메뉴 건너뛰기




Volumn 22, Issue , 2012, Pages 123-134

Planning and design models for construction industry: A critical survey

Author keywords

Construction management; Critical survey; Planning and design models

Indexed keywords

BASIC PRINCIPLES; CONSTRUCTION ENGINEERING; CONSTRUCTION MANAGEMENT; CONSTRUCTION OPERATIONS; DESIGN AND OPERATIONS; DESIGN VARIABLES; ECONOMIC BENEFITS; EFFECTIVE PLANNING; LOGISTICS OPERATIONS; PLANNING AND DESIGN; PLANNING AND DESIGN MODELS; REAL LIFE DATA; SIMULATION-BASED;

EID: 84857366732     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2011.09.011     Document Type: Conference Paper
Times cited : (39)

References (86)
  • 2
    • 49749097236 scopus 로고    scopus 로고
    • Explaining cooperative behavior in building and civil engineering projects' claim process: Interactive effects of outcome favorability and procedural fairness
    • A.A. Aibinu, G. Ofori, and F.Y.Y. Ling Explaining cooperative behavior in building and civil engineering projects' claim process: interactive effects of outcome favorability and procedural fairness Journal of Construction Engineering and Management 134 9 2008 681 691
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.9 , pp. 681-691
    • Aibinu, A.A.1    Ofori, G.2    Ling, F.Y.Y.3
  • 4
    • 74249112184 scopus 로고    scopus 로고
    • A simple correlation for estimation of economic thickness of thermal insulation for process piping and equipment
    • A. Bahadori, and H.B. Vuthaluru A simple correlation for estimation of economic thickness of thermal insulation for process piping and equipment Applied Thermal Engineering 30 2-3 2010 254 259
    • (2010) Applied Thermal Engineering , vol.30 , Issue.23 , pp. 254-259
    • Bahadori, A.1    Vuthaluru, H.B.2
  • 5
    • 33645035011 scopus 로고    scopus 로고
    • Determination of optimum insulation thickness for building walls with respect to various fuels and climate zones in Turkey
    • A. Bolatturk Determination of optimum insulation thickness for building walls with respect to various fuels and climate zones in Turkey Applied Thermal Engineering 26 11 2006 1301 1309
    • (2006) Applied Thermal Engineering , vol.26 , Issue.11 , pp. 1301-1309
    • Bolatturk, A.1
  • 7
    • 77951141677 scopus 로고    scopus 로고
    • A criterion of production model selection for building material with delivery delay
    • D.B. Cao, Y. Yin, and I. Kaku A criterion of production model selection for building material with delivery delay International Journal of Production Research 48 12 2010 3429 3443
    • (2010) International Journal of Production Research , vol.48 , Issue.12 , pp. 3429-3443
    • Cao, D.B.1    Yin, Y.2    Kaku, I.3
  • 8
    • 79551684688 scopus 로고    scopus 로고
    • A Petri net simulation model for virtual construction of earthmoving operations
    • F.F. Cheng, Y.W. Wang, Z.X. Ling, and Y. Bai A Petri net simulation model for virtual construction of earthmoving operations Automation in Construction 20 2 2011 181 188
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 181-188
    • Cheng, F.F.1    Wang, Y.W.2    Ling, Z.X.3    Bai, Y.4
  • 9
    • 77955715122 scopus 로고    scopus 로고
    • Estimate at completion for construction projects using evolutionary support vector machine interference model
    • M.Y. Cheng, H.S. Peng, Y.W. Wu, and T.L. Chen Estimate at completion for construction projects using evolutionary support vector machine interference model Automation in Construction 19 5 2011 619 629
    • (2011) Automation in Construction , vol.19 , Issue.5 , pp. 619-629
    • Cheng, M.Y.1    Peng, H.S.2    Wu, Y.W.3    Chen, T.L.4
  • 10
    • 67949111059 scopus 로고    scopus 로고
    • Entro-based scheduling of resource-constrained construction projects
    • S. Christodoulou, S. Ellinas, and P. Astani Entro-based scheduling of resource-constrained construction projects Automation in Construction 18 7 2009 919 928
