-
1
-
-
0000191706
-
Scheduling/cost optimization and neural dynamics model for construction projects
-
Adeli, H., and Karim, A. (1997). "Scheduling/cost optimization and neural dynamics model for construction projects," J. Constr. Eng. Manage., 123(4), 450-458.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.4
, pp. 450-458
-
-
Adeli, H.1
Karim, A.2
-
2
-
-
15944387385
-
-
American Society of Civil Engineers (ASCE). (2002). "Report card: Reports and statistics." 〈http://www.asce.org/reportcard/〉.
-
(2002)
Report Card: Reports and Statistics
-
-
-
5
-
-
15944377870
-
Guidelines for warranty, multiparameter, and best value contracting
-
National Cooperative Highway Research Program, Washington, D.C.
-
Anderson, A., and Russell, J. (2001). "Guidelines for warranty, multiparameter, and best value contracting." NCHRP Rep. No. 451, National Cooperative Highway Research Program, Washington, D.C.
-
(2001)
NCHRP Rep. No. 451
, vol.451
-
-
Anderson, A.1
Russell, J.2
-
6
-
-
4544318435
-
The LP/IP hybrid method for construction time-cost trade-off analysis
-
Burns, S., Liu, L., and Feng, C. (1996) "The LP/IP hybrid method for construction time-cost trade-off analysis." Constr. Manage. Econom., 14, 265-276.
-
(1996)
Constr. Manage. Econom.
, vol.14
, pp. 265-276
-
-
Burns, S.1
Liu, L.2
Feng, C.3
-
7
-
-
33644506233
-
-
June 11, 2003
-
California Department of Transportation (Caltrans). (2001). "Construction manual." 〈http://www.dot.ca.gov/hq/construc/ manual2001〉, (June 11, 2003).
-
(2001)
Construction Manual
-
-
-
8
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W., Chua, D., and Kannan, G. (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 125-132
-
-
Chan, W.1
Chua, D.2
Kannan, G.3
-
10
-
-
0004095338
-
A fast elitist nondominated sorting genetic algorithm for multiobjective optimization
-
Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India
-
Deb, K., Agrawal, S., Pratap, A., and Meyarivan, T. (2001). "A fast elitist nondominated sorting genetic algorithm for multiobjective optimization." KANGAL Rep. No. 200001, Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India.
-
(2001)
KANGAL Rep. No. 200001
-
-
Deb, K.1
Agrawal, S.2
Pratap, A.3
Meyarivan, T.4
-
11
-
-
0001195356
-
Resource leveling in construction by optimization
-
Easa, S. (1989). "Resource leveling in construction by optimization." J. Constr. Eng. Manage., 115(2), 302-316.
-
(1989)
J. Constr. Eng. Manage.
, vol.115
, Issue.2
, pp. 302-316
-
-
Easa, S.1
-
12
-
-
0030234407
-
Development of work zone lighting standards for nighttime highway work
-
Transportation Research Board, Washington, D.C.
-
Ellis, R., and Amos, S. (1996). "Development of work zone lighting standards for nighttime highway work." Transportation Research Record 1529, Transportation Research Board, Washington, D.C.
-
(1996)
Transportation Research Record
, vol.1529
-
-
Ellis, R.1
Amos, S.2
-
13
-
-
0035392410
-
Optimum planning of highway construction under the A+B bidding method
-
El-Rayes, K. (2001). "Optimum planning of highway construction under the A+B bidding method." J. Constr. Eng. Manage., 127(4), 261-269.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 261-269
-
-
El-Rayes, K.1
-
14
-
-
0035132257
-
Optimizing resource utilization for repetitive construction projects
-
El-Rayes, K., and Moselhi, O. (2001). "Optimizing resource utilization for repetitive construction projects." J. Constr. Eng. Manage., 127(1), 18-27.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 18-27
-
-
El-Rayes, K.1
Moselhi, O.2
-
16
-
-
15944408442
-
CONLIGHT: Lighting design model for nighttime highway construction
-
El-Rayes, K., and Hyari, K. (2004). "CONLIGHT: Lighting design model for nighttime highway construction." J. Constr. Eng. Manage., 131(4), 467.
