1
-
-
0036028136
-
Site pre-cast yard layout arrangement through genetic algorithms
-
" 0926-5805, (),. 10.1016/S0926-5805(01)00044-9
-
Cheung, S. O., Tong, T. K. L., and Tam, C. M. (2002). " Site pre-cast yard layout arrangement through genetic algorithms.." Autom. Constr. 0926-5805, 11 (1), 35-46. 10.1016/S0926-5805(01)00044-9
-
(2002)
Autom. Constr.
, vol.11
, Issue.1
, pp. 35-46
-
-
Cheung, S.O.1
Tong, T.K.L.2
Tam, C.M.3
-
2
-
-
0003177289
-
Location and layout planning
-
10.1007/BF01545586 0171-6468
-
Domschke, W., and Krispin, G. (1997). " Location and layout planning.." OR-Spectrum, 19 (3), 181-194. 10.1007/BF01545586 0171-6468
-
(1997)
OR-Spectrum
, vol.19
, Issue.3
, pp. 181-194
-
-
Domschke, W.1
Krispin, G.2
-
3
-
-
1842611240
-
-
MIT Press, Cambridge, Mass.
-
Dorigo, M., and Stützle, T. (2004). Ant colony optimization, MIT Press, Cambridge, Mass.
-
(2004)
Ant Colony Optimization
-
-
Dorigo, M.1
Stützle, T.2
-
4
-
-
0035052778
-
A hybrid AI-based system for site layout planning in construction
-
1093-9687, (),. 10.1111/0885-9507.00215
-
Elbeltagi, E. and Hegazy, T (2001). " A hybrid AI-based system for site layout planning in construction.." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 16 (2), 79-93. 10.1111/0885-9507.00215
-
(2001)
Comput. Aided Civ. Infrastruct. Eng.
, vol.16
, Issue.2
, pp. 79-93
-
-
Elbeltagi, E.1
Hegazy, T.2
-
7
-
-
0032591536
-
On the implementation of fuzzy arithmetical operations for engineering problems
-
Institute of Electrical and Electronics Engineers, New York.
-
Hanss, M. (1999). " On the implementation of fuzzy arithmetical operations for engineering problems.." Proc., 18th Int. Conf. of the North American Fuzzy Information Processing Society NAFIPS '99, Institute of Electrical and Electronics Engineers, New York, 462-466.
-
(1999)
Proc., 18th Int. Conf. of the North American Fuzzy Information Processing Society NAFIPS '99
, pp. 462-466
-
-
Hanss, M.1
-
8
-
-
0033156961
-
EvoSite: Evolution-based model for site layout planning
-
DOI 10.1061/(ASCE)0887-3801(1999)13:3(198)
-
Hegazy, T., and Elbeltagi, E. (1999). " EVOSITE: Evolution-based model for site layout planning.." J. Comput. Civ. Eng. 0887-3801, 13 (3), 198-206. 10.1061/(ASCE)0887-3801(1999)13:3(198) (Pubitemid 30894034)
-
(1999)
Journal of Computing in Civil Engineering
, vol.13
, Issue.3
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
9
-
-
34248344222
-
The application of the ant colony optimization algorithm to the construction site layout planning problem
-
DOI 10.1080/01446190600972870, PII 778091851
-
Lam, K. C., Ning, X., and Ng, S. T. (2007). " Application of the ant colony optimization algorithm to the construction site layout planning problem.." Construct. Manag. Econ., 25 (4), 359-374. 10.1080/ 01446190600972870 0144-6193 (Pubitemid 46730776)
-
(2007)
Construction Management and Economics
, vol.25
, Issue.4
, pp. 359-374
-
-
Lam, K.-C.1
Ning, X.2
Ng, T.3
-
10
-
-
25844517320
-
Using the principal component analysis method as a tool in contractor pre-qualification
-
DOI 10.1080/01446190500041263
-
Lam, K. C., Tang, C. M., and Lee, W. C. (2005). " Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects.." Construct. Manag. Econ., 23 (2), 127-145. 10.1080/01446190500041263 0144-6193 (Pubitemid 41388507)
-
(2005)
Construction Management and Economics
, vol.23
, Issue.7
, pp. 673-684
-
-
Lam, K.C.1
Hu, T.S.2
Ng, S.T.3
-
11
-
-
0032187321
-
Site-lever facilities layout using genetic algorithms
-
0887-3801, (),. 10.1061/(ASCE)0887-3801(1998)12:4(227)
-
Li, H., and Love, P. E. D. (1998). " Site-lever facilities layout using genetic algorithms.." J. Comput. Civ. Eng. 0887-3801, 12 (4), 227-231. 10.1061/(ASCE)0887-3801(1998)12:4(227)
-
(1998)
J. Comput. Civ. Eng.
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.E.D.2
-
12
-
-
0033880829
-
Genetic search for solving construction site-level unequal-area facility layout problems
-
DOI 10.1016/S0926-5805(99)00006-0
-
Li, H., and Love, P. E. D. (2000). " Genetic search for solving construction site-level unequal-area facility layout problems.." Autom. Constr. 0926-5805, 9 (2), 217-226. 10.1016/S0926-5805(99)00006-0 (Pubitemid 30541681)
-
(2000)
Automation in construction
, vol.9
, Issue.2
, pp. 217-226
-
-
Li, H.1
Love, P.E.D.2
-
13
-
-
0004068012
-
-
4th Ed., Addison-Wesley, Reading, Mass.
