Volumn 18, Issue 2, 2009, Pages 95-108

Multiobjective design of Work-In-Process buffer for scheduling repetitive building projects

Author keywords

Buffering; Evolutionary Strategies; Lean production; Multiple objective analysis; Simulation Optimization models; Work In Process

Indexed keywords

APPLICATIONS; BUILDINGS; CONSTRUCTION INDUSTRY; DESIGN; EVOLUTIONARY ALGORITHMS; INDUSTRIAL MANAGEMENT; OPTIMIZATION; PRODUCTION ENGINEERING; SCHEDULING; STRUCTURAL DESIGN;

EID: 57649231503     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2008.05.005     Document Type: Article
Times cited : (55)

References (56)
  • 2
    • 57649147416 scopus 로고    scopus 로고
    • L. Koskela, An Exploration Towards a Production Theory and its Application to Construction. Ph.D. Dissertation, VTT Building Technology, Helsinki University of Technology, 2000.
    • L. Koskela, An Exploration Towards a Production Theory and its Application to Construction. Ph.D. Dissertation, VTT Building Technology, Helsinki University of Technology, 2000.
  • 4
    • 8844280773 scopus 로고
    • Lean construction and EPC performance improvement
    • Alarcón L.F. (Ed), A.A. Balkema, The Netherlands
    • Ballard G. Lean construction and EPC performance improvement. In: Alarcón L.F. (Ed). Lean Construction (1993), A.A. Balkema, The Netherlands
    • (1993) Lean Construction
    • Ballard, G.1
  • 7
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: impact of work flow variability on trade performance
    • Tommelein I.D., Riley D.R., and Howell G. Parade game: impact of work flow variability on trade performance. J. Constr. Eng. Manag. 125 5 (1999) 304-310
    • (1999) J. Constr. Eng. Manag. , vol.125 , Issue.5 , pp. 304-310
    • Tommelein, I.D.1    Riley, D.R.2    Howell, G.3
  • 8
    • 13944264322 scopus 로고    scopus 로고
    • Reducing variability to improve performance as a lean construction principle
    • Thomas H.R., Horman M.J., Lemes de Souza U.E., and Zavrski I. Reducing variability to improve performance as a lean construction principle. J. Constr. Eng. Manag. 128 2 (2002) 144-154
    • (2002) J. Constr. Eng. Manag. , vol.128 , Issue.2 , pp. 144-154
    • Thomas, H.R.1    Horman, M.J.2    Lemes de Souza, U.E.3    Zavrski, I.4
  • 9
    • 12344327099 scopus 로고    scopus 로고
    • Improving labor flow reliability for better productivity as a lean construction principle
    • Thomas H.R., Horman M.J., Minchin R.E., and Chen D. Improving labor flow reliability for better productivity as a lean construction principle. J. Constr. Eng. Manag. 129 3 (2003) 251-261
    • (2003) J. Constr. Eng. Manag. , vol.129 , Issue.3 , pp. 251-261
    • Thomas, H.R.1    Horman, M.J.2    Minchin, R.E.3    Chen, D.4
  • 10
    • 2342418968 scopus 로고
    • Implementing lean construction: stabilizing work flow
    • Alarcón L.F. (Ed), A.A. Balkema, The Netherlands
    • Ballard G., and Howell G. Implementing lean construction: stabilizing work flow. In: Alarcón L.F. (Ed). Lean Construction (1994), A.A. Balkema, The Netherlands
    • (1994) Lean Construction
    • Ballard, G.1    Howell, G.2
  • 12
    • 1642304896 scopus 로고
    • Factors affecting project success in the piping function
    • Alarcón L.F. (Ed), A.A. Balkema, The Netherlands
    • Howell G., and Ballard G. Factors affecting project success in the piping function. In: Alarcón L.F. (Ed). Lean Construction (1995), A.A. Balkema, The Netherlands
    • (1995) Lean Construction
    • Howell, G.1    Ballard, G.2
  • 13
    • 33845809157 scopus 로고    scopus 로고
    • Simulation-based decision support system for economical supply chain management of rebar
    • Polat G., Arditi D., and Mungen U. Simulation-based decision support system for economical supply chain management of rebar. J. Constr. Eng. Manag. 133 1 (2007) 29-39
