메뉴 건너뛰기




Volumn 135, Issue 11, 2009, Pages 1162-1171

Stochastic time-cost-resource utilization optimization using nondominated sorting genetic algorithm and discrete fuzzy sets

Author keywords

Construction management; Costs; Fuzzy sets; Optimization; Resource allocation; Scheduling; Stochastic processes

Indexed keywords

ALLOCATION STRATEGY; CONSTRUCTION MANAGEMENT; CONSTRUCTION PROJECTS; COST VARIABLES; DECISION MAKERS; FUZZY VARIABLE; MODEL OUTPUTS; MULTI-OBJECTIVE OPTIMIZATION MODELS; NON-DOMINATED SORTING GENETIC ALGORITHMS; NONDOMINATED SORTING GENETIC ALGORITHM; OPTIMAL BALANCE; OPTIMIZATION PROBLEMS; PARETO FRONT; PRACTICAL SOLUTIONS; PROJECT EXECUTION; RESOURCE AVAILABILITY; RESOURCE LEVELING; RESOURCE UTILIZATIONS; STOCHASTIC PROCESSES; TIME COST; TIME-COST OPTIMIZATION; UNCERTAIN VARIABLES;

EID: 70350070859     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000092     Document Type: Article
Times cited : (87)

References (20)
  • 1
    • 0036530772 scopus 로고    scopus 로고
    • A fast and elitist multiobjective genetic algorithm: NSGA-II
    • DOI 10.1109/4235.996017, PII S1089778X02041012
    • Deb, K., Pratap, A., Agarwal, S., and Meyarivan, T. (2002). " A fast and elitist multi-objective genetic algorithm NSGA-II.." IEEE Trans. Evol. Comput. 1089-778X, 6 (2), 182-197. 10.1109/4235.996017 (Pubitemid 34555372)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.2 , pp. 182-197
    • Deb, K.1    Pratap, A.2    Agarwal, S.3    Meyarivan, T.4
  • 2
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • " 0733-9364.
    • Feng, C. W., Liu, L., and Burns, S. A. (1997). " Using genetic algorithms to solve construction time-cost trade-off problems.." J. Constr. Eng. Manage. 0733-9364, 11 (3), 184-189.
    • (1997) J. Constr. Eng. Manage. , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.W.1    Liu, L.2    Burns, S.A.3
  • 4
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • Hegazy, T. (1999a). " Optimization of resource allocation and leveling using genetic algorithms.." J. Constr. Eng. Manage. 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 5
    • 0033497302 scopus 로고    scopus 로고
    • Optimization of construction time-cost trade-off analysis using genetic algorithms
    • 10.1139/cjce-26-6-685
    • Hegazy, T. (1999b). " Optimization of construction time-cost trade-off analysis using genetic algorithms.." Can. J. Civ. Eng., 26, 685-697. 10.1139/cjce-26-6-685
    • (1999) Can. J. Civ. Eng. , vol.26 , pp. 685-697
    • Hegazy, T.1
  • 6
    • 0035335134 scopus 로고    scopus 로고
    • Applying modified minimum moment method to multiple resource leveling
    • DOI 10.1061/(ASCE)0733-9364(2001)127:3(192), Reportnr 22212
    • Hiyassat, M. A. S (2001). " Modification of minimum moment method to multiple resource leveling.." J. Constr. Eng. Manage. 0733-9364, 127 (3), 192-198. 10.1061/(ASCE)0733-9364(2001)127:3(192) (Pubitemid 32508537)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 192-198
    • Hiyassat, M.A.S.1
  • 8
    • 0031364931 scopus 로고    scopus 로고
    • Constructing fuzzy measures in expert systems
    • " 0165-0114, (),. 10.1016/S0165-0114(97)00174-7
    • Klir, G. J., Wang, Z., and Harmanec, D. (1997). " Constructing fuzzy measures in expert systems.." Fuzzy Sets Syst. 0165-0114, 92 (2), 251-264. 10.1016/S0165-0114(97)00174-7
    • (1997) Fuzzy Sets Syst. , vol.92 , Issue.2 , pp. 251-264
    • Klir, G.J.1    Wang, Z.2    Harmanec, D.3
  • 9
    • 0027828985 scopus 로고
    • Least impact algorithm for resource allocation
    • 0315-1468.
    • Moselhi, A., and Lorterapong, P. (1993). " Least impact algorithm for resource allocation.." Can. J. Civ. Eng. 0315-1468, 20 (2), 180-188.
    • (1993) Can. J. Civ. Eng. , vol.20 , Issue.2 , pp. 180-188
    • Moselhi, A.1    Lorterapong, P.2
  • 10
    • 33645834140 scopus 로고    scopus 로고
    • Multiobjective optimal waste load allocation models for rivers using nondominated sorting genetic algorithm-II
    • " 0733-9496, (),. 10.1061/(ASCE)0733-9496(2006)132:3(133)
    • Murty Yandamuri, S. R., Srinivasan, K., and Murty Bhallamudi, S. (2006). " Multiobjective optimal waste load allocation models for rivers using nondominated sorting genetic algorithm-II.." J. Water Resour. Plann. Manage. 0733-9496, 132 (3), 133-143. 10.1061/(ASCE)0733-9496(2006)132:3(133)
    • (2006) J. Water Resour. Plann. Manage. , vol.132 , Issue.3 , pp. 133-143
    • Murty Yandamuri, S.R.1    Srinivasan, K.2    Murty Bhallamudi, S.3
  • 11
    • 13944256583 scopus 로고    scopus 로고
    • Incorporating practicability into genetic algorithm-based time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2002)128:2(139)
