메뉴 건너뛰기




Volumn 135, Issue 10, 2009, Pages 1049-1057

Conjoining MMAS to ga to solve construction site layout planning problem

Author keywords

Algorithms; Construction management; Construction sites; Optimization

Indexed keywords

COMPUTATIONAL CAPABILITY; CONSTRUCTION COSTS; CONSTRUCTION MANAGEMENT; CONSTRUCTION SITES; GA ALGORITHM; INITIAL POPULATION; MAX-MIN ANT SYSTEM; OBJECTIVE FUNCTIONS; OPTIMAL CONSTRUCTION; OPTIMAL SOLUTIONS; PROJECT MANAGERS; SITE LAYOUT; SOLUTION QUALITY; TRANSPORTATION FLOW;

EID: 70349334592     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:10(1049)     Document Type: Article
Times cited : (38)

References (28)
  • 1
    • 0036028136 scopus 로고    scopus 로고
    • Site pre-cast yard layout arrangement through genetic algorithms
    • " 0926-5805, (),. 10.1016/S0926-5805(01)00044-9
    • Cheung, S. O., Tong, T. K. L., and Tam, C. M. (2002). " Site pre-cast yard layout arrangement through genetic algorithms.." Autom. Constr. 0926-5805, 11 (1), 35-46. 10.1016/S0926-5805(01)00044-9
    • (2002) Autom. Constr. , vol.11 , Issue.1 , pp. 35-46
    • Cheung, S.O.1    Tong, T.K.L.2    Tam, C.M.3
  • 2
    • 0003177289 scopus 로고    scopus 로고
    • Location and layout planning
    • 10.1007/BF01545586 0171-6468
    • Domschke, W., and Krispin, G. (1997). " Location and layout planning.." OR-Spectrum, 19 (3), 181-194. 10.1007/BF01545586 0171-6468
    • (1997) OR-Spectrum , vol.19 , Issue.3 , pp. 181-194
    • Domschke, W.1    Krispin, G.2
  • 4
    • 0035052778 scopus 로고    scopus 로고
    • A hybrid AI-based system for site layout planning in construction
    • 1093-9687, (),. 10.1111/0885-9507.00215
    • Elbeltagi, E. and Hegazy, T (2001). " A hybrid AI-based system for site layout planning in construction.." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 16 (2), 79-93. 10.1111/0885-9507.00215
    • (2001) Comput. Aided Civ. Infrastruct. Eng. , vol.16 , Issue.2 , pp. 79-93
    • Elbeltagi, E.1    Hegazy, T.2
  • 7
    • 0032591536 scopus 로고    scopus 로고
    • On the implementation of fuzzy arithmetical operations for engineering problems
    • Institute of Electrical and Electronics Engineers, New York.
    • Hanss, M. (1999). " On the implementation of fuzzy arithmetical operations for engineering problems.." Proc., 18th Int. Conf. of the North American Fuzzy Information Processing Society NAFIPS '99, Institute of Electrical and Electronics Engineers, New York, 462-466.
    • (1999) Proc., 18th Int. Conf. of the North American Fuzzy Information Processing Society NAFIPS '99 , pp. 462-466
    • Hanss, M.1
  • 8
    • 0033156961 scopus 로고    scopus 로고
    • EvoSite: Evolution-based model for site layout planning
    • DOI 10.1061/(ASCE)0887-3801(1999)13:3(198)
    • Hegazy, T., and Elbeltagi, E. (1999). " EVOSITE: Evolution-based model for site layout planning.." J. Comput. Civ. Eng. 0887-3801, 13 (3), 198-206. 10.1061/(ASCE)0887-3801(1999)13:3(198) (Pubitemid 30894034)
    • (1999) Journal of Computing in Civil Engineering , vol.13 , Issue.3 , pp. 198-206
    • Hegazy, T.1    Elbeltagi, E.2
  • 9
    • 34248344222 scopus 로고    scopus 로고
    • The application of the ant colony optimization algorithm to the construction site layout planning problem
    • DOI 10.1080/01446190600972870, PII 778091851
    • Lam, K. C., Ning, X., and Ng, S. T. (2007). " Application of the ant colony optimization algorithm to the construction site layout planning problem.." Construct. Manag. Econ., 25 (4), 359-374. 10.1080/ 01446190600972870 0144-6193 (Pubitemid 46730776)
    • (2007) Construction Management and Economics , vol.25 , Issue.4 , pp. 359-374
    • Lam, K.-C.1    Ning, X.2    Ng, T.3
  • 10
    • 25844517320 scopus 로고    scopus 로고
    • Using the principal component analysis method as a tool in contractor pre-qualification
    • DOI 10.1080/01446190500041263
    • Lam, K. C., Tang, C. M., and Lee, W. C. (2005). " Application of the entropy technique and genetic algorithms to construction site layout planning of medium-size projects.." Construct. Manag. Econ., 23 (2), 127-145. 10.1080/01446190500041263 0144-6193 (Pubitemid 41388507)
