-
1
-
-
85191113430
-
Simulated annealing
-
in Aarts, E. and Lenstra, J.K. (eds), Wiley, New York
-
Aarts, E., Korst, J.H.M. and van Laarhoven, P.J.M. (1997) Simulated annealing, in Aarts, E. and Lenstra, J.K. (eds) Local Search in Combinatorial Optimization, Wiley, New York, pp. 91-120.
-
(1997)
Local Search In Combinatorial Optimization
, pp. 91-120
-
-
Aarts, E.1
Korst, J.H.M.2
van Laarhoven, P.J.M.3
-
3
-
-
0028518189
-
Optimal resource levelling using non-serial dynamic programming
-
Bandelloni, M., Tucci, M. and Rinaldi, R. (1994) Optimal resource levelling using non-serial dynamic programming. European Journal of Operational Research, 78(2), 162-77.
-
(1994)
European Journal of Operational Research
, vol.78
, Issue.2
, pp. 162-177
-
-
Bandelloni, M.1
Tucci, M.2
Rinaldi, R.3
-
4
-
-
0002679297
-
Variation in activity level on a cyclic arrow diagram
-
Burgess, A.R. and Killebrew, J.B. (1962) Variation in activity level on a cyclic arrow diagram. Industrial Engineering, 13(2), 76-83.
-
(1962)
Industrial Engineering
, vol.13
, Issue.2
, pp. 76-83
-
-
Burgess, A.R.1
Killebrew, J.B.2
-
5
-
-
3042708858
-
Hyper-heuristics: An emerging direction in modern search technology
-
in Glover, F. and Kochenberger, G.A. (eds), Kluwer Academic Publishers, Dordrecht
-
Burke, E., Kendall, G., Newall, J., Hart, E., Ross, P. and Schulenburg, S. (2003) Hyper-heuristics: an emerging direction in modern search technology, in Glover, F. and Kochenberger, G.A. (eds) Handbook of Metaheuristics, Kluwer Academic Publishers, Dordrecht, pp. 457-74.
-
(2003)
Handbook of Metaheuristics
, pp. 457-474
-
-
Burke, E.1
Kendall, G.2
Newall, J.3
Hart, E.4
Ross, P.5
Schulenburg, S.6
-
6
-
-
1442283467
-
A tabu search hyperheuristic for timetabling and rostering
-
Burke, E., Kendall, G. and Soubeiga, E. (2004) A tabu search hyperheuristic for timetabling and rostering. Journal of Heuristics, 9(6), 451-70.
-
(2004)
Journal of Heuristics
, vol.9
, Issue.6
, pp. 451-470
-
-
Burke, E.1
Kendall, G.2
Soubeiga, E.3
-
7
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W., Chua, D.K.H. and Kannan, G. (1996) Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management, 122(2), 125-32.
-
(1996)
Journal of Construction Engineering and Management
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.1
Chua, D.K.H.2
Kannan, G.3
-
8
-
-
84901458708
-
An investigation of a hyperheuristic genetic algorithm applied to a trainer scheduling problem
-
IEEE Computer Society Press, Honolulu, USA
-
Cowling, P., Kendall, G. and Han, L. (2002) An investigation of a hyperheuristic genetic algorithm applied to a trainer scheduling problem, in Proceedings of the 2002 Congress on Evolutionary Computation (CEC 2002), IEEE Computer Society Press, Honolulu, USA, pp. 1185-90.
-
(2002)
Proceedings of The 2002 Congress On Evolutionary Computation (CEC 2002)
, pp. 1185-1190
-
-
Cowling, P.1
Kendall, G.2
Han, L.3
-
10
-
-
33845941176
-
A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation
-
Dowsland, K.A., Soubeiga, E. and Burke, E. (2007) A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation. European Journal of Operational Research, 179(3), 759-74.
-
(2007)
European Journal of Operational Research
, vol.179
, Issue.3
, pp. 759-774
-
-
Dowsland, K.A.1
Soubeiga, E.2
Burke, E.3
-
13
-
-
0032642926
-
Optimization of resource allocation and levelling using genetic algorithms
-
Hegazy, T. (1999) Optimization of resource allocation and levelling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), 167-75.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
15
-
-
1842763857
-
-
in Glover, F. and Kochenberger, G.A. (eds), Kluwer Academic Publishers, Dordrecht
-
Henderson, D., Jacobson, S.H. and Johnson, A.W. (2003) The theory and practice of simulated annealing, in Glover, F. and Kochenberger, G.A. (eds) Handbook of Metaheuristics, Kluwer Academic Publishers, Dordrecht, pp. 287-319.
