1
-
-
0003131416
-
Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem
-
S. Voss, S. Martello, I. Osman, and C. Roucairol, eds., Kluwer, Dordrecht, The Netherlands
-
Baar, T., Brucker, P., and Knust, S. (1999). " Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem.." Meta-heuristics: Advances and trends in local search paradigms for optimization, S. Voss, S. Martello, I. Osman, and, C. Roucairol, eds., Kluwer, Dordrecht, The Netherlands, 1-8.
-
(1999)
Meta-heuristics: Advances and Trends in Local Search Paradigms for Optimization
, pp. 1-8
-
-
Baar, T.1
Brucker, P.2
Knust, S.3
-
2
-
-
0004193076
-
-
Wiley, New York
-
Bedworth, D. D., and Bailey, J. E. (1982). Integrated production control systems-management, analysis, design, Wiley, New York.
-
(1982)
Integrated Production Control Systems-management, Analysis, Design
-
-
Bedworth, D.D.1
Bailey, J.E.2
-
3
-
-
0030216966
-
Resource-constrained project scheduling by simulated annealing
-
0020-7543, 10.1080/00207549608905028
-
Boctor, F. F. (1996). " Resource-constrained project scheduling by simulated annealing.." Int. J. Prod. Res. 0020-7543, 34 (8), 2335-2351. 10.1080/00207549608905028
-
(1996)
Int. J. Prod. Res.
, vol.34
, Issue.8
, pp. 2335-2351
-
-
Boctor, F.F.1
-
4
-
-
0037508562
-
A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version
-
0377-2217,. 10.1016/S0377-2217(02)00761-0
-
Bouleimen, K., and Lecocq, H. (2003). " A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version.." Eur. J. Oper. Res. 0377-2217, 149, 268-281. 10.1016/S0377-2217(02)00761-0
-
(2003)
Eur. J. Oper. Res.
, vol.149
, pp. 268-281
-
-
Bouleimen, K.1
Lecocq, H.2
-
5
-
-
0032096810
-
A branch and bound algorithm for the resource-constrained project scheduling problem
-
0377-2217, 10.1016/S0377-2217(97)00335-4
-
Brucker, P., Knust, S., Schoo, A., and Thiele, O. (1998). " A branch and bound algorithm for the resource-constrained project scheduling problem.." Eur. J. Oper. Res. 0377-2217, 107 (2), 272-288. 10.1016/S0377-2217(97)00335-4
-
(1998)
Eur. J. Oper. Res.
, vol.107
, Issue.2
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
6
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
0733-9364, 10.1061/(ASCE)0733-9364(1996)122:2(125)
-
Chan, W., Chua, D. K. H., and Kannan, G. (1996). " Construction resource scheduling with genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 122 (2), 125-132. 10.1061/(ASCE)0733-9364(1996)122:2(125)
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.1
Chua, D.K.H.2
Kannan, G.3
-
7
-
-
15944391749
-
Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
-
DOI 10.1061/(ASCE)0733-9364(2005)131:4(400)
-
Elazouni, A. M., and Metwally, F. G. (2005). " Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 131 (4), 400-412. 10.1061/(ASCE)0733-9364(2005)131:4(400) (Pubitemid 40430136)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.4
, pp. 400-412
-
-
Elazouni, A.M.1
Metwally, F.G.2
-
8
-
-
0003722376
-
-
Addison-Wesley, Reading, Mass
-
Goldberg, D. E. (1989). Genetic algorithms in search, optimization, and machine learning, Addison-Wesley, Reading, Mass.
-
(1989)
Genetic Algorithms in Search, Optimization, and Machine Learning
-
-
Goldberg, D.E.1
-
9
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
0894-069X,. 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0. CO;2-C
-
Hartmann, S. (1998). " A competitive genetic algorithm for resource-constrained project scheduling.." Naval Res. Logistics Quart. 0894-069X, 45, 733-750. 10.1002/(SICI)1520-6750(199810)45:7<733::AID- NAV5>3.0.CO;2-C
-
(1998)
Naval Res. Logistics Quart.
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
10
-
-
0347077154
-
Project scheduling under limited resources: Models, methods and applications
-
Springer, New York
-
Hartmann, S. (1999). " Project scheduling under limited resources: Models, methods and applications.." Lec. Notes in Eco. and Math. Sys, Springer, New York.
