Volumn 15, Issue 6, 2006, Pages 737-745

Intelligence approach to production planning system for bespoke precast concrete products

Author keywords

Artificial intelligence; Offsite prefabrication; Precast concrete products; Production planning

Indexed keywords

CONCRETE CONSTRUCTION; DATABASE SYSTEMS; PRODUCTION ENGINEERING; STRATEGIC PLANNING; STRUCTURAL DESIGN;

EID: 33748155228     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2005.09.007     Document Type: Article
Times cited : (49)

References (21)
  • 2
    • 0025745949 scopus 로고
    • The nature of estimating accuracy: developing correct associations
    • Ogunlana S., and Thrope A. The nature of estimating accuracy: developing correct associations. Building and Environment 26 2 (1991) 77-86
    • (1991) Building and Environment , vol.26 , Issue.2 , pp. 77-86
    • Ogunlana, S.1    Thrope, A.2
  • 3
    • 0036680651 scopus 로고    scopus 로고
    • A knowledge-based system for automatic measurement of steel reinforcement
    • Wang S., Cao Y., Yang R.Y., and Li H. A knowledge-based system for automatic measurement of steel reinforcement. Automation in Construction 11 5 (2002) 607-616
    • (2002) Automation in Construction , vol.11 , Issue.5 , pp. 607-616
    • Wang, S.1    Cao, Y.2    Yang, R.Y.3    Li, H.4
  • 4
    • 0033338322 scopus 로고    scopus 로고
    • Automation of quantity surveying in construction projects
    • Eben Saleh M.A. Automation of quantity surveying in construction projects. Journal of Architectural Engineering 5 4 (1999) 141-148
    • (1999) Journal of Architectural Engineering , vol.5 , Issue.4 , pp. 141-148
    • Eben Saleh, M.A.1
  • 5
    • 0036680230 scopus 로고    scopus 로고
    • Raster to vector conversion of construction engineering drawings
    • Song J., Su F., Li H., and Cai S. Raster to vector conversion of construction engineering drawings. Automation in Construction 11 5 (2002) 597-606
    • (2002) Automation in Construction , vol.11 , Issue.5 , pp. 597-606
    • Song, J.1    Su, F.2    Li, H.3    Cai, S.4
  • 7
    • 0028417085 scopus 로고
    • Estimating construction productivity: neural-network-based approach
    • Chao L.C., and Skibniewski M.J. Estimating construction productivity: neural-network-based approach. Journal of Computing in Civil Engineering 8 2 (1994) 234-251
    • (1994) Journal of Computing in Civil Engineering , vol.8 , Issue.2 , pp. 234-251
    • Chao, L.C.1    Skibniewski, M.J.2
  • 13
    • 0037289993 scopus 로고    scopus 로고
    • Thermal environment and construction workers' productivity: some evidence from Thailand
    • Srinavin K., and Mohamed S. Thermal environment and construction workers' productivity: some evidence from Thailand. Building and Environment 38 2 (2003) 339-345
    • (2003) Building and Environment , vol.38 , Issue.2 , pp. 339-345
    • Srinavin, K.1    Mohamed, S.2
  • 14
    • 0005061735 scopus 로고    scopus 로고
    • Quantity estimating of building with logarithm-neuron networks
    • Yeh I.C. Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management 124 5 (1998) 374-380
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.5 , pp. 374-380
    • Yeh, I.C.1
  • 16
    • 0012234280 scopus 로고    scopus 로고
    • Production scheduling for precast plants using a flow shop sequencing model
    • Chan W.T., and Hu H. Production scheduling for precast plants using a flow shop sequencing model. Journal of Computing in Civil Engineering 16 3 (2002) 165-174
    • (2002) Journal of Computing in Civil Engineering , vol.16 , Issue.3 , pp. 165-174
    • Chan, W.T.1    Hu, H.2
  • 17
    • 0035391119 scopus 로고    scopus 로고
    • Optimal repetitive scheduling model with sharable resource constraint
    • Leu S., and Hwang S. Optimal repetitive scheduling model with sharable resource constraint. Journal of Construction Engineering and Management 127 4 (2001) 270-280
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.4 , pp. 270-280
    • Leu, S.1    Hwang, S.2
  • 18
    • 13944259031 scopus 로고    scopus 로고
    • Flowshop scheduling model for bespoke precast concrete production planning
    • Benjaoran V., Dawood N., and Hobbs B. Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics 23 1 (2005) 93-105
    • (2005) Construction Management and Economics , vol.23 , Issue.1 , pp. 93-105
    • Benjaoran, V.1    Dawood, N.2    Hobbs, B.3
  • 19
    • 0029635352 scopus 로고
    • Heuristics for scheduling in flowshop with multiple objective
    • Rajendran C. Heuristics for scheduling in flowshop with multiple objective. European Journal of Operational Research 82 3 (1995) 540-555
    • (1995) European Journal of Operational Research , vol.82 , Issue.3 , pp. 540-555
    • Rajendran, C.1
  • 20
    • 0035341619 scopus 로고    scopus 로고
    • Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date
    • Sung C.S., and Min J.I. Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date. European Journal of Operational Research 131 1 (2001) 95-106
    • (2001) European Journal of Operational Research , vol.131 , Issue.1 , pp. 95-106
    • Sung, C.S.1    Min, J.I.2
  • 21
    • 33748155923 scopus 로고    scopus 로고
    • K. Karstila, IAI ST-3 precast concrete construction project document draft 3 review, IFC Release 3 Current Project: International Alliance for Interoperability (IAI), http://cic.vtt.fi/vera/Projects/e_pcc-ifc.htm (2003).


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.