Hybrid time-cost optimization of nonserial repetitive construction projects

Author keywords

Construction management; Hybrid methods; Optimization; Uncertainty principles

Indexed keywords

COMMERCE; CONSTRUCTION INDUSTRY; COST BENEFIT ANALYSIS; COSTS; DIESEL ENGINES; DYNAMIC PROGRAMMING; FUNCTIONS; GENETIC ALGORITHMS; HYBRID SENSORS; MATHEMATICAL MODELS; PROGRAMMING THEORY; PROJECT MANAGEMENT; SYSTEMS ENGINEERING; UNCERTAINTY ANALYSIS;

EID: 58149229057     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:1(42)     Document Type: Article
Times cited : (35)

References (19)
  • 1
    • 0000191706 scopus 로고    scopus 로고
    • Scheduling/cost optimization and neural dynamics model for construction
    • Adeli, H., and Karim, A. (1997). " Scheduling/cost optimization and neural dynamics model for construction.." J. Constr. Eng. Manage., 123 (4), 450-458.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.4 , pp. 450-458
    • Adeli, H.1    Karim, A.2
  • 2
    • 0032670219 scopus 로고    scopus 로고
    • CONSCOM: An OO construction scheduling and change management system
    • Adeli, H., and Karim, A. (1999). " CONSCOM: An OO construction scheduling and change management system.." J. Constr. Eng. Manage., 125 (5), 368-376.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 368-376
    • Adeli, H.1    Karim, A.2
  • 6
    • 0035132257 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction project
    • El Rayes, K., and Moselhi, O. (2001). " Optimizing resource utilization for repetitive construction project.." J. Constr. Eng. Manage., 127 (1), 18-27.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 18-27
    • El Rayes, K.1    Moselhi, O.2
  • 7
    • 0034172005 scopus 로고    scopus 로고
    • Stochastic construction time-cost trade-off analysis
    • Feng, C.-W., and Liu, L. (2000). " Stochastic construction time-cost trade-off analysis.." J. Comput. Civ. Eng., 14 (2), 117-126.
    • (2000) J. Comput. Civ. Eng. , vol.14 , Issue.2 , pp. 117-126
    • Feng, C.-W.1    Liu, L.2
  • 9
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resources allocation and leveling using genetic algorithms
    • Hegazy, T. (1999). " Optimization of resources allocation and leveling using genetic algorithms.." J. Constr. Eng. Manage., 125 (3), 167-175.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 10
    • 0035335808 scopus 로고    scopus 로고
    • Cost optimization in projects with repetitive non-serial activities
    • Hegazy, T. (2001). " Cost optimization in projects with repetitive non-serial activities.." J. Constr. Eng. Manage., 127 (3), 183-191.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.3 , pp. 183-191
    • Hegazy, T.1
  • 11
    • 0034543055 scopus 로고    scopus 로고
    • Building blocks, cohort genetic algorithms, and hyperplane-defined functions
    • Holland, J. H. (2000). " Building blocks, cohort genetic algorithms, and hyperplane-defined functions.." Evol. Comput., 8 (4), 373-391.
    • (2000) Evol. Comput. , vol.8 , Issue.4 , pp. 373-391
    • Holland, J.H.1
  • 12
    • 0032655303 scopus 로고    scopus 로고
    • OO information model for construction project management
    • Karim, A., and Adeli, H. (1999). " OO information model for construction project management.." J. Constr. Eng. Manage., 125 (5), 361-367.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 361-367
    • Karim, A.1    Adeli, H.2
  • 13
    • 0036715627 scopus 로고    scopus 로고
    • A species conserving genetic algorithm for multimodal function optimization
    • ".
    • Li, J. P., Balazs, M. E., and Paeks, G. T. (2002). " A species conserving genetic algorithm for multimodal function optimization.." Evol. Comput., 10 (3), 207-237.
    • (2002) Evol. Comput. , vol.10 , Issue.3 , pp. 207-237
    • Li, J.P.1    Balazs, M.E.2    Paeks, G.T.3
  • 15
    • 0035391119 scopus 로고    scopus 로고
    • Optimal repetitive model with sharable resource constraint
    • Lue, S.-S., and Hwang, S.-T. (2001). " Optimal repetitive model with sharable resource constraint.." J. Constr. Eng. Manage., 127 (4), 270-280.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 270-280
    • Lue, S.-S.1    Hwang, S.-T.2
  • 16
    • 13944256583 scopus 로고    scopus 로고
    • Incorporating practicability into genetic algorithms-based time-cost optimization
    • Que, B. C. (2002). " Incorporating practicability into genetic algorithms-based time-cost optimization.." J. Constr. Eng. Manage., 128 (2), 139-143.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.2 , pp. 139-143
    • Que, B.C.1
  • 17
    • 5244378567 scopus 로고    scopus 로고
    • Dynamic programming approach to scheduling of non-serial linear project
    • Senouci, A. B. (1996). " Dynamic programming approach to scheduling of non-serial linear project.." J. Comput. Civ. Eng., 10 (2), 106-114.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.2 , pp. 106-114
    • Senouci, A.B.1
  • 19
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • Weng-Tat, C., and Chua, D. K. (1996). " Construction resource scheduling with genetic algorithms.." J. Constr. Eng. Manage., 122 (2), 125-132.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 125-132
    • Weng-Tat, C.1    Chua, D.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.