Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems
-
E&FN Spon
-
Allam, S. I. G. (1998). "Multi-project scheduling: A new categorization for heuristic scheduling rules in construction scheduling problems." J. Constr. Mgmt. and Economics, E&FN Spon, 6(2), 93-115.
-
(1998)
J. Constr. Mgmt. and Economics
, vol.6
, Issue.2
, pp. 93-115
-
-
Allam, S.I.G.1
-
2
-
-
0016498438
-
A comparison of heuristic and optimum solutions in resource-constrained project scheduling
-
Davis, E. W., and Patterson, J. H. (1975). "A comparison of heuristic and optimum solutions in resource-constrained project scheduling." Mgmt. Sci., 21(8), 944-955.
-
(1975)
Mgmt. Sci.
, vol.21
, Issue.8
, pp. 944-955
-
-
Davis, E.W.1
Patterson, J.H.2
-
3
-
-
0001195356
-
Resource leveling in construction by optimization
-
ASCE
-
Easa, S. (1989). "Resource leveling in construction by optimization." J. Constr. Engrg. and Mgmt., ASCE, 115(2), 302-316.
-
(1989)
J. Constr. Engrg. and Mgmt.
, vol.115
, Issue.2
, pp. 302-316
-
-
Easa, S.1
-
4
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
ASCE
-
Feng, C., Liu, L., and Burns, S. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comp. Civ. Engrg., ASCE, 11(3), 184-189.
-
(1997)
J. Comp. Civ. Engrg.
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.1
Liu, L.2
Burns, S.3
-
5
-
-
0001424551
-
Algorithms for multi-resource generalized assignment problem
-
Gavish, B., and Pirkul, H. (1991). "Algorithms for multi-resource generalized assignment problem." Mgmt. Sci., 37(6), 695-713.
-
(1991)
Mgmt. Sci.
, vol.37
, Issue.6
, pp. 695-713
-
-
Gavish, B.1
Pirkul, H.2
-
8
-
-
0032070137
-
Project management software that meet the challenge
-
Hegazy, T., and El-Zamzamy, H. (1998). "Project management software that meet the challenge." Cost Engrg. J., 4(5), 25-33.
-
(1998)
Cost Engrg. J.
, vol.4
, Issue.5
, pp. 25-33
-
-
Hegazy, T.1
El-Zamzamy, H.2
-
9
-
-
0028330587
-
Analogy-based solution to markup estimation problem
-
ASCE
-
Hegazy, T., and Moselhi, O. (1994). "Analogy-based solution to markup estimation problem." J. Comp. Civ. Engrg., ASCE, 8(1), 72-87.
-
(1994)
J. Comp. Civ. Engrg.
, vol.8
, Issue.1
, pp. 72-87
-
-
Hegazy, T.1
Moselhi, O.2
-
10
-
-
0002385938
-
Resource constrained scheduling capabilities of commercial project management software
-
Johnson, R. (1992). "Resource constrained scheduling capabilities of commercial project management software." Proj. Mgmt. J., 22(4), 39-43.
-
(1992)
Proj. Mgmt. J.
, vol.22
, Issue.4
, pp. 39-43
-
-
Johnson, R.1
-
11
-
-
0001418264
-
Economic optimization of construction project scheduling
-
E&FN Spon
-
Karshenas, S., and Haber, D. (1990). "Economic optimization of construction project scheduling." J. Constr. Mgmt. and Economics, E&FN Spon, 8(2), 135-146.
-
(1990)
J. Constr. Mgmt. and Economics
, vol.8
, Issue.2
, pp. 135-146
-
-
Karshenas, S.1
Haber, D.2
-
12
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
ASCE
-
Li, H., and Loing, P. (1997). "Using improved genetic algorithms to facilitate time-cost optimization." J. Constr. Engrg. and Mgmt., ASCE, 123(3), 233-237.
-
(1997)
J. Constr. Engrg. and Mgmt.
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Loing, P.2
-
13
-
-
0342491221
-
-
Microsoft Corporation, Redmond, Wash.
-
Microsoft Project. (1995). Reference manual, ver. 4.1 for Windows 95. Microsoft Corporation, Redmond, Wash.
-
(1995)
Reference Manual, Ver. 4.1 for Windows 95
-
-
-
14
-
-
0027828985
-
Least impact algorithm for resource allocation
-
CSCE
-
Moselhi, A., and Lorterapong, P. (1993). "Least impact algorithm for resource allocation." Can. J. Civ. Engrg., CSCE, 20(2), 180-188.
-
(1993)
Can. J. Civ. Engrg.
, vol.20
, Issue.2
, pp. 180-188
-
-
Moselhi, A.1
Lorterapong, P.2
-
16
-
-
0027306405
-
Optimal resource leveling using integer-linear programming
-
ASCE, Reston, Va.
-
Shah, K., Farid, F., and Baugh, J. (1993). "Optimal resource leveling using integer-linear programming." Proc., 5th Int. Conf. in Comp. in Civ. & Bldg. Engrg., ASCE, Reston, Va., 1, 501-508.
-
(1993)
Proc., 5th Int. Conf. in Comp. in Civ. & Bldg. Engrg.
, vol.1
, pp. 501-508
-
-
Shah, K.1
Farid, F.2
Baugh, J.3
-
17
-
-
0343918512
-
Optimal methods for scheduling projects under resource constrains
-
Dec., 26-33
-
Talbot, F., and Patterson, J. (1979). "Optimal methods for scheduling projects under resource constrains." Proj. Mgmt. Quarterly, Dec., 26-33.
-
(1979)
Proj. Mgmt. Quarterly
-
-
Talbot, F.1
Patterson, J.2
-
18
-
-
0001303226
-
Some properties of schedules for large projects with limited resource
-
Wiest, D. (1964). "Some properties of schedules for large projects with limited resource." Operations Res., 12, 395-416.
-
(1964)
Operations Res.
, vol.12
, pp. 395-416
-
-
Wiest, D.1
|