Volumn 33, Issue 12, 2006, Pages 1547-1557

A chronographic method for construction project planning

Author keywords

Chronographic method; Critical path method; Gantt; Modeling; Planning; Precedence; Scheduling; Time scaled

Indexed keywords

CRITICAL PATH ANALYSIS; GRAPHIC METHODS; HIERARCHICAL SYSTEMS; MATHEMATICAL MODELS; PLANNING; SCHEDULING;

EID: 34249860742     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L06-148     Document Type: Article
Times cited : (24)

References (30)
  • 11
    • 33646239158 scopus 로고    scopus 로고
    • Francis, A., and Miresco, E.T. 2002a. Amélioration de la repr ésentation des contraintes d'exécution par la méthode chronographique. In 2002 Challenges Ahead: Proceedings of the CSCE 30th Annual Conference, Montréal, Que., 5-8 June 2002. Edited by M.-J. Nollet and M. Trepanier. [CD-ROM.] Canadian Society for Civil Engineering, Montréal, Que. Paper no. GE019, pp. g-27.
    • Francis, A., and Miresco, E.T. 2002a. Amélioration de la repr ésentation des contraintes d'exécution par la méthode chronographique. In 2002 Challenges Ahead: Proceedings of the CSCE 30th Annual Conference, Montréal, Que., 5-8 June 2002. Edited by M.-J. Nollet and M. Trepanier. [CD-ROM.] Canadian Society for Civil Engineering, Montréal, Que. Paper no. GE019, pp. g-27.
  • 12
    • 85015594216 scopus 로고    scopus 로고
    • Francis, A., and Miresco, E.T. 2002b. Decision support for project management using a chronographic approach. Journal of Decision Systems (Special Issue: Decision Making in Urban and Civil Engineering), 11(3-4): 383-404.
    • Francis, A., and Miresco, E.T. 2002b. Decision support for project management using a chronographic approach. Journal of Decision Systems (Special Issue: Decision Making in Urban and Civil Engineering), 11(3-4): 383-404.
  • 13
    • 34249855726 scopus 로고    scopus 로고
    • Discussion of "Critical path method with multiple calendars" by Kyunghwan Kim and Jesús M. de la Garza
    • Francis, A., and Miresco, E.T. 2006a. Discussion of "Critical path method with multiple calendars" by Kyunghwan Kim and Jesús M. de la Garza. Journal of Construction Engineering and Management, ASCE, 132(5): 540-541.
    • (2006) Journal of Construction Engineering and Management, ASCE , vol.132 , Issue.5 , pp. 540-541
    • Francis, A.1    Miresco, E.T.2
  • 21
  • 23
    • 0019141802 scopus 로고
    • Development of new features for ICES-PROJECT/I
    • June, Edited by D.R. Schelling. American Society of Civil Engineers, New York, N.Y. pp
    • Miresco, E.T. 1980. Development of new features for ICES-PROJECT/I. In Proceedings of the 2nd Conference on Computing in Civil Engineering, Baltimore, Md., 9-13 June 1980. Edited by D.R. Schelling. American Society of Civil Engineers, New York, N.Y. pp. 151-157.
    • (1980) Proceedings of the 2nd Conference on Computing in Civil Engineering, Baltimore, Md., 9-13 , pp. 151-157
    • Miresco, E.T.1
  • 25
    • 17244362051 scopus 로고    scopus 로고
    • Dynamic planning and control methodology for design/build fast-track construction projects
    • Peña-Mora, F., and Li, M. 2001. Dynamic planning and control methodology for design/build fast-track construction projects. Journal of Construction Engineering and Management, ASCE, 127(1): 1-17.
    • (2001) Journal of Construction Engineering and Management, ASCE , vol.127 , Issue.1 , pp. 1-17
    • Peña-Mora, F.1    Li, M.2
  • 26
    • 0020099056 scopus 로고
    • Compression of overlapping precedence networks
    • Perera, S. 1982. Compression of overlapping precedence networks. Journal of the Construction Division, ASCE, 108(CO1): 1-12.
    • (1982) Journal of the Construction Division, ASCE , vol.108 , Issue.CO1 , pp. 1-12
    • Perera, S.1
  • 27
    • 34249849346 scopus 로고
    • Critical path scheduling: An overview and a practical alternative
    • July
    • Pinnell, S.S. 1980. Critical path scheduling: an overview and a practical alternative. Civil Engineering ASCE, 80(July): 66-70.
    • (1980) Civil Engineering ASCE , vol.80 , pp. 66-70
    • Pinnell, S.S.1
  • 30
    • 0040069749 scopus 로고
    • Precedence diagramming method: Some unusual characteristics and their implications for project managers
    • Wiest, J.D. 1981. Precedence diagramming method: some unusual characteristics and their implications for project managers. Journal of Operations Management, 1(3): 121-130.
    • (1981) Journal of Operations Management , vol.1 , Issue.3 , pp. 121-130
    • Wiest, J.D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.