메뉴 건너뛰기




Volumn 135, Issue 10, 2009, Pages 948-954

Optimization of earthmoving operations in heavy civil engineering projects

Author keywords

Computer programming; Construction management; Earthmoving; Geographic information systems; Optimization

Indexed keywords

BORROW PITS; CONSTRUCTION MANAGEMENT; CONSTRUCTION SITES; DEVELOPED MODEL; EARTHMOVING; EARTHMOVING OPERATIONS; EQUIPMENT CHARACTERISTICS; GENERAL CONTRACTORS; HEAVY CIVIL; INDIRECT COSTS; LANDFILL SITE; MANAGEMENT FUNCTIONS; NUMERICAL EXAMPLE; OPTIMIZATION MODELS; PROJECT BUDGET; PROJECT CONSTRAINTS; PROTOTYPE SOFTWARE; SOIL TYPES; TIME CONSTRAINTS;

EID: 70349321609     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:10(948)     Document Type: Article
Times cited : (72)

References (21)
  • 1
    • 0024082533 scopus 로고
    • Expert system for earthmoving equipment selection in road construction
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1988)114:3(426)
    • Alkass, S., and Harris, F. (1988). " Expert system for earthmoving equipment selection in road construction.." J. Constr. Eng. Manage. 0733-9364, 114 (3), 426-440. 10.1061/(ASCE)0733-9364(1988)114:3(426)
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.3 , pp. 426-440
    • Alkass, S.1    Harris, F.2
  • 2
    • 0003920417 scopus 로고    scopus 로고
    • Caterpillar, Inc.., Caterpillar Inc, Peoria, Ill.
    • Caterpillar, Inc. (1998). FPC users' manual, Caterpillar Inc, Peoria, Ill.
    • (1998) FPC Users' Manual
  • 3
    • 0034775368 scopus 로고    scopus 로고
    • A model for integrated production planning in cellular manufacturing systems
    • DOI 10.1108/09576060110392588
    • Chen, M. (2001). " A model for integrated production planning in cellular manufacturing systems.." Integr. Manuf. Syst. 0957-6061, 12 (4), 275-284. 10.1108/09576060110392588 (Pubitemid 32991487)
    • (2001) Integrated Manufacturing Systems , vol.12 , Issue.4 , pp. 275-284
    • Chen, M.1
  • 4
    • 0029768469 scopus 로고    scopus 로고
    • Improving earthmoving estimation by more realistic knowledge
    • 0315-1468.
    • Christian, J., and Xie, T. X. (1996). " Improving earthmoving estimation by more realistic knowledge.." Can. J. Civ. Eng. 0315-1468, 23 (1), 250-259.
    • (1996) Can. J. Civ. Eng. , vol.23 , Issue.1 , pp. 250-259
    • Christian, J.1    Xie, T.X.2
  • 5
    • 0024138169 scopus 로고
    • Earthwork allocations with linear unit costs
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1988)114:4(641)
    • Easa, S. M. (1988). " Earthwork allocations with linear unit costs.." J. Constr. Eng. Manage. 0733-9364, 114 (4), 641-655. 10.1061/(ASCE)0733-9364(1988)114:4(641)
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.4 , pp. 641-655
    • Easa, S.M.1
  • 6
    • 0033315084 scopus 로고    scopus 로고
    • Symphony: An environment for building special purpose simulation
    • ASCE, Phoenix.
    • Hajjar, D., and AbouRizk, S. (1999). " Symphony: An environment for building special purpose simulation.." Proc., 31st Winter Simulation Conf., ASCE, Phoenix, 998-1006.
    • (1999) Proc., 31st Winter Simulation Conf. , pp. 998-1006
    • Hajjar, D.1    Abourizk, S.2
  • 8
    • 0025400898 scopus 로고
    • Further development of integer programming in earthwork optimization
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1990)116:1(18)
    • Jayawardane, A. K., and Harris, F. C. (1990). " Further development of integer programming in earthwork optimization.." J. Constr. Eng. Manage. 0733-9364, 116 (1), 18-34. 10.1061/(ASCE)0733-9364(1990)116:1(18)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.1 , pp. 18-34
    • Jayawardane, A.K.1    Harris, F.C.2
  • 9
    • 34250111733 scopus 로고
    • Optimizing off-highway truck characteristics for minimum haulage cost
    • 10.1007/BF00880840
    • Lineberry, G. T. (1985). " Optimizing off-highway truck characteristics for minimum haulage cost.." Int. J. Mining Eng., 3 (4), 295-310. 10.1007/BF00880840
    • (1985) Int. J. Mining Eng. , vol.3 , Issue.4 , pp. 295-310
    • Lineberry, G.T.1
  • 10
    • 0035575069 scopus 로고    scopus 로고
    • An efficient approach integrating genetic algorithm, linear programming, and ordinal optimization for linear mixed-integer programming problems
    • Luo, Y., Chen, C., and Guignard, M. (2001). " An efficient approach integrating genetic algorithm, linear programming, and ordinal optimization for linear mixed integer programming problems.." Int. J. Smart. Eng. Sys. Des., 3, 279-287. (Pubitemid 34249371)
    • (2001) International Journal of Smart Engineering System Design , vol.3 , Issue.4 , pp. 279-287
    • Luo, Y.-C.1    Chen, C.-H.2    Guignard, M.3
  • 11
    • 32144450481 scopus 로고    scopus 로고
    • A genetic algorithm for the reactive power/voltage control problem, 〈〉 (May 28, 2008).
