Augmented Lagrangian genetic algorithm for structural optimization
-
Adeli, H., and Cheng, N. (1994). "Augmented Lagrangian genetic algorithm for structural optimization." J. Aerosp. Eng., 7(1), 104-118.
-
(1994)
J. Aerosp. Eng.
, vol.7
, Issue.1
, pp. 104-118
-
-
Adeli, H.1
Cheng, N.2
-
2
-
-
0004108326
-
-
CRC Press, Boca Raton, Fla.
-
Adeli, H., and Park, H. S. (1998). Neurocomputing for design automation, CRC Press, Boca Raton, Fla.
-
(1998)
Neurocomputing for Design Automation
-
-
Adeli, H.1
Park, H.S.2
-
3
-
-
0025701919
-
Some efficient multi-heuristic procedures for resource-constrained project scheduling
-
Boctor, F. F. (1990). "Some efficient multi-heuristic procedures for resource-constrained project scheduling." Eur. J. Oper. Res., 9, 3-13.
-
(1990)
Eur. J. Oper. Res.
, vol.9
, pp. 3-13
-
-
Boctor, F.F.1
-
4
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W. T., Chua, D. K. H., and Kannan, G. (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.T.1
Chua, D.K.H.2
Kannan, G.3
-
5
-
-
0343952317
-
Project scheduling with resource constraints: A branch and bound approach
-
Christofides, N., Alvarez-Valdes, R., and Tamarit, J. M. (1987). "Project scheduling with resource constraints: a branch and bound approach," Comput Ind., 12(1), 227-242.
-
(1987)
Comput Ind.
, vol.12
, Issue.1
, pp. 227-242
-
-
Christofides, N.1
Alvarez-Valdes, R.2
Tamarit, J.M.3
-
6
-
-
0031272722
-
New benchmark results for the resource-constrained project scheduling problem
-
Demeulemeester, E., and Herroelen, W. (1997). "New benchmark results for the resource-constrained project scheduling problem." Manage. Sci., 43, 1485-1492.
-
(1997)
Manage. Sci.
, vol.43
, pp. 1485-1492
-
-
Demeulemeester, E.1
Herroelen, W.2
-
7
-
-
0001195356
-
Resource leveling in construction by optimization
-
Easa, S. M. (1989). "Resource leveling in construction by optimization." J. Constr. Eng. Manage., 115(2), 302-316.
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.2
, pp. 302-316
-
-
Easa, S.M.1
-
8
-
-
0003722376
-
-
Addison-Wesley, Reading, Mass
-
Goldberg, D. E. (1989). Genetic algorithms in search, optimization, and machine learning, Addison-Wesley, Reading, Mass.
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
9
-
-
0025444361
-
Packing method for resource leveling (PACK)
-
Harris, R. B. (1990). "Packing method for resource leveling (PACK)." J. Constr. Eng. Manage., 116(2), 331-350.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 331-350
-
-
Harris, R.B.1
-
10
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms." J. Constr. Eng. Manage., 125(3), 167-175.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
11
-
-
0022776097
-
Resource management in construction
-
Karra, F. A., and Nasr, A. Y. (1986). "Resource management in construction." J. Constr. Eng. Manage., 112(3), 346-357.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.3
, pp. 346-357
-
-
Karra, F.A.1
Nasr, A.Y.2
-
12
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
Leu, S. S., and Yang, C. H. (1999). "GA-based multicriteria optimal model for construction scheduling," J. Constr. Eng. Manage., 125(6), 420-427.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.S.1
Yang, C.H.2
-
13
-
-
0033156974
-
Fuzzy optimal model for resource-constrained construction scheduling
-
Leu, S. S., Chen, A. T., and Yang, C. H. (1999). "Fuzzy optimal model for resource-constrained construction scheduling." J. Comput. Civ. Eng., 13(3), 207-216.
-
(1999)
J. Comput. Civ. Eng.
, vol.13
, Issue.3
, pp. 207-216
-
-
Leu, S.S.1
Chen, A.T.2
Yang, C.H.3
-
14
-
-
0030830501
-
Resource-constrained project scheduling with renewable and non-renewable resources and time-resources tradeoffs
-
Nudtasomboon, N., and Randhawa, S. (1996). "Resource-constrained project scheduling with renewable and non-renewable resources and time-resources tradeoffs." Comput. Industr. Eng., 32(1), 227-242.
-
(1996)
Comput. Industr. Eng.
, vol.32
, Issue.1
, pp. 227-242
-
-
Nudtasomboon, N.1
Randhawa, S.2
-
15
-
-
0026171588
-
Resource strategies for dynamic project management
-
Padilla, E., and Carr, R. (1991). "Resource strategies for dynamic project management." J. Constr. Eng. Manage., 117(2), 279-293.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.2
, pp. 279-293
-
-
Padilla, E.1
Carr, R.2
-
16
-
-
0030216667
-
Construction resource leveling using neural networks
-
Savian, D., Alkass, S., and Fazio, P. (1996). "Construction resource leveling using neural networks." Can. J. Civ. Eng., 23, 917-925.
-
(1996)
Can. J. Civ. Eng.
, vol.23
, pp. 917-925
-
-
Savian, D.1
Alkass, S.2
Fazio, P.3
-
17
-
-
0032187584
-
Calculating weight matrix of neural network for resource leveling."
-
Savian, D., Alkass, S., and Fazio, P. (1998). "Calculating weight matrix of neural network for resource leveling." J. Comput. Civ. Eng., 12(4), 241-248.
-
(1998)
J. Comput. Civ. Eng.
, vol.12
, Issue.4
, pp. 241-248
-
-
Savian, D.1
Alkass, S.2
Fazio, P.3
-
18
-
-
0035138778
-
Resource scheduling using neural dynamics model of Adeli and Park
-
Senouci, A. B., and Adeli, H. (2001). "Resource scheduling using neural dynamics model of Adeli and Park." J. Constr. Eng. Manage., 127(1), 28-34.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 28-34
-
-
Senouci, A.B.1
Adeli, H.2
|