메뉴 건너뛰기




Volumn 132, Issue 12, 2006, Pages 1294-1305

Multiproject planning and resource controls for facility management

Author keywords

Construction industry; Facilities; Project management; Resource management

Indexed keywords

ALTERNATIVE CREW ALLOCATIONS; FACILITY MANAGEMENT; GEOGRAPHIC SPACE; MULTIPLE CONCURRENT PROJECTS; MULTIPROJECT PLANNING;

EID: 33751290672     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:12(1294)     Document Type: Article
Times cited : (9)

References (29)
  • 2
    • 2942650451 scopus 로고    scopus 로고
    • A typology for clients multiproject environments
    • Blismas, N., Sher, W., Thorpe, A., and Bladwin, A. (2004). " A typology for clients multiproject environments.. " Constr. Manage. Econom., 22 (4), 357-371.
    • (2004) Constr. Manage. Econom. , vol.22 , Issue.4 , pp. 357-371
    • Blismas, N.1    Sher, W.2    Thorpe, A.3    Bladwin, A.4
  • 4
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • Chan, W.-T., Chua, D. K. H., and Kannan, G. (1996). " Construction resource scheduling with genetic algorithms.. " J. Constr. Eng. Manage., 122 (2), 125-132.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.-T.1    Chua, D.K.H.2    Kannan, G.3
  • 6
    • 0016498438 scopus 로고
    • A comparison of heuristics and optimum solutions in resource constrained project scheduling
    • Davis, E. W., and Patterson, J. H. (1975). " A comparison of heuristics and optimum solutions in resource constrained project scheduling.. " Manage. Sci., 21, 994-955.
    • (1975) Manage. Sci. , vol.21 , pp. 994-955
    • Davis, E.W.1    Patterson, J.H.2
  • 7
    • 33751270277 scopus 로고    scopus 로고
    • Ph.D. thesis, Dept. of Civil and Environmental Engineering, Univ. of Illinois at Urbana-Champaign.
    • East, E. W. (2005). " Facility and infrastructure resource scheduling.. " Ph.D. thesis, Dept. of Civil and Environmental Engineering, Univ. of Illinois at Urbana-Champaign.
    • (2005) Facility and Infrastructure Resource Scheduling
    • East, E.W.1
  • 8
    • 0000510934 scopus 로고
    • Genetic algorithms, noise, and the sizing of population
    • Goldberg, D. E., Deb, K., and Clark, J. H. (1992). " Genetic algorithms, noise, and the sizing of population.. " Complex Syst. 6, 333-362.
    • (1992) Complex Syst. , vol.6 , pp. 333-362
    • Goldberg, D.E.1    Deb, K.2    Clark, J.H.3
  • 9
    • 0001907722 scopus 로고
    • Rapid accurate optimization of difficult problems using fast messy genetic algorithms
    • S.Forrest, ed., Morgan Kaufman, San Mateo, Calif., p
    • Goldberg, D., Deb, K., Kargupta, H., and Harik, G. (1993). " Rapid accurate optimization of difficult problems using fast messy genetic algorithms.. " Proc., 5th Int. Conf. on Genetic Algorithms, S. Forrest, ed., Morgan Kaufman, San Mateo, Calif., pp. 56-64.
    • (1993) Proc., 5th Int. Conf. on Genetic Algorithms , pp. 56-64
    • Goldberg, D.1    Deb, K.2    Kargupta, H.3    Harik, G.4
  • 10
    • 3242662207 scopus 로고    scopus 로고
    • 980007, Illinois Genetic Algorithms Laboratory, Univ. of Illinois, Urbana, Ill.
    • Goldberg, D. (1998). " The race, the hurdle, and the sweet spot.. " IlliGAL Rep. No. 980007, Illinois Genetic Algorithms Laboratory, Univ. of Illinois, Urbana, Ill.
    • (1998) The Race, the Hurdle, and the Sweet Spot
    • Goldberg, D.1
  • 13
    • 33751299911 scopus 로고
    • Ph.D. thesis, Business Administration, University of Iowa, University Microfilms International, Ann Arbor, Mich.
    • Han, J. (1988). " A new heuristic algorithm for resource-constrained project scheduling.. " Ph.D. thesis, Business Administration, University of Iowa, University Microfilms International, Ann Arbor, Mich.
    • (1988) A New Heuristic Algorithm for Resource-constrained Project Scheduling
    • Han, J.1
  • 14
    • 33751266409 scopus 로고