    • Que, B. C. (2002). " Incorporation practicability into genetic algorithm based time-cost optimization.." J. Constr. Eng. Manage. 0733-9364, 128 (2), 139-143. 10.1061/(ASCE)0733-9364(2002)128:2(139) (Pubitemid 40265561)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.2 , pp. 139-143
    • Que, B.C.1
  • 12
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
    • Senouci A. B., and Eldin N. N. (2004). " Use of genetic algorithms in resource scheduling of construction projects.." J. Constr. Eng. Manage. 0733-9364, 130 (6), 869-877. 10.1061/(ASCE)0733-9364(2004)130:6(869) (Pubitemid 40265320)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 13
    • 13944282626 scopus 로고    scopus 로고
    • Binary resource leveling model: Activity splitting allowed
    • DOI 10.1061/(ASCE)0733-9364(2004)130:6(887)
    • Son, J., and Mattila, K. G. (2004). " Binary resource leveling model: Activity splitting allowed.." J. Constr. Eng. Manage. 0733-9364, 130 (6), 887-894. 10.1061/(ASCE)0733-9364(2004)130:6(887) (Pubitemid 40265322)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.6 , pp. 887-894
    • Son, J.1    Mattila, K.G.2
  • 14
    • 0000852513 scopus 로고
    • Multi-objective function optimization using nondominated sorting genetic algorithms
    • 1063-6560, (),. 10.1162/evco.1994.2.3.221
    • Srinivas, N., and Deb, K. (1994). " Multi-objective function optimization using nondominated sorting genetic algorithms.." Evol. Comput. 1063-6560, 2 (3), 221-248. 10.1162/evco.1994.2.3.221
    • (1994) Evol. Comput. , vol.2 , Issue.3 , pp. 221-248
    • Srinivas, N.1    Deb, K.2
  • 15
    • 38149009704 scopus 로고    scopus 로고
    • Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(2008)134:2(153)
    • Xiong, Y., and Kuang, Y. (2008). " Applying an ant colony optimization algorithm-based multiobjective approach for time-cost trade-off.." J. Constr. Eng. Manage. 0733-9364, 134 (2), 153-156. 10.1061/(ASCE)0733-9364(2008)134:2(153)
    • (2008) J. Constr. Eng. Manage. , vol.134 , Issue.2 , pp. 153-156
    • Xiong, Y.1    Kuang, Y.2
  • 16
    • 34250644399 scopus 로고    scopus 로고
    • Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis
    • DOI 10.1061/(ASCE)0733-9364(2007)133:7(498)
    • Yang, I. -T. (2007). " Using elitist particle swarm optimization to facilitate bicriterion time-cost trade-off analysis.." J. Constr. Eng. Manage. 0733-9364, 133 (7), 498-505. 10.1061/(ASCE)0733-9364(2007)133:7(498) (Pubitemid 46935013)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.7 , pp. 498-505
    • Yang, I.-T.1
  • 17
    • 34248666540 scopus 로고
    • Fuzzy sets
    • 0019-9958, (),. 10.1016/S0019-9958(65)90241-X
    • Zadeh, L. A. (1965). " Fuzzy sets.." Inf. Control. 0019-9958, 8 (3), 338-353. 10.1016/S0019-9958(65)90241-X
    • (1965) Inf. Control. , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.A.1
  • 18
    • 12744266507 scopus 로고    scopus 로고
    • Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
    • DOI 10.1061/(ASCE)0733-9364(2005)131:2(176)
    • Zheng, D. X. M., and Ng S. T. (2005). " Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front.." J. Constr. Eng. Manage. 0733-9364, 131 (2), 176-186. 10.1061/(ASCE)0733-9364(2005)131:2(176) (Pubitemid 40155177)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.2 , pp. 176-186
    • Zheng, D.X.M.1    Ng, S.T.2
  • 19
    • 2342615793 scopus 로고    scopus 로고
    • Applying a genetic algorithm-based multiobjective approach for time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2004)130:2(168)
    • Zheng, D. X. M., Ng S. T., and Kumaraswamy M. M. (2004). " Applying a genetic algorithm-based multi-objective approach for time-cost optimization. J. Constr. Eng. Manage. 0733-9364, 130 (2), 168-176. 10.1061/(ASCE)0733- 9364(2004)130:2(168) (Pubitemid 40265383)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.2 , pp. 168-176
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3
  • 20
    • 12344265028 scopus 로고    scopus 로고
    • Applying pareto ranking and niche formation to genetic algorithm-based multiobjective time-cost optimization
    • DOI 10.1061/(ASCE)0733-9364(2005)131:1(81)
    • Zheng, D. X. M., Ng, S. T., and Kumaraswamy, M. M. (2005). " Applying Pareto ranking and niche formation to genetic algorithm-based multi-objective time-cost optimization.." J. Constr. Eng. Manage. 0733-9364, 131 (1), 81-91. 10.1061/(ASCE)0733-9364(2005)131:1(81) (Pubitemid 40135235)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 81-91
    • Zheng, D.X.M.1    Ng, S.T.2    Kumaraswamy, M.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.