    • (2009) Automation in Construction , vol.18 , Issue.7 , pp. 919-928
    • Christodoulou, S.1    Ellinas, S.2    Astani, P.3
  • 11
    • 0037332442 scopus 로고    scopus 로고
    • Optimum insulation thickness of external walls for energy saving
    • K. ÇomaklI, and B. Yüksel Optimum insulation thickness of external walls for energy saving Applied Thermal Engineering 23 4 2003 473 479
    • (2003) Applied Thermal Engineering , vol.23 , Issue.4 , pp. 473-479
    • Çomakli, K.1    Yüksel, B.2
  • 13
    • 1642436941 scopus 로고    scopus 로고
    • From supply chain to demand chain: The role of lead time reduction in improving demand chain performance
    • S. de Treville, R.D. Shapiro, and A.-P. Hameri From supply chain to demand chain: the role of lead time reduction in improving demand chain performance Journal of Operations Management 21 6 2004 613 627
    • (2004) Journal of Operations Management , vol.21 , Issue.6 , pp. 613-627
    • De Treville, S.1    Shapiro, R.D.2    Hameri, A.-P.3
  • 14
    • 33745134436 scopus 로고    scopus 로고
    • Optimization of insulation thickness for external walls using different energy-source
    • Ö.A. DombaycI, M. Gölcö, and Y. Pancar Optimization of insulation thickness for external walls using different energy-source Applied Energy 83 9 2006 921 928
    • (2006) Applied Energy , vol.83 , Issue.9 , pp. 921-928
    • Dombayci, Ö.A.1    Gölcö, M.2    Pancar, Y.3
  • 18
    • 29144449379 scopus 로고    scopus 로고
    • Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks
    • C.-W. Feng, and H.T. Wu Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks Automation in Construction 15 2 2006 186 199
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 186-199
    • Feng, C.-W.1    Wu, H.T.2
  • 19
    • 0742306058 scopus 로고    scopus 로고
    • Integrating closed loop supply chains and spare-parts management at IBM
    • M. Fleischmann, J.A.E.E. van Nunen, and B. Gräve Integrating closed loop supply chains and spare-parts management at IBM Interfaces 33 6 2003 44 56
    • (2003) Interfaces , vol.33 , Issue.6 , pp. 44-56
    • Fleischmann, M.1    Van Nunen, J.A.E.E.2    Gräve, B.3
  • 20
    • 34249860742 scopus 로고    scopus 로고
    • A chronographic method for construction project planning
    • A. Francis, and E. Miresco A chronographic method for construction project planning Canadian Journal of Civil Engineering 33 12 2006 1547 1557
    • (2006) Canadian Journal of Civil Engineering , vol.33 , Issue.12 , pp. 1547-1557
    • Francis, A.1    Miresco, E.2
  • 21
    • 0001907722 scopus 로고
    • Rapid, accurate optimization of difficult problems using fast messy genetic algorithms
    • Forrest Stephanie, Morgan Kaufmann Publishers Inc San Francisco, CA 1-55860-299-2
    • D.E. Goldberg, K. Deb, H. Kaegupta, and G. Harik Rapid, accurate optimization of difficult problems using fast messy genetic algorithms Forrest Stephanie, Proceedings of the Fifth International Conference on Genetic Algorithms 1993 Morgan Kaufmann Publishers Inc San Francisco, CA 1-55860-299-2 56 64
    • (1993) Proceedings of the Fifth International Conference on Genetic Algorithms , pp. 56-64
    • Goldberg, D.E.1    Deb, K.2    Kaegupta, H.3    Harik, G.4
  • 22
    • 57649231503 scopus 로고    scopus 로고
    • Multi-objective design of work-in-process buffer for scheduling repetitive building projects
    • V. González, L.F. Alarcón, and K. Molenaar Multi-objective design of work-in-process buffer for scheduling repetitive building projects Automation in Construction 18 2 2009 95 108
    • (2009) Automation in Construction , vol.18 , Issue.2 , pp. 95-108
    • González, V.1    Alarcón, L.F.2    Molenaar, K.3
  • 23
    • 38749139945 scopus 로고    scopus 로고
    • The single vehicle routing problem with deliveries and selective pickups