    • (2007) J. Constr. Eng. Manag. , vol.133 , Issue.1 , pp. 29-39
    • Polat, G.1    Arditi, D.2    Mungen, U.3
  • 14
    • 57649185560 scopus 로고    scopus 로고
    • M.J. Horman, Process Dynamics: Buffer Management in Building Project Operations, Ph D Dissertation, Faculty of Architecture, Building and Planning, The University of Melbourne, 2000.
    • M.J. Horman, Process Dynamics: Buffer Management in Building Project Operations, Ph D Dissertation, Faculty of Architecture, Building and Planning, The University of Melbourne, 2000.
  • 17
    • 57649153644 scopus 로고    scopus 로고
    • Construction Industry Institute, Project Materials Management Primer, RS47-1, Prepared by the Material Management Task Force, Austin, Texas, 1988.
    • Construction Industry Institute, Project Materials Management Primer, RS47-1, Prepared by the Material Management Task Force, Austin, Texas, 1988.
  • 18
    • 0003926816 scopus 로고    scopus 로고
    • North River Press, Great Barrington, Massachusetts
    • Goldratt E.M. Critical Chain (1997), North River Press, Great Barrington, Massachusetts
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 22
    • 18144406628 scopus 로고    scopus 로고
    • Schedule and cost buffer sizing: how account for the bias between project performance and your model
    • Leach L.P. Schedule and cost buffer sizing: how account for the bias between project performance and your model. Proj. Manage. J. 34 2 (2003) 34-47
    • (2003) Proj. Manage. J. , vol.34 , Issue.2 , pp. 34-47
    • Leach, L.P.1
  • 23
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique
    • Tommelein I.D. Pull-driven scheduling for pipe-spool installation: simulation of lean construction technique. J. Constr. Eng. Manag. 124 4 (1998) 279-288
    • (1998) J. Constr. Eng. Manag. , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.D.1
  • 25
    • 57649206145 scopus 로고    scopus 로고
    • G. Ballard, The Last Planner System of Production Control, Ph.D. Dissertation, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, 2000.
    • G. Ballard, The Last Planner System of Production Control, Ph.D. Dissertation, School of Civil Engineering, Faculty of Engineering, The University of Birmingham, 2000.
  • 26
    • 0027805668 scopus 로고
    • Interaction between subcycles: one key to improved methods
    • Howell G., Laufer A., and Ballard G. Interaction between subcycles: one key to improved methods. J. Constr. Eng. Manag. 119 4 (1993) 714-728
    • (1993) J. Constr. Eng. Manag. , vol.119 , Issue.4 , pp. 714-728
    • Howell, G.1    Laufer, A.2    Ballard, G.3
  • 27
    • 1642563359 scopus 로고    scopus 로고
    • Implications of even flow production methodology for U.S. Housing Industry
    • Bashford H.H., Sawhney A., Walsh K.D., and Kot K. Implications of even flow production methodology for U.S. Housing Industry. J. Constr. Eng. Manag. 129 3 (2003) 330-337
    • (2003) J. Constr. Eng. Manag. , vol.129 , Issue.3 , pp. 330-337
    • Bashford, H.H.1    Sawhney, A.2    Walsh, K.D.3    Kot, K.4
  • 28
    • 13944281790 scopus 로고    scopus 로고
    • Reliability buffering for construction projects
    • Park M., and Peña-Mora F. Reliability buffering for construction projects. J. Constr. Eng. Manage. 130 5 (2004) 626-637
    • (2004) J. Constr. Eng. Manage. , vol.130 , Issue.5 , pp. 626-637
    • Park, M.1    Peña-Mora, F.2
  • 29
    • 34248579316 scopus 로고    scopus 로고
    • Multiobjective linear programming for scheduling linear repetitive projects
    • Ipsilandis P.G. Multiobjective linear programming for scheduling linear repetitive projects. J. Constr. Eng. Manag. 133 6 (2007) 417-424
    • (2007) J. Constr. Eng. Manag. , vol.133 , Issue.6 , pp. 417-424
    • Ipsilandis, P.G.1
  • 34
    • 33847109286 scopus 로고    scopus 로고
    • Production equation for unsteady-state construction processes
