Volumn 136, Issue 2, 2010, Pages 160-169

Comparing schedule generation schemes in resource-constrained project scheduling using elitist genetic algorithm

Author keywords

Comparative study; Genetic algorithms; Optimization; Project management; Resource; Scheduling

Indexed keywords

COMPARATIVE STUDIES; COMPARATIVE STUDY; COMPUTATIONAL EXPERIMENT; CONSTRUCTION ENGINEERING; DIFFERENT MECHANISMS; OPTIMIZATION PROJECT; PARALLEL SCHEME; RESOURCE CONSTRAINED PROJECT SCHEDULING; RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; RESOURCE-SCHEDULING; SCHEDULE GENERATION; STANDARD PROBLEMS;

EID: 75649117074     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2010)136:2(160)     Document Type: Article
Times cited : (31)

References (30)
  • 1
    • 0003131416 scopus 로고    scopus 로고
    • Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem
    • S. Voss, S. Martello, I. Osman, and C. Roucairol, eds., Kluwer, Dordrecht, The Netherlands
    • Baar, T., Brucker, P., and Knust, S. (1999). " Tabu-search algorithms and lower bounds for the resource-constrained project scheduling problem.." Meta-heuristics: Advances and trends in local search paradigms for optimization, S. Voss, S. Martello, I. Osman, and, C. Roucairol, eds., Kluwer, Dordrecht, The Netherlands, 1-8.
    • (1999) Meta-heuristics: Advances and Trends in Local Search Paradigms for Optimization , pp. 1-8
    • Baar, T.1    Brucker, P.2    Knust, S.3
  • 3
    • 0030216966 scopus 로고    scopus 로고
    • Resource-constrained project scheduling by simulated annealing
    • 0020-7543, 10.1080/00207549608905028
    • Boctor, F. F. (1996). " Resource-constrained project scheduling by simulated annealing.." Int. J. Prod. Res. 0020-7543, 34 (8), 2335-2351. 10.1080/00207549608905028
    • (1996) Int. J. Prod. Res. , vol.34 , Issue.8 , pp. 2335-2351
    • Boctor, F.F.1
  • 4
    • 0037508562 scopus 로고    scopus 로고
    • A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version
    • 0377-2217,. 10.1016/S0377-2217(02)00761-0
    • Bouleimen, K., and Lecocq, H. (2003). " A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple modes version.." Eur. J. Oper. Res. 0377-2217, 149, 268-281. 10.1016/S0377-2217(02)00761-0
    • (2003) Eur. J. Oper. Res. , vol.149 , pp. 268-281
    • Bouleimen, K.1    Lecocq, H.2
  • 5
    • 0032096810 scopus 로고    scopus 로고
    • A branch and bound algorithm for the resource-constrained project scheduling problem
    • 0377-2217, 10.1016/S0377-2217(97)00335-4
    • Brucker, P., Knust, S., Schoo, A., and Thiele, O. (1998). " A branch and bound algorithm for the resource-constrained project scheduling problem.." Eur. J. Oper. Res. 0377-2217, 107 (2), 272-288. 10.1016/S0377-2217(97)00335-4
    • (1998) Eur. J. Oper. Res. , vol.107 , Issue.2 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 6
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • 0733-9364, 10.1061/(ASCE)0733-9364(1996)122:2(125)
    • Chan, W., Chua, D. K. H., and Kannan, G. (1996). " Construction resource scheduling with genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 122 (2), 125-132. 10.1061/(ASCE)0733-9364(1996)122:2(125)
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.1    Chua, D.K.H.2    Kannan, G.3
  • 7
    • 15944391749 scopus 로고    scopus 로고
    • Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms
    • DOI 10.1061/(ASCE)0733-9364(2005)131:4(400)
    • Elazouni, A. M., and Metwally, F. G. (2005). " Finance-based scheduling: Tool to maximize project profit using improved genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 131 (4), 400-412. 10.1061/(ASCE)0733-9364(2005)131:4(400) (Pubitemid 40430136)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.4 , pp. 400-412
    • Elazouni, A.M.1    Metwally, F.G.2
  • 9
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • 0894-069X,. 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0. CO;2-C
    • Hartmann, S. (1998). " A competitive genetic algorithm for resource-constrained project scheduling.." Naval Res. Logistics Quart. 0894-069X, 45, 733-750. 10.1002/(SICI)1520-6750(199810)45:7<733::AID- NAV5>3.0.CO;2-C
