메뉴 건너뛰기




Volumn 28, Issue 2, 2010, Pages 163-175

A simulated annealing hyperheuristic for construction resource levelling

Author keywords

Hyperheuristic; Metaheuristics; Priorities; Resource levelling; Simulated annealing

Indexed keywords

COMMERCIAL PROJECTS; COMPLEX SCHEDULING; COMPUTATIONAL ANALYSIS; COMPUTATIONAL OPTIMIZATION; CONSTRUCTION RESOURCE; HYPERHEURISTIC; ILLUSTRATIVE EXAMPLES; LOW LEVEL; META HEURISTICS; META-HEURISTIC APPROACH; NEIGHBOURHOOD; PRIORITY LEVELS; RESOURCE PROFILE; RESOURCE USAGE; SOFTWARE USE; TIME PERIODS;

EID: 77950952082     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190903369907     Document Type: Article
Times cited : (42)

References (26)
  • 4
    • 0002679297 scopus 로고
    • Variation in activity level on a cyclic arrow diagram
    • Burgess, A.R. and Killebrew, J.B. (1962) Variation in activity level on a cyclic arrow diagram. Industrial Engineering, 13(2), 76-83.
    • (1962) Industrial Engineering , vol.13 , Issue.2 , pp. 76-83
    • Burgess, A.R.1    Killebrew, J.B.2
  • 5
    • 3042708858 scopus 로고    scopus 로고
    • Hyper-heuristics: An emerging direction in modern search technology
    • in Glover, F. and Kochenberger, G.A. (eds), Kluwer Academic Publishers, Dordrecht
    • Burke, E., Kendall, G., Newall, J., Hart, E., Ross, P. and Schulenburg, S. (2003) Hyper-heuristics: an emerging direction in modern search technology, in Glover, F. and Kochenberger, G.A. (eds) Handbook of Metaheuristics, Kluwer Academic Publishers, Dordrecht, pp. 457-74.
    • (2003) Handbook of Metaheuristics , pp. 457-474
    • Burke, E.1    Kendall, G.2    Newall, J.3    Hart, E.4    Ross, P.5    Schulenburg, S.6
  • 6
    • 1442283467 scopus 로고    scopus 로고
    • A tabu search hyperheuristic for timetabling and rostering
    • Burke, E., Kendall, G. and Soubeiga, E. (2004) A tabu search hyperheuristic for timetabling and rostering. Journal of Heuristics, 9(6), 451-70.
    • (2004) Journal of Heuristics , vol.9 , Issue.6 , pp. 451-470
    • Burke, E.1    Kendall, G.2    Soubeiga, E.3
  • 8
    • 84901458708 scopus 로고    scopus 로고
    • An investigation of a hyperheuristic genetic algorithm applied to a trainer scheduling problem
    • IEEE Computer Society Press, Honolulu, USA
    • Cowling, P., Kendall, G. and Han, L. (2002) An investigation of a hyperheuristic genetic algorithm applied to a trainer scheduling problem, in Proceedings of the 2002 Congress on Evolutionary Computation (CEC 2002), IEEE Computer Society Press, Honolulu, USA, pp. 1185-90.
    • (2002) Proceedings of The 2002 Congress On Evolutionary Computation (CEC 2002) , pp. 1185-1190
    • Cowling, P.1    Kendall, G.2    Han, L.3
  • 10
    • 33845941176 scopus 로고    scopus 로고
    • A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation
    • Dowsland, K.A., Soubeiga, E. and Burke, E. (2007) A simulated annealing based hyperheuristic for determining shipper sizes for storage and transportation. European Journal of Operational Research, 179(3), 759-74.
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 759-774
    • Dowsland, K.A.1    Soubeiga, E.2    Burke, E.3
  • 13
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and levelling using genetic algorithms
    • Hegazy, T. (1999) Optimization of resource allocation and levelling using genetic algorithms. Journal of Construction Engineering and Management, 125(3), 167-75.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 16
    • 0034227663 scopus 로고    scopus 로고
    • Modification of minimum moment approach in resource levelling
    • Hiyassat, M.A.S. (2000) Modification of minimum moment approach in resource levelling. Journal of Construction Engineering and Management, 126(4), 278-84.
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.4 , pp. 278-284
    • Hiyassat, M.A.S.1
  • 17
    • 0001418264 scopus 로고
    • Economic optimization of construction project scheduling
    • Karshenas, S. and Haber, D. (1990) Economic optimization of construction project scheduling. Construction Manage- ment and Economics, 8(2), 135-46.
    • (1990) Construction Manage- Ment and Economics , vol.8 , Issue.2 , pp. 135-146
    • Karshenas, S.1    Haber, D.2
  • 18
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gellat, C.D. and Vecchi, M.P. (1983) Optimization by simulated annealing. Science, 220(4598), 671-80.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gellat, C.D.2    Vecchi, M.P.3
  • 19
    • 0034324916 scopus 로고    scopus 로고
    • Resource levelling in construction by genetic algorithm-based optimization and its decision support system application
    • Leu, S.S., Yang, C.H. and Huang, J.C. (2000) Resource levelling in construction by genetic algorithm-based optimization and its decision support system application. Automation in Construction, 10(1), 27-41.
    • (2000) Automation In Construction , vol.10 , Issue.1 , pp. 27-41
    • Leu, S.S.1    Yang, C.H.2    Huang, J.C.3
  • 20
    • 57749121110 scopus 로고    scopus 로고
    • Microsoft Corporation, v2000 edn, Microsoft Corporation, Redmond, WA, USA
    • Microsoft Corporation (2000) Microsoft Project Electronic Manual, v2000 edn, Microsoft Corporation, Redmond, WA, USA.
    • (2000) Microsoft Project Electronic Manual
  • 22
    • 0034559447 scopus 로고    scopus 로고
    • Procedures for resource levelling and net present value problems in project scheduling with general temporal and resource constraints
    • Neumann, K. and Zimmermann, J. (2000) Procedures for resource levelling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research, 127(2), 425-43.
    • (2000) European Journal of Operational Research , vol.127 , Issue.2 , pp. 425-443
    • Neumann, K.1    Zimmermann, J.2
  • 23
    • 0037827373 scopus 로고    scopus 로고
    • Primavera Systems Inc., Ver. 3.0, Primavera Systems Inc, Bala Cynwyd, PA
    • Primavera Systems Inc. (1999) Primavera Project Planner, Ver. 3.0, Primavera Systems Inc, Bala Cynwyd, PA.
    • (1999) Primavera Project Planner
  • 24
    • 0035335852 scopus 로고    scopus 로고
    • Experimental evaluation of heuristic optimization algorithms: A tutorial
    • Rardin, R.L. and Uzsoy, R. (2001) Experimental evaluation of heuristic optimization algorithms: a tutorial. Journal of Heuristics, 7(3), 261-304.
    • (2001) Journal of Heuristics , vol.7 , Issue.3 , pp. 261-304
    • Rardin, R.L.1    Uzsoy, R.2
  • 26
    • 0032633457 scopus 로고    scopus 로고
    • Multiheuristic approach for resource levelling problem in construction engineering: Hybrid approach
    • Son, J. and Skibniewski, M.J. (1999) Multiheuristic approach for resource levelling problem in construction engineering: hybrid approach. Journal of Construction Engineering and Management, 125(1), 23-31.
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.1 , pp. 23-31
    • Son, J.1    Skibniewski, M.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.