-
2
-
-
2942650451
-
A typology for clients multiproject environments
-
Blismas, N., Sher, W., Thorpe, A., and Bladwin, A. (2004). " A typology for clients multiproject environments.. " Constr. Manage. Econom., 22 (4), 357-371.
-
(2004)
Constr. Manage. Econom.
, vol.22
, Issue.4
, pp. 357-371
-
-
Blismas, N.1
Sher, W.2
Thorpe, A.3
Bladwin, A.4
-
3
-
-
0003844699
-
-
2nd Ed. Addison-Wesley, Reading, Mass., p
-
Booch, G., Jacobsen, I., and Rumbaugh, J. (2004). UML distilled: A brief guide to the standard object modeling language, 2nd Ed. Addison-Wesley, Reading, Mass., pp. 49-66.
-
(2004)
UML Distilled: A Brief Guide to the Standard Object Modeling Language
, pp. 49-66
-
-
Booch, G.1
Jacobsen, I.2
Rumbaugh, J.3
-
4
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W.-T., Chua, D. K. H., and Kannan, G. (1996). " Construction resource scheduling with genetic algorithms.. " J. Constr. Eng. Manage., 122 (2), 125-132.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.-T.1
Chua, D.K.H.2
Kannan, G.3
-
5
-
-
0042304836
-
-
William Kaufman, Stanford, Calif., Vol.
-
Cohen, P. R., and Feigenbaum, E. A. (1982). The handbook of artifical intelligence, William Kaufman, Stanford, Calif., Vol. 3, p. 522.
-
(1982)
The Handbook of Artifical Intelligence
, vol.3
, pp. 522
-
-
Cohen, P.R.1
Feigenbaum, E.A.2
-
6
-
-
0016498438
-
A comparison of heuristics and optimum solutions in resource constrained project scheduling
-
Davis, E. W., and Patterson, J. H. (1975). " A comparison of heuristics and optimum solutions in resource constrained project scheduling.. " Manage. Sci., 21, 994-955.
-
(1975)
Manage. Sci.
, vol.21
, pp. 994-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
7
-
-
33751270277
-
-
Ph.D. thesis, Dept. of Civil and Environmental Engineering, Univ. of Illinois at Urbana-Champaign.
-
East, E. W. (2005). " Facility and infrastructure resource scheduling.. " Ph.D. thesis, Dept. of Civil and Environmental Engineering, Univ. of Illinois at Urbana-Champaign.
-
(2005)
Facility and Infrastructure Resource Scheduling
-
-
East, E.W.1
-
8
-
-
0000510934
-
Genetic algorithms, noise, and the sizing of population
-
Goldberg, D. E., Deb, K., and Clark, J. H. (1992). " Genetic algorithms, noise, and the sizing of population.. " Complex Syst. 6, 333-362.
-
(1992)
Complex Syst.
, vol.6
, pp. 333-362
-
-
Goldberg, D.E.1
Deb, K.2
Clark, J.H.3
-
9
-
-
0001907722
-
Rapid accurate optimization of difficult problems using fast messy genetic algorithms
-
S.Forrest, ed., Morgan Kaufman, San Mateo, Calif., p
-
Goldberg, D., Deb, K., Kargupta, H., and Harik, G. (1993). " Rapid accurate optimization of difficult problems using fast messy genetic algorithms.. " Proc., 5th Int. Conf. on Genetic Algorithms, S. Forrest, ed., Morgan Kaufman, San Mateo, Calif., pp. 56-64.
-
(1993)
Proc., 5th Int. Conf. on Genetic Algorithms
, pp. 56-64
-
-
Goldberg, D.1
Deb, K.2
Kargupta, H.3
Harik, G.4
-
10
-
-
3242662207
-
-
980007, Illinois Genetic Algorithms Laboratory, Univ. of Illinois, Urbana, Ill.
-
Goldberg, D. (1998). " The race, the hurdle, and the sweet spot.. " IlliGAL Rep. No. 980007, Illinois Genetic Algorithms Laboratory, Univ. of Illinois, Urbana, Ill.
-
(1998)
The Race, the Hurdle, and the Sweet Spot
-
-
Goldberg, D.1
-
11
-
-
0029216885
-
Optimization of uncertain resource plans with GAs
-
ASCE, Atlanta, Ga., p
-
Gobler, F., Kannan, G., Subick, C., and Kargupta, H. (1995). " Optimization of uncertain resource plans with GAs.. " Proc., 2nd Int. Congress on Computing in Civil Engineering, ASCE, Atlanta, Ga., pp. 1643-1650.
-
(1995)
Proc., 2nd Int. Congress on Computing in Civil Engineering
, pp. 1643-1650
-
-
Gobler, F.1
Kannan, G.2
Subick, C.3
Kargupta, H.4
-
13
-
-
33751299911
-
-
Ph.D. thesis, Business Administration, University of Iowa, University Microfilms International, Ann Arbor, Mich.
-
Han, J. (1988). " A new heuristic algorithm for resource-constrained project scheduling.. " Ph.D. thesis, Business Administration, University of Iowa, University Microfilms International, Ann Arbor, Mich.