-
(2004)
J. Constr. Eng. Manage.
, vol.131
, Issue.4
, pp. 467
-
-
El-Rayes, K.1
Hyari, K.2
-
18
-
-
0013029255
-
-
Office of Highway Policy Information, FHWA, U.S. Dept. of Transportation, Washington, D.C.
-
Federal Highway Administration (FHWA). (2000). "Highway statistics 2000." Office of Highway Policy Information, FHWA, U.S. Dept. of Transportation, Washington, D.C.
-
(2000)
Highway Statistics 2000
-
-
-
19
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng, C., Liu, L., and Burns, S. A. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comput. Civ. Eng., 11(3), 184-189.
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.1
Liu, L.2
Burns, S.A.3
-
20
-
-
0034172005
-
Stochastic construction time-cost trade-off analysis
-
Feng, C., Liu, L., and Burns, S. (2000). "Stochastic construction time-cost trade-off analysis." J. Comput. Civ. Eng., 14(2), 117-126.
-
(2000)
J. Comput. Civ. Eng.
, vol.14
, Issue.2
, pp. 117-126
-
-
Feng, C.1
Liu, L.2
Burns, S.3
-
22
-
-
3242662050
-
Assignment and allocation optimization of partially multiskilled workforce
-
Gomar, J., Haas, C., and Morton, D. (2002). "Assignment and allocation optimization of partially multiskilled workforce." J. Constr, Eng. Manage., 128(2), 103-109.
-
(2002)
J. Constr, Eng. Manage.
, vol.128
, Issue.2
, pp. 103-109
-
-
Gomar, J.1
Haas, C.2
Morton, D.3
-
23
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms," J. Constr. Eng. Manage., 125(3), 167-175.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
24
-
-
0035509424
-
Simplified spreadsheet solutions. II: Overall schedule optimization
-
Hegazy, T., and Ersahin, T. (2001). "Simplified spreadsheet solutions. II: Overall schedule optimization." J. Constr. Eng. Manage., 127(6), 469-475.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.6
, pp. 469-475
-
-
Hegazy, T.1
Ersahin, T.2
-
25
-
-
0035335808
-
Cost optimization in projects with repetitive nonserial activities
-
Hegazy, T., and Wassef, N. (2001). "Cost optimization in projects with repetitive nonserial activities." J. Constr. Eng. Manage., 127(3), 183-191.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 183-191
-
-
Hegazy, T.1
Wassef, N.2
-
26
-
-
0029532894
-
A+B bidding method - Hidden success story for highway construction
-
Herbsman, Z. (1995). "A+B bidding method - Hidden success story for highway construction." J. Constr. Eng. Manage., 121(4), 430-437.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 430-437
-
-
Herbsman, Z.1
-
27
-
-
15944424310
-
-
June 11, 2003
-
Illinois Department of Transportation (IDOT). (2002). "2002 construction manual." 〈http://www.dot.state.il.us/constructionmanual/ preface.html〉 (June 11, 2003).
-
(2002)
2002 Construction Manual
-
-
-
28
-
-
0029271414
-
Incentive/disincentive guidelines for highway construction contracts
-
Jaraiedi, M., Plummer, R., and Aber, M. (1995). "Incentive/ disincentive guidelines for highway construction contracts." J. Constr. Eng. Manage., 121(1), 112-120.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.1
, pp. 112-120
-
-
Jaraiedi, M.1
Plummer, R.2
Aber, M.3
-
29
-
-
0035391119
-
Optimal repetitive scheduling model with shareable resource constraint
-
Leu, S., and Hwang, S. (2001). "Optimal repetitive scheduling model with shareable resource constraint." J. Constr. Eng. Manage., 127(4), 270-280.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.4
, pp. 270-280
-
-
Leu, S.1
Hwang, S.2
-
30
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
Li, H., and Love, P. (1997). "Using improved genetic algorithms to facilitate time-cost optimization." J. Constr, Eng. Manage., 123(3), 233-237.