    • (2005) Construction Management and Economics , vol.23 , Issue.7 , pp. 673-684
    • Lam, K.C.1    Hu, T.S.2    Ng, S.T.3
  • 11
    • 0032187321 scopus 로고    scopus 로고
    • Site-lever facilities layout using genetic algorithms
    • 0887-3801, (),. 10.1061/(ASCE)0887-3801(1998)12:4(227)
    • Li, H., and Love, P. E. D. (1998). " Site-lever facilities layout using genetic algorithms.." J. Comput. Civ. Eng. 0887-3801, 12 (4), 227-231. 10.1061/(ASCE)0887-3801(1998)12:4(227)
    • (1998) J. Comput. Civ. Eng. , vol.12 , Issue.4 , pp. 227-231
    • Li, H.1    Love, P.E.D.2
  • 12
    • 0033880829 scopus 로고    scopus 로고
    • Genetic search for solving construction site-level unequal-area facility layout problems
    • DOI 10.1016/S0926-5805(99)00006-0
    • Li, H., and Love, P. E. D. (2000). " Genetic search for solving construction site-level unequal-area facility layout problems.." Autom. Constr. 0926-5805, 9 (2), 217-226. 10.1016/S0926-5805(99)00006-0 (Pubitemid 30541681)
    • (2000) Automation in construction , vol.9 , Issue.2 , pp. 217-226
    • Li, H.1    Love, P.E.D.2
  • 14
    • 13244275240 scopus 로고    scopus 로고
    • Application of 4D for dynamic site layout and management of construction projects
    • DOI 10.1016/j.autcon.2004.08.011, PII S0926580504001104, International Conference for Construction Information Technology
    • Ma, A. Y., Shen, Q. P., and Zhang, J. P. (2005). " Application of 4D for dynamic site layout and management of construction projects.." Autom. Constr. 0926-5805, 14 (3), 369-381. 10.1016/j.autcon.2004.08.011 (Pubitemid 40183428)
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 369-381
    • Ma, Z.1    Shen, Q.2    Zhang, J.3
  • 15
    • 0033893262 scopus 로고    scopus 로고
    • Constrained optimization of test intervals using a steady-state genetic algorithm
    • DOI 10.1016/S0951-8320(99)00074-5
    • Martorell, S., Carlos, S., Sanchez, A., and Serradell, V. (2000). " Constrained optimization of test intervals using a steady-state genetic algorithm.." Reliab. Eng. Syst. Saf. 0951-8320, 67 (3), 215-232. 10.1016/S0951-8320(99)00074-5 (Pubitemid 30555821)
    • (2000) Reliability Engineering and System Safety , vol.67 , Issue.3 , pp. 215-232
    • Martorell, S.1    Carlos, S.2    Sanchez, A.3    Serradell, V.4
  • 16
    • 4344695708 scopus 로고    scopus 로고
    • Genetic algorithms for construction site layout in project planning
    • DOI 10.1061/(ASCE)0733-9364(2002)128:5(418)
    • Mawdesley, M. J., Al-jibouri, S. H., and Yang, H. B. (2002). " Genetic algorithms for construction site layout in project planning.." J. Constr. Eng. Manage. 0733-9364, 128 (5), 418-426. 10.1061/(ASCE)0733-9364(2002) 128:5(418) (Pubitemid 40265526)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.5 , pp. 418-426
    • Mawdesley, M.J.1    Al-jibouri, S.H.2    Yang, H.3
  • 17
    • 0141990673 scopus 로고    scopus 로고
    • A hybrid CAD-based construction site layout planning system using genetic algorithms
    • " 0926-5805, (),. 10.1016/S0926-5805(03)00058-X
    • Osman, H. M., Georgy, M. E., and Ibrahim, M. E. (2003). " A hybrid CAD-based construction site layout planning system using genetic algorithms.." Autom. Constr. 0926-5805, 12 (6), 749-764. 10.1016/S0926-5805(03)00058-X
    • (2003) Autom. Constr. , vol.12 , Issue.6 , pp. 749-764
    • Osman, H.M.1    Georgy, M.E.2    Ibrahim, M.E.3
  • 18
    • 4344704102 scopus 로고    scopus 로고
    • A CAD-based model for site planning
    • " 0926-5805, (),. 10.1016/j.autcon.2004.02.004
    • Sadeghpour, F., Moselhi, O., and Alkass, S. (2004). " A CAD-based model for site planning.." Autom. Constr. 0926-5805, 13 (6), 701-715. 10.1016/j.autcon.2004.02.004
    • (2004) Autom. Constr. , vol.13 , Issue.6 , pp. 701-715
    • Sadeghpour, F.1    Moselhi, O.2    Alkass, S.3
  • 19
    • 84878356631 scopus 로고    scopus 로고
    • Site layout of temporary construction facilities using ant colony optimization
    • ", ASCE Los Angeles Section, Los Angeles.