-
(1988)
A New Heuristic Algorithm for Resource-constrained Project Scheduling
-
-
Han, J.1
-
14
-
-
33751266409
-
-
Ph.D. thesis, Carnegie Mellon Univ., University Microfilms International, Ann Arbor, Mich.
-
Hassain, M. B. (1993) " Constraint-based construction project scheduling.. " Ph.D. thesis, Carnegie Mellon Univ., University Microfilms International, Ann Arbor, Mich.
-
(1993)
Constraint-based Construction Project Scheduling
-
-
Hassain, M.B.1
-
15
-
-
12744251346
-
Distributed scheduling model for infrastructure networks
-
Hegazy, T., Elhakeem, A., and Elbeltagi, E. (2004). " Distributed scheduling model for infrastructure networks.. " J. Constr. Eng. Manage., 130 (2), 160-167.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.2
, pp. 160-167
-
-
Hegazy, T.1
Elhakeem, A.2
Elbeltagi, E.3
-
17
-
-
0003872979
-
-
MIT Press, Cambridge, Mass. p
-
Ibaraki, T., and Katoh, N. (1988). Resource allocation problems, algorithmic approaches, MIT Press, Cambridge, Mass. pp. 35-37.
-
(1988)
Resource Allocation Problems, Algorithmic Approaches
, pp. 35-37
-
-
Ibaraki, T.1
Katoh, N.2
-
19
-
-
0034324916
-
Resource leveling in construction by genetic algorithm-based optimization and its decision support system application
-
Leu, S.-S., and Yang, C.-H. (2000). " Resource leveling in construction by genetic algorithm-based optimization and its decision support system application.. " Automat. Construct., 10, 27-41.
-
(2000)
Automat. Construct.
, vol.10
, pp. 27-41
-
-
Leu, S.-S.1
Yang, C.-H.2
-
21
-
-
0039797033
-
Near-optimal solution for resource-constrained scheduling problems
-
Mosehli, O., and Lorterapong, P. (1993). " Near-optimal solution for resource-constrained scheduling problems.. " Construct. Manage. Econ., 11, 293-303.
-
(1993)
Construct. Manage. Econ.
, vol.11
, pp. 293-303
-
-
Mosehli, O.1
Lorterapong, P.2
-
22
-
-
84860034583
-
-
MRO Software.
-
MRO Software. (2004). " MRO Software Solutions.. " 〈 http://www.mro.com 〉 (2004).
-
(2004)
MRO Software Solutions
-
-
-
23
-
-
0000961185
-
Random keys genetic algorithm for job-shop scheduling
-
Norman, B., and Bean, J. (1997). " Random keys genetic algorithm for job-shop scheduling.. " Eng. Design Automat., 3 (2), 145-156.
-
(1997)
Eng. Design Automat.
, vol.3
, Issue.2
, pp. 145-156
-
-
Norman, B.1
Bean, J.2
-
24
-
-
0029393209
-
A survey on the resource-constrained project scheduling problem
-
Ozdamar, L., and Ulusoy, G. (1995). " A survey on the resource-constrained project scheduling problem.. " IEEE Trans., 27, 574-586.
-
(1995)
IEEE Trans.
, vol.27
, pp. 574-586
-
-
Ozdamar, L.1
Ulusoy, G.2
-
25
-
-
0007625013
-
Program management and its information system requirements
-
Turner, J., and Speiser, A. (1992). " Program management and its information system requirements.. " Int. J. Project Manage., 10 (4), 196-206.
-
(1992)
Int. J. Project Manage.
, vol.10
, Issue.4
, pp. 196-206
-
-
Turner, J.1
Speiser, A.2
-
26
-
-
84860037396
-
-
U. S. Dept. of the Army.
-
U. S. Dept. of the Army. (2002). " Microsoft Excel worksheet: Facilities.. " 〈 http://www.arl.army.mil/main/Main/resource.xls 〉 (27 June 2002).
-
(2002)
Microsoft Excel Worksheet: Facilities
-
-
-
27
-
-
84860026434
-
-
U. S. Dept. of the Army.
-
U. S. Dept. of the Army. (2004). " Fort Gordon mision.. " 〈 http://www.gordon.army.mil/usascfg/fgmission.asp 〉 (23 May 2003).
-
(2004)
Fort Gordon Mision
-
-
-
28
-
-
84860030225
-
-
University of Illinois).
-
University of Illinois). (2004). " University fact sheet.. " University of Illinois, Urbana, Ill. 〈 http://www.admin.uiuc.edu/pubaff/ facts.html 〉.
-
(2004)
University Fact Sheet
-
-
-
29
-
-
0004273826
-
-
Whitley, D. (2004). " A genetic algorithm tutorial.. " Computer Science Dept., Colorado State Univ., Samizdat Press, 〈 http://sam.zdat.mines,edu/ga_tutorial/ 〉.
-
(2004)
A Genetic Algorithm Tutorial
-
-
Whitley, D.1
|