-
(1997)
J. Constr, Eng. Manage.
, vol.123
, Issue.3
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
31
-
-
0032638332
-
Using machine learning and genetic algorithm to solve time-cost trade-off problems
-
Li, H., Cao, J., and Love, P. (1999). "Using machine learning and genetic algorithm to solve time-cost trade-off problems." J. Constr. Eng. Manage., 125(5), 347-353.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 347-353
-
-
Li, H.1
Cao, J.2
Love, P.3
-
32
-
-
0006767542
-
Optimization of crew configurations using activity-based costing
-
Maxwell, D., Back, E., and Toon, J. (1998). "Optimization of crew configurations using activity-based costing." J. Constr. Eng. Manage., 124(2), 162-168.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.2
, pp. 162-168
-
-
Maxwell, D.1
Back, E.2
Toon, J.3
-
33
-
-
0042471966
-
-
Prentice-Hall, Englewood Cliffs, N.J.
-
Meredith, D., Kam, W., Woodhead, R., and Wortman, R. (1985). Design and planning of engineering systems, Prentice-Hall, Englewood Cliffs, N.J.
-
(1985)
Design and Planning of Engineering Systems
-
-
Meredith, D.1
Kam, W.2
Woodhead, R.3
Wortman, R.4
-
34
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
Moselhi, O., and El-Rayes, K. (1993). "Scheduling of repetitive projects with cost optimization." J. Constr. Eng. Manage., 119(4), 681-697.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
35
-
-
15944385313
-
-
PTI 2001-25, The Pennsylvania Transportation Institute, The Pennsylvania State Univ., University Park, Pa
-
Minchin, R. E., and Smith, G. R. (2001). "Quality-based performance rating of contractors for prequalification and bidding purposes." PTI 2001-25, The Pennsylvania Transportation Institute, The Pennsylvania State Univ., University Park, Pa.
-
(2001)
Quality-based Performance Rating of Contractors for Prequalification and Bidding Purposes
-
-
Minchin, R.E.1
Smith, G.R.2
-
37
-
-
5244378567
-
Dynamic programming approach to scheduling of nonserial linear project
-
Senouci, A., and Eldin, N. (1996). "Dynamic programming approach to scheduling of nonserial linear project." J. Comput. Civ. Eng., 10(2), 106-114.
-
(1996)
J. Comput. Civ. Eng.
, vol.10
, Issue.2
, pp. 106-114
-
-
Senouci, A.1
Eldin, N.2
-
38
-
-
15944366883
-
1999 status of the nation's highways, bridges and transit: Conditions and performance
-
Federal Highway Administration, Federal Transit Administration, Washington, D.C.
-
U.S. Department of Transportation (USDOT). (2000). "1999 status of the nation's highways, bridges and transit: Conditions and performance." Rep. to Congress, Federal Highway Administration, Federal Transit Administration, Washington, D.C.
-
(2000)
Rep. to Congress
-
-
-
39
-
-
0004140075
-
SPEA2: Improving the strength Pareto evolutionary algorithm
-
Swiss Federal Institute of Technology, (ETH), Zurich, Switzerland
-
Zitzler, E., Laumanns, M., and Thiele, L. (2001). "SPEA2: Improving the strength Pareto evolutionary algorithm." TIK-Rep. No. 103, Swiss Federal Institute of Technology, (ETH), Zurich, Switzerland.
-
(2001)
TIK-Rep. No. 103
, vol.103
-
-
Zitzler, E.1
Laumanns, M.2
Thiele, L.3
|