-
2
-
-
0025745949
-
The nature of estimating accuracy: developing correct associations
-
Ogunlana S., and Thrope A. The nature of estimating accuracy: developing correct associations. Building and Environment 26 2 (1991) 77-86
-
(1991)
Building and Environment
, vol.26
, Issue.2
, pp. 77-86
-
-
Ogunlana, S.1
Thrope, A.2
-
3
-
-
0036680651
-
A knowledge-based system for automatic measurement of steel reinforcement
-
Wang S., Cao Y., Yang R.Y., and Li H. A knowledge-based system for automatic measurement of steel reinforcement. Automation in Construction 11 5 (2002) 607-616
-
(2002)
Automation in Construction
, vol.11
, Issue.5
, pp. 607-616
-
-
Wang, S.1
Cao, Y.2
Yang, R.Y.3
Li, H.4
-
4
-
-
0033338322
-
Automation of quantity surveying in construction projects
-
Eben Saleh M.A. Automation of quantity surveying in construction projects. Journal of Architectural Engineering 5 4 (1999) 141-148
-
(1999)
Journal of Architectural Engineering
, vol.5
, Issue.4
, pp. 141-148
-
-
Eben Saleh, M.A.1
-
5
-
-
0036680230
-
Raster to vector conversion of construction engineering drawings
-
Song J., Su F., Li H., and Cai S. Raster to vector conversion of construction engineering drawings. Automation in Construction 11 5 (2002) 597-606
-
(2002)
Automation in Construction
, vol.11
, Issue.5
, pp. 597-606
-
-
Song, J.1
Su, F.2
Li, H.3
Cai, S.4
-
6
-
-
27144527260
-
Taking-off and 3D data modeling from 2D CAD data
-
Kim W., Jung Y., Park Y., and Lee S. Taking-off and 3D data modeling from 2D CAD data. Proceedings of the 4th ECPPM, Slovenia (2002) 457-458
-
(2002)
Proceedings of the 4th ECPPM, Slovenia
, pp. 457-458
-
-
Kim, W.1
Jung, Y.2
Park, Y.3
Lee, S.4
-
7
-
-
0028417085
-
Estimating construction productivity: neural-network-based approach
-
Chao L.C., and Skibniewski M.J. Estimating construction productivity: neural-network-based approach. Journal of Computing in Civil Engineering 8 2 (1994) 234-251
-
(1994)
Journal of Computing in Civil Engineering
, vol.8
, Issue.2
, pp. 234-251
-
-
Chao, L.C.1
Skibniewski, M.J.2
-
12
-
-
0346255639
-
Demotivating factors influencing the productivity of civil engineering projects
-
Ng S.T., Skitmore R.M., Lam K.C., and Poon A.W.C. Demotivating factors influencing the productivity of civil engineering projects. International Journal of Project Management 22 2 (2003) 139-146
-
(2003)
International Journal of Project Management
, vol.22
, Issue.2
, pp. 139-146
-
-
Ng, S.T.1
Skitmore, R.M.2
Lam, K.C.3
Poon, A.W.C.4
-
13
-
-
0037289993
-
Thermal environment and construction workers' productivity: some evidence from Thailand
-
Srinavin K., and Mohamed S. Thermal environment and construction workers' productivity: some evidence from Thailand. Building and Environment 38 2 (2003) 339-345
-
(2003)
Building and Environment
, vol.38
, Issue.2
, pp. 339-345
-
-
Srinavin, K.1
Mohamed, S.2
-
14
-
-
0005061735
-
Quantity estimating of building with logarithm-neuron networks
-
Yeh I.C. Quantity estimating of building with logarithm-neuron networks. Journal of Construction Engineering and Management 124 5 (1998) 374-380
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.5
, pp. 374-380
-
-
Yeh, I.C.1
-
16
-
-
0012234280
-
Production scheduling for precast plants using a flow shop sequencing model
-
Chan W.T., and Hu H. Production scheduling for precast plants using a flow shop sequencing model. Journal of Computing in Civil Engineering 16 3 (2002) 165-174
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.3
, pp. 165-174
-
-
Chan, W.T.1
Hu, H.2
-
17
-
-
0035391119
-
Optimal repetitive scheduling model with sharable resource constraint
-
Leu S., and Hwang S. Optimal repetitive scheduling model with sharable resource constraint. Journal of Construction Engineering and Management 127 4 (2001) 270-280
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.4
, pp. 270-280
-
-
Leu, S.1
Hwang, S.2
-
18
-
-
13944259031
-
Flowshop scheduling model for bespoke precast concrete production planning
-
Benjaoran V., Dawood N., and Hobbs B. Flowshop scheduling model for bespoke precast concrete production planning. Construction Management and Economics 23 1 (2005) 93-105
-
(2005)
Construction Management and Economics
, vol.23
, Issue.1
, pp. 93-105
-
-
Benjaoran, V.1
Dawood, N.2
Hobbs, B.3
-
19
-
-
0029635352
-
Heuristics for scheduling in flowshop with multiple objective
-
Rajendran C. Heuristics for scheduling in flowshop with multiple objective. European Journal of Operational Research 82 3 (1995) 540-555
-
(1995)
European Journal of Operational Research
, vol.82
, Issue.3
, pp. 540-555
-
-
Rajendran, C.1
-
20
-
-
0035341619
-
Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date
-
Sung C.S., and Min J.I. Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date. European Journal of Operational Research 131 1 (2001) 95-106
-
(2001)
European Journal of Operational Research
, vol.131
, Issue.1
, pp. 95-106
-
-
Sung, C.S.1
Min, J.I.2
-
21
-
-
33748155923
-
-
K. Karstila, IAI ST-3 precast concrete construction project document draft 3 review, IFC Release 3 Current Project: International Alliance for Interoperability (IAI), http://cic.vtt.fi/vera/Projects/e_pcc-ifc.htm (2003).
-
-
-
|