering 19 10 (1968) 505-515
-
(1968)
Journal of Industrial Engineering
, vol.19
, Issue.10
, pp. 505-515
-
-
Fendley, L.G.1
-
3
-
-
0015742216
-
Alternative methods of project scheduling with limited resources
-
Patterson J.H. Alternative methods of project scheduling with limited resources. Naval Research Logistics Quarterly 20 4 (1973) 767-784
-
(1973)
Naval Research Logistics Quarterly
, vol.20
, Issue.4
, pp. 767-784
-
-
Patterson, J.H.1
-
4
-
-
0020087944
-
Multi-project scheduling: categorization of heuristic rules performance
-
Kurtulus I., and Davis W. Multi-project scheduling: categorization of heuristic rules performance. Management Science 28 2 (1982) 161-172
-
(1982)
Management Science
, vol.28
, Issue.2
, pp. 161-172
-
-
Kurtulus, I.1
Davis, W.2
-
5
-
-
0025701908
-
A heuristic for multi-project scheduling with limited resources in the housing industry
-
Tsubakitani S., and Deckro R.F. A heuristic for multi-project scheduling with limited resources in the housing industry. European Journal of Operational Research 49 (1990) 80-91
-
(1990)
European Journal of Operational Research
, vol.49
, pp. 80-91
-
-
Tsubakitani, S.1
Deckro, R.F.2
-
6
-
-
0003147390
-
Two heuristics for scheduling multiple projects with resource constraints
-
Tsai D.M., and Chiu H.N. Two heuristics for scheduling multiple projects with resource constraints. Construction Management and Economics 14 (1996) 325-340
-
(1996)
Construction Management and Economics
, vol.14
, pp. 325-340
-
-
Tsai, D.M.1
Chiu, H.N.2
-
7
-
-
0034559445
-
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
-
Lova A., Maroto C., and Tormos P. A multicriteria heuristic method to improve resource allocation in multiproject scheduling. European journal of operational research 127 (2000) 408-424
-
(2000)
European journal of operational research
, vol.127
, pp. 408-424
-
-
Lova, A.1
Maroto, C.2
Tormos, P.3
-
10
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick S., Gelatt Jr. C.D., and Vecchi M.P. Optimization by simulated annealing. Science 220 4598 (1983) 671-680
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt Jr., C.D.2
Vecchi, M.P.3
-
11
-
-
5744249209
-
Equation of state calculations by fast computing machines
-
Metropolis N., Rosenbluth A.W., Rosenbluth M.N., Teller A.H., and Teller E. Equation of state calculations by fast computing machines. Journal of Chemical Physics 21 6 (1953) 1087-1092
-
(1953)
Journal of Chemical Physics
, vol.21
, Issue.6
, pp. 1087-1092
-
-
Metropolis, N.1
Rosenbluth, A.W.2
Rosenbluth, M.N.3
Teller, A.H.4
Teller, E.5
-
13
-
-
63549100713
-
Modified simulated annealing algorithm and modified two-stage solution finding procedure for optimizing linear scheduling projects with multiple resource constraints
-
Kochi, India
-
Chen P.H., and Shahandashti S.M. Modified simulated annealing algorithm and modified two-stage solution finding procedure for optimizing linear scheduling projects with multiple resource constraints. Proceedings of 24th International Symposium on Automation and Robotics in Construction (ISARC 2007) (2007) 411-416 Kochi, India
-
(2007)
Proceedings of 24th International Symposium on Automation and Robotics in Construction (ISARC 2007)
, pp. 411-416
-
-
Chen, P.H.1
Shahandashti, S.M.2
-
18
-
-
0028368259
-
Genetic algorithm crossover operators for ordering applications
-
Poon P.W., and Poon J.N. Genetic algorithm crossover operators for ordering applications. Computers Operations Research 22 1 (1995) 135-177
-
(1995)
Computers Operations Research
, vol.22
, Issue.1
, pp. 135-177
-
-
Poon, P.W.1
Poon, J.N.2
-
19
-
-
4344652018
-
Schema analysis of the traveling salesman problem using genetic algorithms
-
Homaifar A., Guan S., and Liepins G.E. Schema analysis of the traveling salesman problem using genetic algorithms. Complex Systems 6 (1992) 533-552
-
(1992)
Complex Systems
, vol.6
, pp. 533-552
-
-
Homaifar, A.1
Guan, S.2
Liepins, G.E.3
|