    • (1998) Naval Res. Logistics Quart. , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 10
    • 0347077154 scopus 로고    scopus 로고
    • Project scheduling under limited resources: Models, methods and applications
    • Springer, New York
    • Hartmann, S. (1999). " Project scheduling under limited resources: Models, methods and applications.." Lec. Notes in Eco. and Math. Sys, Springer, New York.
    • (1999) Lec. Notes in Eco. and Math. Sys
    • Hartmann, S.1
  • 11
    • 0034559432 scopus 로고    scopus 로고
    • Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
    • DOI 10.1016/S0377-2217(99)00485-3
    • Hartmann, S., and Kolisch, R. (2000). " Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem.." Eur. J. Oper. Res. 0377-2217, 127, 394-407. 10.1016/S0377- 2217(99)00485-3 (Pubitemid 30964563)
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 394-407
    • Hartmann, S.1    Kolisch, R.2
  • 12
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • 0733-9364, 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 13
    • 6344281398 scopus 로고    scopus 로고
    • Resource optimization using combined simulation and genetic algorithms
    • DOI 10.1061/(ASCE)0733-9364(2003)129:6(698)
    • Hegazy, T., and Kassab, M. (2003). " Resource optimization using combined simulation and genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 129 (6), 698-705. 10.1061/(ASCE)0733-9364(2003)129:6(698) (Pubitemid 40265430)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.6 , pp. 698-705
    • Hegazy, T.1    Kassab, M.2
  • 14
    • 33746214781 scopus 로고    scopus 로고
    • Scheduling construction projects using evolutionary algorithm
    • DOI 10.1061/(ASCE)0733-9364(2006)132:8(861)
    • Jaśkowski, P., and Sobotka, A. (2006). " Scheduling construction projects using evolutionary algorithm.." J. Constr. Eng. Manage. 0733-9364, 132 (8), 861-870. 10.1061/(ASCE)0733-9364(2006)132:8(861) (Pubitemid 44090933)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.8 , pp. 861-870
    • Jaskowski, P.1    Sobotka, A.2
  • 15
    • 33646171275 scopus 로고    scopus 로고
    • Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects
    • 0733-9364, 10.1061/(ASCE)0733-9364(2006)132:5(491)
    • Kandil, A., and El-Rayes, K. (2006). " Parallel genetic algorithms for optimizing resource utilization in large-scale construction projects.." J. Constr. Eng. Manage. 0733-9364, 132 (5), 491-498. 10.1061/(ASCE)0733- 9364(2006)132:5(491)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.5 , pp. 491-498
    • Kandil, A.1    El-Rayes, K.2
  • 16
    • 0002866635 scopus 로고
    • The critical-path method: Resources planning and scheduling
    • J. F. Muth and G. L. Thompson, eds., Prentice-Hall, Englewood Cliffs, N.J
    • Kelley, J. E., Jr. (1963). " The critical-path method: Resources planning and scheduling.." Industrial scheduling, J. F. Muth, and, G. L. Thompson, eds., Prentice-Hall, Englewood Cliffs, N.J., 347-365.
    • (1963) Industrial Scheduling , pp. 347-365
    • Kelley Jr., J.E.1
  • 18
    • 0043140243 scopus 로고    scopus 로고
    • Experiences with fine-grained parallel genetic algorithms
    • 0254-5330, 10.1023/A:1018912715283
    • Kohlmorgen, U., Schmeck, H., and Haase, K. (1999). " Experiences with fine-grained parallel genetic algorithms.." Ann. Operat. Res. 0254-5330, 90, 203-219. 10.1023/A:1018912715283
    • (1999) Ann. Operat. Res. , vol.90 , pp. 203-219
    • Kohlmorgen, U.1    Schmeck, H.2    Haase, K.3
  • 19
    • 0030121479 scopus 로고    scopus 로고
    • Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
    • 0377-2217,. 10.1016/0377-2217(95)00357-6
    • Kolisch, R. (1996). " Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation.." Eur. J. Oper. Res. 0377-2217, 90, 320-333. 10.1016/0377-2217(95)00357-6
    • (1996) Eur. J. Oper. Res. , vol.90 , pp. 320-333
    • Kolisch, R.1
  • 20
    • 0030788844 scopus 로고    scopus 로고
    • PSPLIB-A project scheduling problem library
    • 0377-2217,. 10.1016/S0377-2217(96)00170-1
    • Kolisch, R., and Sprecher, A. (1996). " PSPLIB-A project scheduling problem library.." Eur. J. Oper. Res. 0377-2217, 96, 205-216. 10.1016/S0377-2217(96)00170-1
    • (1996) Eur. J. Oper. Res. , vol.96 , pp. 205-216
