-
1
-
-
0030644746
-
Manpower scheduling optimization using genetic algorithms
-
ASCE, Reston, Va.
-
Al-Tabtabai, H., and Alex, A. P. (1997). "Manpower scheduling optimization using genetic algorithms." Proc., 4th Congress on Computing in Civil Engineering, ASCE, Reston, Va., 702-709.
-
(1997)
Proc., 4th Congress on Computing in Civil Engineering
, pp. 702-709
-
-
Al-Tabtabai, H.1
Alex, A.P.2
-
2
-
-
0030124747
-
Genetic algorithms - A tool for OR?
-
Dowsland, K. A. (1996). "Genetic algorithms - a tool for OR?" J. Oper. Res. Soc., 44, 550-561.
-
(1996)
J. Oper. Res. Soc.
, vol.44
, pp. 550-561
-
-
Dowsland, K.A.1
-
3
-
-
0003722376
-
-
Addison-Wesley, Reading, Mass.
-
Goldberg, D. E. (1989). Genetic algorithms in search, optimization, and machine learning, Addison-Wesley, Reading, Mass.
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
4
-
-
0024923984
-
Knowledge representation for the site layout problem
-
ASCE, Reston, Va.
-
Hamiani, A. (1989). "Knowledge representation for the site layout problem." Proc., Computing in Civil Engineering, ASCE, Reston, Va., 283-289.
-
(1989)
Proc., Computing in Civil Engineering
, pp. 283-289
-
-
Hamiani, A.1
-
5
-
-
0030151930
-
Search heuristics for constrained project scheduling
-
Lee, J. K., and Kim, Y. D. (1996). "Search heuristics for constrained project scheduling." J. Oper. Res. Soc., 47(5), 678-689.
-
(1996)
J. Oper. Res. Soc.
, vol.47
, Issue.5
, pp. 678-689
-
-
Lee, J.K.1
Kim, Y.D.2
-
6
-
-
0025723153
-
Automating project scheduling - A case study
-
ASCE, New York
-
Mawdesley, M. J., and Askew, W. H. (1991). "Automating project scheduling - a case study." Preparing for Construction in the 21st Century: Proc., Construction Congress '91, ASCE, New York, 360-365.
-
(1991)
Preparing for Construction in the 21st Century: Proc., Construction Congress '91
, pp. 360-365
-
-
Mawdesley, M.J.1
Askew, W.H.2
-
7
-
-
0031191045
-
Selection of optimal construction robot using genetic algorithms
-
Navon, R., and McCrea, A. M. (1997). "Selection of optimal construction robot using genetic algorithms." J. Comput. Civ. Eng., 11(3), 175-183.
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.3
, pp. 175-183
-
-
Navon, R.1
McCrea, A.M.2
-
8
-
-
0032124247
-
Intelligent management systems in operation: A review
-
Proudlove, N. C., Vadera, S., and Kobbacy, K. A. H. (1998). "Intelligent management systems in operation: a review." J. Oper. Res. Soc., 49(7), 682-699.
-
(1998)
J. Oper. Res. Soc.
, vol.49
, Issue.7
, pp. 682-699
-
-
Proudlove, N.C.1
Vadera, S.2
Kobbacy, K.A.H.3
-
9
-
-
0020735579
-
The layout of temporary construction facilities
-
Rad, P. F., and James, B. M. (1983). "The layout of temporary construction facilities." Cost Eng., 25(2), 19-27.
-
(1983)
Cost Eng.
, vol.25
, Issue.2
, pp. 19-27
-
-
Rad, P.F.1
James, B.M.2
-
10
-
-
33749834100
-
Trends and perspectives: The facility layout problem: Recent and emerging trends and perspectives
-
Russell, D. M., and Gau, K. Y. (1996). "Trends and perspectives: the facility layout problem: recent and emerging trends and perspectives." J. Manuf. Syst., 15(5), 351-366.
