-
1
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
Bean, J. (1994). "Genetic algorithms and random keys for sequencing and optimization." ORSA J. Comput., 6(2), 154-160.
-
(1994)
ORSA J. Comput.
, vol.6
, Issue.2
, pp. 154-160
-
-
Bean, J.1
-
2
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W. T., Chua, D. K. H., and Kannan, G. (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
Kannan, G.3
-
3
-
-
0003808054
-
Process scheduling using genetic algorithms for construction industry
-
Springer, Shanghai, China, Paper No. R507 (CDROM)
-
Chan, W. T., and Hu, H. (1998). "Process scheduling using genetic algorithms for construction industry." Proc., 3rd Int. Conf. on Management, Springer, Shanghai, China, Paper No. R507 (CDROM).
-
(1998)
Proc., 3rd Int. Conf. on Management
-
-
Chan, W.T.1
Hu, H.2
-
4
-
-
13944271070
-
Production scheduling using genetic algorithms in precast factories
-
Comp Press, Oxford, U.K.
-
Chan, W. T., and Hu, H. (1999). "Production scheduling using genetic algorithms in precast factories." Proc., 5th Int. Conf. on Application of Artificial Intelligence to Civil and Structural Engineering, Vol. C, Comp Press, Oxford, U.K., 25-33.
-
(1999)
Proc., 5th Int. Conf. on Application of Artificial Intelligence to Civil and Structural Engineering
, vol.C
, pp. 25-33
-
-
Chan, W.T.1
Hu, H.2
-
5
-
-
0029207545
-
An application of genetic algorithms for flow shop problems
-
Chen, C. L., Vempati, V. S., and Aljaber, N. (1995). "An application of genetic algorithms for flow shop problems." Eur. J. Oper. Res., 80, 389-396.
-
(1995)
Eur. J. Oper. Res.
, vol.80
, pp. 389-396
-
-
Chen, C.L.1
Vempati, V.S.2
Aljaber, N.3
-
6
-
-
0032667279
-
WorkPlan: Constraint-based database for work package scheduling
-
Choo, H. J., Tommelein, I. D., Ballard, G., and Zabelle, R. (1999). "WorkPlan: Constraint-based database for work package scheduling." J. Constr. Eng. Manage., 125(3), 151-160.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 151-160
-
-
Choo, H.J.1
Tommelein, I.D.2
Ballard, G.3
Zabelle, R.4
-
7
-
-
0004374576
-
A time-cost trade-off model with resource consideration using genetic algorithm
-
Chua, D. K. H., Chan, W. T., and Govindan, K. (1997). "A time-cost trade-off model with resource consideration using genetic algorithm." Civ. Eng. Sys., 14, 291-311.
-
(1997)
Civ. Eng. Sys.
, vol.14
, pp. 291-311
-
-
Chua, D.K.H.1
Chan, W.T.2
Govindan, K.3
-
8
-
-
0027147695
-
A capacity planning model for precast concrete building products
-
Dawood, N. N., and Neale, R. H. (1993). "A capacity planning model for precast concrete building products." Build. Environ., 28(1), 81-95.
-
(1993)
Build. Environ.
, vol.28
, Issue.1
, pp. 81-95
-
-
Dawood, N.N.1
Neale, R.H.2
-
9
-
-
0002499542
-
The lessons of flow-shop scheduling research
-
Dudek, R. A., Panwalkar, S. S., and Smith, M. L. (1992). "The lessons of flow-shop scheduling research." Oper. Res., 40(1), 7-13.
-
(1992)
Oper. Res.
, vol.40
, Issue.1
, pp. 7-13
-
-
Dudek, R.A.1
Panwalkar, S.S.2
Smith, M.L.3
-
10
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng, C. W., Liu, L., and Burns, S. A. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comput. Civ. Eng., 11(3), 184-189.
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
12
-
-
0032654594
-
Genetic algorithms application and testing for equipment selection
-
Haidar, A., Naoum, S., Howes, R., and Tah, J. (1999). "Genetic algorithms application and testing for equipment selection." J. Constr. Eng. Manage., 125(1), 32-38.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 32-38
-
-
Haidar, A.1
Naoum, S.2
Howes, R.3
Tah, J.4
-
13
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J. Constr. Eng. Manage., 125(3), 167-175.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
15
-
-
0032141635
-
A multi-objective genetic local search algorithm and its application to flowshop scheduling
-
Piscataway, N.J.