-
Luger, G. F. (2002). Artificial intelligence, structures and strategies for complex problem solving, 4th Ed., Addison-Wesley, Reading, Mass.
-
(2002)
Artificial Intelligence, Structures and Strategies for Complex Problem Solving
-
-
Luger, G.F.1
-
14
-
-
13244275240
-
Application of 4D for dynamic site layout and management of construction projects
-
DOI 10.1016/j.autcon.2004.08.011, PII S0926580504001104, International Conference for Construction Information Technology
-
Ma, A. Y., Shen, Q. P., and Zhang, J. P. (2005). " Application of 4D for dynamic site layout and management of construction projects.." Autom. Constr. 0926-5805, 14 (3), 369-381. 10.1016/j.autcon.2004.08.011 (Pubitemid 40183428)
-
(2005)
Automation in Construction
, vol.14
, Issue.3
, pp. 369-381
-
-
Ma, Z.1
Shen, Q.2
Zhang, J.3
-
15
-
-
0033893262
-
Constrained optimization of test intervals using a steady-state genetic algorithm
-
DOI 10.1016/S0951-8320(99)00074-5
-
Martorell, S., Carlos, S., Sanchez, A., and Serradell, V. (2000). " Constrained optimization of test intervals using a steady-state genetic algorithm.." Reliab. Eng. Syst. Saf. 0951-8320, 67 (3), 215-232. 10.1016/S0951-8320(99)00074-5 (Pubitemid 30555821)
-
(2000)
Reliability Engineering and System Safety
, vol.67
, Issue.3
, pp. 215-232
-
-
Martorell, S.1
Carlos, S.2
Sanchez, A.3
Serradell, V.4
-
16
-
-
4344695708
-
Genetic algorithms for construction site layout in project planning
-
DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
-
Mawdesley, M. J., Al-jibouri, S. H., and Yang, H. B. (2002). " Genetic algorithms for construction site layout in project planning.." J. Constr. Eng. Manage. 0733-9364, 128 (5), 418-426. 10.1061/(ASCE)0733-9364(2002) 128:5(418) (Pubitemid 40265526)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.5
, pp. 418-426
-
-
Mawdesley, M.J.1
Al-jibouri, S.H.2
Yang, H.3
-
17
-
-
0141990673
-
A hybrid CAD-based construction site layout planning system using genetic algorithms
-
" 0926-5805, (),. 10.1016/S0926-5805(03)00058-X
-
Osman, H. M., Georgy, M. E., and Ibrahim, M. E. (2003). " A hybrid CAD-based construction site layout planning system using genetic algorithms.." Autom. Constr. 0926-5805, 12 (6), 749-764. 10.1016/S0926-5805(03)00058-X
-
(2003)
Autom. Constr.
, vol.12
, Issue.6
, pp. 749-764
-
-
Osman, H.M.1
Georgy, M.E.2
Ibrahim, M.E.3
-
18
-
-
4344704102
-
A CAD-based model for site planning
-
" 0926-5805, (),. 10.1016/j.autcon.2004.02.004
-
Sadeghpour, F., Moselhi, O., and Alkass, S. (2004). " A CAD-based model for site planning.." Autom. Constr. 0926-5805, 13 (6), 701-715. 10.1016/j.autcon.2004.02.004
-
(2004)
Autom. Constr.
, vol.13
, Issue.6
, pp. 701-715
-
-
Sadeghpour, F.1
Moselhi, O.2
Alkass, S.3
-
19
-
-
84878356631
-
Site layout of temporary construction facilities using ant colony optimization
-
", ASCE Los Angeles Section, Los Angeles.
-
Samdani, S. A., Bhakal, L., and Singh, A. K. (2006). " Site layout of temporary construction facilities using ant colony optimization.." Proc., 4th Int. Engineering and Construction Conf., ASCE Los Angeles Section, Los Angeles.
-
(2006)
Proc., 4th Int. Engineering and Construction Conf.
-
-
Samdani, S.A.1
Bhakal, L.2
Singh, A.K.3
-
20
-
-
70349350777
-
-
Ant colony optimization-An introduction, 〈〉 (Apr. 20, 2005).