    • Malachi, Y., and Singer, S. (2000). A genetic algorithm for the reactive power/voltage control problem, 218-221 〈 http://ieeexplore.ieee.org/iel5/ 7368/19993/00924374.pdf 〉 (May 28, 2008).
    • (2000) , pp. 218-221
    • Malachi, Y.1    Singer, S.2
  • 12
    • 0242633355 scopus 로고    scopus 로고
    • Object-oriented simulation model for earthmoving operations
    • DOI 10.1061/(ASCE)0733-9364(2003)129:2(173)
    • Marzouk, M., and Moselhi, O. (2003). " Object-oriented simulation model for earthmoving operations.." J. Constr. Eng. Manage. 0733-9364, 129 (2), 173-181. 10.1061/(ASCE)0733-9364(2003)129:2(173) (Pubitemid 40265486)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.2 , pp. 173-181
    • Marzouk, M.1    Moselhi, O.2
  • 13
    • 13944277711 scopus 로고    scopus 로고
    • Multiobjective optimization of earthmoving operations
    • DOI 10.1061/(ASCE)0733-9364(2004)130:1(105)
    • Marzouk, M., and Moselhi, O. (2004). " Multi-objective optimization of earthmoving operations.." J. Constr. Eng. Manage. 0733-9364, 130 (1), 105-113. 10.1061/(ASCE)0733-9364(2004)130:1(105) (Pubitemid 40265411)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.1 , pp. 105-113
    • Marzouk, M.1    Moselhi, O.2
  • 14
    • 0019583134 scopus 로고
    • Earthmoving logistics
    • 0569-7948, (CO2).
    • Mayer, R. H., and Stark, R. M. (1981). " Earthmoving logistics.." J. Constr. Div. 0569-7948, 107 (CO2), 297-312.
    • (1981) J. Constr. Div. , vol.107 , pp. 297-312
    • Mayer, R.H.1    Stark, R.M.2
  • 15
    • 0032267108 scopus 로고    scopus 로고
    • Belief networks in construction simulation
    • IEEE, Washington, D.C..
    • McCabe, B. (1998). " Belief networks in construction simulation.." Proc., 30th Winter Simulation Conf., IEEE, Washington, D.C., 1279-1286.
    • (1998) Proc., 30th Winter Simulation Conf. , pp. 1279-1286
    • McCabe, B.1
  • 16
    • 33846811666 scopus 로고    scopus 로고
    • Crew optimization in planning and control of earthmoving operations using spatial technologies
    • 1874-4753.
    • Moselhi, O., and Alshibani, A. (2007). " Crew optimization in planning and control of earthmoving operations using spatial technologies.." J. Inf. Tech. Constr. 1874-4753, 12, 121-137.
    • (2007) J. Inf. Tech. Constr. , vol.12 , pp. 121-137
    • Moselhi, O.1    Alshibani, A.2
  • 17
    • 70349360053 scopus 로고    scopus 로고
    • Tracking and control of earthmoving operations using spatial technologies
    • 0578-5634.
    • Moselhi, O., and Alshibani, A. (2008). " Tracking and control of earthmoving operations using spatial technologies.." Coast. Eng. Japan 0578-5634, 50 (10), 26-33.
    • (2008) Coast. Eng. Japan , vol.50 , Issue.10 , pp. 26-33
    • Moselhi, O.1    Alshibani, A.2
  • 18
    • 0027206329 scopus 로고
    • Modelling operational activities in object-oriented simulation
    • 0887-3801, (),. 10.1061/(ASCE)0887-3801(1993)7:1(94)
    • Oloufa, A. (1993). " Modelling operational activities in object-oriented simulation.." J. Comput. Civ. Eng. 0887-3801, 7 (1), 94-106. 10.1061/(ASCE)0887-3801(1993)7:1(94)
    • (1993) J. Comput. Civ. Eng. , vol.7 , Issue.1 , pp. 94-106
    • Oloufa, A.1
  • 19
    • 33645062656 scopus 로고    scopus 로고
    • Water supply reservoir operation by combined genetic algorithm-linear programming GA-LP approach
    • " 0920-4741, (),. 10.1007/s11269-006-8049-z
    • Ries, L., Bessler, F., Walters, G., and Savic, D. (2006). " Water supply reservoir operation by combined genetic algorithm-linear programming GA-LP approach.." Water Resour. Manage. 0920-4741, 20 (2), 227-255. 10.1007/s11269-006-8049-z
    • (2006) Water Resour. Manage. , vol.20 , Issue.2 , pp. 227-255
    • Ries, L.1    Bessler, F.2    Walters, G.3    Savic, D.4
  • 20
    • 0010653925 scopus 로고
    • An optimization method for simulating large complex system
    • 0305-215X, (),. 10.1080/03052159508941264
    • Shi, J., and AbouRizk, S. M. (1995). " An optimization method for simulating large complex system.." Eng. Optimiz. 0305-215X, 25 (3), 213-229. 10.1080/03052159508941264
    • (1995) Eng. Optimiz. , vol.25 , Issue.3 , pp. 213-229
    • Shi, J.1    Abourizk, S.M.2
  • 21
    • 14544286475 scopus 로고    scopus 로고
    • Determination of haul distance and direction in mass excavation
    • DOI 10.1061/(ASCE)0733-9364(2005)131:3(302)
    • Son, J., Mattila, K., and Myers, D. (2005). " Determination of haul distance and direction in mass excavation.." J. Constr. Eng. Manage. 0733-9364, 131 (3), 302-309. 10.1061/(ASCE)0733-9364(2005)131:3(302) (Pubitemid 40303938)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 302-309
    • Son, J.1    Mattila, K.G.2    Myers, D.S.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.