메뉴 건너뛰기




Volumn 48, Issue 12, 2010, Pages 3429-3443

A criterion of production model selection for building material with delivery delay

Author keywords

Building materials; Delivery delay; Inventory; Production control; Pull; Push

Indexed keywords

AVERAGE LENGTH; COEFFICIENT OF VARIATION; DELIVERY DELAY; DELIVERY TIME; INVENTORY; INVENTORY LEVELS; LEADTIME; PERFORMANCE MEASURE; PRODUCTION CYCLE; PRODUCTION MODELS; QUANTITATIVE CRITERIA; SERVICE LEVELS; SYSTEM CONDITIONS;

EID: 77951141677     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802651931     Document Type: Article
Times cited : (4)

References (16)
  • 1
    • 0002436324 scopus 로고
    • MRP, JIT, OPT, FMS? Making sense of production operations system
    • September-October
    • Aggarwal, S.C., 1985. MRP, JIT, OPT, FMS? Making sense of production operations system. Harvard Business Review, September-October, 8-16.
    • (1985) Harvard Business Review , pp. 8-16
    • Aggarwal, S.C.1
  • 3
    • 0031259399 scopus 로고    scopus 로고
    • Delivery delay variation in multi-echelon inventory problems
    • Graman, G.A. and Rogers, D.F., 1997. Delivery delay variation in multi-echelon inventory problems. Journal of the Operational Research Society, 48 (10), 1029-1036.
    • (1997) Journal of the Operational Research Society , vol.48 , Issue.10 , pp. 1029-1036
    • Graman, G.A.1    Rogers, D.F.2
  • 5
    • 0026168681 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part I
    • Hodgson, T.J. and Wang, D., 1991a. Optimal hybrid push/pull control strategies for a parallel multistage system: part I. International Journal of Production Research, 29 (6), 1279-1287. (Pubitemid 21652852)
    • (1991) International Journal of Production Research , vol.29 , Issue.6 , pp. 1279-1287
    • Hodgson Thom, J.1    Wang Dingwei2
  • 6
    • 0026187108 scopus 로고
    • Optimal hybrid push/pull control strategies for a parallel multistage system: Part II
    • Hodgson, T.J. and Wang, D., 1991b. Optimal hybrid push/pull control strategies for a parallel multistage system: part II. International Journal of Production Research, 29 (7), 1453-1460. (Pubitemid 21649913)
    • (1991) International Journal of Production Research , vol.29 , Issue.7 , pp. 1453-1460
    • Hodgson Thom, J.1    Wang Dingwei2
  • 7
    • 0024725591 scopus 로고
    • Getting control of just-in-time
    • Karmarkar, U., 1989. Getting control of just-in-time. Harvard Business Review, 89 (5), 122-131.
    • (1989) Harvard Business Review , vol.89 , Issue.5 , pp. 122-131
    • Karmarkar, U.1
  • 8
    • 0242269801 scopus 로고    scopus 로고
    • Simulation-based comparison of push and pull systems in a job-shop environment considering the context of JIT implementation
    • Li, J.-W, 2003. Simulation-based comparison of push and pull systems in a job-shop environment considering the context of JIT implementation. International Journal of Production Research, 41 (3), 427-447.
    • (2003) International Journal of Production Research , vol.41 , Issue.3 , pp. 427-447
    • Li, J.-W.1
  • 11
    • 0031234628 scopus 로고    scopus 로고
    • Simulation analysis of a pull-push system for an electronic assembly line
    • Savsar, M., 1997. Simulation analysis of a pull-push system for an electronic assembly line. International Journal of Production Economics, 51 (3), 205-214.
    • (1997) International Journal of Production Economics , vol.51 , Issue.3 , pp. 205-214
    • Savsar, M.1
  • 12
    • 0028405569 scopus 로고
    • The pull production system: Modeling and characteristics
    • Siha, S., 1994. The pull production system: modeling and characteristics. International Journal of Production Research, 32 (4), 933-949.
    • (1994) International Journal of Production Research , vol.32 , Issue.4 , pp. 933-949
    • Siha, S.1
  • 14
    • 0026859945 scopus 로고
    • Push and pull production systems: Issues and comparison
    • Spearman, M.L. and Zazanis, M.A., 1992. Push and pull production systems: issues and comparison. Operations Research, 40 (3), 521-532.
    • (1992) Operations Research , vol.40 , Issue.3 , pp. 521-532
    • Spearman, M.L.1    Zazanis, M.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.