    • Kolisch, R.1    Sprecher, A.2
  • 21
    • 0030151930 scopus 로고    scopus 로고
    • Search heuristics for resource-constrained project scheduling
    • 0160-5682, 10.1057/jors.1996.79
    • Lee, J. -K., and Kim, Y. -D. (1996). " Search heuristics for resource-constrained project scheduling.." J. Oper. Res. Soc. 0160-5682, 47 (5), 678-689. 10.1057/jors.1996.79
    • (1996) J. Oper. Res. Soc. , vol.47 , Issue.5 , pp. 678-689
    • Lee, J.-K.1    Kim, Y.-D.2
  • 22
    • 0033156974 scopus 로고    scopus 로고
    • Fuzzy optimal model for resource-constrained construction scheduling
    • DOI 10.1061/(ASCE)0887-3801(1999)13:3(207)
    • Leu, S., Chen, A., and Yang, C. (1999). " Fuzzy optimal model for resource-constrained construction scheduling.." J. Comput. Civ. Eng. 0887-3801, 13 (3), 207-216. 10.1061/(ASCE)0887-3801(1999)13:3(207) (Pubitemid 30894033)
    • (1999) Journal of Computing in Civil Engineering , vol.13 , Issue.3 , pp. 207-216
    • Leu, S.-S.1    Chen, A.-T.2    Yang, C.-H.3
  • 23
    • 0033312040 scopus 로고    scopus 로고
    • GA-based multicriteria optimal model for construction scheduling
    • DOI 10.1061/(ASCE)0733-9364(1999)125:6(420)
    • Leu, S., and Yang, C. (1999). " GA-based multicriteria optimal model for construction scheduling.." J. Constr. Eng. Manage. 0733-9364, 125 (6), 420-427. 10.1061/(ASCE)0733-9364(1999)125:6(420) (Pubitemid 30509596)
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.6 , pp. 420-427
    • Leu, S.-S.1    Yang, C.-H.2
  • 24
    • 28444479514 scopus 로고    scopus 로고
    • Optimization of resource allocation in construction using genetic algorithms
    • IEEE Press, Guangzhou, China
    • Liu, Y., Zhao, S. -L., Du, X. -K., and Li, S. -Q. (2005). " Optimization of resource allocation in construction using genetic algorithms.." Proc., 2005 Int. Conf. on Machine Learning and Cybernetics, Vol. 6, IEEE Press, Guangzhou, China, 3428-3432.
    • (2005) Proc., 2005 Int. Conf. on Machine Learning and Cybernetics , vol.6 , pp. 3428-3432
    • Liu, Y.1    Zhao, S.-L.2    Du, X.-K.3    Li, S.-Q.4
  • 26
    • 0001541244 scopus 로고
    • Using tabu search for solving the resource-constrained project scheduling problem
    • PMS '94, Leuven, Belgium
    • Pinson, E., Prins, C., and Rullier, F. (1994). " Using tabu search for solving the resource-constrained project scheduling problem.." Proc., 4th Int. Work. on Proj. Manage. and Sched., PMS '94, Leuven, Belgium, 102-106.
    • (1994) Proc., 4th Int. Work. on Proj. Manage. and Sched. , pp. 102-106
    • Pinson, E.1    Prins, C.2    Rullier, F.3
  • 27
    • 0036024939 scopus 로고    scopus 로고
    • Application of genetic algorithms to construction scheduling with or without resource constraints
    • DOI 10.1139/l02-034
    • Toklu, Y. C. (2002). " Application of genetic algorithms to construction scheduling with or without resource constraints.." Can. J. Civ. Eng. 0315-1468, 29, 421-429. 10.1139/l02-034 (Pubitemid 34961556)
    • (2002) Canadian Journal of Civil Engineering , vol.29 , Issue.3 , pp. 421-429
    • Toklu, Y.C.1
  • 28
    • 0017110416 scopus 로고
    • Project scheduling with resource constraints using branch and bound methods
    • 0030-3623, 10.1057/jors.1976.61
    • Willis, R. J., and Hastings, N. A. J. (1976). " Project scheduling with resource constraints using branch and bound methods.." Oper. Res. Q. 0030-3623, 27 (2), 341-349. 10.1057/jors.1976.61
    • (1976) Oper. Res. Q. , vol.27 , Issue.2 , pp. 341-349
    • Willis, R.J.1    Hastings, N.A.J.2
  • 29
    • 32944459555 scopus 로고    scopus 로고
    • Permutation-based particle swarm optimization for resource-constrained project scheduling
    • DOI 10.1061/(ASCE)0887-3801(2006)20:2(141)
    • Zhang, H., Li, H., and Tam, C. M. (2006). " Permutation-based particle swarm optimization for resource-constrained project scheduling.." J. Comput. Civ. Eng. 0887-3801, 20 (2), 141-149. 10.1061/(ASCE)0887-3801(2006) 20:2(141) (Pubitemid 43260088)
    • (2006) Journal of Computing in Civil Engineering , vol.20 , Issue.2 , pp. 141-149
    • Zhang, H.1    Li, H.2    Tam, C.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.