Volumn 130, Issue 5, 2004, Pages 626-637

Reliability buffering for construction projects

Author keywords

Buffeting; Construction management; Project management; Reliability; Simulation

Indexed keywords

BUFFERING; CONSTRUCTION MANAGEMENT; PROJECT MODELS; PROJECT PLANNING;

EID: 13944281790     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2004)130:5(626)     Document Type: Article
Times cited : (59)

References (18)
  • 1
    • 2342425232 scopus 로고    scopus 로고
    • Phase scheduling
    • Lean Construction Institute (Sep. 2003)
    • Ballard, G. (2000). "Phase scheduling." ICI White Paper 7, Lean Construction Institute 〈www.leanconstruction.org〉 (Sep. 2003).
    • (2000) ICI White Paper , vol.7
    • Ballard, G.1
  • 2
    • 13944279675 scopus 로고
    • Association of Researchers in Construction Management, Sheffield, England
    • Ballard, G., and Howell, G. (1995). Proc., 1995 ARCOM Conf., Association of Researchers in Construction Management, Sheffield, England.
    • (1995) Proc., 1995 ARCOM Conf.
    • Ballard, G.1    Howell, G.2
  • 3
    • 13944270029 scopus 로고    scopus 로고
    • Aiming for continuous flow
    • Sep. 2003
    • Ballard, G., and Tommelein, I. (1999). "Aiming for continuous flow." LCI White Paper 3 (www.leanconstruction.org) (Sep. 2003).
    • (1999) LCI White Paper , vol.3
    • Ballard, G.1    Tommelein, T.I.2
  • 4
    • 59249103934 scopus 로고    scopus 로고
    • Constraint modeling and buffer management with integrated production scheduler
    • Singapore
    • Chua, D., and Shen, L. (2001). "Constraint modeling and buffer management with integrated production scheduler." Proc., 9th Int. Group for Lean Construction Conf., Singapore.
    • (2001) Proc., 9th Int. Group for Lean Construction Conf.
    • Chua, D.1    Shen, L.2
  • 5
    • 33646170633 scopus 로고
    • Overlapping product development activities by analysis of information transfer practice
    • Sloan School of Management, MIT, Cambridge, Mass.
    • Eppinger, S., and Krishnan, V. (1992). "Overlapping product development activities by analysis of information transfer practice." Working Paper 3478-92, Sloan School of Management, MIT, Cambridge, Mass.
    • (1992) Working Paper , vol.3478 , Issue.92
    • Eppinger, S.1    Krishnan, V.2
  • 6
    • 0003926816 scopus 로고    scopus 로고
    • North River Press, Great Barrington, Mass.
    • Goldratt, E. (1997). Critical chain, North River Press, Great Barrington, Mass.
    • (1997) Critical Chain
    • Goldratt, E.1
  • 8
    • 0000718046 scopus 로고    scopus 로고
    • Management of production in construction: A theoretical view
    • Univ. of California, Berkeley, Calif.
    • Koskela, L. (1999). "Management of production in construction: A theoretical view." Proc., IGLC-7, Univ. of California, Berkeley, Calif.
    • (1999) Proc., IGLC-7
    • Koskela, L.1
  • 10
    • 0032052024 scopus 로고    scopus 로고
    • Simulation modeling and management of large basement construction project
    • Ng, W., Khor, E., and Lee, J. (1998). "Simulation modeling and management of large basement construction project." J. Comput. Civ. Eng., 12(2), 101-110.
    • (1998) J. Comput. Civ. Eng. , vol.12 , Issue.2 , pp. 101-110
    • Ng, W.1    Khor, E.2    Lee, J.3
  • 11
    • 0142025004 scopus 로고    scopus 로고
    • Dynamic change management for construction: Introducing, change cycle to model-based project management
    • Park, M., and Pena-Mora, F. (2003). "Dynamic change management for construction: Introducing, change cycle to model-based project management." Syst. Dyn. Rev., 19(3), 213-242.
    • (2003) Syst. Dyn. Rev. , vol.19 , Issue.3 , pp. 213-242
    • Park, M.1    Pena-Mora, F.2
  • 12
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic planning and control methodology for design build fast-track construction projects
    • Pena-Mora, F., and Li, M. (2001). "Dynamic planning and control methodology for design build fast-track construction projects." J. Constr. Eng. Manage., 127(1), 1-17.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 1-17
    • Pena-Mora, F.1    Li, M.2
  • 13
    • 0035510392 scopus 로고    scopus 로고
    • Dynamic planning for fast-tracking building construction projects
    • Pena-Mora, F., and Park, M. (2001). "Dynamic planning for fast-tracking building construction projects." J. Constr. Eng. Manage., 127(6), 445-456.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 445-456
    • Pena-Mora, F.1    Park, M.2
  • 14
    • 84982705959 scopus 로고
    • Introduction to the system dynamics review
    • Richardson, G. (1985). "Introduction to the system dynamics review." Syst. Dyn. Rev., 1(1), 1-3.
    • (1985) Syst. Dyn. Rev. , vol.1 , Issue.1 , pp. 1-3
    • Richardson, G.1
  • 15
    • 0003391719 scopus 로고
    • Sloan School of Management, MIT, Cambridge, Mass, (Sep. 2003)
    • Sterman, J. (1992). "System dynamics modeling for project management." Sloan School of Management, MIT, Cambridge, Mass, 〈http://web.mit.edu/jsterman/www/〉 (Sep. 2003).
    • (1992) System Dynamics Modeling for Project Management.
    • Sterman, J.1
  • 18
    • 4043118882 scopus 로고    scopus 로고
    • Resource-driven scheduling for repetitive projects: A pull-system approach
    • Singapore
    • Yang, I., and Photios, G. (2001). "Resource-driven scheduling for repetitive projects: A pull-system approach." Proc., 9th Int. Group for Lean Construction Conf., Singapore.
    • (2001) Proc., 9th Int. Group for Lean Construction Conf.
    • Yang, I.1    Photios, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.