메뉴 건너뛰기




Volumn 131, Issue 4, 2005, Pages 477-486

Time-cost-quality trade-off analysis for highway construction

Author keywords

Algorithms; Construction industry; Contracts; Cost control; Highway construction; Information technology (IT)

Indexed keywords

COST CONTROL; CREW OVERTIME POLICY; HIGHWAY CONSTRUCTION; TRADE-OFF ANALYSIS;

EID: 15944361924     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:4(477)     Document Type: Article
Times cited : (316)

References (39)
  • 1
    • 0000191706 scopus 로고    scopus 로고
    • Scheduling/cost optimization and neural dynamics model for construction projects
    • Adeli, H., and Karim, A. (1997). "Scheduling/cost optimization and neural dynamics model for construction projects," J. Constr. Eng. Manage., 123(4), 450-458.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.4 , pp. 450-458
    • Adeli, H.1    Karim, A.2
  • 2
    • 15944387385 scopus 로고    scopus 로고
    • American Society of Civil Engineers (ASCE). (2002). "Report card: Reports and statistics." 〈http://www.asce.org/reportcard/〉.
    • (2002) Report Card: Reports and Statistics
  • 5
    • 15944377870 scopus 로고    scopus 로고
    • Guidelines for warranty, multiparameter, and best value contracting
    • National Cooperative Highway Research Program, Washington, D.C.
    • Anderson, A., and Russell, J. (2001). "Guidelines for warranty, multiparameter, and best value contracting." NCHRP Rep. No. 451, National Cooperative Highway Research Program, Washington, D.C.
    • (2001) NCHRP Rep. No. 451 , vol.451
    • Anderson, A.1    Russell, J.2
  • 6
    • 4544318435 scopus 로고    scopus 로고
    • The LP/IP hybrid method for construction time-cost trade-off analysis
    • Burns, S., Liu, L., and Feng, C. (1996) "The LP/IP hybrid method for construction time-cost trade-off analysis." Constr. Manage. Econom., 14, 265-276.
    • (1996) Constr. Manage. Econom. , vol.14 , pp. 265-276
    • Burns, S.1    Liu, L.2    Feng, C.3
  • 7
    • 33644506233 scopus 로고    scopus 로고
    • June 11, 2003
    • California Department of Transportation (Caltrans). (2001). "Construction manual." 〈http://www.dot.ca.gov/hq/construc/ manual2001〉, (June 11, 2003).
    • (2001) Construction Manual
  • 8
    • 1842587322 scopus 로고    scopus 로고
    • Construction resource scheduling with genetic algorithms
    • Chan, W., Chua, D., and Kannan, G. (1996). "Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 122(2), 125-132.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 125-132
    • Chan, W.1    Chua, D.2    Kannan, G.3
  • 10
    • 0004095338 scopus 로고    scopus 로고
    • A fast elitist nondominated sorting genetic algorithm for multiobjective optimization
    • Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India
    • Deb, K., Agrawal, S., Pratap, A., and Meyarivan, T. (2001). "A fast elitist nondominated sorting genetic algorithm for multiobjective optimization." KANGAL Rep. No. 200001, Genetic Algorithm Laboratory, Indian Institute of Technology, Kanpur, India.
    • (2001) KANGAL Rep. No. 200001
    • Deb, K.1    Agrawal, S.2    Pratap, A.3    Meyarivan, T.4
  • 11
    • 0001195356 scopus 로고
    • Resource leveling in construction by optimization
    • Easa, S. (1989). "Resource leveling in construction by optimization." J. Constr. Eng. Manage., 115(2), 302-316.
    • (1989) J. Constr. Eng. Manage. , vol.115 , Issue.2 , pp. 302-316
    • Easa, S.1
  • 12
    • 0030234407 scopus 로고    scopus 로고
    • Development of work zone lighting standards for nighttime highway work
    • Transportation Research Board, Washington, D.C.
    • Ellis, R., and Amos, S. (1996). "Development of work zone lighting standards for nighttime highway work." Transportation Research Record 1529, Transportation Research Board, Washington, D.C.
    • (1996) Transportation Research Record , vol.1529
    • Ellis, R.1    Amos, S.2
  • 13
