-
1
-
-
0043253368
-
Formalization and automation of time-space conflict analysis
-
Akinci, B. and Fischer, M. and Levitt, R. and Carlson, R. (2002) Formalization and automation of time-space conflict analysis. Journal of Computing in Civil Engineering, 16((2)), pp. 124 - 34.
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 124-134
-
-
Akinci, B.1
Fischer, M.2
Levitt, R.3
Carlson, R.4
-
3
-
-
0004011301
-
The last planner system of production control
-
University of Birmingham PhD thesis
-
Ballard, G.(2000). In. University of Birmingham. The last planner system of production control, PhD thesis
-
(2000)
-
-
Ballard, G.1
-
4
-
-
0032667279
-
WorkPlan: Constraint-based database for work package scheduling
-
Choo, H. J. and Tommelein, I. D. and Ballard, G. and Zabelle, T. R. (1999) WorkPlan: Constraint-based database for work package scheduling. Journal of Construction Engineering and Management, 125((3)), pp. 151 - 60.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 151-160
-
-
Choo, H.J.1
Tommelein, I.D.2
Ballard, G.3
Zabelle, T.R.4
-
5
-
-
0000626184
-
An updated survey of GA-based multiobjective optimization techniques
-
Coello, C. A. (2000) An updated survey of GA-based multiobjective optimization techniques. ACM Computing Surveys, 32((2)), pp. 109 - 43.
-
(2000)
ACM Computing Surveys
, vol.32
, Issue.2
, pp. 109-143
-
-
Coello, C.A.1
-
8
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng, C.-W. and Liu, L. and Burns, S. A. (1997) Using genetic algorithms to solve construction time-cost trade-off problems. Journal of Computing in Civil Engineering, 11((3)), pp. 184 - 9.
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.-W.1
Liu, L.2
Burns, S.A.3
-
10
-
-
0003926816
-
-
Great Barrington: The North River Press
-
Goldratt, E. M.(1997). In Critical Chain. Great Barrington: The North River Press.
-
(1997)
Critical Chain
-
-
Goldratt, E.M.1
-
11
-
-
0036680235
-
Integration of virtually real construction model and design-for-safety process database
-
Hadikusumo, B. H. W. and Rowlinson, S. (2002) Integration of virtually real construction model and design-for-safety process database. Automation in Construction, 11((5)), pp. 501 - 10.
-
(2002)
Automation in Construction
, vol.11
, Issue.5
, pp. 501-510
-
-
Hadikusumo, B.H.W.1
Rowlinson, S.2
-
12
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. (1999) Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management, 125((3)), pp. 167 - 75.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
14
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu, S.-S. and Yang, C.-H. (1999) GA-based multicriteria optimal model for construction scheduling. Journal of Construction Engineering and Management, 125((6)), pp. 420 - 7.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
15
-
-
0032638332
-
Using machine learning and GA to solve time-cost trade-off problems
-
Li, H. and Cao, J.-N. and Love, P. E. D. (1999) Using machine learning and GA to solve time-cost trade-off problems. Journal of Construction Engineering and Management, 125((5)), pp. 347 - 53.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.-N.2
Love, P.E.D.3
-
16
-
-
0032165225
-
Generating, evaluating and visualizing construction schedule with CAD tools
-
McKinney, K. and Fischer, M. (1998) Generating, evaluating and visualizing construction schedule with CAD tools. Automation in Construction, 7((6)), pp. 433 - 47.
-
(1998)
Automation in Construction
, vol.7
, Issue.6
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
18
-
-
13944256583
-
Incorporating practicability into genetic algorithm-based time-cost optimization
-
Que, B. C. (2002) Incorporating practicability into genetic algorithm-based time-cost optimization. Journal of Construction Engineering and Management, 128((2)), pp. 139 - 43.
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.2
, pp. 139-143
-
-
Que, B.C.1
-
19
-
-
0033886896
-
Object-oriented resource-based planning method (ORPM) for construction
-
Shi, J. J. and Deng, Z. (2000) Object-oriented resource-based planning method (ORPM) for construction. International Journal of Project Management, 18((3)), pp. 179 - 88.
-
(2000)
International Journal of Project Management
, vol.18
, Issue.3
, pp. 179-188
-
-
Shi, J.J.1
Deng, Z.2
-
20
-
-
0000852513
-
Multi-objective optimization using non-dominated sorting in genetic algorithms
-
Srinivas, N. and Deb, K. (1995) Multi-objective optimization using non-dominated sorting in genetic algorithms. Evolutionary Computation, 2((3)), pp. 221 - 48.
-
(1995)
Evolutionary Computation
, vol.2
, Issue.3
, pp. 221-248
-
-
Srinivas, N.1
Deb, K.2
-
21
-
-
32844461978
-
An integrated decision support system for multi-constraint planning and control in construction
-
University of Teesside PhD thesis
-
Sriprasert, E.(2004). In. University of Teesside. An integrated decision support system for multi-constraint planning and control in construction, PhD thesis
-
(2004)
-
-
Sriprasert, E.1
-
22
-
-
2942750055
-
Multi-constraint information management and visualization for collaborative planning and control in construction
-
(Special Issue eWork and eBusiness) available online
-
Sriprasert E, Dawood N. 2003. Multi-constraint information management and visualization for collaborative planning and control in construction. Electronic Journal of Information Technology in Construction (ITcon). 8. (Special Issue eWork and eBusiness). 341-66. available online: http://www.itcon.org/2003/25
-
(2003)
Electronic Journal of Information Technology in Construction (ITcon)
, vol.8
, pp. 341-366
-
-
Sriprasert, E.1
Dawood, N.2
|