    • I. Gribkovskaia, G. Laporte, and A. Shyshou The single vehicle routing problem with deliveries and selective pickups Computers and Operational Research 35 9 2008 2908 2924
    • (2008) Computers and Operational Research , vol.35 , Issue.9 , pp. 2908-2924
    • Gribkovskaia, I.1    Laporte, G.2    Shyshou, A.3
  • 24
    • 34249829615 scopus 로고    scopus 로고
    • Internalization of transportation external costs: Impact analysis of logistics company mode and route choices
    • S.-P. Guo Internalization of transportation external costs: impact analysis of logistics company mode and route choices Transportation Planning and Technology 30 2-3 2007 147 165
    • (2007) Transportation Planning and Technology , vol.30 , Issue.23 , pp. 147-165
    • Guo, S.-P.1
  • 27
    • 0033148279 scopus 로고    scopus 로고
    • Optimizing insulation thickness for buildings using life-cycle cost
    • A. Hasan Optimizing insulation thickness for buildings using life-cycle cost Applied Energy 63 2 1999 115 124
    • (1999) Applied Energy , vol.63 , Issue.2 , pp. 115-124
    • Hasan, A.1
  • 28
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithm
    • T. Hegazy Optimization of resource allocation and leveling using genetic algorithm Journal of Construction Engineering and Management 125 3 1999 167 175
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 29
  • 30
    • 0035254136 scopus 로고    scopus 로고
    • A note on the paper "resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al
    • W. Herroelen, E. Demeulemeester, and B.D. Reyck A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al European Journal of Operational Research 128 3 2001 679 688
    • (2001) European Journal of Operational Research , vol.128 , Issue.3 , pp. 679-688
    • Herroelen, W.1    Demeulemeester, E.2    Reyck, B.D.3
  • 33
    • 0012303148 scopus 로고    scopus 로고
    • Managing Uncertainty in the Piping Process
    • Construction Industry Institute University of Texas, Austin, TX
    • G. Howell, and G. Ballard Managing Uncertainty in the Piping Process RR47-13 1996 Construction Industry Institute University of Texas, Austin, TX
    • (1996) RR47-13
    • Howell, G.1    Ballard, G.2
  • 35
    • 67349247794 scopus 로고    scopus 로고
    • Modeling building projects as a basis for change control
    • S. Isaac, and R. Navon Modeling building projects as a basis for change control Automation in Construction 18 5 2010 656 664
    • (2010) Automation in Construction , vol.18 , Issue.5 , pp. 656-664
    • Isaac, S.1    Navon, R.2
  • 36
    • 77955715185 scopus 로고    scopus 로고
    • Two design patterns for facilitating building information model-based synchronous collaboration
    • U. Isikdag, and J. Underwood Two design patterns for facilitating building information model-based synchronous collaboration Automation in Construction 19 5 2010 544 553
    • (2010) Automation in Construction , vol.19 , Issue.5 , pp. 544-553
    • Isikdag, U.1    Underwood, J.2
  • 38
    • 79551688323 scopus 로고    scopus 로고
    • Building information modeling (BIM) framework for practical implementation
    • Y. Jung, and M. Joo Building information modeling (BIM) framework for practical implementation Automation in Construction 20 2 2011 126 133
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 126-133
    • Jung, Y.1    Joo, M.2
  • 40
    • 71749101621 scopus 로고    scopus 로고
    • Numerical simulation of turbulent natural convection in a rectangular enclosure having finite thickness walls
    • G.V. Kuznetsov, and M.A. Sheremet Numerical simulation of turbulent natural convection in a rectangular enclosure having finite thickness walls International Journal of Heat and Mass Transfer 53 1-3 2010 163 177
    • (2010) International Journal of Heat and Mass Transfer , vol.53 , Issue.13 , pp. 163-177
    • Kuznetsov, G.V.1    Sheremet, M.A.2
  • 42
    • 33846441626 scopus 로고    scopus 로고