-
(1999)
Lec. Notes in Eco. and Math. Sys
-
-
Hartmann, S.1
-
11
-
-
0034559432
-
Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
-
DOI 10.1016/S0377-2217(99)00485-3
-
Hartmann, S., and Kolisch, R. (2000). " Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem.." Eur. J. Oper. Res. 0377-2217, 127, 394-407. 10.1016/S0377- 2217(99)00485-3 (Pubitemid 30964563)
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 394-407
-
-
Hartmann, S.1
Kolisch, R.2
-
12
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
0733-9364, 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
13
-
-
6344281398
-
Resource optimization using combined simulation and genetic algorithms
-
DOI 10.1061/(ASCE)0733-9364(2003)129:6(698)
-
Hegazy, T., and Kassab, M. (2003). " Resource optimization using combined simulation and genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 129 (6), 698-705. 10.1061/(ASCE)0733-9364(2003)129:6(698) (Pubitemid 40265430)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.6
, pp. 698-705
-
-
Hegazy, T.1
Kassab, M.2
-
14
-
-
33746214781
-
Scheduling construction projects using evolutionary algorithm
-
DOI 10.1061/(ASCE)0733-9364(2006)132:8(861)
-
Jaśkowski, P., and Sobotka, A. (2006). " Scheduling construction projects using evolutionary algorithm.." J. Constr. Eng. Manage. 0733-9364, 132 (8), 861-870. 10.1061/(ASCE)0733-9364(2006)132:8(861) (Pubitemid 44090933)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.8
, pp. 861-870
-
-
Jaskowski, P.1
Sobotka, A.2
-
15
-
-
33646171275
-
Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
-
0733-9364, 10.1061/(ASCE)0733-9364(2006)132:5(491)
-
Kandil, A., and El-Rayes, K. (2006). " Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects.." J. Constr. Eng. Manage. 0733-9364, 132 (5), 491-498. 10.1061/(ASCE)0733- 9364(2006)132:5(491)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.5
, pp. 491-498
-
-
Kandil, A.1
El-Rayes, K.2
-
16
-
-
0002866635
-
The critical-path method: Resources planning and scheduling
-
J. F. Muth and G. L. Thompson, eds., Prentice-Hall, Englewood Cliffs, N.J
-
Kelley, J. E., Jr. (1963). " The critical-path method: Resources planning and scheduling.." Industrial scheduling, J. F. Muth, and, G. L. Thompson, eds., Prentice-Hall, Englewood Cliffs, N.J., 347-365.
-
(1963)
Industrial Scheduling
, pp. 347-365
-
-
Kelley Jr., J.E.1
-
18
-
-
0043140243
-
Experiences with fine-grained parallel genetic algorithms
-
0254-5330, 10.1023/A:1018912715283
-
Kohlmorgen, U., Schmeck, H., and Haase, K. (1999). " Experiences with fine-grained parallel genetic algorithms.." Ann. Operat. Res. 0254-5330, 90, 203-219. 10.1023/A:1018912715283
-
(1999)
Ann. Operat. Res.
, vol.90
, pp. 203-219
-
-
Kohlmorgen, U.1
Schmeck, H.2
Haase, K.3
-
19
-
-
0030121479
-
Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
-
0377-2217,. 10.1016/0377-2217(95)00357-6
-
Kolisch, R. (1996). " Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation.." Eur. J. Oper. Res. 0377-2217, 90, 320-333. 10.1016/0377-2217(95)00357-6
-
(1996)
Eur. J. Oper. Res.
, vol.90
, pp. 320-333
-
-
Kolisch, R.1
-
20
-
-
0030788844
-
PSPLIB-A project scheduling problem library
-
0377-2217,. 10.1016/S0377-2217(96)00170-1
-
Kolisch, R., and Sprecher, A. (1996). " PSPLIB-A project scheduling problem library.." Eur. J. Oper. Res. 0377-2217, 96, 205-216. 10.1016/S0377-2217(96)00170-1
-
(1996)
Eur. J. Oper. Res.
, vol.96
, pp. 205-216
-
-
Kolisch, R.1
Sprecher, A.2
-
21
-
-
0030151930
-
Search heuristics for resource-constrained project scheduling
-
0160-5682, 10.1057/jors.1996.79
-
Lee, J. -K., and Kim, Y. -D. (1996). " Search heuristics for resource-constrained project scheduling.." J. Oper. Res. Soc. 0160-5682, 47 (5), 678-689. 10.1057/jors.1996.79
-
(1996)
