메뉴 건너뛰기




Volumn 19, Issue 5, 2010, Pages 619-629

Estimate at completion for construction projects using evolutionary support vector machine inference model

Author keywords

Estimate at Completion; Fast Messy Genetic Algorithms; Support Vector Machine

Indexed keywords

CONSTRUCTION PROJECTS; CONTROL PROJECTS; ESTIMATE AT COMPLETIONS; FAST MESSY GENETIC ALGORITHMS; INFERENCE MODELS; LEARNING MODELS; POTENTIAL PROBLEMS; PROJECT COST; PROJECT MANAGERS; PROJECT PERFORMANCE; REAL APPLICATIONS; TRAINING MODEL;

EID: 77955715122     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2010.02.008     Document Type: Article
Times cited : (74)

References (25)
  • 4
    • 14544303228 scopus 로고    scopus 로고
    • Probability of project completion using stochastic project scheduling simulation
    • D.E. Lee Probability of project completion using stochastic project scheduling simulation Journal of Construction Engineering and Management 131 3 2005 310 318
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.3 , pp. 310-318
    • Lee, D.E.1
  • 5
    • 32944482015 scopus 로고    scopus 로고
    • Automated statistical analysis in stochastic project scheduling simulation
    • D.E. Lee, and D. Arditi Automated statistical analysis in stochastic project scheduling simulation Journal of Construction Engineering and Management 132 3 2006 268 277
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.3 , pp. 268-277
    • Lee, D.E.1    Arditi, D.2
  • 6
    • 60449092091 scopus 로고    scopus 로고
    • Probabilistic forecasting of project duration using Bayesian inference and the beta distribution
    • B.C. Kim, and K.F. Reinschmidt Probabilistic forecasting of project duration using Bayesian inference and the beta distribution Journal of Construction Engineering and Management 135 3 2009 178 186
    • (2009) Journal of Construction Engineering and Management , vol.135 , Issue.3 , pp. 178-186
    • Kim, B.C.1    Reinschmidt, K.F.2
  • 8
    • 32644472456 scopus 로고    scopus 로고
    • Designing project management: A scientific notation and an improved formalism for earned value calculations
    • D.F. Cioffi Designing project management: a scientific notation and an improved formalism for earned value calculations International Journal of Project Management 24 2 2006 136 144
    • (2006) International Journal of Project Management , vol.24 , Issue.2 , pp. 136-144
    • Cioffi, D.F.1
  • 9
    • 33645967441 scopus 로고    scopus 로고
    • A comparison of different project duration forecasting methods using earned value metrics
    • S. Vandevoorde, and M. Vanhoucke A comparison of different project duration forecasting methods using earned value metrics International Journal of Project Management 24 4 2006 289 302
    • (2006) International Journal of Project Management , vol.24 , Issue.4 , pp. 289-302
    • Vandevoorde, S.1    Vanhoucke, M.2
  • 10
    • 33646009470 scopus 로고    scopus 로고
    • Using data envelope analysis to compare project efficiency in a multi-project environment
    • G. Vitner, S. Rozenes, and S. Spraggett Using data envelope analysis to compare project efficiency in a multi-project environment International Journal of Project Management 24 4 2006 323 329
    • (2006) International Journal of Project Management , vol.24 , Issue.4 , pp. 323-329
    • Vitner, G.1    Rozenes, S.2    Spraggett, S.3
  • 11
    • 35448944883 scopus 로고    scopus 로고
    • A simulation and evaluation of earned value metrics to forecast the project duration
    • M. Vanhoucke, and S. Vandevoorde A simulation and evaluation of earned value metrics to forecast the project duration Journal of the Operational Research Society 58 10 2007 1361 1374
    • (2007) Journal of the Operational Research Society , vol.58 , Issue.10 , pp. 1361-1374
    • Vanhoucke, M.1    Vandevoorde, S.2
  • 12
    • 64449085007 scopus 로고    scopus 로고
    • Prediction of project outcome: The application of statistical methods to earned value management and earned schedule performance indices
    • W. Lipke, O. Zwikael, K. Henderson, and F. Anbari Prediction of project outcome: the application of statistical methods to earned value management and earned schedule performance indices International Journal of Project Management 27 4 2009 400 407
    • (2009) International Journal of Project Management , vol.27 , Issue.4 , pp. 400-407
    • Lipke, W.1    Zwikael, O.2    Henderson, K.3    Anbari, F.4
  • 13
    • 72049118175 scopus 로고    scopus 로고
    • A model-based DSS for integrating the impact of learning in project control
    • M. Plaza, and O. Turetken A model-based DSS for integrating the impact of learning in project control Decision Support Systems 47 4 2009 488 499
    • (2009) Decision Support Systems , vol.47 , Issue.4 , pp. 488-499
    • Plaza, M.1    Turetken, O.2
  • 14
    • 51849121510 scopus 로고    scopus 로고
    • Project performance evaluation based on statistical process control techniques
    • S.S. Leu, and Y.C. Lin Project performance evaluation based on statistical process control techniques Journal of Construction Engineering and Management 134 10 2008 813 819
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.10 , pp. 813-819
    • Leu, S.S.1    Lin, Y.C.2
  • 18
    • 0036158552 scopus 로고    scopus 로고
    • A simple decomposition method for support vector machine
    • C.W. Hsu, and C.J. Lin A simple decomposition method for support vector machine Machine Learning 46 1-3 2002 219 314
    • (2002) Machine Learning , vol.46 , Issue.13 , pp. 219-314
    • Hsu, C.W.1    Lin, C.J.2
  • 19
    • 33749332473 scopus 로고    scopus 로고
    • Ph.D. Thesis, Department of Electrical Engineering, National Taiwan University
    • C.F. Lin, Fuzzy support vector machines, Ph.D. Thesis, Department of Electrical Engineering, National Taiwan University, 2004.
    • (2004) Fuzzy Support Vector Machines
    • Lin, C.F.1
  • 21
    • 6344282795 scopus 로고    scopus 로고
    • Competitive template analysis of the fast messy genetic algorithm when applied to the protein structure prediction problem
    • Computational Publications Cambridge
    • R. Day, J. Zydallis, and G. Lamont Competitive template analysis of the fast messy genetic algorithm when applied to the protein structure prediction problem Proc. 2nd ICCN '02 2002 Computational Publications Cambridge 36 39
    • (2002) Proc. 2nd ICCN '02 , pp. 36-39
    • Day, R.1    Zydallis, J.2    Lamont, G.3
  • 22
    • 29144449379 scopus 로고    scopus 로고
    • Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks
    • C.W. Feng, and H.T. Wu Integrating fmGA and CYCLONE to optimize the schedule of dispatching RMC trucks Automation in Construction 15 2 2006 186 199
    • (2006) Automation in Construction , vol.15 , Issue.2 , pp. 186-199
    • Feng, C.W.1    Wu, H.T.2
  • 24
    • 0000667930 scopus 로고    scopus 로고
    • Training nu-support vector classifiers: Theory and algorithms
    • C.C. Chang, and C.J. Lin Training nu-support vector classifiers: theory and algorithms Neural Computation 13 9 2001 2119 2147
    • (2001) Neural Computation , vol.13 , Issue.9 , pp. 2119-2147
    • Chang, C.C.1    Lin, C.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.