    • Dynamic prediction model of as-built roughness in asphaltic concrete pavement construction
    • D.G. Lee Dynamic prediction model of as-built roughness in asphaltic concrete pavement construction Journal of Transportation Engineering 133 2 2007 90 95
    • (2007) Journal of Transportation Engineering , vol.133 , Issue.2 , pp. 90-95
    • Lee, D.G.1
  • 44
    • 58149215529 scopus 로고    scopus 로고
    • Automated collection of mixer truck operations data in highly dense urban areas
    • M. Lu, X. Shen, and W. Chen Automated collection of mixer truck operations data in highly dense urban areas Journal of Construction Engineering and Management 135 11 2009 1232 1240
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.11 , pp. 1232-1240
    • Lu, M.1    Shen, X.2    Chen, W.3
  • 45
    • 76549114928 scopus 로고    scopus 로고
    • An evaluation of the applicability of 4D CAD on construction projects
    • A. Mahalingam, R. Kashyap, and C. Mahajan An evaluation of the applicability of 4D CAD on construction projects Automation in Construction 19 2 2010 148 159
    • (2010) Automation in Construction , vol.19 , Issue.2 , pp. 148-159
    • Mahalingam, A.1    Kashyap, R.2    Mahajan, C.3
  • 46
    • 77950459074 scopus 로고    scopus 로고
    • Cost benefits analysis and emission reductions of optimum thickness and air gaps for selected insulation materials for building walls in Maldives
    • T.M.I. Mahlia, and A. Iqbal Cost benefits analysis and emission reductions of optimum thickness and air gaps for selected insulation materials for building walls in Maldives Energy 35 5 2010 2242 2250
    • (2010) Energy , vol.35 , Issue.5 , pp. 2242-2250
    • Mahlia, T.M.I.1    Iqbal, A.2
  • 47
    • 33845724123 scopus 로고    scopus 로고
    • Correlation between thermal conductivity and the thickness of selected insulation materials for building wall
    • T.M.I. Mahlia, B.N. Taufiq, Ismail, and H.H. Masjuki Correlation between thermal conductivity and the thickness of selected insulation materials for building wall Energy and Buildings 39 2 2007 182 187
    • (2007) Energy and Buildings , vol.39 , Issue.2 , pp. 182-187
    • Mahlia, T.M.I.1    Taufiq, B.N.2    Ismail3    Masjuki, H.H.4
  • 48
    • 34249654660 scopus 로고    scopus 로고
    • Consumer and investment demand for manufactured housing units
    • M.I. Marshall, and T.L. Marsh Consumer and investment demand for manufactured housing units Journal of Housing Economics 16 1 2007 59 71
    • (2007) Journal of Housing Economics , vol.16 , Issue.1 , pp. 59-71
    • Marshall, M.I.1    Marsh, T.L.2
  • 49
    • 33750166776 scopus 로고    scopus 로고
    • Comparative analysis between manufacturing and construction enterprises on the use of formalized quality management systems
    • [Electronic publication]
    • S.W. McCrary, R.R. Smith, and R.N. Callahan Comparative analysis between manufacturing and construction enterprises on the use of formalized quality management systems Journal of Industrial Technology 22 3 2006 1 8 [Electronic publication]
    • (2006) Journal of Industrial Technology , vol.22 , Issue.3 , pp. 1-8
    • McCrary, S.W.1    Smith, R.R.2    Callahan, R.N.3
  • 50
    • 51849154229 scopus 로고    scopus 로고
    • Agent-based construction supply chain simulator for measuring the value of real-time information sharing in construction
    • J.U. Min, and H.C. Bjornsson Agent-based construction supply chain simulator for measuring the value of real-time information sharing in construction Journal of Management in Engineering 24 4 2008 245 254
    • (2008) Journal of Management in Engineering , vol.24 , Issue.4 , pp. 245-254
    • Min, J.U.1    Bjornsson, H.C.2
  • 51
    • 31144456119 scopus 로고    scopus 로고
    • Bid calculation for construction projects: Regulations and incentives effects of unit price contracts
    • H. Missbauer, and W. Hauber Bid calculation for construction projects: regulations and incentives effects of unit price contracts European Journal of Operational Research 171 3 2006 1005 1019
