Volumn 18, Issue 5, 2009, Pages 656-664

Modeling building projects as a basis for change control

Author keywords

Change control; Decision making; Project management; Project modeling

Indexed keywords

AUTOMATIC IDENTIFICATION; BUILDING PROJECTS; CHANGE CONTROL; COST OVERRUNS; DESIGN AND PLANNING; IN-BUILDING; PERFORMANCE REQUIREMENTS; PROJECT INFORMATIONS; PROJECT MODELING; PROJECT TEAM;

EID: 67349247794     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2009.01.001     Document Type: Article
Times cited : (26)

References (42)
  • 4
    • 79954534697 scopus 로고    scopus 로고
    • Representational limitations and improvements in building information modeling
    • Antwerpen, Belgium
    • Boeykens S., and Neuckermans H. Representational limitations and improvements in building information modeling. Proc. 26th eCAADe Conference (2008), Antwerpen, Belgium 35-42
    • (2008) Proc. 26th eCAADe Conference , pp. 35-42
    • Boeykens, S.1    Neuckermans, H.2
  • 5
    • 0036881796 scopus 로고    scopus 로고
    • Modeling impacts of process architecture on cost and schedule risk in product development
    • Browning T.R., and Eppinger S.D. Modeling impacts of process architecture on cost and schedule risk in product development. IEEE Transactions on Engineering Management 49 4 (2002) 443-458
    • (2002) IEEE Transactions on Engineering Management , vol.49 , Issue.4 , pp. 443-458
    • Browning, T.R.1    Eppinger, S.D.2
  • 7
    • 0032656018 scopus 로고    scopus 로고
    • Correlations and copulas for decision and risk analysis
    • Clemen R.T., and Reilly T. Correlations and copulas for decision and risk analysis. Management Science 45 2 (1999) 208-224
    • (1999) Management Science , vol.45 , Issue.2 , pp. 208-224
    • Clemen, R.T.1    Reilly, T.2
  • 10
    • 84936824360 scopus 로고
    • An introduction to structured modeling
    • Geoffrion A.M. An introduction to structured modeling. Management Science 33 5 (1987) 547-588
    • (1987) Management Science , vol.33 , Issue.5 , pp. 547-588
    • Geoffrion, A.M.1
  • 11
    • 26844451740 scopus 로고    scopus 로고
    • An analysis of the requirements traceability problem
    • Arnold R., and Bohner S. (Eds), IEEE Computer Society Press
    • Gotel O., and Finkelstein A. An analysis of the requirements traceability problem. In: Arnold R., and Bohner S. (Eds). Software Change Impact Analysis (1996), IEEE Computer Society Press
    • (1996) Software Change Impact Analysis
    • Gotel, O.1    Finkelstein, A.2
  • 12
    • 2142651311 scopus 로고    scopus 로고
    • Software-supported risk management for the construction industry
    • Hall J.W., Cruickshank I.C., and Godfrey P.S. Software-supported risk management for the construction industry. Civil Engineering 144 1 (2001) 42-48
    • (2001) Civil Engineering , vol.144 , Issue.1 , pp. 42-48
    • Hall, J.W.1    Cruickshank, I.C.2    Godfrey, P.S.3
  • 15
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy T. Optimization of resource allocation and leveling using genetic algorithms. Journal of Construction Engineering and Management 125 3 (1999) 167-175
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 17
    • 67349244748 scopus 로고    scopus 로고
    • International Code Council, accessed 28.12.08
    • International Code Council, SMARTcodes, http://www.iccsafe.org/SMARTcodes/ (accessed 28.12.08).
    • SMARTcodes
  • 18
    • 38149114645 scopus 로고    scopus 로고
    • Feasibility study of an automated tool for identifying the implications of changes in construction projects
    • Isaac S., and Navon R. Feasibility study of an automated tool for identifying the implications of changes in construction projects. Journal of Construction Engineering and Management 134 2 (2008) 139-145
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.2 , pp. 139-145
    • Isaac, S.1    Navon, R.2
  • 19
    • 13944251446 scopus 로고    scopus 로고
    • Model management decision environment: a Web service prototype for spreadsheet models
    • Iyer B., Shankaranarayanana G., and Lenard M.L. Model management decision environment: a Web service prototype for spreadsheet models. Decision Support Systems 40 2 (2005) 283-304
    • (2005) Decision Support Systems , vol.40 , Issue.2 , pp. 283-304
    • Iyer, B.1    Shankaranarayanana, G.2    Lenard, M.L.3
  • 20
    • 0032670219 scopus 로고    scopus 로고
    • CONSCOM: an OO construction scheduling and change management system
    • Karim A., and Adeli H. CONSCOM: an OO construction scheduling and change management system. Journal of Construction Engineering and Management 125 5 (1999) 368-376
    • (1999) Journal of Construction Engineering and Management , vol.125 , Issue.5 , pp. 368-376
    • Karim, A.1    Adeli, H.2
  • 23
    • 34249747198 scopus 로고    scopus 로고
    • Understanding and managing iterative error and change cycles in construction
