메뉴 건너뛰기




Volumn 132, Issue 5, 2006, Pages 491-498

Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects

Author keywords

Algorithms; Computation; Computer aided scheduling; Computer models; Construction management; Contracts; Information technology (IT)

Indexed keywords

COMPUTER AIDED SCHEDULING; COMPUTER MODELS; CONSTRUCTION ENGINEERING; CONSTRUCTION MANAGEMENT;

EID: 33646171275     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:5(491)     Document Type: Article
Times cited : (73)

References (29)
  • 1
    • 0033726367 scopus 로고    scopus 로고
    • High-performance computing for large-scale analysis, optimization, and control
    • Adeli, H. (2000). " High-performance computing for large-scale analysis, optimization, and control.. " J. Aerosp. Eng., 13 (1), 1-10.
    • (2000) J. Aerosp. Eng. , vol.13 , Issue.1 , pp. 1-10
    • Adeli, H.1
  • 2
    • 77955879410 scopus 로고    scopus 로고
    • 97003, Illinois Genetic Algorithms Laboratory, Univ. of Illinois at Urbana Champaign, Urbana, Ill.
    • Cantú-Paz, E. (1997). " A survey of parallel genetic algorithms.. " ILLGAL Report No. 97003, Illinois Genetic Algorithms Laboratory, Univ. of Illinois at Urbana Champaign, Urbana, Ill.
    • (1997) A Survey of Parallel Genetic Algorithms
    • Cantú-Paz, E.1
  • 4
    • 0033909266 scopus 로고    scopus 로고
    • A distributed implementation of an adaptive finite element method for fluid problems
    • De Santiago, E., and Law, K. H. (2000). " A distributed implementation of an adaptive finite element method for fluid problems.. " Comput. Struct., 74 (1), 97-119.
    • (2000) Comput. Struct. , vol.74 , Issue.1 , pp. 97-119
    • De Santiago, E.1    Law, K.H.2
  • 8
    • 0035392410 scopus 로고    scopus 로고
    • Optimum planning of highway construction under the A+B bidding method
    • El-Rayes, K. (2001). " Optimum planning of highway construction under the A+B bidding method.. " J. Constr. Eng. Manage., 127 (4), 261-269.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 261-269
    • El-Rayes, K.1
  • 9
    • 15944408442 scopus 로고    scopus 로고
    • CONLIGHT: Lighting design model for nighttime highway construction
    • El-Rayes, K., and Hyari, K. (2005a). " CONLIGHT: Lighting design model for nighttime highway construction.. " J. Constr. Eng. Manage., 131 (4), 467-476.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 467-476
    • El-Rayes, K.1    Hyari, K.2
  • 10
    • 29044436435 scopus 로고    scopus 로고
    • Optimal lighting arrangements for nighttime highway construction projects
    • El-Rayes, K., and Hyari, K. (2005b). " Optimal lighting arrangements for nighttime highway construction projects.. " J. Constr. Eng. Manage., 131 (12), 1292-1300.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.12 , pp. 1292-1300
    • El-Rayes, K.1    Hyari, K.2
  • 11
    • 15944361924 scopus 로고    scopus 로고
    • Time-cost-quality trade-off analysis for highway construction
    • El-Rayes, K., and Kandil, A. (2005). " Time-cost-quality trade-off analysis for highway construction.. " J. Constr. Eng. Manage., 131 (4), 477-486.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 477-486
    • El-Rayes, K.1    Kandil, A.2
  • 12
    • 27744546885 scopus 로고    scopus 로고
    • Trade-off between safety and cost in planning construction site layouts
    • El-Rayes, K., and Khalafallah, A. (2005). " Trade-off between safety and cost in planning construction site layouts.. " J. Constr. Eng. Manage., 131 (11), 1186-1195.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.11 , pp. 1186-1195
    • El-Rayes, K.1    Khalafallah, A.2
  • 13
    • 0034172005 scopus 로고    scopus 로고
    • Stochastic construction time-cost trade-off analysis
    • Feng, C., Liu, L., and Burns, S. (2000). " Stochastic construction time-cost trade-off analysis.. " J. Comput. Civ. Eng., 14 (2), 117-126.
    • (2000) J. Comput. Civ. Eng. , vol.14 , Issue.2 , pp. 117-126
    • Feng, C.1    Liu, L.2    Burns, S.3
  • 16
    • 6344281398 scopus 로고    scopus 로고
    • Resource optimization using combined simulation and genetic algorithms