-
Ishibuchi, H., and Murata, T. (1998). "A multi-objective genetic local search algorithm and its application to flowshop scheduling." IEEE Transactions on Systems, Man, and Cybernetics - Part C: Applications and Reviews, Piscataway, N.J., 28(3), 392-403.
-
(1998)
IEEE Transactions on Systems, Man, and Cybernetics - Part C: Applications and Reviews
, vol.28
, Issue.3
, pp. 392-403
-
-
Ishibuchi, H.1
Murata, T.2
-
16
-
-
0020290656
-
Study on designing buffer capacity in the production system for the components of the prefabricated houses by precast concrete panel
-
Ishii, K., and Muramatsu, R. (1982). "Study on designing buffer capacity in the production system for the components of the prefabricated houses by precast concrete panel." Bull. Sci. Eng. Res. Lab., 102, 47-61.
-
(1982)
Bull. Sci. Eng. Res. Lab.
, vol.102
, pp. 47-61
-
-
Ishii, K.1
Muramatsu, R.2
-
18
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
Li, H., and Love, P. (1997). "Using improved genetic algorithms to facilitate time-cost optimization." J. Constr. Eng. Manage., 123(3), 233-237.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
19
-
-
0032187321
-
Site-level facilities layout using genetic algorithms
-
Li, H., and Love, P. (1998). "Site-level facilities layout using genetic algorithms." J. Comput. Civ. Eng., 12(4), 227-231.
-
(1998)
J. Comput. Civ. Eng.
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.2
-
20
-
-
0030241820
-
Multi-objective genetic algorithm and its applications to flow shop scheduling
-
Murata, T., Ishibuchi, H., and Tanaka, H. (1996). "Multi-objective genetic algorithm and its applications to flow shop scheduling." Comput. Ind. Eng., 30(4), 957-967.
-
(1996)
Comput. Ind. Eng.
, vol.30
, Issue.4
, pp. 957-967
-
-
Murata, T.1
Ishibuchi, H.2
Tanaka, H.3
-
21
-
-
0029224965
-
A genetic algorithm for flowshop sequencing
-
Reeves, C. R. (1995). "A genetic algorithm for flowshop sequencing." Comput. Op. Res., 22(1), 5-13.
-
(1995)
Comput. Op. Res.
, vol.22
, Issue.1
, pp. 5-13
-
-
Reeves, C.R.1
-
22
-
-
0000599395
-
Multiple objective optimization with vector evaluated genetic algorithms
-
Carnegie-Mellon Univ., Pittsburgh
-
Schaffer, D. (1985). "Multiple objective optimization with vector evaluated genetic algorithms." Proc., 1st Int. Conf. on Genetic Algorithms, Carnegie-Mellon Univ., Pittsburgh, 93-100.
-
(1985)
Proc., 1st Int. Conf. on Genetic Algorithms
, pp. 93-100
-
-
Schaffer, D.1
-
23
-
-
0020139153
-
Managerial planning and control in precast industry
-
Warszawski, A. (1982). "Managerial planning and control in precast industry." J. Constr. Div., Am. Soc. Civ. Eng., 108(2), 299-313.
-
(1982)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.108
, Issue.2
, pp. 299-313
-
-
Warszawski, A.1
-
24
-
-
0021295608
-
Production planning in prefabrication plant
-
Warszawski, A. (1984). "Production planning in prefabrication plant." Build. Environ., 19(2), 139-147.
-
(1984)
Build. Environ.
, vol.19
, Issue.2
, pp. 139-147
-
-
Warszawski, A.1
-
26
-
-
0017017326
-
Production planning and scheduling for long line prestress products
-
Ziverts, G., and Bajars, E. (1976). "Production planning and scheduling for long line prestress products." J. Prestressed Concr. Inst., 21(6), 46-75.
-
(1976)
J. Prestressed Concr. Inst.
, vol.21
, Issue.6
, pp. 46-75
-
-
Ziverts, G.1
Bajars, E.2
|