Volumn 125, Issue 6, 1999, Pages 420-427

GA-based multicriteria optimal model for construction scheduling

Author keywords

[No Author keywords available]

Indexed keywords

COST EFFECTIVENESS; DECISION MAKING; GENETIC ALGORITHMS; MATHEMATICAL MODELS; OPTIMIZATION; RESOURCE ALLOCATION; SCHEDULING;

EID: 0033312040     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:6(420)     Document Type: Article
Times cited : (208)

References (23)
  • 1
    • 0040687741 scopus 로고
    • Dynamic programming for project cost-time curve
    • ASCE
    • Butcher, W. S. (1967). "Dynamic programming for project cost-time curve." J. Constr. Div., ASCE, 93(1), 59-73.
    • (1967) J. Constr. Div. , vol.93 , Issue.1 , pp. 59-73
    • Butcher, W.S.1
  • 2
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • ASCE
    • Chan, W. T., Chua, D. K. H., and Kannan, G. (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Engrg. and Mgmt., ASCE, 122(2), 125-132.
    • (1996) J. Constr. Engrg. and Mgmt. , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.T.1    Chua, D.K.H.2    Kannan, G.3
  • 3
    • 0004374576 scopus 로고    scopus 로고
    • A time-cost trade-off model with resource consideration using genetic algorithm
    • Chua, D. K. H., Chan, W. T., and Govindan, K. (1997). "A time-cost trade-off model with resource consideration using genetic algorithm." Civ. Engrg. Syst., 14, 291-311.
    • (1997) Civ. Engrg. Syst. , vol.14 , pp. 291-311
    • Chua, D.K.H.1    Chan, W.T.2    Govindan, K.3
  • 4
    • 0015725454 scopus 로고
    • Project scheduling under resource constraints -historical review and categorization of procedures
    • Davis, E. W. (1973). "Project scheduling under resource constraints -historical review and categorization of procedures." AIIE Trans., 5(4), 297-312.
    • (1973) AIIE Trans. , vol.5 , Issue.4 , pp. 297-312
    • Davis, E.W.1
  • 6
    • 0001195356 scopus 로고
    • Resource leveling in construction by optimization
    • ASCE
    • Easa, S. M. (1989). "Resource leveling in construction by optimization." J. Constr. Engrg. and Mgmt., ASCE, 115(2), 302-316.
    • (1989) J. Constr. Engrg. and Mgmt. , vol.115 , Issue.2 , pp. 302-316
    • Easa, S.M.1
  • 7
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost tradeoff problems
    • ASCE
    • Feng, C. W., Liu, L., and Burns, S. A. (1997). "Using genetic algorithms to solve construction time-cost tradeoff problems." J. Constr. Engrg. and Mgmt., ASCE, 11(3), 184-189.
    • (1997) J. Constr. Engrg. and Mgmt. , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.W.1    Liu, L.2    Burns, S.A.3
  • 13
    • 0039502581 scopus 로고
    • Critical path planning and scheduling: Mathematical basis
    • Kelly, J. E. (1961). "Critical path planning and scheduling: Mathematical basis." Operations Res., 9(3), 167-179.
    • (1961) Operations Res. , vol.9 , Issue.3 , pp. 167-179
    • Kelly, J.E.1
  • 14
    • 0038909956 scopus 로고
    • Extending CPM for multiform project time-cost curves
    • ASCE
    • Meyer, W. L., and Shaffer, L. R. (1965). "Extending CPM for multiform project time-cost curves." J. Constr. Div., ASCE, 91(1), 45-67.
    • (1965) J. Constr. Div. , vol.91 , Issue.1 , pp. 45-67
    • Meyer, W.L.1    Shaffer, L.R.2
  • 16
    • 0024167217 scopus 로고
    • A study of combining heuristics for scheduling projects with limited multiple resources
    • Morse, L., and Whitehouse, G. (1988). "A study of combining heuristics for scheduling projects with limited multiple resources." Comp. and Industrial Engrg., 15(4), 153-161.
    • (1988) Comp. and Industrial Engrg. , vol.15 , Issue.4 , pp. 153-161
    • Morse, L.1    Whitehouse, G.2
  • 17
    • 0027545671 scopus 로고
    • Schedule compression using the direct stiffness method
    • Ottawa
    • Moselhi, O. (1993). "Schedule compression using the direct stiffness method." Can. J. Civ. Engrg., Ottawa, 20, 65-72.
    • (1993) Can. J. Civ. Engrg. , vol.20 , pp. 65-72
    • Moselhi, O.1
  • 18
    • 0002470532 scopus 로고
    • A study of permutation crossover operators on the traveling salesman problems
    • Lawrence Erlbaum Associate, Hillsdale, N.J.
    • Oliver, I. M., Smith, D. J., and Holland, J. R. C. (1987). "A study of permutation crossover operators on the traveling salesman problems." Genetic algorithms and their application: Proc., 2nd Int. Conf., Lawrence Erlbaum Associate, Hillsdale, N.J., 227-230.
    • (1987) Genetic Algorithms and their Application: Proc., 2nd Int. Conf. , pp. 227-230
    • Oliver, I.M.1    Smith, D.J.2    Holland, J.R.C.3
  • 19
    • 0017506038 scopus 로고
    • Cost-time model for large CPM project networks
    • ASCE
    • Panagiotakopoulos, D. (1977). "Cost-time model for large CPM project networks." J. Constr. Engrg. and Mgmt., ASCE, 103(2), 201-211.
    • (1977) J. Constr. Engrg. and Mgmt. , vol.103 , Issue.2 , pp. 201-211
    • Panagiotakopoulos, D.1
  • 20
    • 0028368259 scopus 로고
    • Genetic algorithms crossover operators for ordering applications
    • Poon, P. W., and Carter, J. N. (1995). "Genetic algorithms crossover operators for ordering applications." Comp. Ops. Res., 22(1), 135-147.
    • (1995) Comp. Ops. Res. , vol.22 , Issue.1 , pp. 135-147
    • Poon, P.W.1    Carter, J.N.2
  • 21
    • 19244376018 scopus 로고
    • A simple CPM time-cost tradeoff algorithm
    • Siemens, N. (1971). "A simple CPM time-cost tradeoff algorithm." Mgmt. Sci., 17(6), B-354-363.
    • (1971) Mgmt. Sci. , vol.17 , Issue.6
    • Siemens, N.1
  • 22
    • 0020193734 scopus 로고
    • Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case
    • Talbot, F. B. (1982). "Resource-constrained project scheduling with time-resource tradeoffs: The nonpreemptive case." Mgmt. Sci., 28, 1197-1210.
    • (1982) Mgmt. Sci. , vol.28 , pp. 1197-1210
    • Talbot, F.B.1
  • 23
    • 0003147390 scopus 로고    scopus 로고
    • Two heuristics for scheduling multiple projects with resource constraints
    • Tsai, D. M., and Chiu, H. N. (1996). "Two heuristics for scheduling multiple projects with resource constraints." Constr. Mgmt. and Economics, 14, 325-340.
    • (1996) Constr. Mgmt. and Economics , vol.14 , pp. 325-340
    • Tsai, D.M.1    Chiu, H.N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.