    • Hegazy, T., and Kassab, M. (2003). " Resource optimization using combined simulation and genetic algorithms.. " J. Constr. Eng. Manage., 129 (6), 698-705.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.6 , pp. 698-705
    • Hegazy, T.1    Kassab, M.2
  • 17
    • 13944255840 scopus 로고    scopus 로고
    • Genetic optimization for dynamic project control
    • Hegazy, T., and Petzold, K. (2003). " Genetic optimization for dynamic project control.. " J. Constr. Eng. Manage., 129 (4), 396-404.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 396-404
    • Hegazy, T.1    Petzold, K.2
  • 18
    • 0029532894 scopus 로고
    • A+B bidding method-Hidden success story for highway construction
    • Herbsman, Z. (1995). " A+B bidding method-Hidden success story for highway construction.. " J. Constr. Eng. Manage., 121 (4), 430-437.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 430-437
    • Herbsman, Z.1
  • 19
    • 33646584142 scopus 로고    scopus 로고
    • Multiobjective optimization for scheduling repetitive construction projects
    • Hyari, K., and El-Rayes, K. (2006) " Multiobjective optimization for scheduling repetitive construction projects.. " J. Manage. Eng., in press.
    • (2006) J. Manage. Eng.
    • Hyari, K.1    El-Rayes, K.2
  • 20
    • 23244452976 scopus 로고    scopus 로고
    • Parallel computing framework for optimizing construction planning in large-scale projects
    • Kandil, A., and El-Rayes, K. (2005). " Parallel computing framework for optimizing construction planning in large-scale projects.. " J. Comput. Civ. Eng., 19 (3), 304-312.
    • (2005) J. Comput. Civ. Eng. , vol.19 , Issue.3 , pp. 304-312
    • Kandil, A.1    El-Rayes, K.2
  • 21
    • 13944277711 scopus 로고    scopus 로고
    • Multiobjective optimization of earthmoving operations
    • Marzouk, M., and Moselhi, O. (2004). " Multiobjective optimization of earthmoving operations.. " J. Constr. Eng. Manage., 130 (1), 105-113.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.1 , pp. 105-113
    • Marzouk, M.1    Moselhi, O.2
  • 22
    • 84858870510 scopus 로고    scopus 로고
    • National Center For Super Computing Applications (NCSA). (Univ. of Illinois at Urbana Champaign 〈
    • National Center For Super Computing Applications (NCSA). (2005). " The xeon linux cluster.. " Univ. of Illinois at Urbana Champaign 〈 http://www.mcsa/ioic/edi 〉 June 6, 2005.
    • (2005) The Xeon Linux Cluster
  • 25
    • 17044458684 scopus 로고    scopus 로고
    • Simplifying multiobjective optimization: An automated design methodology for the non-dominated sorted genetic algorithm-II
    • Reed, P., Minsker, B. S., and Goldberg, D. E. (2003). " Simplifying multiobjective optimization: An automated design methodology for the non-dominated sorted genetic algorithm-II.. " Water Resour. Res., 39 (7), TNN21-TNN25.
    • (2003) Water Resour. Res. , vol.39 , Issue.7
    • Reed, P.1    Minsker, B.S.2    Goldberg, D.E.3
  • 27
    • 12744266507 scopus 로고    scopus 로고
    • Stochastic time-cost optimization model incorporating fuzzy sets theory and nanreplaceable fronts
    • Zheng, D., and Ng, T. (2005). " Stochastic time-cost optimization model incorporating fuzzy sets theory and nanreplaceable fronts.. " J. Constr. Eng. Manage., 131 (2), 176-186.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.2 , pp. 176-186
    • Zheng, D.1    Ng, T.2
  • 28
    • 0029271414 scopus 로고
    • Incentive/disincentive guidelines for highway construction contracts
    • Jaraiedi, M., Plummer, R., and Aber, M. (1995). " Incentive/disincentive guidelines for highway construction contracts.. " J. Constr. Eng. Manage., 121 (1), 112-120.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.1 , pp. 112-120
    • Jaraiedi, M.1    Plummer, R.2    Aber, M.3
  • 29
    • 12344265028 scopus 로고    scopus 로고
    • Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • Zheng, D., Ng, T., and Kumaraswamy, M. (2005). " Applying Pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization.. " J. Constr. Eng. Manage., 131 (1), 81-91.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.1    Ng, T.2    Kumaraswamy, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.