메뉴 건너뛰기




Volumn 128, Issue 5, 2002, Pages 418-426

Genetic algorithms for construction site layout in project planning

Author keywords

Algorithms; Construction sites; Facilities; Project planning

Indexed keywords

ACCIDENT PREVENTION; CONSTRUCTION INDUSTRY; COSTS; DATA PROCESSING; DATABASE SYSTEMS; ENVIRONMENTAL PROTECTION; FACILITIES; GENETIC ALGORITHMS; MATHEMATICAL MODELS; PROBLEM SOLVING; SCHEDULING; SITE SELECTION;

EID: 4344695708     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:5(418)     Document Type: Article
Times cited : (120)

References (19)
  • 2
    • 0030124747 scopus 로고    scopus 로고
    • Genetic algorithms - A tool for OR?
    • Dowsland, K. A. (1996). "Genetic algorithms - a tool for OR?" J. Oper. Res. Soc., 44, 550-561.
    • (1996) J. Oper. Res. Soc. , vol.44 , pp. 550-561
    • Dowsland, K.A.1
  • 4
    • 0024923984 scopus 로고
    • Knowledge representation for the site layout problem
    • ASCE, Reston, Va.
    • Hamiani, A. (1989). "Knowledge representation for the site layout problem." Proc., Computing in Civil Engineering, ASCE, Reston, Va., 283-289.
    • (1989) Proc., Computing in Civil Engineering , pp. 283-289
    • Hamiani, A.1
  • 5
    • 0030151930 scopus 로고    scopus 로고
    • Search heuristics for constrained project scheduling
    • Lee, J. K., and Kim, Y. D. (1996). "Search heuristics for constrained project scheduling." J. Oper. Res. Soc., 47(5), 678-689.
    • (1996) J. Oper. Res. Soc. , vol.47 , Issue.5 , pp. 678-689
    • Lee, J.K.1    Kim, Y.D.2
  • 7
    • 0031191045 scopus 로고    scopus 로고
    • Selection of optimal construction robot using genetic algorithms
    • Navon, R., and McCrea, A. M. (1997). "Selection of optimal construction robot using genetic algorithms." J. Comput. Civ. Eng., 11(3), 175-183.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.3 , pp. 175-183
    • Navon, R.1    McCrea, A.M.2
  • 8
    • 0032124247 scopus 로고    scopus 로고
    • Intelligent management systems in operation: A review
    • Proudlove, N. C., Vadera, S., and Kobbacy, K. A. H. (1998). "Intelligent management systems in operation: a review." J. Oper. Res. Soc., 49(7), 682-699.
    • (1998) J. Oper. Res. Soc. , vol.49 , Issue.7 , pp. 682-699
    • Proudlove, N.C.1    Vadera, S.2    Kobbacy, K.A.H.3
  • 9
    • 0020735579 scopus 로고
    • The layout of temporary construction facilities
    • Rad, P. F., and James, B. M. (1983). "The layout of temporary construction facilities." Cost Eng., 25(2), 19-27.
    • (1983) Cost Eng. , vol.25 , Issue.2 , pp. 19-27
    • Rad, P.F.1    James, B.M.2
  • 10
    • 33749834100 scopus 로고    scopus 로고
    • Trends and perspectives: The facility layout problem: Recent and emerging trends and perspectives
    • Russell, D. M., and Gau, K. Y. (1996). "Trends and perspectives: the facility layout problem: recent and emerging trends and perspectives." J. Manuf. Syst., 15(5), 351-366.
    • (1996) J. Manuf. Syst. , vol.15 , Issue.5 , pp. 351-366
    • Russell, D.M.1    Gau, K.Y.2
  • 11
    • 0000964525 scopus 로고
    • Automated layout design program
    • Seehof, J. M., and Evans, U. O. (1967). "Automated layout design program." Ind. Eng., 18, 690-695.
    • (1967) Ind. Eng. , vol.18 , pp. 690-695
    • Seehof, J.M.1    Evans, U.O.2
  • 12
    • 0030127939 scopus 로고    scopus 로고
    • Fuzzy controlled genetic algorithm search for shape optimization
    • Soh, C. K., and Yang, J. (1996). "Fuzzy controlled genetic algorithm search for shape optimization." J. Comput. Civ. Eng., 10(2), 143-150.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.2 , pp. 143-150
    • Soh, C.K.1    Yang, J.2
  • 13
    • 0001819989 scopus 로고
    • The application of genetic algorithms to resource scheduling
    • R. K. Belew and L. B. Booker, eds., Morgan Kaufman, San Mateo, Calif.
    • Syswerda, G., and Palmucci, J. (1991). "The application of genetic algorithms to resource scheduling." Proc., 4th Int. Conf. on Genetic Algorithms, R. K. Belew and L. B. Booker, eds., Morgan Kaufman, San Mateo, Calif., 502-508.
    • (1991) Proc., 4th Int. Conf. on Genetic Algorithms , pp. 502-508
    • Syswerda, G.1    Palmucci, J.2
  • 14
    • 0026021591 scopus 로고
    • Sightplan experiments: Alternate strategies for site layout design
    • Tommelein, I. D., Levitt, R. E., Hayes-Roth, B., and Confrey, T. (1991). "Sightplan experiments: alternate strategies for site layout design." J. Comput. Civ. Eng., 5(1), 42-63.
    • (1991) J. Comput. Civ. Eng. , vol.5 , Issue.1 , pp. 42-63
    • Tommelein, I.D.1    Levitt, R.E.2    Hayes-Roth, B.3    Confrey, T.4
  • 16
    • 0142146501 scopus 로고
    • An expert system for crane selection and location
    • Israel Institute of Technology and Building Research Station-Technion I.I.T., Haifa, Israel
    • Warszawski, A., and Peled, N. (1987). "An expert system for crane selection and location." Proc., 4th Int. Symp. on Robotics and Artificial Intelligence in Building Construction, Israel Institute of Technology and Building Research Station-Technion I.I.T., Haifa, Israel, Vol. 1, 64-75.
    • (1987) Proc., 4th Int. Symp. on Robotics and Artificial Intelligence in Building Construction , vol.1 , pp. 64-75
    • Warszawski, A.1    Peled, N.2
  • 17
    • 0031284251 scopus 로고    scopus 로고
    • A genetic algorithm for the generalized assignment problem
    • Wilson, J. M. (1997). "A genetic algorithm for the generalized assignment problem." J. Oper. Res. Soc., 48(8), 804-809.
    • (1997) J. Oper. Res. Soc. , vol.48 , Issue.8 , pp. 804-809
    • Wilson, J.M.1
  • 18
    • 0029344681 scopus 로고
    • Construction-site layout using annealed neural network
    • Yeh, I.-C. (1995). "Construction-site layout using annealed neural network." J. Comput. Civ. Eng., 9(3), 201-208.
    • (1995) J. Comput. Civ. Eng. , vol.9 , Issue.3 , pp. 201-208
    • Yeh, I.-C.1
  • 19
    • 0033313625 scopus 로고    scopus 로고
    • Dynamic layout planning using a hybrid incremental solution method
    • Zouein, P. P., and Tommelein, I. D. (1999). "Dynamic layout planning using a hybrid incremental solution method." J. Constr. Eng. Manage., 125(6), 400-408.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 400-408
    • Zouein, P.P.1    Tommelein, I.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.