-
2
-
-
57649147416
-
-
L. Koskela, An Exploration Towards a Production Theory and its Application to Construction. Ph.D. Dissertation, VTT Building Technology, Helsinki University of Technology, 2000.
-
L. Koskela, An Exploration Towards a Production Theory and its Application to Construction. Ph.D. Dissertation, VTT Building Technology, Helsinki University of Technology, 2000.
-
-
-
-
4
-
-
8844280773
-
Lean construction and EPC performance improvement
-
Alarcón L.F. (Ed), A.A. Balkema, The Netherlands
-
Ballard G. Lean construction and EPC performance improvement. In: Alarcón L.F. (Ed). Lean Construction (1993), A.A. Balkema, The Netherlands
-
(1993)
Lean Construction
-
-
Ballard, G.1
-
7
-
-
0032645520
-
Parade game: impact of work flow variability on trade performance
-
Tommelein I.D., Riley D.R., and Howell G. Parade game: impact of work flow variability on trade performance. J. Constr. Eng. Manag. 125 5 (1999) 304-310
-
(1999)
J. Constr. Eng. Manag.
, vol.125
, Issue.5
, pp. 304-310
-
-
Tommelein, I.D.1
Riley, D.R.2
Howell, G.3
-
8
-
-
13944264322
-
Reducing variability to improve performance as a lean construction principle
-
Thomas H.R., Horman M.J., Lemes de Souza U.E., and Zavrski I. Reducing variability to improve performance as a lean construction principle. J. Constr. Eng. Manag. 128 2 (2002) 144-154
-
(2002)
J. Constr. Eng. Manag.
, vol.128
, Issue.2
, pp. 144-154
-
-
Thomas, H.R.1
Horman, M.J.2
Lemes de Souza, U.E.3
Zavrski, I.4
-
9
-
-
12344327099
-
Improving labor flow reliability for better productivity as a lean construction principle
-
Thomas H.R., Horman M.J., Minchin R.E., and Chen D. Improving labor flow reliability for better productivity as a lean construction principle. J. Constr. Eng. Manag. 129 3 (2003) 251-261
-
(2003)
J. Constr. Eng. Manag.
, vol.129
, Issue.3
, pp. 251-261
-
-
Thomas, H.R.1
Horman, M.J.2
Minchin, R.E.3
Chen, D.4
-
10
-
-
2342418968
-
Implementing lean construction: stabilizing work flow
-
Alarcón L.F. (Ed), A.A. Balkema, The Netherlands
-
Ballard G., and Howell G. Implementing lean construction: stabilizing work flow. In: Alarcón L.F. (Ed). Lean Construction (1994), A.A. Balkema, The Netherlands
-
(1994)
Lean Construction
-
-
Ballard, G.1
Howell, G.2
-
11
-
-
84866122553
-
Assessing the impacts of implementing lean construction
-
Alarcón L.F., Diethelm S., Rojo O., and Calderón R. Assessing the impacts of implementing lean construction. Proceedings of 13th Annual Conference of International Group for Lean Construction, Sidney, Australia (2005)
-
(2005)
Proceedings of 13th Annual Conference of International Group for Lean Construction, Sidney, Australia
-
-
Alarcón, L.F.1
Diethelm, S.2
Rojo, O.3
Calderón, R.4
-
12
-
-
1642304896
-
Factors affecting project success in the piping function
-
Alarcón L.F. (Ed), A.A. Balkema, The Netherlands
-
Howell G., and Ballard G. Factors affecting project success in the piping function. In: Alarcón L.F. (Ed). Lean Construction (1995), A.A. Balkema, The Netherlands
-
(1995)
Lean Construction
-
-
Howell, G.1
Ballard, G.2
-
13
-
-
33845809157
-
Simulation-based decision support system for economical supply chain management of rebar
-
Polat G., Arditi D., and Mungen U. Simulation-based decision support system for economical supply chain management of rebar. J. Constr. Eng. Manag. 133 1 (2007) 29-39
-
(2007)
J. Constr. Eng. Manag.
, vol.133
, Issue.1
, pp. 29-39
-
-
Polat, G.1
Arditi, D.2
Mungen, U.3
-
14
-
-
57649185560
-
-
M.J. Horman, Process Dynamics: Buffer Management in Building Project Operations, Ph D Dissertation, Faculty of Architecture, Building and Planning, The University of Melbourne, 2000.
-
M.J. Horman, Process Dynamics: Buffer Management in Building Project Operations, Ph D Dissertation, Faculty of Architecture, Building and Planning, The University of Melbourne, 2000.
