메뉴 건너뛰기




Volumn 19, Issue 3, 2010, Pages 357-367

The use of a virtual building design and construction model for developing an effective project concept in 5D environment

Author keywords

Building information modeling; Comparison of alternatives; Construction process simulation; Cost estimating system; Project variant; Virtual project development

Indexed keywords

APPLICATION PROGRAMS; BUILDING INFORMATION MODELING; CONSTRUCTION PROCESS; CONSTRUCTION PRODUCTS; COST ESTIMATIONS; DESIGN AND CONSTRUCTION; DRIVING FORCES; FACILITY MANAGEMENT; INFORMATION MODELING; INVESTMENT PROJECTS; MULTIPLE-CRITERIA EVALUATION; NUMERICAL SIMULATION; QUALITY REQUIREMENTS; TECHNOLOGICAL ENHANCEMENT; VIRTUAL BUILDING; VIRTUAL PROJECTS;

EID: 77949485153     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2009.12.005     Document Type: Article
Times cited : (119)

References (47)
  • 2
    • 0141792669 scopus 로고    scopus 로고
    • Constructively simple estimating: a project management example
    • Chapman C., and Ward S. Constructively simple estimating: a project management example. Journal of the Operational Research Society 54 10 (2003) 1050-1058
    • (2003) Journal of the Operational Research Society , vol.54 , Issue.10 , pp. 1050-1058
    • Chapman, C.1    Ward, S.2
  • 3
    • 33749588925 scopus 로고    scopus 로고
    • Automated management, modeling and choosing of economically effective variant in construction
    • Ustinovičius L., Popov V., and Migilinskas D. Automated management, modeling and choosing of economically effective variant in construction. Transport and Telecommunication 6 1 (2005) 183-189
    • (2005) Transport and Telecommunication , vol.6 , Issue.1 , pp. 183-189
    • Ustinovičius, L.1    Popov, V.2    Migilinskas, D.3
  • 4
    • 13244275240 scopus 로고    scopus 로고
    • Application of 4D for dynamic site layout and management of construction projects
    • Ma Z., Shen Q., and Zhang J. Application of 4D for dynamic site layout and management of construction projects. Automation in Construction 14 3 (2005) 369-381
    • (2005) Automation in Construction , vol.14 , Issue.3 , pp. 369-381
    • Ma, Z.1    Shen, Q.2    Zhang, J.3
  • 5
    • 33745969646 scopus 로고    scopus 로고
    • Big buzz for BIM
    • Hoekstra J. Big buzz for BIM. Architecture 92 7 (2003) 79-82
    • (2003) Architecture , vol.92 , Issue.7 , pp. 79-82
    • Hoekstra, J.1
  • 6
    • 38649103110 scopus 로고    scopus 로고
    • Automated retrieval of 3D CAD model objects in construction range images
    • Bosche F., and Haas C.T. Automated retrieval of 3D CAD model objects in construction range images. Automation in Construction 17 4 (2008) 499-512
    • (2008) Automation in Construction , vol.17 , Issue.4 , pp. 499-512
    • Bosche, F.1    Haas, C.T.2
  • 7
    • 0141754116 scopus 로고    scopus 로고
    • Development of software for multiple criteria evaluation
    • Zavadskas E.K., Ustinovichius L., and Peldschus F. Development of software for multiple criteria evaluation. Informatica 14 2 (2003) 259-272
    • (2003) Informatica , vol.14 , Issue.2 , pp. 259-272
    • Zavadskas, E.K.1    Ustinovichius, L.2    Peldschus, F.3
  • 8
    • 34548230481 scopus 로고    scopus 로고
    • Application of a quantitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction
    • Ustinovichius L., Zavadskas E.K., and Podvezko V. Application of a quantitative multiple criteria decision making (MCDM-1) approach to the analysis of investments in construction. Control and Cybernetics 36 1 (2007) 251-268
    • (2007) Control and Cybernetics , vol.36 , Issue.1 , pp. 251-268
    • Ustinovichius, L.1    Zavadskas, E.K.2    Podvezko, V.3
  • 9
    • 2342628012 scopus 로고    scopus 로고
    • Model-based computer-aided design environment for operational design
    • Gabbar H.A., Aoyama A., and Naka Y. Model-based computer-aided design environment for operational design. Computers & Industrial Engineering 46 3 (2004) 413-430
    • (2004) Computers & Industrial Engineering , vol.46 , Issue.3 , pp. 413-430
    • Gabbar, H.A.1    Aoyama, A.2    Naka, Y.3
  • 12
    • 0035239263 scopus 로고    scopus 로고
    • Project management under risk: using the real options approach to evaluate flexibility in R&D
    • Huchzermeier A., and Loch C.H. Project management under risk: using the real options approach to evaluate flexibility in R&D. Management Science 47 1 (2001) 85-101
    • (2001) Management Science , vol.47 , Issue.1 , pp. 85-101
    • Huchzermeier, A.1    Loch, C.H.2
  • 13
    • 85160481888 scopus 로고    scopus 로고
    • New construction management practice based on the virtual reality technology
    • Issa R.R.A., Flood I., and O'Brien W.J. (Eds), A.A. Balkema Publishers, Lisse
