Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling
-
Kang J.H., Anderson S.D., and Clayton M.J. Empirical study on the merit of web-based 4D visualization in collaborative construction planning and scheduling. Journal of Construction Engineering and Management 133 6 (2007) 447-461
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.6
, pp. 447-461
-
-
Kang, J.H.1
Anderson, S.D.2
Clayton, M.J.3
-
3
-
-
10444242643
-
Moving beyond the fourth dimension with an IFC-based single project database
-
Tanyer A.M., and Aouad G. Moving beyond the fourth dimension with an IFC-based single project database. Automation in Construction 14 1 (2005) 15-32
-
(2005)
Automation in Construction
, vol.14
, Issue.1
, pp. 15-32
-
-
Tanyer, A.M.1
Aouad, G.2
-
5
-
-
34547532859
-
3D and 4D modeling for design and construction coordination: issues and lessons learned
-
http://www.itcon.org/2007/26
-
Staub-French S., and Khanzode A. 3D and 4D modeling for design and construction coordination: issues and lessons learned. ITcon 12 (2007) 381-407. http://www.itcon.org/2007/26 http://www.itcon.org/2007/26
-
(2007)
ITcon
, vol.12
, pp. 381-407
-
-
Staub-French, S.1
Khanzode, A.2
-
6
-
-
2942740922
-
The product model and fourth dimension project, Special Issue IFC - product models for the AEC arena
-
http://www.itcon.org/2003/12
-
Kam C., Fischer M., Hänninen R., Karjalainen A., and Laitinen J. The product model and fourth dimension project, Special Issue IFC - product models for the AEC arena. ITcon 8 (2003) 137-166. http://www.itcon.org/2003/12 http://www.itcon.org/2003/12
-
(2003)
ITcon
, vol.8
, pp. 137-166
-
-
Kam, C.1
Fischer, M.2
Hänninen, R.3
Karjalainen, A.4
Laitinen, J.5
-
7
-
-
57649243609
-
Fulton Street Transit Center Project: 3D/4D model application report
-
Stanford University
-
Hartmann T., Goodrich W.E., Fischer M., and Eberhard D. Fulton Street Transit Center Project: 3D/4D model application report. Technical Report 170, CIFE (2007), Stanford University
-
(2007)
Technical Report 170, CIFE
-
-
Hartmann, T.1
Goodrich, W.E.2
Fischer, M.3
Eberhard, D.4
-
9
-
-
57649188533
-
-
R. Akbas, Geometry-based modeling and simulation of construction processes, PhD Thesis, Department of Civil and Environmental Engineering, Stanford University 2003.
-
R. Akbas, Geometry-based modeling and simulation of construction processes, PhD Thesis, Department of Civil and Environmental Engineering, Stanford University 2003.
-
-
-
-
10
-
-
2342439702
-
-
ASCE Construction Research Congress, Honolulu, HI., United States
-
Heesom D., Mahdjoubi L., and Proverbs D. A Dynamic VR System For Visualizing Construction Space Usage (2003), ASCE Construction Research Congress, Honolulu, HI., United States 997-1004
-
(2003)
A Dynamic VR System For Visualizing Construction Space Usage
, pp. 997-1004
-
-
Heesom, D.1
Mahdjoubi, L.2
Proverbs, D.3
-
11
-
-
33751384135
-
Challenges and benefits of 4D modeling on the Walt Disney Concert Hall Project
-
Stanford University
-
Haymaker J., and Fischer M. Challenges and benefits of 4D modeling on the Walt Disney Concert Hall Project. Working Paper Nr 064, CIFE (2001), Stanford University
-
(2001)
Working Paper Nr 064, CIFE
-
-
Haymaker, J.1
Fischer, M.2
-
12
-
-
0032165225
-
Generating, evaluating and visualizing construction schedules with 4D-CAD tools
-
McKinney K., and Fischer M. Generating, evaluating and visualizing construction schedules with 4D-CAD tools. Automation in Construction 7 6 (1998) 433-447
-
(1998)
Automation in Construction
, vol.7
, Issue.6
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
13
-
-
0020178299
-
Time space scheduling model, Journal of Construction Division
-
Stradal O., and Cacha J. Time space scheduling model, Journal of Construction Division. ASCE 108 3 (1982) 445-457
-
(1982)
ASCE
, vol.108
, Issue.3
, pp. 445-457
-
-
Stradal, O.1
Cacha, J.2
-
14
-
-
34248579316
-
Multiobjective linear programming model for scheduling linear repetitive projects
-
Ipsilandis P.G. Multiobjective linear programming model for scheduling linear repetitive projects. Journal of Construction Engineering and Management 133 6 (2007) 417-424
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.6
, pp. 417-424
-
-
Ipsilandis, P.G.1
-
18
-
-
33846023352
-
A method for planning of work-flow by combined use of location-based scheduling and 4D CAD
-
Jongeling R., and Olofsson R. A method for planning of work-flow by combined use of location-based scheduling and 4D CAD. Automation in Construction 16 2 (2007) 189-198
-
(2007)
Automation in Construction
, vol.16
, Issue.2
, pp. 189-198
-
-
Jongeling, R.1
Olofsson, R.2
-
19
-
-
42649131324
-
Linear scheduling and 4D visualization, Journal of Computing in Civil Engineering
-
Staub-French S., Russell A.D., and Tran N. Linear scheduling and 4D visualization, Journal of Computing in Civil Engineering. ASCE 22 3 (2008) 192-205
-
(2008)
ASCE
, vol.22
, Issue.3
, pp. 192-205
-
-
Staub-French, S.1
Russell, A.D.2
Tran, N.3
-
21
-
-
0042861949
-
Industrial case study of electronic design, cost, and schedule integration
-
Staub-French S., and Fischer M. Industrial case study of electronic design, cost, and schedule integration. Technical Report No. 122, CIFE, Stanford University, CA (2001)
-
(2001)
Technical Report No. 122, CIFE, Stanford University, CA
-
-
Staub-French, S.1
Fischer, M.2
-
22
-
-
1642481710
-
Automated generation of dynamic, operations level virtual construction scenarios, Special Issue Virtual Reality Technology in Architecture and Construction
-
http://www.itcon.org/2003/6
-
Kamat V.R., and Martinez J.C. Automated generation of dynamic, operations level virtual construction scenarios, Special Issue Virtual Reality Technology in Architecture and Construction. ITcon 8 (2003) 65-84. http://www.itcon.org/2003/6 http://www.itcon.org/2003/6
-
(2003)
ITcon
, vol.8
, pp. 65-84
-
-
Kamat, V.R.1
Martinez, J.C.2
-
25
-
-
1842832075
-
Trends of 4D CAD applications for construction planning
-
Heesom D., and Mahdjoubi L. Trends of 4D CAD applications for construction planning. Construction Management and Economics 22 2 (2004) 171-182
-
(2004)
Construction Management and Economics
, vol.22
, Issue.2
, pp. 171-182
-
-
Heesom, D.1
Mahdjoubi, L.2
|