    • Walsh K.D., Sawhney A., and Bashford H.H. Production equation for unsteady-state construction processes. J. Constr. Eng. Manag. 133 3 (2007) 254-261
    • (2007) J. Constr. Eng. Manag. , vol.133 , Issue.3 , pp. 254-261
    • Walsh, K.D.1    Sawhney, A.2    Bashford, H.H.3
  • 38
    • 57649206149 scopus 로고    scopus 로고
    • Extend v6 User's Guide, Manual User, Imagine That Inc., 2002.
    • Extend v6 User's Guide, Manual User, Imagine That Inc., 2002.
  • 39
    • 0022699580 scopus 로고
    • Strategy related characteristics of discrete-event languages and models
    • Hooper J.W. Strategy related characteristics of discrete-event languages and models. Simulation 46 4 (1986) 153-159
    • (1986) Simulation , vol.46 , Issue.4 , pp. 153-159
    • Hooper, J.W.1
  • 43
    • 0037592480 scopus 로고    scopus 로고
    • Evolution strategies: a comprehensive introduction
    • Beyer H.G., and Schwefel H.P. Evolution strategies: a comprehensive introduction. Nat. Comput. 1 (2002) 3-52
    • (2002) Nat. Comput. , vol.1 , pp. 3-52
    • Beyer, H.G.1    Schwefel, H.P.2
  • 44
    • 79551631191 scopus 로고    scopus 로고
    • An evolution strategy for multiobjective optimization
    • Fogel D.D., et al. (Ed)
    • Costa L., and Oliveira P. An evolution strategy for multiobjective optimization. In: Fogel D.D., et al. (Ed). CEC'02-IEEE Vol. 1 (May 12th-17th 2002) 97-102
    • (2002) CEC'02-IEEE , vol.1 , pp. 97-102
    • Costa, L.1    Oliveira, P.2
  • 47
    • 0035377310 scopus 로고    scopus 로고
    • Convergence in evolutionary programs with self-adaptation
    • Greenwood G.W., and Zhu Q.J. Convergence in evolutionary programs with self-adaptation. Evol. Comput. 9 2 (2001) 147-157
    • (2001) Evol. Comput. , vol.9 , Issue.2 , pp. 147-157
    • Greenwood, G.W.1    Zhu, Q.J.2
  • 48
    • 0002629429 scopus 로고
    • An overview of evolutionary algorithms in multiobjective optimization
    • Fonseca C., and Fleming P. An overview of evolutionary algorithms in multiobjective optimization. Evol. Comput. 3 1 (1995) 1-16
    • (1995) Evol. Comput. , vol.3 , Issue.1 , pp. 1-16
    • Fonseca, C.1    Fleming, P.2
  • 49
    • 12744266507 scopus 로고    scopus 로고
    • Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front
    • Zheng D.X., and Thomas S. Stochastic time-cost optimization model incorporating fuzzy sets theory and nonreplaceable front. J. Constr. Eng. Manag. 131 2 (2005) 176-186
    • (2005) J. Constr. Eng. Manag. , vol.131 , Issue.2 , pp. 176-186
    • Zheng, D.X.1    Thomas, S.2
  • 50
    • 24344467352 scopus 로고    scopus 로고
    • An evolution strategy with probabilistic mutation for multiobjective optimisation
    • IEEE Press, Piscataway NJ
    • Huband S., Hingston P., While L., and Barone L. An evolution strategy with probabilistic mutation for multiobjective optimisation. In Congress on Evolutionary Computation (CEC 2003) (December 8th-12th 2003), IEEE Press, Piscataway NJ 2284-2291
    • (2003) In Congress on Evolutionary Computation (CEC 2003) , pp. 2284-2291
    • Huband, S.1    Hingston, P.2    While, L.3    Barone, L.4
  • 53
    • 0031185451 scopus 로고    scopus 로고
    • Using genetic algorithms to solve construction time-cost trade-off problems
    • Feng C., Liu L., and Burns S. Using genetic algorithms to solve construction time-cost trade-off problems. J. Comput. Civ. Eng. 11 3 (1997) 184-189
    • (1997) J. Comput. Civ. Eng. , vol.11 , Issue.3 , pp. 184-189
    • Feng, C.1    Liu, L.2    Burns, S.3
  • 54
    • 24944537152 scopus 로고    scopus 로고
    • Chance-constrained time-cost tradeoff analysis considering funding variability
    • Yang I. Chance-constrained time-cost tradeoff analysis considering funding variability. J. Constr. Eng. Manag. 131 9 (2005) 1002-1012
    • (2005) J. Constr. Eng. Manag. , vol.131 , Issue.9 , pp. 1002-1012
    • Yang, I.1
  • 55