    • (2006) European Journal of Operational Research , vol.171 , Issue.3 , pp. 1005-1019
    • Missbauer, H.1    Hauber, W.2
  • 53
    • 79954595319 scopus 로고    scopus 로고
    • A decision-making system for construction site layout planning
    • X. Ning, K.C. Lam, and M.C.K. Lam A decision-making system for construction site layout planning Automation in Construction 20 4 2011 459 473
    • (2011) Automation in Construction , vol.20 , Issue.4 , pp. 459-473
    • Ning, X.1    Lam, K.C.2    Lam, M.C.K.3
  • 57
    • 77949485153 scopus 로고    scopus 로고
    • The use of virtual building design and construction models for developing an effective project concept in 5D environment
    • V. Popov, V. Juocevicius, D. Migilinskas, L. Ustinovichius, and S. Mikalauskas The use of virtual building design and construction models for developing an effective project concept in 5D environment Automation in Construction 19 3 2010 357 367
    • (2010) Automation in Construction , vol.19 , Issue.3 , pp. 357-367
    • Popov, V.1    Juocevicius, V.2    Migilinskas, D.3    Ustinovichius, L.4    Mikalauskas, S.5
  • 58
    • 58149233753 scopus 로고    scopus 로고
    • Study of factors influencing the efficiency management and downtime consequences equipment in Thailand
    • R. Prasertrungruang, and B.H.W. Hadikusumo Study of factors influencing the efficiency management and downtime consequences equipment in Thailand Journal of Construction Engineering and Management 135 1 2009 2 11
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.1 , pp. 2-11
    • Prasertrungruang, R.1    Hadikusumo, B.H.W.2
  • 60
    • 57649149304 scopus 로고    scopus 로고
    • Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
    • A. Russell, S. Staub-French, N. Tran, and W. Wong Visualizing high-rise building construction strategies using linear scheduling and 4D CAD Automation in Construction 18 2 2008 219 236
    • (2008) Automation in Construction , vol.18 , Issue.2 , pp. 219-236
    • Russell, A.1    Staub-French, S.2    Tran, N.3    Wong, W.4
  • 61
    • 58149232226 scopus 로고    scopus 로고
    • Quantifying qualitative information on risks: Development of QQIR Method
    • T. Sachs, and R.L.K. Tiong Quantifying qualitative information on risks: development of QQIR Method Journal of Construction Engineering and Management 135 1 2009 56 71
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.1 , pp. 56-71
    • Sachs, T.1    Tiong, R.L.K.2
  • 62
    • 35148820294 scopus 로고    scopus 로고
    • Integrating of production planning, project management and logistics for supply chain management
    • P. Samaranayake, and D. Toncich Integrating of production planning, project management and logistics for supply chain management International Journal of Production Research 45 22 2007 5417 5447
    • (2007) International Journal of Production Research , vol.45 , Issue.22 , pp. 5417-5447
    • Samaranayake, P.1    Toncich, D.2
  • 64
    • 63849343462 scopus 로고    scopus 로고
    • An integrated methodology for assessment and selection of the project risk response actions
    • S.M. Seyedhoseini, S. Noori, and M.A. Hatefi An integrated methodology for assessment and selection of the project risk response actions Risk Analysis 29 5 2009 752 763
    • (2009) Risk Analysis , vol.29 , Issue.5 , pp. 752-763
    • Seyedhoseini, S.M.1    Noori, S.2    Hatefi, M.A.3
  • 65
    • 79551689722 scopus 로고    scopus 로고
    • A theoretical framework for a BIM-based multi-disciplinary collaboration platform
    • V. Singh, N. Gu, and X.Y. Wang A theoretical framework for a BIM-based multi-disciplinary collaboration platform Automation in Construction 20 2 2011 134 144
    • (2011) Automation in Construction , vol.20 , Issue.2 , pp. 134-144
    • Singh, V.1    Gu, N.2    Wang, X.Y.3
  • 66