    • 0035392410 scopus 로고    scopus 로고
    • Optimum planning of highway construction under the A+B bidding method
    • El-Rayes, K. (2001). "Optimum planning of highway construction under the A+B bidding method." J. Constr. Eng. Manage., 127(4), 261-269.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 261-269
    • El-Rayes, K.1
  • 14
    • 0035132257 scopus 로고    scopus 로고
    • Optimizing resource utilization for repetitive construction projects
    • El-Rayes, K., and Moselhi, O. (2001). "Optimizing resource utilization for repetitive construction projects." J. Constr. Eng. Manage., 127(1), 18-27.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 18-27
    • El-Rayes, K.1    Moselhi, O.2
  • 16
    • 15944408442 scopus 로고    scopus 로고
    • CONLIGHT: Lighting design model for nighttime highway construction
    • El-Rayes, K., and Hyari, K. (2004). "CONLIGHT: Lighting design model for nighttime highway construction." J. Constr. Eng. Manage., 131(4), 467.
    • (2004) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 467
    • El-Rayes, K.1    Hyari, K.2
  • 18
    • 0013029255 scopus 로고    scopus 로고
    • Office of Highway Policy Information, FHWA, U.S. Dept. of Transportation, Washington, D.C.
    • Federal Highway Administration (FHWA). (2000). "Highway statistics 2000." Office of Highway Policy Information, FHWA, U.S. Dept. of Transportation, Washington, D.C.
    • (2000) Highway Statistics 2000
  • 19
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng, C., Liu, L., and Burns, S. A. (1997). "Using genetic algorithms to solve construction time-cost trade-off problems." J. Comput. Civ. Eng., 11(3), 184-189.
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.1    Liu, L.2    Burns, S.A.3
  • 20
    • 0034172005 scopus 로고    scopus 로고
    • Stochastic construction time-cost trade-off analysis
    • Feng, C., Liu, L., and Burns, S. (2000). "Stochastic construction time-cost trade-off analysis." J. Comput. Civ. Eng., 14(2), 117-126.
    • (2000) J. Comput. Civ. Eng. , vol.14 , Issue.2 , pp. 117-126
    • Feng, C.1    Liu, L.2    Burns, S.3
  • 22
    • 3242662050 scopus 로고    scopus 로고
    • Assignment and allocation optimization of partially multiskilled workforce
    • Gomar, J., Haas, C., and Morton, D. (2002). "Assignment and allocation optimization of partially multiskilled workforce." J. Constr, Eng. Manage., 128(2), 103-109.
    • (2002) J. Constr, Eng. Manage. , vol.128 , Issue.2 , pp. 103-109
    • Gomar, J.1    Haas, C.2    Morton, D.3
  • 23
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy, T. (1999). "Optimization of resource allocation and leveling using genetic algorithms," J. Constr. Eng. Manage., 125(3), 167-175.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 24
    • 0035509424 scopus 로고    scopus 로고
    • Simplified spreadsheet solutions. II: Overall schedule optimization
    • Hegazy, T., and Ersahin, T. (2001). "Simplified spreadsheet solutions. II: Overall schedule optimization." J. Constr. Eng. Manage., 127(6), 469-475.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.6 , pp. 469-475
    • Hegazy, T.1    Ersahin, T.2
  • 25
    • 0035335808 scopus 로고    scopus 로고
    • Cost optimization in projects with repetitive nonserial activities
    • Hegazy, T., and Wassef, N. (2001). "Cost optimization in projects with repetitive nonserial activities." J. Constr. Eng. Manage., 127(3), 183-191.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.3 , pp. 183-191
    • Hegazy, T.1    Wassef, N.2
  • 26
    • 0029532894 scopus 로고
    • A+B bidding method - Hidden success story for highway construction
    • Herbsman, Z. (1995). "A+B bidding method - Hidden success story for highway construction." J. Constr. Eng. Manage., 121(4), 430-437.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 430-437
    • Herbsman, Z.1
  • 27
    • 15944424310 scopus 로고    scopus 로고
    • June 11, 2003