-
Stützle, T. (2005). Ant colony optimization-An introduction, 〈 http://www.theorie.physik.uni-goettingen.de/~hartmann/nwgruppe/talks/stuetzle. pdf 〉 (Apr. 20, 2005).
-
(2005)
-
-
Stützle, T.1
-
21
-
-
0030707239
-
The max-min ant system and local search for the traveling salesman problem
-
Institute of Electrical and Electronics Engineers, Indianapolis.
-
Stützle, T., and Hoos, H. H. (1997). " The max-min ant system and local search for the traveling salesman problem.." Proc., 1997 IEEE Int. Conf. on Evolutionary Computation (ICEC '97), Institute of Electrical and Electronics Engineers, Indianapolis, 309-314.
-
(1997)
Proc., 1997 IEEE Int. Conf. on Evolutionary Computation (ICEC '97)
, pp. 309-314
-
-
Stützle, T.1
Hoos, H.H.2
-
22
-
-
0006127472
-
Improvements on the ant system: Introducing the max-min ant system
-
Springer, Wien, Austria, - 249.
-
Stützle, T., and Hoos, H. H. (1998). " Improvements on the ant system: Introducing the max-min ant system.." Proc., Int. Conf. on Artificial Neural Networks and Genetic Algorithms, Springer, Wien, Austria, 245-249.
-
(1998)
Proc., Int. Conf. on Artificial Neural Networks and Genetic Algorithms
, pp. 245
-
-
Stützle, T.1
Hoos, H.H.2
-
23
-
-
2342435265
-
Site layout planning using nonstructural fuzzy decision support system
-
DOI 10.1061/(ASCE)0733-9364(2002)128:3(220)
-
Tam, C. M., Tong, K. L., Leung, W. T., and Chiu, W. C. (2002). " Site layout planning using nonstructural fuzzy decision support system.." J. Constr. Eng. Manage. 0733-9364, 128 (3), 220-231. 10.1061/(ASCE)0733- 9364(2002)128:3(220) (Pubitemid 40265547)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.3
, pp. 220-231
-
-
Tam, C.M.1
Tong, T.K.L.2
Leung, A.W.T.3
Chiu, G.W.C.4
-
24
-
-
0027334721
-
The effect of initial population in genetic search for time constrained traveling salesman problems
-
Association for Computer Machine, New York.
-
Yang, C. H., and Nygard, K. E. (1993). " The effect of initial population in genetic search for time constrained traveling salesman problems.." Proc., 1993 ACM Conf. on Computer Science, Association for Computer Machine, New York, 378-383.
-
(1993)
Proc., 1993 ACM Conf. on Computer Science
, pp. 378-383
-
-
Yang, C.H.1
Nygard, K.E.2
-
25
-
-
0029344681
-
Construction-site layout using annealed neural network
-
0887-3801, (),. 10.1061/(ASCE)0887-3801(1995)9:3(201)
-
Yeh, I. C. (1995). " Construction-site layout using annealed neural network.." J. Comput. Civ. Eng. 0887-3801, 9 (3), 201-208. 10.1061/(ASCE)0887-3801(1995)9:3(201)
-
(1995)
J. Comput. Civ. Eng.
, vol.9
, Issue.3
, pp. 201-208
-
-
Yeh, I.C.1
-
26
-
-
34248666540
-
Fuzzy sets
-
10.1016/S0019-9958(65)90241-X
-
Zadeh, L. A. (1965). " Fuzzy sets.." Infect. Control, 8 (3), 338-353. 10.1016/S0019-9958(65)90241-X
-
(1965)
Infect. Control
, vol.8
, Issue.3
, pp. 338-353
-
-
Zadeh, L.A.1
-
27
-
-
0036680436
-
Hybrid intelligence utilization for construction site layout
-
DOI 10.1016/S0926-5805(01)00071-1, PII S0926580501000711
-
Zhang, J. P., Liu, L. H., and Coble, R. J. (2002). " Hybrid intelligence utilization for construction site layout.." Autom. Constr. 0926-5805, 11 (5), 511-519. 10.1016/S0926-5805(01)00071-1 (Pubitemid 34649086)
-
(2002)
Automation in Construction
, vol.11
, Issue.5
, pp. 511-519
-
-
Zhang, J.P.1
Liu, L.H.2
Coble, R.J.3
-
28
-
-
2342444431
-
Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
-
DOI 10.1061/(ASCE)0887-3801(2002)16:2(143)
-
Zouein, P. P., Harmanani, H., and Hajar, A. (2002). " Genetic algorithm for solving site layout problem with unequal-size and constrained facilities.." J. Comput. Civ. Eng. 0887-3801, 16 (2), 143-151. 10.1061/(ASCE)0887-3801(2002)16:2(143) (Pubitemid 40475289)
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 143-151
-
-
Zouein, P.P.1
Harmanani, H.2
Hajar, A.3
|