-
-
-
-
16
-
-
2342442186
-
Implementing lean production strategies in construction companies
-
Alarcón L.F., and Calderón R. Implementing lean production strategies in construction companies. Proceedings Construction Research Congress, Winds of Change: Integration and Innovation of Construction, ASCE, Honolulu, Hawaii (2003)
-
(2003)
Proceedings Construction Research Congress, Winds of Change: Integration and Innovation of Construction, ASCE, Honolulu, Hawaii
-
-
Alarcón, L.F.1
Calderón, R.2
-
17
-
-
57649153644
-
-
Construction Industry Institute, Project Materials Management Primer, RS47-1, Prepared by the Material Management Task Force, Austin, Texas, 1988.
-
Construction Industry Institute, Project Materials Management Primer, RS47-1, Prepared by the Material Management Task Force, Austin, Texas, 1988.
-
-
-
-
18
-
-
0003926816
-
-
North River Press, Great Barrington, Massachusetts
-
Goldratt E.M. Critical Chain (1997), North River Press, Great Barrington, Massachusetts
-
(1997)
Critical Chain
-
-
Goldratt, E.M.1
-
19
-
-
57649153646
-
Design of buffers in repetitive projects: using production management theory and IT tools
-
González V., Rischmoller L., and Alarcón L.F. Design of buffers in repetitive projects: using production management theory and IT tools. Proceedings of 4th International Postgraduate Research Conference, University of Salford, Manchester, UK (2004)
-
(2004)
Proceedings of 4th International Postgraduate Research Conference, University of Salford, Manchester, UK
-
-
González, V.1
Rischmoller, L.2
Alarcón, L.F.3
-
22
-
-
18144406628
-
Schedule and cost buffer sizing: how account for the bias between project performance and your model
-
Leach L.P. Schedule and cost buffer sizing: how account for the bias between project performance and your model. Proj. Manage. J. 34 2 (2003) 34-47
-
(2003)
Proj. Manage. J.
, vol.34
, Issue.2
, pp. 34-47
-
-
Leach, L.P.1
-
23
-
-
0000012732
-
Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique
-
Tommelein I.D. Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique. J. Constr. Eng. Manag. 124 4 (1998) 279-288
-
(1998)
J. Constr. Eng. Manag.
, vol.124
, Issue.4
, pp. 279-288
-
-
Tommelein, I.D.1
-
25
-
-
57649206145
-
-
G. Ballard, The Last Planner System of Production Control, Ph.D. Dissertation, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, 2000.
-
G. Ballard, The Last Planner System of Production Control, Ph.D. Dissertation, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, 2000.
-
-
-
-
26
-
-
0027805668
-
Interaction between subcycles: one key to improved methods
-
Howell G., Laufer A., and Ballard G. Interaction between subcycles: one key to improved methods. J. Constr. Eng. Manag. 119 4 (1993) 714-728
-
(1993)
J. Constr. Eng. Manag.
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
27
-
-
1642563359
-
Implications of even flow production methodology for U.S. Housing Industry
-
Bashford H.H., Sawhney A., Walsh K.D., and Kot K. Implications of even flow production methodology for U.S. Housing Industry. J. Constr. Eng. Manag. 129 3 (2003) 330-337
-
(2003)
J. Constr. Eng. Manag.
, vol.129
, Issue.3
, pp. 330-337
-
-
Bashford, H.H.1
Sawhney, A.2
Walsh, K.D.3
Kot, K.4
-
28
-
-
13944281790
-
Reliability buffering for construction projects
-
Park M., and Peña-Mora F. Reliability buffering for construction projects. J. Constr. Eng. Manage. 130 5 (2004) 626-637
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.5
, pp. 626-637
-
-
Park, M.1
Peña-Mora, F.2
-
29
-
-
34248579316
-
Multiobjective linear programming for scheduling linear repetitive projects
-
Ipsilandis P.G. Multiobjective linear programming for scheduling linear repetitive projects. J. Constr. Eng. Manag. 133 6 (2007) 417-424
-
(2007)
J. Constr. Eng. Manag.
, vol.133
, Issue.6
, pp. 417-424
-
-
Ipsilandis, P.G.1
-
34
-
-
33847109286
-
Production equation for unsteady-state construction processes
-
Walsh K.D., Sawhney A., and Bashford H.H. Production equation for unsteady-state construction processes. J. Constr. Eng. Manag. 133 3 (2007) 254-261
-
(2007)