    • Samdani, S. A., Bhakal, L., and Singh, A. K. (2006). " Site layout of temporary construction facilities using ant colony optimization.." Proc., 4th Int. Engineering and Construction Conf., ASCE Los Angeles Section, Los Angeles.
    • (2006) Proc., 4th Int. Engineering and Construction Conf.
    • Samdani, S.A.1    Bhakal, L.2    Singh, A.K.3
  • 20
    • 70349350777 scopus 로고    scopus 로고
    • Ant colony optimization-An introduction, 〈〉 (Apr. 20, 2005).
    • Stützle, T. (2005). Ant colony optimization-An introduction, 〈 http://www.theorie.physik.uni-goettingen.de/~hartmann/nwgruppe/talks/stuetzle. pdf 〉 (Apr. 20, 2005).
    • (2005)
    • Stützle, T.1
  • 21
    • 0030707239 scopus 로고    scopus 로고
    • The max-min ant system and local search for the traveling salesman problem
    • Institute of Electrical and Electronics Engineers, Indianapolis.
    • Stützle, T., and Hoos, H. H. (1997). " The max-min ant system and local search for the traveling salesman problem.." Proc., 1997 IEEE Int. Conf. on Evolutionary Computation (ICEC '97), Institute of Electrical and Electronics Engineers, Indianapolis, 309-314.
    • (1997) Proc., 1997 IEEE Int. Conf. on Evolutionary Computation (ICEC '97) , pp. 309-314
    • Stützle, T.1    Hoos, H.H.2
  • 23
    • 2342435265 scopus 로고    scopus 로고
    • Site layout planning using nonstructural fuzzy decision support system
    • DOI 10.1061/(ASCE)0733-9364(2002)128:3(220)
    • Tam, C. M., Tong, K. L., Leung, W. T., and Chiu, W. C. (2002). " Site layout planning using nonstructural fuzzy decision support system.." J. Constr. Eng. Manage. 0733-9364, 128 (3), 220-231. 10.1061/(ASCE)0733- 9364(2002)128:3(220) (Pubitemid 40265547)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.3 , pp. 220-231
    • Tam, C.M.1    Tong, T.K.L.2    Leung, A.W.T.3    Chiu, G.W.C.4
  • 24
    • 0027334721 scopus 로고
    • The effect of initial population in genetic search for time constrained traveling salesman problems
    • Association for Computer Machine, New York.
    • Yang, C. H., and Nygard, K. E. (1993). " The effect of initial population in genetic search for time constrained traveling salesman problems.." Proc., 1993 ACM Conf. on Computer Science, Association for Computer Machine, New York, 378-383.
    • (1993) Proc., 1993 ACM Conf. on Computer Science , pp. 378-383
    • Yang, C.H.1    Nygard, K.E.2
  • 25
    • 0029344681 scopus 로고
    • Construction-site layout using annealed neural network
    • 0887-3801, (),. 10.1061/(ASCE)0887-3801(1995)9:3(201)
    • Yeh, I. C. (1995). " Construction-site layout using annealed neural network.." J. Comput. Civ. Eng. 0887-3801, 9 (3), 201-208. 10.1061/(ASCE)0887-3801(1995)9:3(201)
    • (1995) J. Comput. Civ. Eng. , vol.9 , Issue.3 , pp. 201-208
    • Yeh, I.C.1
  • 26
    • 34248666540 scopus 로고
    • Fuzzy sets
    • 10.1016/S0019-9958(65)90241-X
    • Zadeh, L. A. (1965). " Fuzzy sets.." Infect. Control, 8 (3), 338-353. 10.1016/S0019-9958(65)90241-X
    • (1965) Infect. Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1
  • 27
    • 0036680436 scopus 로고    scopus 로고
    • Hybrid intelligence utilization for construction site layout
    • DOI 10.1016/S0926-5805(01)00071-1, PII S0926580501000711
    • Zhang, J. P., Liu, L. H., and Coble, R. J. (2002). " Hybrid intelligence utilization for construction site layout.." Autom. Constr. 0926-5805, 11 (5), 511-519. 10.1016/S0926-5805(01)00071-1 (Pubitemid 34649086)
    • (2002) Automation in Construction , vol.11 , Issue.5 , pp. 511-519
    • Zhang, J.P.1    Liu, L.H.2    Coble, R.J.3
  • 28
    • 2342444431 scopus 로고    scopus 로고
    • Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
    • DOI 10.1061/(ASCE)0887-3801(2002)16:2(143)
    • Zouein, P. P., Harmanani, H., and Hajar, A. (2002). " Genetic algorithm for solving site layout problem with unequal-size and constrained facilities.." J. Comput. Civ. Eng. 0887-3801, 16 (2), 143-151. 10.1061/(ASCE)0887-3801(2002)16:2(143) (Pubitemid 40475289)
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.2 , pp. 143-151
    • Zouein, P.P.1    Harmanani, H.2    Hajar, A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.