-
(2003)
The Theory and Practice of Simulated Annealing
, pp. 287-319
-
-
Henderson, D.1
Jacobson, S.H.2
Johnson, A.W.3
-
16
-
-
0034227663
-
Modification of minimum moment approach in resource levelling
-
Hiyassat, M.A.S. (2000) Modification of minimum moment approach in resource levelling. Journal of Construction Engineering and Management, 126(4), 278-84.
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.4
, pp. 278-284
-
-
Hiyassat, M.A.S.1
-
17
-
-
0001418264
-
Economic optimization of construction project scheduling
-
Karshenas, S. and Haber, D. (1990) Economic optimization of construction project scheduling. Construction Manage- ment and Economics, 8(2), 135-46.
-
(1990)
Construction Manage- Ment and Economics
, vol.8
, Issue.2
, pp. 135-146
-
-
Karshenas, S.1
Haber, D.2
-
18
-
-
26444479778
-
Optimization by simulated annealing
-
Kirkpatrick, S., Gellat, C.D. and Vecchi, M.P. (1983) Optimization by simulated annealing. Science, 220(4598), 671-80.
-
(1983)
Science
, vol.220
, Issue.4598
, pp. 671-680
-
-
Kirkpatrick, S.1
Gellat, C.D.2
Vecchi, M.P.3
-
19
-
-
0034324916
-
Resource levelling in construction by genetic algorithm-based optimization and its decision support system application
-
Leu, S.S., Yang, C.H. and Huang, J.C. (2000) Resource levelling in construction by genetic algorithm-based optimization and its decision support system application. Automation in Construction, 10(1), 27-41.
-
(2000)
Automation In Construction
, vol.10
, Issue.1
, pp. 27-41
-
-
Leu, S.S.1
Yang, C.H.2
Huang, J.C.3
-
20
-
-
57749121110
-
-
Microsoft Corporation, v2000 edn, Microsoft Corporation, Redmond, WA, USA
-
Microsoft Corporation (2000) Microsoft Project Electronic Manual, v2000 edn, Microsoft Corporation, Redmond, WA, USA.
-
(2000)
Microsoft Project Electronic Manual
-
-
-
22
-
-
0034559447
-
Procedures for resource levelling and net present value problems in project scheduling with general temporal and resource constraints
-
Neumann, K. and Zimmermann, J. (2000) Procedures for resource levelling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research, 127(2), 425-43.
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 425-443
-
-
Neumann, K.1
Zimmermann, J.2
-
23
-
-
0037827373
-
-
Primavera Systems Inc., Ver. 3.0, Primavera Systems Inc, Bala Cynwyd, PA
-
Primavera Systems Inc. (1999) Primavera Project Planner, Ver. 3.0, Primavera Systems Inc, Bala Cynwyd, PA.
-
(1999)
Primavera Project Planner
-
-
-
24
-
-
0035335852
-
Experimental evaluation of heuristic optimization algorithms: A tutorial
-
Rardin, R.L. and Uzsoy, R. (2001) Experimental evaluation of heuristic optimization algorithms: a tutorial. Journal of Heuristics, 7(3), 261-304.
-
(2001)
Journal of Heuristics
, vol.7
, Issue.3
, pp. 261-304
-
-
Rardin, R.L.1
Uzsoy, R.2
-
25
-
-
0030216667
-
Construction resource levelling using neural networks
-
Savin, D., Alkass, S. and Fazio, P. (1996) Construction resource levelling using neural networks. Canadian Journal of Civil Engineering, 23(4), 917-25.
-
(1996)
Canadian Journal of Civil Engineering
, vol.23
, Issue.4
, pp. 917-925
-
-
Savin, D.1
Alkass, S.2
Fazio, P.3
-
26
-
-
0032633457
-
Multiheuristic approach for resource levelling problem in construction engineering: Hybrid approach
-
Son, J. and Skibniewski, M.J. (1999) Multiheuristic approach for resource levelling problem in construction engineering: hybrid approach. Journal of Construction Engineering and Management, 125(1), 23-31.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.1
, pp. 23-31
-
-
Son, J.1
Skibniewski, M.J.2
|