    • 0027608522 scopus 로고
    • Optimization of insulation thicknesses using Micros
    • H. Sofrata, and B. Salmeen Optimization of insulation thicknesses using Micros Energy Conversion and Management 34 6 1993 471 479
    • (1993) Energy Conversion and Management , vol.34 , Issue.6 , pp. 471-479
    • Sofrata, H.1    Salmeen, B.2
  • 67
    • 0032735819 scopus 로고    scopus 로고
    • Optimum insulation thickness for refrigeration applications
    • M.S. Söylemez, and M.U. Ünsal Optimum insulation thickness for refrigeration applications Energy Conversion and Management 40 1 1999 13 21
    • (1999) Energy Conversion and Management , vol.40 , Issue.1 , pp. 13-21
    • Söylemez, M.S.1    Ünsal, M.U.2
  • 68
    • 34250429565 scopus 로고
    • Estimating the weights of multiple attributes in a composite criteria using pair-wise judgment
    • V. Srinivasan, and A.D. Shocher Estimating the weights of multiple attributes in a composite criteria using pair-wise judgment Psychometrika 38 4 1973 473 493
    • (1973) Psychometrika , vol.38 , Issue.4 , pp. 473-493
    • Srinivasan, V.1    Shocher, A.D.2
  • 70
    • 33845772209 scopus 로고    scopus 로고
    • Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme
    • K. Subprasom, and A. Chen Effects of regulation on highway pricing and capacity choice of a build-operate-transfer scheme Journal of Construction Engineering and Management 131 1 2007 64 71
    • (2007) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 64-71
    • Subprasom, K.1    Chen, A.2
  • 71
    • 33845986388 scopus 로고    scopus 로고
    • A flexible adaptable memory-based algorithm for real-life transportation operations: Two case studies from dairy and construction sector
    • C.D. Tarantilis, and C.T. Kiranoudis A flexible adaptable memory-based algorithm for real-life transportation operations: two case studies from dairy and construction sector European Journal of Operational Research 179 3 2007 806 822
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 806-822
    • Tarantilis, C.D.1    Kiranoudis, C.T.2
  • 74
    • 13944281185 scopus 로고    scopus 로고
    • Role of workforce management in bridge superstructure labor productivity
    • H.R. Thomas, R.E. Minchin, and D. Chen Role of workforce management in bridge superstructure labor productivity Journal of Management in Engineering 19 1 2003 9 16
    • (2003) Journal of Management in Engineering , vol.19 , Issue.1 , pp. 9-16
    • Thomas, H.R.1    Minchin, R.E.2    Chen, D.3
  • 76
    • 2342419514 scopus 로고    scopus 로고
    • Impact of variability and uncertainty on product and process development
    • American Society of Civil Engineers Reston, VA
    • I.D. Tommelein Impact of variability and uncertainty on product and process development Proceedings of Construction Congress, VI 2000 American Society of Civil Engineers Reston, VA 969 976
    • (2000) Proceedings of Construction Congress, VI , pp. 969-976
    • Tommelein, I.D.1
  • 82
    • 34948868259 scopus 로고    scopus 로고
    • Dynamic mobile RFID-based supply chain control and management systems in construction
    • L.C. Wang, Y.C. Lin, and P.H. Lin Dynamic mobile RFID-based supply chain control and management systems in construction Advanced Engineering Informatics 21 4 2007 377 390
    • (2007) Advanced Engineering Informatics , vol.21 , Issue.4 , pp. 377-390
    • Wang, L.C.1    Lin, Y.C.2    Lin, P.H.3
  • 86
    • 33847621652 scopus 로고    scopus 로고
    • Optimal simplified thermal methods of building envelope based on frequency domain regression using genetic algorithm
    • X. Xu, and S. Wang Optimal simplified thermal methods of building envelope based on frequency domain regression using genetic algorithm Energy and Building 39 5 2006 525 536
    • (2006) Energy and Building , vol.39 , Issue.5 , pp. 525-536
    • Xu, X.1    Wang, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.