    • Ph.D. thesis, Carnegie Mellon Univ., University Microfilms International, Ann Arbor, Mich.
    • Hassain, M. B. (1993) " Constraint-based construction project scheduling.. " Ph.D. thesis, Carnegie Mellon Univ., University Microfilms International, Ann Arbor, Mich.
    • (1993) Constraint-based Construction Project Scheduling
    • Hassain, M.B.1
  • 15
    • 12744251346 scopus 로고    scopus 로고
    • Distributed scheduling model for infrastructure networks
    • Hegazy, T., Elhakeem, A., and Elbeltagi, E. (2004). " Distributed scheduling model for infrastructure networks.. " J. Constr. Eng. Manage., 130 (2), 160-167.
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.2 , pp. 160-167
    • Hegazy, T.1    Elhakeem, A.2    Elbeltagi, E.3
  • 19
    • 0034324916 scopus 로고    scopus 로고
    • Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
    • Leu, S.-S., and Yang, C.-H. (2000). " Resource leveling in construction by genetic algorithm-based optimization and its decision support system application.. " Automat. Construct., 10, 27-41.
    • (2000) Automat. Construct. , vol.10 , pp. 27-41
    • Leu, S.-S.1    Yang, C.-H.2
  • 21
    • 0039797033 scopus 로고
    • Near-optimal solution for resource-constrained scheduling problems
    • Mosehli, O., and Lorterapong, P. (1993). " Near-optimal solution for resource-constrained scheduling problems.. " Construct. Manage. Econ., 11, 293-303.
    • (1993) Construct. Manage. Econ. , vol.11 , pp. 293-303
    • Mosehli, O.1    Lorterapong, P.2
  • 22
    • 84860034583 scopus 로고    scopus 로고
    • MRO Software.
    • MRO Software. (2004). " MRO Software Solutions.. " 〈 http://www.mro.com 〉 (2004).
    • (2004) MRO Software Solutions
  • 23
    • 0000961185 scopus 로고    scopus 로고
    • Random keys genetic algorithm for job-shop scheduling
    • Norman, B., and Bean, J. (1997). " Random keys genetic algorithm for job-shop scheduling.. " Eng. Design Automat., 3 (2), 145-156.
    • (1997) Eng. Design Automat. , vol.3 , Issue.2 , pp. 145-156
    • Norman, B.1    Bean, J.2
  • 24
    • 0029393209 scopus 로고
    • A survey on the resource-constrained project scheduling problem
    • Ozdamar, L., and Ulusoy, G. (1995). " A survey on the resource-constrained project scheduling problem.. " IEEE Trans., 27, 574-586.
    • (1995) IEEE Trans. , vol.27 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 25
    • 0007625013 scopus 로고
    • Program management and its information system requirements
    • Turner, J., and Speiser, A. (1992). " Program management and its information system requirements.. " Int. J. Project Manage., 10 (4), 196-206.
    • (1992) Int. J. Project Manage. , vol.10 , Issue.4 , pp. 196-206
    • Turner, J.1    Speiser, A.2
  • 26
    • 84860037396 scopus 로고    scopus 로고
    • U. S. Dept. of the Army.
    • U. S. Dept. of the Army. (2002). " Microsoft Excel worksheet: Facilities.. " 〈 http://www.arl.army.mil/main/Main/resource.xls 〉 (27 June 2002).
    • (2002) Microsoft Excel Worksheet: Facilities
  • 27
    • 84860026434 scopus 로고    scopus 로고
    • U. S. Dept. of the Army.
    • U. S. Dept. of the Army. (2004). " Fort Gordon mision.. " 〈 http://www.gordon.army.mil/usascfg/fgmission.asp 〉 (23 May 2003).
    • (2004) Fort Gordon Mision
  • 28
    • 84860030225 scopus 로고    scopus 로고
    • University of Illinois).
    • University of Illinois). (2004). " University fact sheet.. " University of Illinois, Urbana, Ill. 〈 http://www.admin.uiuc.edu/pubaff/ facts.html 〉.
    • (2004) University Fact Sheet
  • 29
    • 0004273826 scopus 로고    scopus 로고
    • Whitley, D. (2004). " A genetic algorithm tutorial.. " Computer Science Dept., Colorado State Univ., Samizdat Press, 〈 http://sam.zdat.mines,edu/ga_tutorial/ 〉.
    • (2004) A Genetic Algorithm Tutorial
    • Whitley, D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.