-
1
-
-
0002719897
-
"The application of Petri-nets to workflow management", Journal of Circuits
-
W.M.P. Aalst "The application of Petri-nets to workflow management", Journal of Circuits Systems and Computers 8 1 1998 21 66
-
(1998)
Systems and Computers
, vol.8
, Issue.1
, pp. 21-66
-
-
Aalst, W.M.P.1
-
2
-
-
77955717400
-
Estimation of earthworks execution time cost by means of artificial neural networks
-
Bozena Hola, and Krzysztof Schabowicz Estimation of earthworks execution time cost by means of artificial neural networks Automation in Construction 19 5 2010 570 579
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 570-579
-
-
Hola, B.1
Schabowicz, K.2
-
3
-
-
0037408566
-
An effective simulation mechanism for construction operations
-
T.M. Cheng, and C.W. Feng An effective simulation mechanism for construction operations Automation in Construction 12 3 2003 227 244
-
(2003)
Automation in Construction
, vol.12
, Issue.3
, pp. 227-244
-
-
Cheng, T.M.1
Feng, C.W.2
-
4
-
-
10444251125
-
A hybrid mechanism for optimizing construction simulation models
-
T.M. Cheng, C.W. Feng, and Y.L. Chen A hybrid mechanism for optimizing construction simulation models Automation in Construction 14 1 2005 85 98
-
(2005)
Automation in Construction
, vol.14
, Issue.1
, pp. 85-98
-
-
Cheng, T.M.1
Feng, C.W.2
Chen, Y.L.3
-
5
-
-
34248340059
-
Optimizing the development schedule of resort projects by integrating simulation and genetic algorithm
-
Dzeng Ren-Jye, and Lee Hsin-Yun Optimizing the development schedule of resort projects by integrating simulation and genetic algorithm International Journal of Project Management 25 5 2007 506 516
-
(2007)
International Journal of Project Management
, vol.25
, Issue.5
, pp. 506-516
-
-
Ren-Jye, D.1
Hsin-Yun, L.2
-
10
-
-
1642440732
-
Variable-speed resource motion in animations of discrete-event process models
-
V.R. Kamat, and J.C. Martinez Variable-speed resource motion in animations of discrete-event process models Systems Analysis Modelling Simulation 43 4 2003 455 467
-
(2003)
Systems Analysis Modelling Simulation
, vol.43
, Issue.4
, pp. 455-467
-
-
Kamat, V.R.1
Martinez, J.C.2
-
11
-
-
1642518590
-
Validating complex construction simulation models using 3D visualization
-
V.R. Kamat, and J.C. Martinez Validating complex construction simulation models using 3D visualization S. Chick, P.J. Sánchez, D. Ferrin, D.J. Morrice, Proceedings of the 2003 Winter Simulation Conference, New Orleans, L.A 2003 IEEE Piscataway, N.J 1518 1526
-
(2003)
Proceedings of the 2003 Winter Simulation Conference, New Orleans, L.A
, pp. 1518-1526
-
-
Kamat, V.R.1
Martinez, J.C.2
-
12
-
-
34848867519
-
Generic representation of 3D motion paths in dynamic animations of simulated construction processes
-
V.R. Kamat, and J.C. Martinez Generic representation of 3D motion paths in dynamic animations of simulated construction processes Automation in Construction 17 2 2008 188 200
-
(2008)
Automation in Construction
, vol.17
, Issue.2
, pp. 188-200
-
-
Kamat, V.R.1
Martinez, J.C.2
-
13
-
-
0034428148
-
Optimizing earthmoving operations using object-oriented simulation
-
M. Marzouk, and O. Moselhi Optimizing earthmoving operations using object-oriented simulation J.A. Joines, R.R. Barton, P. Fishwick, K. Kang, Proceedings of the 2000 Winter Simulation Conference, Orlando, Fla 2000 IEEE Piscataway, N.J 1926 1932
-
(2000)
Proceedings of the 2000 Winter Simulation Conference, Orlando, Fla
, pp. 1926-1932
-
-
Marzouk, M.1
Moselhi, O.2
-
15
-
-
0004068620
-
-
Schriften des Instituts für Instrumentelle Mathematik der Universität Bonn Bonn, Germany v. d
-
C.A. Petri Kommunikation mit Automaten 1962 Schriften des Instituts für Instrumentelle Mathematik der Universität Bonn Bonn, Germany v. d
-
(1962)
Kommunikation Mit Automaten
-
-
Petri, C.A.1
-
20
-
-
49349106933
-
Multi-objective simulation-optimization for earthmoving operations
-
H. Zhang Multi-objective simulation-optimization for earthmoving operations Automation in Construction 18 1 2008 79 86
-
(2008)
Automation in Construction
, vol.18
, Issue.1
, pp. 79-86
-
-
Zhang, H.1
-
21
-
-
9144254022
-
Fuzzy discrete-event simulation for modeling uncertain activity duration
-
H. Zhang, Heng Li, and C.M. Tam Fuzzy discrete-event simulation for modeling uncertain activity duration Engineering, Construction and Architectural Management 11 6 2004 426 437
-
(2004)
Engineering, Construction and Architectural Management
, vol.11
, Issue.6
, pp. 426-437
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
|