메뉴 건너뛰기




Volumn 18, Issue 2, 2009, Pages 219-236

Visualizing high-rise building construction strategies using linear scheduling and 4D CAD

Author keywords

4D CAD; Building information models; Linear scheduling; Product modeling; Scheduling; Three dimensional models; Visualization

Indexed keywords

BUILDINGS; DATA STRUCTURES; SCHEDULING; TALL BUILDINGS; THREE DIMENSIONAL; VISUALIZATION;

EID: 57649149304     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2008.08.001     Document Type: Article
Times cited : (77)

References (25)
  • 1
    • 34248575853 scopus 로고    scopus 로고
    • Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
    • Kang J.H., Anderson S.D., and Clayton M.J. Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling. Journal of Construction Engineering and Management 133 6 (2007) 447-461
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 447-461
    • Kang, J.H.1    Anderson, S.D.2    Clayton, M.J.3
  • 3
    • 10444242643 scopus 로고    scopus 로고
    • Moving beyond the fourth dimension with an IFC-based single project database
    • Tanyer A.M., and Aouad G. Moving beyond the fourth dimension with an IFC-based single project database. Automation in Construction 14 1 (2005) 15-32
    • (2005) Automation in Construction , vol.14 , Issue.1 , pp. 15-32
    • Tanyer, A.M.1    Aouad, G.2
  • 5
    • 34547532859 scopus 로고    scopus 로고
    • 3D and 4D modeling for design and construction coordination: issues and lessons learned
    • http://www.itcon.org/2007/26
    • Staub-French S., and Khanzode A. 3D and 4D modeling for design and construction coordination: issues and lessons learned. ITcon 12 (2007) 381-407. http://www.itcon.org/2007/26 http://www.itcon.org/2007/26
    • (2007) ITcon , vol.12 , pp. 381-407
    • Staub-French, S.1    Khanzode, A.2
  • 6
    • 2942740922 scopus 로고    scopus 로고
    • The product model and fourth dimension project, Special Issue IFC - product models for the AEC arena
    • http://www.itcon.org/2003/12
    • Kam C., Fischer M., Hänninen R., Karjalainen A., and Laitinen J. The product model and fourth dimension project, Special Issue IFC - product models for the AEC arena. ITcon 8 (2003) 137-166. http://www.itcon.org/2003/12 http://www.itcon.org/2003/12
    • (2003) ITcon , vol.8 , pp. 137-166
    • Kam, C.1    Fischer, M.2    Hänninen, R.3    Karjalainen, A.4    Laitinen, J.5
  • 9
    • 57649188533 scopus 로고    scopus 로고
    • R. Akbas, Geometry-based modeling and simulation of construction processes, PhD Thesis, Department of Civil and Environmental Engineering, Stanford University 2003.
    • R. Akbas, Geometry-based modeling and simulation of construction processes, PhD Thesis, Department of Civil and Environmental Engineering, Stanford University 2003.
  • 11
    • 33751384135 scopus 로고    scopus 로고
    • Challenges and benefits of 4D modeling on the Walt Disney Concert Hall Project
    • Stanford University
    • Haymaker J., and Fischer M. Challenges and benefits of 4D modeling on the Walt Disney Concert Hall Project. Working Paper Nr 064, CIFE (2001), Stanford University
    • (2001) Working Paper Nr 064, CIFE
    • Haymaker, J.1    Fischer, M.2
  • 12
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedules with 4D-CAD tools
    • McKinney K., and Fischer M. Generating, evaluating and visualizing construction schedules with 4D-CAD tools. Automation in Construction 7 6 (1998) 433-447
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 13
    • 0020178299 scopus 로고
    • Time space scheduling model, Journal of Construction Division
    • Stradal O., and Cacha J. Time space scheduling model, Journal of Construction Division. ASCE 108 3 (1982) 445-457
    • (1982) ASCE , vol.108 , Issue.3 , pp. 445-457
    • Stradal, O.1    Cacha, J.2
  • 14
    • 34248579316 scopus 로고    scopus 로고
    • Multiobjective linear programming model for scheduling linear repetitive projects
    • Ipsilandis P.G. Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management 133 6 (2007) 417-424
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 417-424
    • Ipsilandis, P.G.1
  • 18
    • 33846023352 scopus 로고    scopus 로고
    • A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
    • Jongeling R., and Olofsson R. A method for planning of work-flow by combined use of location-based scheduling and 4D CAD. Automation in Construction 16 2 (2007) 189-198
    • (2007) Automation in Construction , vol.16 , Issue.2 , pp. 189-198
    • Jongeling, R.1    Olofsson, R.2
  • 19
    • 42649131324 scopus 로고    scopus 로고
    • Linear scheduling and 4D visualization, Journal of Computing in Civil Engineering
    • Staub-French S., Russell A.D., and Tran N. Linear scheduling and 4D visualization, Journal of Computing in Civil Engineering. ASCE 22 3 (2008) 192-205
    • (2008) ASCE , vol.22 , Issue.3 , pp. 192-205
    • Staub-French, S.1    Russell, A.D.2    Tran, N.3
  • 22
    • 1642481710 scopus 로고    scopus 로고
    • Automated generation of dynamic, operations level virtual construction scenarios, Special Issue Virtual Reality Technology in Architecture and Construction
    • http://www.itcon.org/2003/6
    • Kamat V.R., and Martinez J.C. Automated generation of dynamic, operations level virtual construction scenarios, Special Issue Virtual Reality Technology in Architecture and Construction. ITcon 8 (2003) 65-84. http://www.itcon.org/2003/6 http://www.itcon.org/2003/6
    • (2003) ITcon , vol.8 , pp. 65-84
    • Kamat, V.R.1    Martinez, J.C.2
  • 25
    • 1842832075 scopus 로고    scopus 로고
    • Trends of 4D CAD applications for construction planning
    • Heesom D., and Mahdjoubi L. Trends of 4D CAD applications for construction planning. Construction Management and Economics 22 2 (2004) 171-182
    • (2004) Construction Management and Economics , vol.22 , Issue.2 , pp. 171-182
    • Heesom, D.1    Mahdjoubi, L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.