J. Oper. Res. Soc.
, vol.47
, Issue.5
, pp. 678-689
-
-
Lee, J.-K.1
Kim, Y.-D.2
-
22
-
-
0033156974
-
Fuzzy optimal model for resource-constrained construction scheduling
-
DOI 10.1061/(ASCE)0887-3801(1999)13:3(207)
-
Leu, S., Chen, A., and Yang, C. (1999). " Fuzzy optimal model for resource-constrained construction scheduling.." J. Comput. Civ. Eng. 0887-3801, 13 (3), 207-216. 10.1061/(ASCE)0887-3801(1999)13:3(207) (Pubitemid 30894033)
-
(1999)
Journal of Computing in Civil Engineering
, vol.13
, Issue.3
, pp. 207-216
-
-
Leu, S.-S.1
Chen, A.-T.2
Yang, C.-H.3
-
23
-
-
0033312040
-
GA-based multicriteria optimal model for construction scheduling
-
DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
-
Leu, S., and Yang, C. (1999). " GA-based multicriteria optimal model for construction scheduling.." J. Constr. Eng. Manage. 0733-9364, 125 (6), 420-427. 10.1061/(ASCE)0733-9364(1999)125:6(420) (Pubitemid 30509596)
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.6
, pp. 420-427
-
-
Leu, S.-S.1
Yang, C.-H.2
-
24
-
-
28444479514
-
Optimization of resource allocation in construction using genetic algorithms
-
IEEE Press, Guangzhou, China
-
Liu, Y., Zhao, S. -L., Du, X. -K., and Li, S. -Q. (2005). " Optimization of resource allocation in construction using genetic algorithms.." Proc., 2005 Int. Conf. on Machine Learning and Cybernetics, Vol. 6, IEEE Press, Guangzhou, China, 3428-3432.
-
(2005)
Proc., 2005 Int. Conf. on Machine Learning and Cybernetics
, vol.6
, pp. 3428-3432
-
-
Liu, Y.1
Zhao, S.-L.2
Du, X.-K.3
Li, S.-Q.4
-
25
-
-
1242331226
-
-
Prentice-Hall, Upper Saddle River, NJ
-
Meyer, R., and Krueger, D. (1998). A minitab guide to statistics, Prentice-Hall, Upper Saddle River, N.J.
-
(1998)
A Minitab Guide to Statistics
-
-
Meyer, R.1
Krueger, D.2
-
26
-
-
0001541244
-
Using tabu search for solving the resource-constrained project scheduling problem
-
PMS '94, Leuven, Belgium
-
Pinson, E., Prins, C., and Rullier, F. (1994). " Using tabu search for solving the resource-constrained project scheduling problem.." Proc., 4th Int. Work. on Proj. Manage. and Sched., PMS '94, Leuven, Belgium, 102-106.
-
(1994)
Proc., 4th Int. Work. on Proj. Manage. and Sched.
, pp. 102-106
-
-
Pinson, E.1
Prins, C.2
Rullier, F.3
-
27
-
-
0036024939
-
Application of genetic algorithms to construction scheduling with or without resource constraints
-
DOI 10.1139/l02-034
-
Toklu, Y. C. (2002). " Application of genetic algorithms to construction scheduling with or without resource constraints.." Can. J. Civ. Eng. 0315-1468, 29, 421-429. 10.1139/l02-034 (Pubitemid 34961556)
-
(2002)
Canadian Journal of Civil Engineering
, vol.29
, Issue.3
, pp. 421-429
-
-
Toklu, Y.C.1
-
28
-
-
0017110416
-
Project scheduling with resource constraints using branch and bound methods
-
0030-3623, 10.1057/jors.1976.61
-
Willis, R. J., and Hastings, N. A. J. (1976). " Project scheduling with resource constraints using branch and bound methods.." Oper. Res. Q. 0030-3623, 27 (2), 341-349. 10.1057/jors.1976.61
-
(1976)
Oper. Res. Q.
, vol.27
, Issue.2
, pp. 341-349
-
-
Willis, R.J.1
Hastings, N.A.J.2
-
29
-
-
32944459555
-
Permutation-based particle swarm optimization for resource-constrained project scheduling
-
DOI 10.1061/(ASCE)0887-3801(2006)20:2(141)
-
Zhang, H., Li, H., and Tam, C. M. (2006). " Permutation-based particle swarm optimization for resource-constrained project scheduling.." J. Comput. Civ. Eng. 0887-3801, 20 (2), 141-149. 10.1061/(ASCE)0887-3801(2006) 20:2(141) (Pubitemid 43260088)
-
(2006)
Journal of Computing in Civil Engineering
, vol.20
, Issue.2
, pp. 141-149
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
-
30
-
-
14044256646
-
Task scheduling of parallel development projects using genetic algorithm
-
ASME, Salt Lake City, Utah
-
Zhuang, M., and Yassine, A. A. (2004). " Task scheduling of parallel development projects using genetic algorithm.." Proc., ASME 2004 Int. Design Eng. Tech. Conf. and Comp. and Info. in Eng. Conf., ASME, Salt Lake City, Utah, 1-11.
-
(2004)
Proc., ASME 2004 Int. Design Eng. Tech. Conf. and Comp. and Info. in Eng. Conf.
, pp. 1-11
-
-
Zhuang, M.1
Yassine, A.A.2
|