-
(1996)
J. Manuf. Syst.
, vol.15
, Issue.5
, pp. 351-366
-
-
Russell, D.M.1
Gau, K.Y.2
-
11
-
-
0000964525
-
Automated layout design program
-
Seehof, J. M., and Evans, U. O. (1967). "Automated layout design program." Ind. Eng., 18, 690-695.
-
(1967)
Ind. Eng.
, vol.18
, pp. 690-695
-
-
Seehof, J.M.1
Evans, U.O.2
-
12
-
-
0030127939
-
Fuzzy controlled genetic algorithm search for shape optimization
-
Soh, C. K., and Yang, J. (1996). "Fuzzy controlled genetic algorithm search for shape optimization." J. Comput. Civ. Eng., 10(2), 143-150.
-
(1996)
J. Comput. Civ. Eng.
, vol.10
, Issue.2
, pp. 143-150
-
-
Soh, C.K.1
Yang, J.2
-
13
-
-
0001819989
-
The application of genetic algorithms to resource scheduling
-
R. K. Belew and L. B. Booker, eds., Morgan Kaufman, San Mateo, Calif.
-
Syswerda, G., and Palmucci, J. (1991). "The application of genetic algorithms to resource scheduling." Proc., 4th Int. Conf. on Genetic Algorithms, R. K. Belew and L. B. Booker, eds., Morgan Kaufman, San Mateo, Calif., 502-508.
-
(1991)
Proc., 4th Int. Conf. on Genetic Algorithms
, pp. 502-508
-
-
Syswerda, G.1
Palmucci, J.2
-
14
-
-
0026021591
-
Sightplan experiments: Alternate strategies for site layout design
-
Tommelein, I. D., Levitt, R. E., Hayes-Roth, B., and Confrey, T. (1991). "Sightplan experiments: alternate strategies for site layout design." J. Comput. Civ. Eng., 5(1), 42-63.
-
(1991)
J. Comput. Civ. Eng.
, vol.5
, Issue.1
, pp. 42-63
-
-
Tommelein, I.D.1
Levitt, R.E.2
Hayes-Roth, B.3
Confrey, T.4
-
15
-
-
0142208608
-
-
Arnold, London
-
Twort, A. C., and Rees, J. G. (1995). Civil engineering supervision and management, 3rd Ed., Arnold, London.
-
(1995)
Civil Engineering Supervision and Management, 3rd Ed.
-
-
Twort, A.C.1
Rees, J.G.2
-
16
-
-
0142146501
-
An expert system for crane selection and location
-
Israel Institute of Technology and Building Research Station-Technion I.I.T., Haifa, Israel
-
Warszawski, A., and Peled, N. (1987). "An expert system for crane selection and location." Proc., 4th Int. Symp. on Robotics and Artificial Intelligence in Building Construction, Israel Institute of Technology and Building Research Station-Technion I.I.T., Haifa, Israel, Vol. 1, 64-75.
-
(1987)
Proc., 4th Int. Symp. on Robotics and Artificial Intelligence in Building Construction
, vol.1
, pp. 64-75
-
-
Warszawski, A.1
Peled, N.2
-
17
-
-
0031284251
-
A genetic algorithm for the generalized assignment problem
-
Wilson, J. M. (1997). "A genetic algorithm for the generalized assignment problem." J. Oper. Res. Soc., 48(8), 804-809.
-
(1997)
J. Oper. Res. Soc.
, vol.48
, Issue.8
, pp. 804-809
-
-
Wilson, J.M.1
-
18
-
-
0029344681
-
Construction-site layout using annealed neural network
-
Yeh, I.-C. (1995). "Construction-site layout using annealed neural network." J. Comput. Civ. Eng., 9(3), 201-208.
-
(1995)
J. Comput. Civ. Eng.
, vol.9
, Issue.3
, pp. 201-208
-
-
Yeh, I.-C.1
-
19
-
-
0033313625
-
Dynamic layout planning using a hybrid incremental solution method
-
Zouein, P. P., and Tommelein, I. D. (1999). "Dynamic layout planning using a hybrid incremental solution method." J. Constr. Eng. Manage., 125(6), 400-408.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 400-408
-
-
Zouein, P.P.1
Tommelein, I.D.2
|