    • Lee S., and Pena-Mora F. Understanding and managing iterative error and change cycles in construction. System Dynamics Review 23 1 (2007) 35-60
    • (2007) System Dynamics Review , vol.23 , Issue.1 , pp. 35-60
    • Lee, S.1    Pena-Mora, F.2
  • 24
    • 33646526465 scopus 로고    scopus 로고
    • Schedule estimation and uncertainty surrounding the cone of uncertainty
    • Little T. Schedule estimation and uncertainty surrounding the cone of uncertainty. IEEE Software 23 3 (2006) 48-54
    • (2006) IEEE Software , vol.23 , Issue.3 , pp. 48-54
    • Little, T.1
  • 25
    • 0000797825 scopus 로고    scopus 로고
    • Quantifying the causes and costs of rework in construction
    • Love P.E.D., and Li H. Quantifying the causes and costs of rework in construction. Construction Management and Economics 18 4 (2000) 479-490
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 479-490
    • Love, P.E.D.1    Li, H.2
  • 26
    • 55849087307 scopus 로고    scopus 로고
    • accessed 28.12.08
    • Lumina Decision Systems, http://www.lumina.com/ (accessed 28.12.08).
    • Lumina Decision Systems
  • 31
    • 27844554764 scopus 로고    scopus 로고
    • Managing stakeholder expectations in facility management using workplace planning and commitment making techniques
    • Pennanen A., Whelton M., and Ballard G. Managing stakeholder expectations in facility management using workplace planning and commitment making techniques. Facilities 23 13/14 (2005) 542-557
    • (2005) Facilities , vol.23 , Issue.13-14 , pp. 542-557
    • Pennanen, A.1    Whelton, M.2    Ballard, G.3
  • 32
    • 2142748474 scopus 로고    scopus 로고
    • Impact of correlation and induced correlation on the estimation of project cost of buildings
    • Ranasinghe M. Impact of correlation and induced correlation on the estimation of project cost of buildings. Construction Management and Economics 18 4 (2000) 395-406
    • (2000) Construction Management and Economics , vol.18 , Issue.4 , pp. 395-406
    • Ranasinghe, M.1
  • 33
    • 0032024112 scopus 로고    scopus 로고
    • ADEPTflex - supporting dynamic changes of workflows without losing control
    • Reichert M., and Dadam P. ADEPTflex - supporting dynamic changes of workflows without losing control. Journal of Intelligent Information Systems 10 2 (1998) 93-129
    • (1998) Journal of Intelligent Information Systems , vol.10 , Issue.2 , pp. 93-129
    • Reichert, M.1    Dadam, P.2
  • 34
    • 33847273800 scopus 로고    scopus 로고
    • Performance measurement using location-based status data
    • Seppanen O., and Kenley R. Performance measurement using location-based status data. Proc. IGLC-13, Sydney, Australia (2005) 263-269
    • (2005) Proc. IGLC-13, Sydney, Australia , pp. 263-269
    • Seppanen, O.1    Kenley, R.2
  • 36
  • 37
    • 5144222628 scopus 로고    scopus 로고
    • Statistical dependence through common risk factors: with applications in uncertainty analysis
    • van Dorp J.R. Statistical dependence through common risk factors: with applications in uncertainty analysis. European Journal of Operations Research 161 1 (2004) 240-255
    • (2004) European Journal of Operations Research , vol.161 , Issue.1 , pp. 240-255
    • van Dorp, J.R.1
  • 38
    • 0033524327 scopus 로고    scopus 로고
    • Statistical dependence in risk analysis for project networks using Monte Carlo methods
    • van Dorp J.R., and Duffy M.R. Statistical dependence in risk analysis for project networks using Monte Carlo methods. International Journal Of Production Economics 58 (1999) 17-29
    • (1999) International Journal Of Production Economics , vol.58 , pp. 17-29
    • van Dorp, J.R.1    Duffy, M.R.2
  • 39
    • 0037292985 scopus 로고    scopus 로고
    • Transforming project risk management into uncertainty management
    • Ward S., and Chapman C. Transforming project risk management into uncertainty management. International Journal of Project Management 21 2 (2003) 97-105
    • (2003) International Journal of Project Management , vol.21 , Issue.2 , pp. 97-105
    • Ward, S.1    Chapman, C.2
  • 41
    • 0344441886 scopus 로고    scopus 로고
    • The contribution of mathematical modelling to the practice of project management
    • Williams T. The contribution of mathematical modelling to the practice of project management. IMA Journal of Management Mathematics 14 1 (2003) 3-30
    • (2003) IMA Journal of Management Mathematics , vol.14 , Issue.1 , pp. 3-30
    • Williams, T.1
  • 42
    • 33749424371 scopus 로고    scopus 로고
    • Using Gaussian copula to simulate repetitive projects
    • Yang I.T. Using Gaussian copula to simulate repetitive projects. Construction Management and Economics 24 9 (2006) 901-909
    • (2006) Construction Management and Economics , vol.24 , Issue.9 , pp. 901-909
    • Yang, I.T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.