J. Constr. Eng. Manag.
, vol.133
, Issue.3
, pp. 254-261
-
-
Walsh, K.D.1
Sawhney, A.2
Bashford, H.H.3
-
35
-
-
0036932457
-
Contributors to lead time in construction supply chains: case of pipe supports used in power plants
-
Arbulu R., Tommelein I.D., Walsh K.D., and Hershauer J.C. Contributors to lead time in construction supply chains: case of pipe supports used in power plants. Proceedings of 34th Winter Simulation Conference, San Diego, California, USA (2002)
-
(2002)
Proceedings of 34th Winter Simulation Conference, San Diego, California, USA
-
-
Arbulu, R.1
Tommelein, I.D.2
Walsh, K.D.3
Hershauer, J.C.4
-
36
-
-
0036932344
-
Lead time reduction via pre-positioning of inventory in an industrial construction supply chain
-
Walsh K.D., Hershauer J., Walsh T., Tommelein I.D., and Sawhney A. Lead time reduction via pre-positioning of inventory in an industrial construction supply chain. Proceedings of 34th Winter Simulation Conference, San Diego, California, USA (2002)
-
(2002)
Proceedings of 34th Winter Simulation Conference, San Diego, California, USA
-
-
Walsh, K.D.1
Hershauer, J.2
Walsh, T.3
Tommelein, I.D.4
Sawhney, A.5
-
38
-
-
57649206149
-
-
Extend v6 User's Guide, Manual User, Imagine That Inc., 2002.
-
Extend v6 User's Guide, Manual User, Imagine That Inc., 2002.
-
-
-
-
39
-
-
0022699580
-
Strategy related characteristics of discrete-event languages and models
-
Hooper J.W. Strategy related characteristics of discrete-event languages and models. Simulation 46 4 (1986) 153-159
-
(1986)
Simulation
, vol.46
, Issue.4
, pp. 153-159
-
-
Hooper, J.W.1
-
43
-
-
0037592480
-
Evolution strategies: a comprehensive introduction
-
Beyer H.G., and Schwefel H.P. Evolution strategies: a comprehensive introduction. Nat. Comput. 1 (2002) 3-52
-
(2002)
Nat. Comput.
, vol.1
, pp. 3-52
-
-
Beyer, H.G.1
Schwefel, H.P.2
-
44
-
-
79551631191
-
An evolution strategy for multiobjective optimization
-
Fogel D.D., et al. (Ed)
-
Costa L., and Oliveira P. An evolution strategy for multiobjective optimization. In: Fogel D.D., et al. (Ed). CEC'02-IEEE Vol. 1 (May 12th-17th 2002) 97-102
-
(2002)
CEC'02-IEEE
, vol.1
, pp. 97-102
-
-
Costa, L.1
Oliveira, P.2
-
47
-
-
0035377310
-
Convergence in evolutionary programs with self-adaptation
-
Greenwood G.W., and Zhu Q.J. Convergence in evolutionary programs with self-adaptation. Evol. Comput. 9 2 (2001) 147-157
-
(2001)
Evol. Comput.
, vol.9
, Issue.2
, pp. 147-157
-
-
Greenwood, G.W.1
Zhu, Q.J.2
-
48
-
-
0002629429
-
An overview of evolutionary algorithms in multiobjective optimization
-
Fonseca C., and Fleming P. An overview of evolutionary algorithms in multiobjective optimization. Evol. Comput. 3 1 (1995) 1-16
-
(1995)
Evol. Comput.
, vol.3
, Issue.1
, pp. 1-16
-
-
Fonseca, C.1
Fleming, P.2
-
49
-
-
12744266507
-
Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
-
Zheng D.X., and Thomas S. Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. J. Constr. Eng. Manag. 131 2 (2005) 176-186
-
(2005)
J. Constr. Eng. Manag.
, vol.131
, Issue.2
, pp. 176-186
-
-
Zheng, D.X.1
Thomas, S.2
-
50
-
-
24344467352
-
An evolution strategy with probabilistic mutation for multiobjective optimisation
-
IEEE Press, Piscataway NJ
-
Huband S., Hingston P., While L., and Barone L. An evolution strategy with probabilistic mutation for multiobjective optimisation. In Congress on Evolutionary Computation (CEC 2003) (December 8th-12th 2003), IEEE Press, Piscataway NJ 2284-2291
-
(2003)
In Congress on Evolutionary Computation (CEC 2003)
, pp. 2284-2291
-
-
Huband, S.1
Hingston, P.2
While, L.3
Barone, L.4
-
53
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng C., Liu L., and Burns S. Using genetic algorithms to solve construction time-cost trade-off problems. J. Comput. Civ. Eng. 11 3 (1997) 184-189
-
(1997)
J. Comput. Civ. Eng.
, vol.11
, Issue.3
, pp. 184-189
-
-
Feng, C.1
Liu, L.2
Burns, S.3
-
54
-
-
24944537152
-
Chance-constrained time-cost tradeoff analysis considering funding variability
-
Yang I. Chance-constrained time-cost tradeoff analysis considering funding variability. J. Constr. Eng. Manag. 131 9 (2005) 1002-1012
-
(2005)
J. Constr. Eng. Manag.
, vol.131
, Issue.9
, pp. 1002-1012
-
-
Yang, I.1
|