    • Leinonen J., and Kähkönen K. New construction management practice based on the virtual reality technology. In: Issa R.R.A., Flood I., and O'Brien W.J. (Eds). 4D CAD and Visualization in Construction (2003), A.A. Balkema Publishers, Lisse 75-100
    • (2003) 4D CAD and Visualization in Construction , pp. 75-100
    • Leinonen, J.1    Kähkönen, K.2
  • 15
    • 0346008100 scopus 로고    scopus 로고
    • Plausibility in the planning process - reason and confidence in the computer-aided design and planning of buildings
    • Donath D., Loemker T.M., and Richter K. Plausibility in the planning process - reason and confidence in the computer-aided design and planning of buildings. Automation in Construction 13 2 (2004) 159-166
    • (2004) Automation in Construction , vol.13 , Issue.2 , pp. 159-166
    • Donath, D.1    Loemker, T.M.2    Richter, K.3
  • 16
    • 77949489264 scopus 로고    scopus 로고
    • The time-cost trade-off analysis in construction project using computer simulation and interactive procedure
    • Błaszczyk T., and Nowak M. The time-cost trade-off analysis in construction project using computer simulation and interactive procedure. Technological and Economic Development of Economy 15 4 (2009) 523-539
    • (2009) Technological and Economic Development of Economy , vol.15 , Issue.4 , pp. 523-539
    • Błaszczyk, T.1    Nowak, M.2
  • 19
    • 47149101108 scopus 로고    scopus 로고
    • Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique
    • Turskis Z. Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique. Technological and Economic Development of Economy 14 2 (2008) 224-239
    • (2008) Technological and Economic Development of Economy , vol.14 , Issue.2 , pp. 224-239
    • Turskis, Z.1
  • 20
    • 33749596980 scopus 로고    scopus 로고
    • Computer-aided modelling, evaluation and management of construction project according PLM concept
    • Migilinskas D., and Ustinovichius L. Computer-aided modelling, evaluation and management of construction project according PLM concept. Lecture Notes in Computer Science 4101 (2006) 242-250
    • (2006) Lecture Notes in Computer Science , vol.4101 , pp. 242-250
    • Migilinskas, D.1    Ustinovichius, L.2
  • 21
    • 33745989316 scopus 로고    scopus 로고
    • Complex usage of 4D information modeling concept for building design, estimation, scheduling and determination of effective variants
    • Popov V., Mikalauskas S., Migilinskas D., and Vainiunas P. Complex usage of 4D information modeling concept for building design, estimation, scheduling and determination of effective variants. Technological and Economic Development of Economy 12 2 (2006) 91-98
    • (2006) Technological and Economic Development of Economy , vol.12 , Issue.2 , pp. 91-98
    • Popov, V.1    Mikalauskas, S.2    Migilinskas, D.3    Vainiunas, P.4
  • 22
    • 1642618587 scopus 로고    scopus 로고
    • Parametric 3D modeling in building construction with examples from precast concrete
    • Sacks R., Eastmanand C.M., and Lee G. Parametric 3D modeling in building construction with examples from precast concrete. Automation in Construction 13 3 (2004) 291-312
    • (2004) Automation in Construction , vol.13 , Issue.3 , pp. 291-312
    • Sacks, R.1    Eastmanand, C.M.2    Lee, G.3
  • 23
    • 0028444139 scopus 로고
    • Computer-integrated construction
    • Coles B.C., and Reinschmidt K.F. Computer-integrated construction. Civil Engineering 64 6 (1994) 50-53
    • (1994) Civil Engineering , vol.64 , Issue.6 , pp. 50-53
    • Coles, B.C.1    Reinschmidt, K.F.2
  • 24
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedules with 4D-CAD tools
    • McKinney K., and Fischer M. Generating, evaluating and visualizing construction schedules with 4D-CAD tools. Automation in Construction 7 6 (1998) 433-447
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 26
    • 57849103545 scopus 로고    scopus 로고
    • Multicriteria graphical-analytical evaluation of the financial state of construction enterprises
    • Ginevičius R., and Podvezko V. Multicriteria graphical-analytical evaluation of the financial state of construction enterprises. Technological and Economic Development of Economy 14 4 (2008) 452-461
    • (2008) Technological and Economic Development of Economy , vol.14 , Issue.4 , pp. 452-461
    • Ginevičius, R.1    Podvezko, V.2
  • 28
    • 2142811113 scopus 로고    scopus 로고
    • A modularised integrated computer environment for the construction industry: SPACE
    • Faraj I., and Alshawi M. A modularised integrated computer environment for the construction industry: SPACE. Journal of Information Technology in Construction 4 (1999) 37-52
    • (1999) Journal of Information Technology in Construction , vol.4 , pp. 37-52
    • Faraj, I.1    Alshawi, M.2
  • 29
    • 30444458522 scopus 로고    scopus 로고
