-
1
-
-
4544318435
-
The LP/IP hybrid method for construction time-cost trade-off analysis
-
Burns S.A., Liu L., and Feng C.W. The LP/IP hybrid method for construction time-cost trade-off analysis. Constr. Manag. Econ. 14 3 (1996) 265-276
-
(1996)
Constr. Manag. Econ.
, vol.14
, Issue.3
, pp. 265-276
-
-
Burns, S.A.1
Liu, L.2
Feng, C.W.3
-
2
-
-
0040687741
-
Dynamic programming for project cost-time curve
-
Butcher W.S. Dynamic programming for project cost-time curve. J. Constr. Div., ASCE 93 C01 (1967) 59-73
-
(1967)
J. Constr. Div., ASCE
, vol.93
, Issue.C01
, pp. 59-73
-
-
Butcher, W.S.1
-
3
-
-
0027302082
-
Resource allocation via dynamic programming in activity networks
-
Elmagrhraby S.E. Resource allocation via dynamic programming in activity networks. Eur. J. Oper. Res. 64 (1993) 199-215
-
(1993)
Eur. J. Oper. Res.
, vol.64
, pp. 199-215
-
-
Elmagrhraby, S.E.1
-
4
-
-
0003921398
-
-
Prentice-Hall, Inc., Englewood Cliffs, N.J.
-
Henderickson C., and Au T. Project management for Construction (1989), Prentice-Hall, Inc., Englewood Cliffs, N.J.
-
(1989)
Project management for Construction
-
-
Henderickson, C.1
Au, T.2
-
5
-
-
0039502581
-
Critical path planning and scheduling: mathematical basis
-
Kelly J.E. Critical path planning and scheduling: mathematical basis. Oper. Res. 9 3 (1961) 167-179
-
(1961)
Oper. Res.
, vol.9
, Issue.3
, pp. 167-179
-
-
Kelly, J.E.1
-
6
-
-
0038909956
-
Extending CPM for multiform project time-cost curves
-
Meyer W.L., and Shaffer L.R. Extending CPM for multiform project time-cost curves. J. Constr. Div., ASCE 91 C01 (1965) 45-67
-
(1965)
J. Constr. Div., ASCE
, vol.91
, Issue.C01
, pp. 45-67
-
-
Meyer, W.L.1
Shaffer, L.R.2
-
8
-
-
0017506038
-
Cost-time model for large CPM project networks
-
Panagiotakopouols D. Cost-time model for large CPM project networks. J. Constr. Eng. Manag., ASCE 103 C02 (1977) 201-211
-
(1977)
J. Constr. Eng. Manag., ASCE
, vol.103
, Issue.C02
, pp. 201-211
-
-
Panagiotakopouols, D.1
-
9
-
-
0038909957
-
A non-computer approach to the critical path method for the construction industry
-
The Construction Institute, Department of Civil Engineering, Stanford University, Stanford, Calif.
-
Fondahl J.W. A non-computer approach to the critical path method for the construction industry. Technical Rep. No. 9 (1961), The Construction Institute, Department of Civil Engineering, Stanford University, Stanford, Calif.
-
(1961)
Technical Rep. No. 9
-
-
Fondahl, J.W.1
-
10
-
-
19244376018
-
A simple CPM time-cost tradeoff algorithm
-
B-354-0B-363
-
Siemens N. A simple CPM time-cost tradeoff algorithm. Manag. Sci. 17 6 (1971) B-354-0B-363
-
(1971)
Manag. Sci.
, vol.17
, Issue.6
-
-
Siemens, N.1
-
11
-
-
0027545671
-
Schedule compression using the direct stiffness method
-
Moselhi O. Schedule compression using the direct stiffness method. Can. J. Civ. Eng., Ottawa 20 1 (1993) 65-72
-
(1993)
Can. J. Civ. Eng., Ottawa
, vol.20
, Issue.1
, pp. 65-72
-
-
Moselhi, O.1
-
12
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng C., Liu L., and Burns S. Using genetic algorithms to solve construction time-cost trade-off problems. J. Comput. Civ. Eng., ASCE 11 3 (1997) 184-189
-
(1997)
J. Comput. Civ. Eng., ASCE
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.1
Liu, L.2
Burns, S.3
-
13
-
-
0035193271
-
A GA-based fuzzy optimal model for construction time-cost trade-off
-
Leu S.S., Chen A.T., and Yang C.H. A GA-based fuzzy optimal model for construction time-cost trade-off. Int. J. Proj. Manag. 19 1 (2001) 47-58
-
(2001)
Int. J. Proj. Manag.
, vol.19
, Issue.1
, pp. 47-58
-
-
Leu, S.S.1
Chen, A.T.2
Yang, C.H.3
-
14
-
-
0000191706
-
Scheduling/cost optimization and neural dynamics model for construction
-
Adeli H., and Karim A. Scheduling/cost optimization and neural dynamics model for construction. J. Constr. Eng. Manag., ASCE 123 4 (1997) 450-458
-
(1997)
J. Constr. Eng. Manag., ASCE
, vol.123
, Issue.4
, pp. 450-458
-
-
Adeli, H.1
Karim, A.2
-
15
-
-
0000813734
-
An algorithm for optimal project scheduling under multiple resource constraints
-
Davis E., and Heidorn G. An algorithm for optimal project scheduling under multiple resource constraints. Manag. Sci. 17 (1971) 803-816
-
(1971)
Manag. Sci.
, vol.17
, pp. 803-816
-
-
Davis, E.1
Heidorn, G.2
-
16
-
-
0041584301
-
Multiproject scheduling with limited resources: a 0-1 approach
-
Pritsker A., Waters L., and Wolfe P. Multiproject scheduling with limited resources: a 0-1 approach. Manag. Sci. 16 (1969) 93-108
-
(1969)
Manag. Sci.
, vol.16
, pp. 93-108
-
-
Pritsker, A.1
Waters, L.2
Wolfe, P.3
-
18
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan W.T., Chua D.K.H., and Kannan G. Construction resource scheduling with genetic algorithms. J. Constr. Eng. Manag., ASCE 122 2 (1996) 125-132
-
(1996)
J. Constr. Eng. Manag., ASCE
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
Kannan, G.3
-
19
-
-
0003735261
-
-
John Wiley & Sons, Inc, New York, N.Y.
-
Gen M., and Cheng R. Genetic Algorithms & Engineering Design (1997), John Wiley & Sons, Inc, New York, N.Y.
-
(1997)
Genetic Algorithms & Engineering Design
-
-
Gen, M.1
Cheng, R.2
-
20
-
-
0033886896
-
Object-oriented resource-based planning method (ORPM) for construction
-
Shi J., and Deng Z.M. Object-oriented resource-based planning method (ORPM) for construction. Int. J. Proj. Manag. 18 3 (2000) 179-188
-
(2000)
Int. J. Proj. Manag.
, vol.18
, Issue.3
, pp. 179-188
-
-
Shi, J.1
Deng, Z.M.2
-
21
-
-
0003722376
-
-
Addison-Wesley Publishing Co., Inc., Reading, Mass
-
Goldberg D.E. Genetic Algorithm in Search, Optimization and Machine Learning (1989), Addison-Wesley Publishing Co., Inc., Reading, Mass
-
(1989)
Genetic Algorithm in Search, Optimization and Machine Learning
-
-
Goldberg, D.E.1
|