    • Illinois Department of Transportation (IDOT). (2002). "2002 construction manual." 〈http://www.dot.state.il.us/constructionmanual/ preface.html〉 (June 11, 2003).
    • (2002) 2002 Construction Manual
  • 28
    • 0029271414 scopus 로고
    • Incentive/disincentive guidelines for highway construction contracts
    • Jaraiedi, M., Plummer, R., and Aber, M. (1995). "Incentive/ disincentive guidelines for highway construction contracts." J. Constr. Eng. Manage., 121(1), 112-120.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.1 , pp. 112-120
    • Jaraiedi, M.1    Plummer, R.2    Aber, M.3
  • 29
    • 0035391119 scopus 로고    scopus 로고
    • Optimal repetitive scheduling model with shareable resource constraint
    • Leu, S., and Hwang, S. (2001). "Optimal repetitive scheduling model with shareable resource constraint." J. Constr. Eng. Manage., 127(4), 270-280.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.4 , pp. 270-280
    • Leu, S.1    Hwang, S.2
  • 30
    • 5244262334 scopus 로고    scopus 로고
    • Using improved genetic algorithms to facilitate time-cost optimization
    • Li, H., and Love, P. (1997). "Using improved genetic algorithms to facilitate time-cost optimization." J. Constr, Eng. Manage., 123(3), 233-237.
    • (1997) J. Constr, Eng. Manage. , vol.123 , Issue.3 , pp. 233-237
    • Li, H.1    Love, P.2
  • 31
    • 0032638332 scopus 로고    scopus 로고
    • Using machine learning and genetic algorithm to solve time-cost trade-off problems
    • Li, H., Cao, J., and Love, P. (1999). "Using machine learning and genetic algorithm to solve time-cost trade-off problems." J. Constr. Eng. Manage., 125(5), 347-353.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 347-353
    • Li, H.1    Cao, J.2    Love, P.3
  • 32
    • 0006767542 scopus 로고    scopus 로고
    • Optimization of crew configurations using activity-based costing
    • Maxwell, D., Back, E., and Toon, J. (1998). "Optimization of crew configurations using activity-based costing." J. Constr. Eng. Manage., 124(2), 162-168.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.2 , pp. 162-168
    • Maxwell, D.1    Back, E.2    Toon, J.3
  • 34
    • 0027866760 scopus 로고
    • Scheduling of repetitive projects with cost optimization
    • Moselhi, O., and El-Rayes, K. (1993). "Scheduling of repetitive projects with cost optimization." J. Constr. Eng. Manage., 119(4), 681-697.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 681-697
    • Moselhi, O.1    El-Rayes, K.2
  • 37
    • 5244378567 scopus 로고    scopus 로고
    • Dynamic programming approach to scheduling of nonserial linear project
    • Senouci, A., and Eldin, N. (1996). "Dynamic programming approach to scheduling of nonserial linear project." J. Comput. Civ. Eng., 10(2), 106-114.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.2 , pp. 106-114
    • Senouci, A.1    Eldin, N.2
  • 38
    • 15944366883 scopus 로고    scopus 로고
    • 1999 status of the nation's highways, bridges and transit: Conditions and performance
    • Federal Highway Administration, Federal Transit Administration, Washington, D.C.
    • U.S. Department of Transportation (USDOT). (2000). "1999 status of the nation's highways, bridges and transit: Conditions and performance." Rep. to Congress, Federal Highway Administration, Federal Transit Administration, Washington, D.C.
    • (2000) Rep. to Congress
  • 39
    • 0004140075 scopus 로고    scopus 로고
    • SPEA2: Improving the strength Pareto evolutionary algorithm
    • Swiss Federal Institute of Technology, (ETH), Zurich, Switzerland
    • Zitzler, E., Laumanns, M., and Thiele, L. (2001). "SPEA2: Improving the strength Pareto evolutionary algorithm." TIK-Rep. No. 103, Swiss Federal Institute of Technology, (ETH), Zurich, Switzerland.
    • (2001) TIK-Rep. No. 103 , vol.103
    • Zitzler, E.1    Laumanns, M.2    Thiele, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.