    • A multiple criteria evaluation of multi-family apartment block's maintenance contractors: I - model for maintenance contractor evaluation and the determination of its selection criteria
    • Zavadskas E.K., and Vilutienė T. A multiple criteria evaluation of multi-family apartment block's maintenance contractors: I - model for maintenance contractor evaluation and the determination of its selection criteria. Building and Environment 41 5 (2006) 621-632
    • (2006) Building and Environment , vol.41 , Issue.5 , pp. 621-632
    • Zavadskas, E.K.1    Vilutiene, T.2
  • 34
    • 0033309096 scopus 로고    scopus 로고
    • Context management in modeling information systems (IS)
    • Garner B., and Raban R. Context management in modeling information systems (IS). Information and Software Technology 41 14 (1999) 957-961
    • (1999) Information and Software Technology , vol.41 , Issue.14 , pp. 957-961
    • Garner, B.1    Raban, R.2
  • 36
    • 33748134686 scopus 로고    scopus 로고
    • Specifying parametric building object behavior (BOB) for a building information modeling system
    • Lee G., Sacks R., and Eastman C.M. Specifying parametric building object behavior (BOB) for a building information modeling system. Automation in Construction 15 (2006) 758-776
    • (2006) Automation in Construction , vol.15 , pp. 758-776
    • Lee, G.1    Sacks, R.2    Eastman, C.M.3
  • 37
    • 34047099451 scopus 로고    scopus 로고
    • Managerial and economic optimisations for prefabricated building systems
    • Abdallah A. Managerial and economic optimisations for prefabricated building systems. Technological and Economic Development of Economy 13 1 (2007) 83-91
    • (2007) Technological and Economic Development of Economy , vol.13 , Issue.1 , pp. 83-91
    • Abdallah, A.1
  • 38
    • 41849099981 scopus 로고    scopus 로고
    • A wireless network system for automated tracking of construction materials on project sites
    • Jang W.-S., and Skibniewski M.J. A wireless network system for automated tracking of construction materials on project sites. Journal of Civil Engineering and Management 14 1 (2008) 11-19
    • (2008) Journal of Civil Engineering and Management , vol.14 , Issue.1 , pp. 11-19
    • Jang, W.-S.1    Skibniewski, M.J.2
  • 40
    • 33749552903 scopus 로고    scopus 로고
    • Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot
    • Seo J.W., Haas C., and Saidi K. Graphical modeling and simulation for design and control of a tele-operated clinker clearing robot. Automation in Construction 16 1 (2007) 96-106
    • (2007) Automation in Construction , vol.16 , Issue.1 , pp. 96-106
    • Seo, J.W.1    Haas, C.2    Saidi, K.3
  • 41
    • 34147115212 scopus 로고    scopus 로고
    • A virtual prototyping system for simulating construction processes
    • Huang T., Kong C.W., Guo H.L., Baldwin A., and Li H. A virtual prototyping system for simulating construction processes. Automation in Construction 16 5 (2007) 576-585
    • (2007) Automation in Construction , vol.16 , Issue.5 , pp. 576-585
    • Huang, T.1    Kong, C.W.2    Guo, H.L.3    Baldwin, A.4    Li, H.5
  • 44
    • 47949083669 scopus 로고    scopus 로고
    • A new logarithmic normalization method in games theory
    • Zavadskas E.K., and Turskis Z. A new logarithmic normalization method in games theory. Informatica 19 2 (2008) 303-314
    • (2008) Informatica , vol.19 , Issue.2 , pp. 303-314
    • Zavadskas, E.K.1    Turskis, Z.2
  • 45
    • 70349092704 scopus 로고    scopus 로고
    • Multi-criteria optimization system for decision making in construction design and management
    • Turskis Z., Zavadskas E.K., and Peldschus F. Multi-criteria optimization system for decision making in construction design and management. Inzinerine Ekonomika-Engineering Economics 1 (2009) 7-17
    • (2009) Inzinerine Ekonomika-Engineering Economics , vol.1 , pp. 7-17
    • Turskis, Z.1    Zavadskas, E.K.2    Peldschus, F.3
  • 46
    • 58049221090 scopus 로고    scopus 로고
    • Experience of the game theory application in construction management
    • Peldschus F. Experience of the game theory application in construction management. Technological and Economic Development of Economy 14 4 (2008) 531-545
    • (2008) Technological and Economic Development of Economy , vol.14 , Issue.4 , pp. 531-545
    • Peldschus, F.1
  • 47
    • 77949485875 scopus 로고    scopus 로고
    • The analysis of the quality of the results obtained with the methods of multi-criteria decisions
    • Peldschus F. The analysis of the quality of the results obtained with the methods of multi-criteria decisions. Technological and Economic Development of Economy 15 4 (2009) 580-592
    • (2009) Technological and Economic Development of Economy , vol.15 , Issue.4 , pp. 580-592
    • Peldschus, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.